PERFORMANCE WORK STATEMENT
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PPQ.doc | DOC document | |
| EXHIBIT1correct.xlsx | XLSX spreadsheet | |
| RFQCONFORM.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
Project RA-48RC4-5J “ Signs Replacement at Caserma Ederle, Villaggio Housing Area, ASP#7, Caserma Del Din, Longare, Lerino and Livorno - Italy”.
Part 1 General Information
1. General: This is a non-personnel services contract to provide Signs Replacement. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Signs Replacement as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: This is a contract to replace the Building and Community Identification Signs in Caserma Ederle, ASP#7, Villaggio Housing Area and Caserma Del Din, Longare, Lerino and Livorno - Italy.
Building identification signs are used inside the installation to provide information about buildings, major tenants within buildings, areas within the installation, and organizational or functional units. Different sizes and design elements are used to identify the different organizational levels. The signs should carry one unit name and any secondary information to identify the unit component (such as headquarters) and may also include a street address.
No unit mottoes, names, or titles of individuals are permitted.
1.3 Objectives: Establish standardization of the signs used for Caserma Ederle, Villaggio Housing Area, ASP #7,Caserma Del Din, Longare, Lerino and Livorno – Italy.
1.4 Scope: The contractor shall accomplish the provision, erection, and maintenance of permanent identification and directional signs.
1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years. The Period of Performance reads as follows:
Base Year: 21 September 2015 through 20 September 2016
Option Year I: 21 September 2016 through 20 September 2017
Option Year II: 21 September 2017 through 20 September 2018
Option Year III: 21 September 2018 through 20 September 2019 Option Year IV: 21 September 2019 through 20 September 2020
1.6 General Information
1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The Contractor shall submit his Quality Control Plan (QCP) to the COR for approval within 7 (seven) calendar days after contract award. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays:
| U.S. HOLIDAYs |
| DATE |
| New Year's Day |
| January 1st |
| Martin Luther King Memorial Day |
| 3rd Monday in January |
| Presidents' Day |
| 3rd Monday in February |
| Memorial Day |
| Last Monday in May |
| Independence Day |
| July 4th |
| Labor Day |
| 1st Monday in September |
| Columbus Day |
| 2nd Monday in October |
| Veterans' Day |
| November 11th |
| Thanksgiving Day |
| 4th Thursday in November |
| Christmas Day |
| December 25th |
| ITALIAN HOLIDAYS |
| DATE |
| New Year's Day |
| 1 January |
| Epiphany Day |
| 6 January |
| Easter Monday |
| Varies yearly |
| Liberation Day |
| 25 April |
| Labor Day |
| 1 May |
| Republic Day |
| 2 June |
| Assumption Day |
| 15 August |
| Local Holiday * |
| 8 September * |
| All Saints’ Day |
| 1 November |
| Immaculate Conception Day |
| 8 December |
| Christmas Day |
| 25 December |
| Saint Stephen’s Day |
| 26 December |
1.6.4 Hours of Operation: The contractor is responsible for conducting business, between 08:00am through 05:00pm, Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at Caserma Ederle, Villaggio Housing Area, ASP#7, Caserma Del Din, Longare and Livorno.
1.6.6 Type of Contract: The government will award a Requirements type Contract FAR Part 16.503. There is not a commitment of funds. Funds will be obligated through issuance of task order.
1.6.7 Security Requirements: Contractor personnel performing work under this contract must have a AT Level 1 at time of the proposal submission, and must maintain the level of security required for the life of the contract. Conformance with Italian safety regulation and EM-385-1-1 Anti Terrorism: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas will complete AT Level 1 awareness training within 30 calendar days after the contract start-date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor will submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned. Prior to issuance of Installation Access Passes. AT Level 1 awareness training is available online at https://atlevel1.dtic.mil/at .
The contractor and all associated subcontractor employees will comply with applicable installation, facility, and area commander installation/facility access and local secutiry policy and procedures (provided by Government representative). The contractor will also provide all information required for background checks to meet installation-access requirements to be accomplished by the installation provost marshall office, director of emergency services, or security office. The contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and local policy. In addition to the changes clause of this contract, should the force protection condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The contractor and all associated subcontractors will brief all employees on the local iWATCH/iSALUTE program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training will be completed within 30 calendar days after the contract is awarded and within 30 calendar days after new employees commence contract performance, with the results reported to the COR.
