W912PB23R3016_Attachment 1_ELIN_Storage Tanks Gas Stations_Bavaria.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Maintenance, Inspection and Repair Work for Storage Tanks and Gas Stations
Solicitation number
W912PB23R3016
Issued by

About this file

This spreadsheet contains pricing details for preventative maintenance, inspection, and repair work for storage tanks and gas stations at various US Army installations in Bavaria, Germany over multiple option years. The work includes recurring maintenance, inspections, and testing of storage tanks and gas stations at Grafenwoehr, Vilseck, Hohenfels, and Garmisch according to specifications. Requirements are broken out by installation and line item numbers that describe the type and frequency of work. Pricing is to be provided by prospective contractors, as this appears to be a pricing template included with solicitation number W912PB23R3016 issued by the Department of the Army for maintenance, inspection, and repair of storage tanks and gas stations.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

ELIN - Basic Year - Grafenwoehr, Vilseck, Hohenfels, Garmisch
POP: 01 November 2023 - 31 October 2024 (FY23/24)
Maintenance, Repair and Inspection of Storage Tanks and Gas Stations

at USAG Bavaria (TB, RB, HOH, GAP)

ELINDESCRIPTIONQUANTITYU/IUNIT
PRICETOTAL

AMOUNT

A001 Preventive Maintenance and Inspection of Storage Tanks and Gas Stations at Grafenwoehr Tower Barracks and Vilseck Rose Barracks IAW the PWS and Attachment # 1

ELIN A001AA - A001AG- 0 €
A001AARecurring maintenance work at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in Attachment # 1

para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6

Unit size = 1 job for 1 each tank.315EA- 0 €- 0 €
A001ABPeriodic electrical/explosion inspections at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in

Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Electrical TUeV Inspection - 3 Year Cycle)146EA- 0 €- 0 €
A001ACPeriodic mechanical/technical inspections at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in

Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Mechanical TUeV Inspection - 5 Year Cycle)9EA- 0 €- 0 €
A001ADRecurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Grafenwoehr and Vilseck,

IAW the PWS, Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5, and Attachment # 1 para 5.4.1

Unit size = 1 job for all tanks.2EA- 0 €- 0 €
A001AERecurring explosion protection inspection at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5

and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)

Unit size = 1 job for all tanks.15EA- 0 €- 0 €
A001AFRecurring safety inspection at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5

and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)

Unit size = 1 job for all tanks.5EA- 0 €- 0 €
A001AGPerformance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B,

and Attachment # 1 para 5.4.4.1

Unit size = 1 job for all tanks.15EA- 0 €- 0 €
A005Preventive Maintenance and Inspection

of Storage Tanks and Gas Stations at Hohenfels IAW the PWS and Attachment # 1

ELIN A005AA - A005AG- 0 €
A005AARecurring maintenance work at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in Attachment # 1

para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6

Unit size = 1 job for 1 each tank.53EA- 0 €- 0 €
A005ABPeriodic electrical/explosion inspections at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in

Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Electrical TUeV Inspection - 3 Year Cycle)1EA- 0 €- 0 €
A005ACPeriodic mechanical/technical inspections at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in

Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Mechanical TUeV Inspection - 5 Year Cycle)1EA- 0 €- 0 €
A005ADRecurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Hohenfels,

IAW the PWS, Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5, and Attachment # 1 para 5.4.1

Unit size = 1 job for all tanks.2EA- 0 €- 0 €
A005AERecurring explosion protection inspection at all listed Gas Stations at Hohenfels, IAW the PWS Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5

and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)

Unit size = 1 job for all tanks.1EA- 0 €- 0 €
A005AFRecurring safety inspection at all listed Gas Stations at Hohenfels, IAW the PWS Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5

and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)

Unit size = 1 job for all tanks.0EA- 0 €- 0 €
A005AGPerformance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Hohenfels,

