W912PB23R3016_Attachment 1_ELIN_Storage Tanks Gas Stations_Bavaria.xlsx
XLSX spreadsheet 20 KB Posted
- Solicitation number
- W912PB23R3016
About this file
This spreadsheet contains pricing details for preventative maintenance, inspection, and repair work for storage tanks and gas stations at various US Army installations in Bavaria, Germany over multiple option years. The work includes recurring maintenance, inspections, and testing of storage tanks and gas stations at Grafenwoehr, Vilseck, Hohenfels, and Garmisch according to specifications. Requirements are broken out by installation and line item numbers that describe the type and frequency of work. Pricing is to be provided by prospective contractors, as this appears to be a pricing template included with solicitation number W912PB23R3016 issued by the Department of the Army for maintenance, inspection, and repair of storage tanks and gas stations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PB23R3016 Amendment 0002.pdf | ||
| EMERGENCY ACTION PLAN - TE 5.pdf | ||
| W912PB23R3016-0001.pdf | ||
| W912PB23R3016.pdf | ||
| Gas Stations Grafenwoehr - TE 2 - Appendix A.pdf | ||
| Gas Stations Garmisch - TE 2 - Appendix D.pdf | ||
| Storage Tanks Garmisch - TE 1 - Appendix D.xlsx | XLSX spreadsheet | |
| Storage Tanks Vilseck - TE 1 - Appendix B.xlsx | XLSX spreadsheet | |
| Storage Tanks Grafenwoehr - TE 1 - Appendix A.xls | XLS spreadsheet | |
| Gas Stations Vilseck - TE 2 - Appendix B.pdf | ||
| Storage Tanks Hohenfels - TE 1 - Appendix C.xlsx | XLSX spreadsheet | |
| Gas Stations Hohenfels - TE 2 - Appendix C.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| ELIN - Basic Year - Grafenwoehr, Vilseck, Hohenfels, Garmisch |
| POP: 01 November 2023 - 31 October 2024 (FY23/24) |
| Maintenance, Repair and Inspection of Storage Tanks and Gas Stations |
at USAG Bavaria (TB, RB, HOH, GAP)
| ELIN | DESCRIPTION | QUANTITY | U/I | UNIT | |
| PRICE | TOTAL |
AMOUNT
A001 Preventive Maintenance and Inspection of Storage Tanks and Gas Stations at Grafenwoehr Tower Barracks and Vilseck Rose Barracks IAW the PWS and Attachment # 1
| ELIN A001AA - A001AG | - 0 € | ||
| A001AA | Recurring maintenance work at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in Attachment # 1 |
para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6
| Unit size = 1 job for 1 each tank. | 315 | EA | - 0 € | - 0 € |
| A001AB | Periodic electrical/explosion inspections at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in |
Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Electrical TUeV Inspection - 3 Year Cycle) | 146 | EA | - 0 € | - 0 € |
| A001AC | Periodic mechanical/technical inspections at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in |
Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Mechanical TUeV Inspection - 5 Year Cycle) | 9 | EA | - 0 € | - 0 € |
| A001AD | Recurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Grafenwoehr and Vilseck, |
IAW the PWS, Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5, and Attachment # 1 para 5.4.1
| Unit size = 1 job for all tanks. | 2 | EA | - 0 € | - 0 € |
| A001AE | Recurring explosion protection inspection at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)
| Unit size = 1 job for all tanks. | 15 | EA | - 0 € | - 0 € |
| A001AF | Recurring safety inspection at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)
| Unit size = 1 job for all tanks. | 5 | EA | - 0 € | - 0 € |
| A001AG | Performance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B, |
and Attachment # 1 para 5.4.4.1
| Unit size = 1 job for all tanks. | 15 | EA | - 0 € | - 0 € |
| A005 | Preventive Maintenance and Inspection |
of Storage Tanks and Gas Stations at Hohenfels IAW the PWS and Attachment # 1
| ELIN A005AA - A005AG | - 0 € | ||
| A005AA | Recurring maintenance work at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in Attachment # 1 |
para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6
| Unit size = 1 job for 1 each tank. | 53 | EA | - 0 € | - 0 € |
| A005AB | Periodic electrical/explosion inspections at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in |
Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Electrical TUeV Inspection - 3 Year Cycle) | 1 | EA | - 0 € | - 0 € |
| A005AC | Periodic mechanical/technical inspections at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in |
Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Mechanical TUeV Inspection - 5 Year Cycle) | 1 | EA | - 0 € | - 0 € |
| A005AD | Recurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Hohenfels, |
IAW the PWS, Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5, and Attachment # 1 para 5.4.1