The contractor will develop an OPSEC standing operating procedure (SOP)/plan within 90 calendar days after the contract is awarded, to be reviewed and approved by the responsible Government OPSEC officer, according to AR 530-1.This SOP/plan will include the Government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, the contractor will identify an individual who will be an OPSEC coordinator. The contractor will ensure this individual becomes OPSEC Level II certified according to AR 530-1.
According to AR 530-1, new contractor employees must complete Level I OPSEC training within 30 calendar days after they report for duty. All contractor employees must complete annual OPSEC awareness training.
1.6.7.1 PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.7.2 Key Control : N.A.
1.6.7.3 Lock Combinations : N.A.
1.6.8 Special Qualifications: The contractor is responsible for ensuring all employees possess and maintain current Information Assurance Technician (IAT) Level I professional certification during the execution of this contract.
1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.11 Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 5:00 p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
1.6.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.13 Contractor Travel : N.A.
1.6.14 Other Direct Costs : N.A.
1.6.15 Data Rights : N.A.
1.6.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.17 PHASE IN /PHASE OUT PERIOD : N.A.
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms:
2.1. DEFINITIONS
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR
Alternate Contracting Officer's Representative
AFARS
Army Federal Acquisition Regulation Supplement
AR
Army Regulation
CCE
Contracting Center of Excellence
CFR
Code of Federal Regulations
CONUS
Continental United States (excludes Alaska and Hawaii)
COR
Contracting Officer Representative
COTR
Contracting Officer's Technical Representative
COTS
Commercial-Off-the-Shelf
DA
Department of the Army
DD250
Department of Defense Form 250 (Receiving Report)
DD254
Department of Defense Contract Security Requirement List
DFARS
Defense Federal Acquisition Regulation Supplement
DMDC
Defense Manpower Data Center
DOD
Department of Defense
DPW
Directorate of Public Works
FAR
Federal Acquisition Regulation
HIPAA
Health Insurance Portability and Accountability Act of 1996
KO
Contracting Officer
OCI
Organizational Conflict of Interest
OCONUS
Outside Continental United States (includes Alaska and Hawaii)
ODC
Other Direct Costs
PIPO
Phase In/Phase Out
POC
Point of Contact
PRS
Performance Requirements Summary
PWS
Performance Work Statement
QA
Quality Assurance
QAP
Quality Assurance Program
QASP
Quality Assurance Surveillance Plan
QC
Quality Control
QCP
Quality Control Program
TE
Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: The Government will provide security and fire protection
· Fire Protection:
| PHONE # |
| 0444-717092 |
| DSN |
| 117 |
· Security Police:
| PHONE # |
| 0444-717114 |
| DSN |
| 114 |
3.2 Facilities: N.A.
3.3 Utilities: The Government will furnish sewage, water and electricity at no cost to the Contractor. The contractor shall use Government furnished utilities in a prudent manner consistent with current energy conservation policies. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
3.4 Equipment: The Governament will not provide equipment.
3.5 Materials: N.A.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Secret Facility Clearance : N.A.
4.3. Materials: The Contractor shall provide all material used, partially or totally, to perform to work required in this contract and not furnished by the U.S. Government. The Contractor shall include the cost for these items in the cost of the contract cost and in no case are to be reimbursed for by the U.S Government.
4.4. Equipment: The Contractor shall furnish all necessary equipment, tools, supplies, and any other material necessary for the efficient, safe performance of this contract. Equipment shall be the type and size suitable for commercial operations.
4.5. Services: The Contractor shall provide the COR at least one commercial telephone number and one mobile phone number at which the Contractor can be reached during times as specified in this PWS.
4.6. Environmental reporting : The contractor will provide the following information semi-annually to be used by the Government to address environmental performance relative to the goals of the USAG Vicenza Environmental Management System. Please note that the amounts reported are those used/generated by the contractor regardless of source (private purchase or government furnished). Reports for January – June will be submitted by 15 July and reports for July-December will be submitted by 15 January each year.
| Media |
| Report Element #1 |
| Report Element #2 |
| Non-Hazardous Solid Waste |
| Total Waste Generated (Kg) |
| Amount of Waste Diverted from Landfill (Kg) |
| Construction Debris/Demolition Materials |
| Total Waste Generated (Kg) |
| Amount of Waste Diverted from Landfill (Kg) |
| Compostable/Organic Material |
| Total Waste Generated (Kg) |
| Amount of Waste Diverted from Landfill (Kg) |
| Hazardous Materials |
| Total Used (Kg) |
| Hazardous Waste |
| Total Generated (Kg) |
| Total Recycled (Kg) |
| Energy Consumption - Electricity |
| Total Energy Consumed (MBtu) |
| Energy Consumption - Fuel |
| Total Fuel Consumed (L) |
| Renewable/Alternative Energy |
| Total Consumed (MW) |
| Facility Construction/Renovation |
| Number of Buildings LEED Certified Silver or Higher |
| SqFt of buildings LEED Certified |
4.7. Clean up and disposal: The Contractor shall clean up the works area at the completion of the specific task, or at the close of each workday.