IAW the PWS Technical Exhibit # 2 - Appendix C, and Attachment # 1 para 5.4.4.1

Unit size = 1 job for all tanks.1EA- 0 €- 0 €
A009Preventive Maintenance and Inspection

of Storage Tanks and Gas Stations at Garmisch IAW the PWS and Attachment # 1

ELIN A009AA - A009AG- 0 €
A009AARecurring maintenance work at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in Attachment # 1

para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6

Unit size = 1 job for 1 each tank.13EA- 0 €- 0 €
A009ABPeriodic electrical/explosion inspections at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in

Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Electrical TUeV Inspection - 3 Year Cycle)6EA- 0 €- 0 €
A009ACPeriodic mechanical/technical inspections at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in

Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Mechanical TUeV Inspection - 5 Year Cycle)1EA- 0 €- 0 €
A009ADRecurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Garmisch

IAW the PWS, Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5, and Attachment # 1 para 5.4.1

Unit size = 1 job for all tanks.2EA- 0 €- 0 €
A009AERecurring explosion protection inspection at all listed Gas Stations at Garmisch IAW the PWS Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5

and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)

Unit size = 1 job for all tanks.0EA- 0 €- 0 €
A009AFRecurring safety inspection at all listed Gas Stations at Garmisch, IAW the PWS Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5

and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)

Unit size = 1 job for all tanks.0EA- 0 €- 0 €
A009AGPerformance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Garmisch,

IAW the PWS Technical Exhibit # 2 - Appendix D, and Attachment # 1 para 5.4.4.1 Unit size = 1 job for all tanks. 0 EA - 0 € - 0 €

Total0.00 €
EA: Each
HR: HourCF:0.9381$0.00
AU: Equals one Job

1st OY

ELIN - 1st Option Year - Grafenwoehr, Vilseck, Hohenfels, Garmisch
POP: 01 November 2024 - 31 October 2025 (FY24/25)
Maintenance, Repair and Inspection of Storage Tanks and Gas Stations
ELINDESCRIPTIONQUANTITYU/IUNIT
PRICETOTAL

AMOUNT

B001 Preventive Maintenance and Inspection of Storage Tanks and Gas Stations at Grafenwoehr Tower Barracks and Vilseck Rose Barracks IAW the PWS and Attachment # 1

ELIN B001AA - B001AG- 0 €
B001AARecurring maintenance work at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in Attachment # 1

para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6

Unit size = 1 job for 1 each tank.315EA- 0 €- 0 €
B001ABPeriodic electrical/explosion inspections at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in

Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Electrical TUeV Inspection - 3 Year Cycle)7EA- 0 €- 0 €
B001ACPeriodic mechanical/technical inspections at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in

Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Mechanical TUeV Inspection - 5 Year Cycle)6EA- 0 €- 0 €
B001ADRecurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Grafenwoehr and Vilseck,

IAW the PWS, Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5, and Attachment # 1 para 5.4.1

Unit size = 1 job for all tanks.2EA- 0 €- 0 €
B001AERecurring explosion protection inspection at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5

and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)

Unit size = 1 job for all tanks.1EA- 0 €- 0 €
B001AFRecurring safety inspection at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5

and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)

Unit size = 1 job for all tanks.0EA- 0 €- 0 €
B001AGPerformance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B,

and Attachment # 1 para 5.4.4.1

Unit size = 1 job for all tanks.1EA- 0 €- 0 €
B005Preventive Maintenance and Inspection

of Storage Tanks and Gas Stations at Hohenfels IAW the PWS and Attachment # 1

ELIN B005AA - B005AG- 0 €
B005AARecurring maintenance work at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in Attachment # 1

para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6

Unit size = 1 job for 1 each tank.53EA- 0 €- 0 €
B005ABPeriodic electrical/explosion inspections at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in

Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Electrical TUeV Inspection - 3 Year Cycle)53EA- 0 €- 0 €
B005ACPeriodic mechanical/technical inspections at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in

Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Mechanical TUeV Inspection - 5 Year Cycle)3EA- 0 €- 0 €
B005ADRecurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Hohenfels,

IAW the PWS, Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5, and Attachment # 1 para 5.4.1