| Unit size = 1 job for all tanks. | 2 | EA | - 0 € | - 0 € |
| A005AE | Recurring explosion protection inspection at all listed Gas Stations at Hohenfels, IAW the PWS Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)
| Unit size = 1 job for all tanks. | 1 | EA | - 0 € | - 0 € |
| A005AF | Recurring safety inspection at all listed Gas Stations at Hohenfels, IAW the PWS Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)
| Unit size = 1 job for all tanks. | 0 | EA | - 0 € | - 0 € |
| A005AG | Performance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Hohenfels, |
IAW the PWS Technical Exhibit # 2 - Appendix C, and Attachment # 1 para 5.4.4.1
| Unit size = 1 job for all tanks. | 1 | EA | - 0 € | - 0 € |
| A009 | Preventive Maintenance and Inspection |
of Storage Tanks and Gas Stations at Garmisch IAW the PWS and Attachment # 1
| ELIN A009AA - A009AG | - 0 € | ||
| A009AA | Recurring maintenance work at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in Attachment # 1 |
para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6
| Unit size = 1 job for 1 each tank. | 13 | EA | - 0 € | - 0 € |
| A009AB | Periodic electrical/explosion inspections at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in |
Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Electrical TUeV Inspection - 3 Year Cycle) | 6 | EA | - 0 € | - 0 € |
| A009AC | Periodic mechanical/technical inspections at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in |
Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Mechanical TUeV Inspection - 5 Year Cycle) | 1 | EA | - 0 € | - 0 € |
| A009AD | Recurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Garmisch |
IAW the PWS, Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5, and Attachment # 1 para 5.4.1
| Unit size = 1 job for all tanks. | 2 | EA | - 0 € | - 0 € |
| A009AE | Recurring explosion protection inspection at all listed Gas Stations at Garmisch IAW the PWS Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)
| Unit size = 1 job for all tanks. | 0 | EA | - 0 € | - 0 € |
| A009AF | Recurring safety inspection at all listed Gas Stations at Garmisch, IAW the PWS Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)
| Unit size = 1 job for all tanks. | 0 | EA | - 0 € | - 0 € |
| A009AG | Performance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Garmisch, |
IAW the PWS Technical Exhibit # 2 - Appendix D, and Attachment # 1 para 5.4.4.1 Unit size = 1 job for all tanks. 0 EA - 0 € - 0 €
| Total | 0.00 € | ||
| EA: Each | |||
| HR: Hour | CF: | 0.9381 | $0.00 |
| AU: Equals one Job |
1st OY
| ELIN - 1st Option Year - Grafenwoehr, Vilseck, Hohenfels, Garmisch |
| POP: 01 November 2024 - 31 October 2025 (FY24/25) |
| Maintenance, Repair and Inspection of Storage Tanks and Gas Stations |
| ELIN | DESCRIPTION | QUANTITY | U/I | UNIT | |
| PRICE | TOTAL |
AMOUNT
B001 Preventive Maintenance and Inspection of Storage Tanks and Gas Stations at Grafenwoehr Tower Barracks and Vilseck Rose Barracks IAW the PWS and Attachment # 1
| ELIN B001AA - B001AG | - 0 € | ||
| B001AA | Recurring maintenance work at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in Attachment # 1 |
para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6
| Unit size = 1 job for 1 each tank. | 315 | EA | - 0 € | - 0 € |
| B001AB | Periodic electrical/explosion inspections at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in |
Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Electrical TUeV Inspection - 3 Year Cycle) | 7 | EA | - 0 € | - 0 € |
| B001AC | Periodic mechanical/technical inspections at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in |
Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Mechanical TUeV Inspection - 5 Year Cycle) | 6 | EA | - 0 € | - 0 € |
| B001AD | Recurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Grafenwoehr and Vilseck, |
IAW the PWS, Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5, and Attachment # 1 para 5.4.1
| Unit size = 1 job for all tanks. | 2 | EA | - 0 € | - 0 € |
| B001AE | Recurring explosion protection inspection at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)
| Unit size = 1 job for all tanks. | 1 | EA | - 0 € | - 0 € |
| B001AF | Recurring safety inspection at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)
| Unit size = 1 job for all tanks. | 0 | EA | - 0 € | - 0 € |
| B001AG | Performance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B, |
and Attachment # 1 para 5.4.4.1
| Unit size = 1 job for all tanks. | 1 | EA | - 0 € | - 0 € |
| B005 | Preventive Maintenance and Inspection |