PART 5
SPECIFIC TASKS
5. SPECIFIC TASKS:
5. Basic Services. The contractor shall provide services for the provision, erection, and maintenance of permanent identification and directional signs. The contractor has to provide the installation of signs basing under the request of various installation by 30 calendar days from the request.
5.1. Font Standards: The term “font” is used in this UFC for references to typography. Most sign messages should use upper- and lowercase text for optimum readability. Use the Helvetica Neue family of fonts. The font standards for sign message content include the following:
· Helvetica Neue – 85 Heavy
· Helvetica Neue – 75 Bold
· Helvetica Neue – 65 Medium
· Helvetica Neue – 55 Roman
5.1.1. Helvetica Neue – 85 Heavy: Use Helvetica Neue 85 Heavy for the names of military units on freestanding primary building identification signs and building-mounted identification letters.
5.1.2. Helvetica Neue – 75 Bold: Use Helvetica Neue 75 Bold to identify the installation name on installation/gate identification signs. This font may also be used as the larger font where a hierarchy of typestyles is beneficial.
5.1.3. Helvetica Neue – 65 Medium: Helvetica Neue 65 Medium is the approved font for primary or “headline” messages on both interior and exterior signs unless otherwise specified.
5.1.4. Helvetica Neue – 55 Roman: Helvetica Neue 55 Roman is the approved font for secondary or “body text” messages on both interior and exterior signs unless otherwise specified. This font should also be used for all tactile messages on interior signs.
5.1.5. Alternative Fonts: Alternative fonts may be used on signs for historic buildings or installations with unique architectural character. Alternative fonts must comply with ABAAS (Architectural Barriers Act Accessibility Standards) when used for tactile characters associated with Braille requirements.
5.1.6. Letter Spacing: Appropriate letter spacing is important for consistency and the visual appearance of message content on signs. Kerning refers to the spacing between letters and optical kerning of letters is desired for digital sign message layouts. Comply with the letter spacing examples provided below for all installation and gate identification signs. All other sign message requirements will use optical kerning and zero letter spacing.
5.2. Freestanding Building Identification Signs: Building identification signs are used inside the installation to provide information about buildings, major tenants within buildings, areas within the installation, and organizational or functional units. Different sizes and design elements are used to identify the different organizational levels. The signs should carry one unit name and any secondary information to identify the unit component (such as headquarters) and may also include a street address. No unit mottoes, names, or titles of individuals are permitted.
Most buildings can be best identified by using a freestanding building identification sign in front of the building near the main entrance or at the main entrance to the associated parking area. There are three basic types of freestanding building identification signs:
5.2.1. Primary - These signs identify high-level organizations such as command, squadron, or unit headquarters;
5.2.2. Secondary - These signs identify lower-profile buildings. These signs use the same basic principles as primary facility signs, only these are somewhat smaller;
5.2.3. Tertiary - These signs identify buildings or other miscellaneous facilities that do not require a street address or building number, such as recreational facilities, training areas, and maintenance or storage facilities.
The appropriate sign type required is based upon the importance of the building or tenant identification required. Place primary identification signs as close as possible to the building entrance and perpendicular to the roadway to permit viewing by traffic moving in both directions. If the building is set back from the roadway and is not visible or is only partially visible from the roadway, place the sign next to the entrance driveway and on the side of the driveway closest to the building. Provide one sign for each building unless additional signs are required due to unique site conditions. Consider intersection sight distances provided in AASHTO A Policy on Geometric Design of Highways and Streets (Green Book), in addition to the lateral offsets included in the MUTCD.
5.2.4. Freestanding Building Identification Sign Layouts:
5.2.5. Materials and Colors: Freestanding building identification signs must be non-illuminated and use a standard post-and-panel type construction. Use extruded aluminum square posts with flat aluminum sign message panels that are removable for easy replacement. Sign post and panel sizes must be engineered by the sign contractor according to wind loads and other requirements at each installation. Minor deviations from these general specifications are permitted where needed to align with installation-specific standards and pre-existing sign programs.