Unit size = 1 job for all tanks.2EA- 0 €- 0 €
B005AERecurring explosion protection inspection at all listed Gas Stations at Hohenfels, IAW the PWS Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5

and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)

Unit size = 1 job for all tanks.0EA- 0 €- 0 €
B005AFRecurring safety inspection at all listed Gas Stations at Hohenfels, IAW the PWS Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5

and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)

Unit size = 1 job for all tanks.1EA- 0 €- 0 €
B005AGPerformance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Hohenfels,

IAW the PWS Technical Exhibit # 2 - Appendix C, and Attachment # 1 para 5.4.4.1

Unit size = 1 job for all tanks.1EA- 0 €- 0 €
B009Preventive Maintenance and Inspection

of Storage Tanks and Gas Stations at Garmisch IAW the PWS and Attachment # 1

ELIN B009AA - B009AG- 0 €
B009AARecurring maintenance work at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in Attachment # 1

para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6

Unit size = 1 job for 1 each tank.13EA- 0 €- 0 €
B009ABPeriodic electrical/explosion inspections at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in

Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Electrical TUeV Inspection - 3 Year Cycle)1EA- 0 €- 0 €
B009ACPeriodic mechanical/technical inspections at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in

Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Mechanical TUeV Inspection - 5 Year Cycle)1EA- 0 €- 0 €
B009ADRecurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Garmisch

IAW the PWS, Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5, and Attachment # 1 para 5.4.1

Unit size = 1 job for all tanks.2EA- 0 €- 0 €
B009AERecurring explosion protection inspection at all listed Gas Stations at Garmisch IAW the PWS Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5

and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)

Unit size = 1 job for all tanks.1EA- 0 €- 0 €
B009AFRecurring safety inspection at all listed Gas Stations at Garmisch, IAW the PWS Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5

and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)

Unit size = 1 job for all tanks.0EA- 0 €- 0 €
B009AGPerformance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Garmisch,

IAW the PWS Technical Exhibit # 2 - Appendix D, and Attachment # 1 para 5.4.4.1 Unit size = 1 job for all tanks. 1 EA - 0 € - 0 €

Total0.00 €
EA: Each
HR: HourCF:0.9381$0.00
AU: Equals one Job

2nd OY

ELIN - 2nd Option Year - Grafenwoehr, Vilseck, Hohenfels, Garmisch
POP: 01 November 2025 - 31 October 2026 (FY25/26)
Maintenance, Repair and Inspection of Storage Tanks and Gas Stations
ELINDESCRIPTIONQUANTITYU/IUNIT
PRICETOTAL

AMOUNT

C001 Preventive Maintenance and Inspection of Storage Tanks and Gas Stations at Grafenwoehr Tower Barracks and Vilseck Rose Barracks IAW the PWS and Attachment # 1

ELIN C001AA - C001AG- 0 €
C001AARecurring maintenance work at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in Attachment # 1

para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6

Unit size = 1 job for 1 each tank.315EA- 0 €- 0 €
C001ABPeriodic electrical/explosion inspections at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in

Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Electrical TUeV Inspection - 3 Year Cycle)148EA- 0 €- 0 €
C001ACPeriodic mechanical/technical inspections at all listed Storage Tanks at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 1 - Appendix A/B and as prescribed in

Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Mechanical TUeV Inspection - 5 Year Cycle)204EA- 0 €- 0 €
C001ADRecurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Grafenwoehr and Vilseck,

IAW the PWS, Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5, and Attachment # 1 para 5.4.1

Unit size = 1 job for all tanks.2EA- 0 €- 0 €
C001AERecurring explosion protection inspection at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5

and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)

Unit size = 1 job for all tanks.8EA- 0 €- 0 €
C001AFRecurring safety inspection at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B, Technical Exhibit # 5

and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)