of Storage Tanks and Gas Stations at Hohenfels IAW the PWS and Attachment # 1
| ELIN B005AA - B005AG | - 0 € | ||
| B005AA | Recurring maintenance work at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in Attachment # 1 |
para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6
| Unit size = 1 job for 1 each tank. | 53 | EA | - 0 € | - 0 € |
| B005AB | Periodic electrical/explosion inspections at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in |
Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Electrical TUeV Inspection - 3 Year Cycle) | 53 | EA | - 0 € | - 0 € |
| B005AC | Periodic mechanical/technical inspections at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in |
Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Mechanical TUeV Inspection - 5 Year Cycle) | 3 | EA | - 0 € | - 0 € |
| B005AD | Recurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Hohenfels, |
IAW the PWS, Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5, and Attachment # 1 para 5.4.1
| Unit size = 1 job for all tanks. | 2 | EA | - 0 € | - 0 € |
| B005AE | Recurring explosion protection inspection at all listed Gas Stations at Hohenfels, IAW the PWS Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)
| Unit size = 1 job for all tanks. | 0 | EA | - 0 € | - 0 € |
| B005AF | Recurring safety inspection at all listed Gas Stations at Hohenfels, IAW the PWS Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)
| Unit size = 1 job for all tanks. | 1 | EA | - 0 € | - 0 € |
| B005AG | Performance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Hohenfels, |
IAW the PWS Technical Exhibit # 2 - Appendix C, and Attachment # 1 para 5.4.4.1
| Unit size = 1 job for all tanks. | 1 | EA | - 0 € | - 0 € |
| B009 | Preventive Maintenance and Inspection |
of Storage Tanks and Gas Stations at Garmisch IAW the PWS and Attachment # 1
| ELIN B009AA - B009AG | - 0 € | ||
| B009AA | Recurring maintenance work at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in Attachment # 1 |
para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6
| Unit size = 1 job for 1 each tank. | 13 | EA | - 0 € | - 0 € |
| B009AB | Periodic electrical/explosion inspections at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in |
Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Electrical TUeV Inspection - 3 Year Cycle) | 1 | EA | - 0 € | - 0 € |
| B009AC | Periodic mechanical/technical inspections at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in |
Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Mechanical TUeV Inspection - 5 Year Cycle) | 1 | EA | - 0 € | - 0 € |
| B009AD | Recurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Garmisch |
IAW the PWS, Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5, and Attachment # 1 para 5.4.1
| Unit size = 1 job for all tanks. | 2 | EA | - 0 € | - 0 € |
| B009AE | Recurring explosion protection inspection at all listed Gas Stations at Garmisch IAW the PWS Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)
| Unit size = 1 job for all tanks. | 1 | EA | - 0 € | - 0 € |
| B009AF | Recurring safety inspection at all listed Gas Stations at Garmisch, IAW the PWS Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)
| Unit size = 1 job for all tanks. | 0 | EA | - 0 € | - 0 € |
| B009AG | Performance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Garmisch, |
IAW the PWS Technical Exhibit # 2 - Appendix D, and Attachment # 1 para 5.4.4.1 Unit size = 1 job for all tanks. 1 EA - 0 € - 0 €
| Total | 0.00 € | ||
| EA: Each | |||
| HR: Hour | CF: | 0.9381 | $0.00 |
| AU: Equals one Job |
2nd OY
| ELIN - 2nd Option Year - Grafenwoehr, Vilseck, Hohenfels, Garmisch |
| POP: 01 November 2025 - 31 October 2026 (FY25/26) |
| Maintenance, Repair and Inspection of Storage Tanks and Gas Stations |
| ELIN | DESCRIPTION | QUANTITY | U/I | UNIT | |
| PRICE | TOTAL |
AMOUNT
C001 Preventive Maintenance and Inspection of Storage Tanks and Gas Stations at Grafenwoehr Tower Barracks and Vilseck Rose Barracks IAW the PWS and Attachment # 1
| ELIN C001AA - C001AG | - 0 € | ||
| C001AA | Recurring maintenance work at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in Attachment # 1 |
para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6
| Unit size = 1 job for 1 each tank. | 315 | EA | - 0 € | - 0 € |
| C001AB | Periodic electrical/explosion inspections at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in |
Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Electrical TUeV Inspection - 3 Year Cycle) | 148 | EA | - 0 € | - 0 € |
| C001AC | Periodic mechanical/technical inspections at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in |
Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Mechanical TUeV Inspection - 5 Year Cycle) | 204 | EA | - 0 € | - 0 € |
| C001AD | Recurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Grafenwoehr and Vilseck, |
IAW the PWS, Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5, and Attachment # 1 para 5.4.1
| Unit size = 1 job for all tanks. | 2 | EA | - 0 € | - 0 € |
| C001AE | Recurring explosion protection inspection at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)
| Unit size = 1 job for all tanks. | 8 | EA | - 0 € | - 0 € |
| C001AF | Recurring safety inspection at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)
| Unit size = 1 job for all tanks. | 0 | EA | - 0 € | - 0 € |
| C001AG | Performance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B, |
and Attachment # 1 para 5.4.4.1
| Unit size = 1 job for all tanks. | 8 | EA | - 0 € | - 0 € |
| C005 | Preventive Maintenance and Inspection |
of Storage Tanks and Gas Stations at Hohenfels IAW the PWS and Attachment # 1
| ELIN C005AA - C005AG | ERROR:#VALUE! | - 0 € | ||
| C005AA | Recurring maintenance work at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in Attachment # 1 |
para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6
| Unit size = 1 job for 1 each tank. | 53 | EA | - 0 € | - 0 € |
| C005AB | Periodic electrical/explosion inspections at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in |
Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Electrical TUeV Inspection - 3 Year Cycle) | 1 | EA | - 0 € | - 0 € |
| C005AC | Periodic mechanical/technical inspections at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in |
Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Mechanical TUeV Inspection - 5 Year Cycle) | 1 | EA | - 0 € | - 0 € |
| C005AD | Recurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Hohenfels, |
IAW the PWS, Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5, and Attachment # 1 para 5.4.1
| Unit size = 1 job for all tanks. | 2 | EA | - 0 € | - 0 € |
| C005AE | Recurring explosion protection inspection at all listed Gas Stations at Hohenfels, IAW the PWS Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)
| Unit size = 1 job for all tanks. | 0 | EA | - 0 € | - 0 € |
| C005AF | Recurring safety inspection at all listed Gas Stations at Hohenfels, IAW the PWS Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)
| Unit size = 1 job for all tanks. | 0 | EA | - 0 € | - 0 € |
| C005AG | Performance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Hohenfels, |
IAW the PWS Technical Exhibit # 2 - Appendix C, and Attachment # 1 para 5.4.4.1
| Unit size = 1 job for all tanks. | 0 | EA | - 0 € | - 0 € |
| C009 | Preventive Maintenance and Inspection |
of Storage Tanks and Gas Stations at Garmisch IAW the PWS and Attachment # 1
| ELIN C009AA - C009AG | - 0 € | ||
| C009AA | Recurring maintenance work at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in Attachment # 1 |
para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6
| Unit size = 1 job for 1 each tank. | 13 | EA | - 0 € | - 0 € |
| C009AB | Periodic electrical/explosion inspections at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in |
Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Electrical TUeV Inspection - 3 Year Cycle) | 1 | EA | - 0 € | - 0 € |
| C009AC | Periodic mechanical/technical inspections at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in |
Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.
| (Mechanical TUeV Inspection - 5 Year Cycle) | 1 | EA | - 0 € | - 0 € |
| C009AD | Recurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Garmisch |
IAW the PWS, Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5, and Attachment # 1 para 5.4.1
| Unit size = 1 job for all tanks. | 2 | EA | - 0 € | - 0 € |
| C009AE | Recurring explosion protection inspection at all listed Gas Stations at Garmisch IAW the PWS Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)
| Unit size = 1 job for all tanks. | 0 | EA | - 0 € | - 0 € |
| C009AF | Recurring safety inspection at all listed Gas Stations at Garmisch, IAW the PWS Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5 |
and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)
| Unit size = 1 job for all tanks. | 0 | EA | - 0 € | - 0 € |
| C009AG | Performance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Garmisch, |
IAW the PWS Technical Exhibit # 2 - Appendix D, and Attachment # 1 para 5.4.4.1 Unit size = 1 job for all tanks. 0 EA - 0 € - 0 €
| Total | 0.00 € | ||
| EA: Each | |||
| HR: Hour | CF: | 0.9381 | $0.00 |
| AU: Equals one Job |
File details come from the government source that posted it. Updated .