Provide a dark bronze painted (RAL8016) finish for the background of the message panels and support posts. Sign message content must be white reflective engineering-grade vinyl. Use these standard materials and colors unless there are specific requirements established in the IPS. These color standards and special Service branch exceptions do not apply to traffic control signs that have color and material requirements specified in the MUTCD.
5.2.6. Street Address and Building Numbers: Include the street address or building numbers (if used) on all building and facility identification signs, where possible. Include this information at the main entrance to the building and on other exterior portions of the building as necessary for wayfinding.
5.3. Building Entrance Signs: Only one identification sign is permitted at each building entrance. If the building is set back from the roadway and is not visible or only partially visible from the roadway, place the sign next to the main entrance of the building to confirm the information shown on the sign at the entrance driveway. Some buildings have more than one primary entrance. Use building-mounted entry signs to identify organizations that are reached through the alternate entries of these types of Buildings.
5.3.1. Materials and Colors: Building-mounted entry signs must be non-illuminated and must be painted aluminum with white vinyl messages. Signs must be wall-mounted where possible and attachment methods way vary depending upon building conditions. The dimensions of the signs are 1.5 feet x 1.5 feet (457 mm x 457 mm). If building numbers are used they should be located at the top of the sign. If the required message on a building entry sign is too long to fit on the standard layouts shown, reduce the size of the text as required.
Provide a dark bronze painted (RAL8016) finish for the background of the message panels or other background color that is consistent with the installation standards. Minor deviations from these general specifications are permitted where needed to align with installation- specific standards and pre-existing sign programs. Use these standard materials and colors unless there are specific requirements established in the IPS.
5.3.2. Building Entrance Signs on Glass: Customized solutions may be designed for buildings with glass entrances. Provide frosted or white vinyl building identification on glass entryway signs where required. Provide building numbers or the street address that are appropriately sized for the average viewing distance. As a guide, use letters 1 inch (25 mm) high per 25 feet (7.62 meters) of viewing distance and establish an installation standard based on the average door size and the average viewing distance. Include limited additional information such as tenant identification information and hours of operation where appropriate.
5.4. Community Identification signs: Centralized facilities signs may be designed to address multiple buildings or services that use a common roadway entrance or parking area. Set the sign to permit viewing by traffic moving in both directions. The size, placement, and material composition of these signs must be consistent with installation-specific standards.
Limited use of specialty community identification signs is permitted to identify communities, housing areas, districts, or other installation-specific specialty facilities. These signs may be customized to align with the unique architectural characteristics of each area or installation, as required. Use the general guidance and design principles provided in UFC 3-120-01 for these types of non-standard signage options.
5.5. Directional and Wayfinding Signs: There are two types of directional and wayfinding signs: pedestrian and vehicular. Pedestrian circulation is separate from vehicular circulation and requires its own wayfinding system. Vehicular directional and wayfinding signs are detailed in the MUTCD and paragraph 3-4 of this UFC. A cohesive signage plan is important and both sign systems must work together.
5.5.1. General Guidelines: Provide pedestrian directional signs at critical points where decisions are necessary for movement to a destination. It is very important for these signs to meet the information needs of visitors and other installation users. There are too many potential destinations on any military installation to list on directional signs, but effective directional signs help visitors find their destinations more easily. Directional signs, proper street identification, and effective installation maps form the basic keys to visitor orientation and effective wayfinding. Graphics and messages must appear on both sides of the sign if visible and meaningful to people moving in both directions. Separate the destinations with white rule lines. Place no more than six, and no fewer than two, destinations on pedestrian directional signs.
5.5.2. Materials and Colors: Pedestrian directional signs must be non-illuminated and use a standard post-and-panel type construction. Use extruded aluminum square posts with flat aluminum graphic sign message panels that are removable for easy replacement. Sign post and panel sizes must be engineered by the sign contractor according to the wind loads and other requirements at each installation. Minor deviations from these general specifications are permitted where needed to align with installation-specific standards and pre-existing sign programs provide a dark bronze painted (RAL8016) finish for the background of the message panels and support posts. Sign message content must be white vinyl. Use these standard materials and colors unless there are specific requirements established in the IPS.