Unit size = 1 job for all tanks.0EA- 0 €- 0 €
C001AGPerformance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Grafenwoehr and Vilseck, IAW the PWS Technical Exhibit # 2 - Appendix A/B,

and Attachment # 1 para 5.4.4.1

Unit size = 1 job for all tanks.8EA- 0 €- 0 €
C005Preventive Maintenance and Inspection

of Storage Tanks and Gas Stations at Hohenfels IAW the PWS and Attachment # 1

ELIN C005AA - C005AGERROR:#VALUE!- 0 €
C005AARecurring maintenance work at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in Attachment # 1

para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6

Unit size = 1 job for 1 each tank.53EA- 0 €- 0 €
C005ABPeriodic electrical/explosion inspections at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in

Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Electrical TUeV Inspection - 3 Year Cycle)1EA- 0 €- 0 €
C005ACPeriodic mechanical/technical inspections at all listed Storage Tanks at Hohenfels, IAW the PWS Technical Exhibit # 1 - Appendix C and as prescribed in

Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Mechanical TUeV Inspection - 5 Year Cycle)1EA- 0 €- 0 €
C005ADRecurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Hohenfels,

IAW the PWS, Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5, and Attachment # 1 para 5.4.1

Unit size = 1 job for all tanks.2EA- 0 €- 0 €
C005AERecurring explosion protection inspection at all listed Gas Stations at Hohenfels, IAW the PWS Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5

and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)

Unit size = 1 job for all tanks.0EA- 0 €- 0 €
C005AFRecurring safety inspection at all listed Gas Stations at Hohenfels, IAW the PWS Technical Exhibit # 2 - Appendix C, Technical Exhibit # 5

and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)

Unit size = 1 job for all tanks.0EA- 0 €- 0 €
C005AGPerformance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Hohenfels,

IAW the PWS Technical Exhibit # 2 - Appendix C, and Attachment # 1 para 5.4.4.1

Unit size = 1 job for all tanks.0EA- 0 €- 0 €
C009Preventive Maintenance and Inspection

of Storage Tanks and Gas Stations at Garmisch IAW the PWS and Attachment # 1

ELIN C009AA - C009AG- 0 €
C009AARecurring maintenance work at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in Attachment # 1

para 5.3.1 / 5.3.4 / 5.3.5 / 5.3.6

Unit size = 1 job for 1 each tank.13EA- 0 €- 0 €
C009ABPeriodic electrical/explosion inspections at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in

Attachment # 1 para 5.3.3 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Electrical TUeV Inspection - 3 Year Cycle)1EA- 0 €- 0 €
C009ACPeriodic mechanical/technical inspections at all listed Storage Tanks at Garmisch, IAW the PWS Technical Exhibit # 1 - Appendix D and as prescribed in

Attachment # 1 para 5.3.2 / 5.3.4 / 5.3.5 / 5.3.6 Unit size = 1 job for 1 each tank.

(Mechanical TUeV Inspection - 5 Year Cycle)1EA- 0 €- 0 €
C009ADRecurring Routine Semiannual maintenance and inspection at all listed Gas Stations at Garmisch

IAW the PWS, Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5, and Attachment # 1 para 5.4.1

Unit size = 1 job for all tanks.2EA- 0 €- 0 €
C009AERecurring explosion protection inspection at all listed Gas Stations at Garmisch IAW the PWS Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5

and Attachment # 1 para 5.4.3 / 5.4.4 / 5.4.5 (Electrical TUeV Inspection - 3 Year Cycle)

Unit size = 1 job for all tanks.0EA- 0 €- 0 €
C009AFRecurring safety inspection at all listed Gas Stations at Garmisch, IAW the PWS Technical Exhibit # 2 - Appendix D, Technical Exhibit # 5

and Attachment # 1 para 5.4.2 / 5.4.5 (Mechanical TUeV Inspection - 5 Year Cycle)

Unit size = 1 job for all tanks.0EA- 0 €- 0 €
C009AGPerformance of annual electrical measurement (Potential Compensation) at all listed Gas Stations at Garmisch,

IAW the PWS Technical Exhibit # 2 - Appendix D, and Attachment # 1 para 5.4.4.1 Unit size = 1 job for all tanks. 0 EA - 0 € - 0 €

Total0.00 €
EA: Each
HR: HourCF:0.9381$0.00
AU: Equals one Job

File details come from the government source that posted it. Updated .