5.6. Orientations Map and Wayfinding Signs: Most first-time visitors to a military installation receive verbal information at the entry gate, but may also need wayfinding/orientation map information. Provide installation maps at strategic locations to orient visitors and help them find destinations. The installation map, directional signs, and building and street identification signs comprise the total wayfinding system outlined in this UFC. It is essential to use consistent nomenclature throughout the system. For example, the community center should be indicated by the same name on the map, directional signs, and the building identification sign. Design maps for clarity and ease of use. Maps created by merely reducing the installation site plan are usually too difficult to read, so the site plan must be simplified to emphasize major circulation routes and destinations. Use a halftone screen to indicate roadways. Emphasize important buildings by increasing the scale of the buildings in relation to other buildings or by adding color. Maps should be drawn from the perspective of the main entrance to aid visitor orientation and include “You Are Here” orientation information.
5.7. Reserved Parking Signs: Handicapped parking spaces, Headquarters reserved parking spaces, official vehicle and emergency ambulance parking spaces. All vertical and horizontal signs will be in accordance with Codice della Strada only and have to be accepted,before its installation, by Comando dei Carabinieri and MP.
The reserved parking sign shall be installed in three different ways: one type shall be attached on wall or fences, the other two shall be installed either in the short pole (h.90cm) and for in the higher pole (h.210cm).
5.8. Building number identification Signs:
5.9. Prohibitory/Warning Signs: Prohibitory sign restrict, warn and advise visitor and installation personnel in matters of Army Security, safety and parking controls. To avoid confusion directives should not be unnecessarily wordy. Signs should be used in moderation so that their visual impact is not lessened. Warning signs notify visitors of restrictions governing conduct on the installation and of entrances limited to authorized personnel. All warning signs should be written in both English and Italian.
The word “Warning” should appear at the top of the sign in red letters on a white background or white letters in a red background and shall be attached on wall or fences.
5.10. “No Smoking”Signs:
5.11. Paint and Letters of a complete Strip Signs:
5.11.1. Only letters of a portion of Strip Signs:
5.11.2. Paint and letters of a portion of Strip Signs:
5.11.3. Peeling Strips and setting bars:
5.12. CONTRACTOR MANAGEMENT REPORTING (CMR) : The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address https://Contractormanpower.army.pentagon.mil .
The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative (COTR) or also know as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.
PART 6
APPLICABLE PUBLICATIONS
6. Applicable Publications (Current Editions)
6.1. All work performed by the Contractor shall be performed in accordance with all applicable U.S. and Host Nation laws and regulations, whichever is more restrictive at contract award date. This includes any required certification by authorized technicians in Italy (norms UNI- CEE) moreover the contractor should be ISO 9001-2000 certified.
6.2. The Contractor must abide “UNIFIED FACILITIES CRITERIA (UFC)” 3-120-01 dated 01 March 2014 (Change 1, 08 May 2014).
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. Attachment/Technical Exhibit List:
7.1. Attachment 1/Technical Exhibit 1 – Performance Requirements Summary
TECHNICAL EXHIBIT 1
Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
| Standard |
| Performance Threshold |
Method of Surveillance
PRS # 1.4 The contractor shall accomplish the provision, erection, and maintenance of permanent identification and directional signs.
Efficiency shall be maintained at acceptable levels in order to maintain the regular functioning and safety of community.
| Zero Deviation |
| 100% Inspection |
PRS # 1.6.1The contractor shall develop and maintain an effective quality control plan (QCP) to ensure services are performed in accordance with this PWS.
Efficiency shall be maintained at acceptable levels to ensure non-recurrence of defective services.
| Zero Deviation |
| 100% Inspection |
PRS # 4.7 The Contractor shall clean up the works area at the completion of the specific task, or at the close of each workday
Efficiency shall be maintained at acceptable levels to ensure the performance of this contract be in compliance with all local laws and regulations.
| Zero Deviation |
| 100% Inspection |
PRS # 5.1 The contractor shall provide all personnel, labor, vehicles, containers, tools, materials, equipment, transportation, supervision and other item and services.
| Efficiency shall be maintained at acceptable levels in order to perform the work subscribed under this contract. |
| Zero Deviation |
| 100% Inspection |
PRS #6.1 All work performed by the Contractor shall be performed in accordance with all applicable U.S. and Host Nation laws and regulation.
Efficiency shall be maintained at acceptable levels to ensure proper functionality required by this Contract and in order to be in compliance with the Laws.
| Zero Deviation |
| 100% Inspection |
Approved by Marco Bellot, Chief O&M Div./DPW : ________________________________