PERFORMANCE WORK STATEMENT (PWS)

Joint Multinational Readiness Center (JMRC) and Prepositioned Training Fleet (PTF) Maintenance Support

18 October 2022

Part 1

General Information

1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide logistical services. The

Government shall not exercise any supervision or control over the contract service providers performing the services herein.

Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.2 Background: Provide field maintenance and administrative support for PTF equipment set, composed of 292 tactical and

140 Non-tactical vehicles (NTV including 3 Busses with 26 Seats up to 56 Seats), 13 Material handling Equiment vehicles, 300 space heaters, 50 generators (MOGAS and/or Diesel), Yard/Forrest Equiment (includes 3 Ride on Lawn Mowers, 2 Lawn

Mowers, 5 Chainsaws)and 50 floodlight sets used to support U.S. Title X and coalition forces at Hohenfels and Grafenwoehr, Germany and at coalition and NATO bases as needed.

1.3 Scope: The Contractor shall provide non-personal service(s). The Contractor shall perform all work and assume responsibility for planning, programming, administering, managing, and executing all functions necessary to provide the services specified in this PWS. The Contractor shall conduct work in accordance with this PWS and all applicable United

States (U.S.), German, and local laws, US Army regulations, standards, provisions, and directives to include applicable publications in Part 6. The Contractor shall ensure that all work meets the level of service, performance standards, or tolerances specified in the PWS and in accordance with applicable Technical Manuals TM. Field and/or Sustainment Level and/or higher under this Contract may be performed at designated facilities, or portions of installations, by in-house

Government personnel or by other Contractors are not within the scope of this PWS.

1.4 Objectives: The Contractor shall assume total responsibility for all requirements stated herein on the commencement date of the performance period. The Contractor shall perform as specified in this Contract and under the direction of the Contracting

Officer (KO).

1.4.1 Administrative Responsibility: The Contractor shall perform all related administrative actions required to provide services or perform work such as material requisitioning (i.e. Class II, III, IV, VIII and IX), quality control (QC), financial control, meetings, and correspondence. The Contractor shall also maintain accurate and complete records, files, and libraries of documents to include all U.S., German, and local regulations, standards, provisions, codes, laws, TMs, and manufacturers’ instructions and recommendations that are necessary and related to the functions being performed. The Contractor shall compile historical data, prepare required reports, and submit information as specified by the Deliverable List presented in Enclosure 2 of this PWS.

1.5 General Information

1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.

The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s

Representative (COR) for review within 10 working days after date of contract award.

The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within 10 working days. If the Government has provided comments, the Contractor shall then have 3 working days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than 30 days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:

a. A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team.

b. How will the Contractor monitor work to ensure that performance complies with all deliverables (etc. timelines, deadlines, and goals)?

c. How will the Contractor monitor work to ensure that performance complies with all specifications and requirements of the contract, including clauses?

d. How will the Contractor monitor and ensure staff qualifications remain current and valid including DOCPER processes/approvals throughout contract performance?

e. How will the Contractor ensure all keys issued will remain controlled items (Paragraph 1.7 Key Control)?

f. How will the Contractor inventory and track maintenance of all Government Provided Equipment / Materials?

g. How will the Contractor identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future?

h. How will the Contractor file and save all Quality Control related documents for the life of the contract plus 5 years?

1.5.1.1 An Analysis of Quality Control and Timeliness of Submittals (i.e. deliverables) shall be provided to the COR within

30 days upon completion of each option period or Task Order

1.5.1.2 The Contractor shall inform the COR of issues or potential issues that might affect the performance within 24 hours of identifying those issues except in emergency situations in which case immediate notification is encouraged. Verbal reports shall be followed up by written reports within 2 work days.

1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.5.3 U.S. Holidays: Work shall be performed on U.S. holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.

New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in January

Presidents Day 3rd Monday in February Memorial Day last Monday in May

Juneteenth Day June 19th Independence Day July 4th

Labor Day 1st Monday in September Columbus Day 2nd Monday in October

Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November

Christmas Day December 25th

1.5.3.1 Host Nation Holidays: Work shall be performed on local Host Nation holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.

1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.

1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0800 to 1700 Monday through Friday except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0600 to 1800 Monday through Friday. The Government facility is open for operations during the recognized U.S. Holidays identified in paragraph 1.6.3.1 above. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.

1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0600 to 1800 Monday through

Friday. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor. During exercises/events, it may be necessary for Contractor to provide support for up to 24 hours a day. The Government will not reimburse the Contractor separately for overtime. Exercise periods are scheduled throughout the year. Each exercise period, shall last approximately one

(1) month or four (4) weeks. Each exercise is unique, therefore exercise periods may be shorter or longer in duration. During each exercise there shall be approximately a one (1) week build up period, two (2) weeks of actual exercise, and a one (1) week retrograde period. Additional exercise periods may be added or deleted during the term of this contract. If Contractor is required to work with less than (1) week build up and a one (1) week retrograde period a surge CLIN will be used for compensation on a weekly basis. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the

Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.5.5 Training Holidays: USAREUR has historically granted military personnel training holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday. However, announced training holidays or exodus of military personnel may provide the

Contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.

1.5.6 Place of Performance: The work to be performed under this contract will be performed throughout United States Army

Garrision (USAG) Hohenfels. An office and motorpool with maintenance buildings will be available for use by the contractor.

See Map in Enclosure 7.

1.6 Security Requirements: The following information is provided on security related matters.

1.6.1 Installation Access: Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances in accordance with Army in Europe (AE) Regulation 190-16 (AE Reg 190-16) Installation Access

Control or (AE) Regulation 604-1 for Germany specific contracts, will be grounds for denying access to U.S. installations and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements. Should anything in this paragraph conflict with AE Reg 190-16 or (AE) Regulation

604-1, the regulation takes precedent.

The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The

Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with

Installation Access Control System (IACS) processing requirements.

The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.

AE Reg 190-16 (and AE 190-16-G German translation) can be found on the following website:

https://www.aepubs.eur.army.mil/AE-Regulations/

1.6.1.1 Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within 30 calender days after contract award. The log must at a minimum contain the following information : : Last, First Middle Name, Cadency Name, Personal identifier (e.g. Social Security Number, Federal Identification Number, or Tax Identification Number), date of birth, primary email address (this email address will be used to contact the individual) The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the

Government and submitted to the COR within five (5) days after any changes to the log.

1.6.1.2 The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within 1 business day

1.6.1.3 Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within 3 business days

1.6.1.4 Common Access Cards (CAC): The Contractor shall provide the following information for its employees or subcontractors requiring base access: Last, First Middle Name, Cadency Name, Personal identifier (e.g. Social Security

Number, Federal Identification Number, or Tax Identification Number), date of birth, primary email address (this email address will be used to contact the individual) to the COR with 15 calendar days after award (unless circumstances require otherwise and as directed by the Contracting Officer). The Contractor shall ensure safeguarding of Personally Identifiable Information

(PII) and comply with requirements under 1.22.5.

1.6.1.4.1 The Contractor shall provide a CAC log within the first 30 calendar days after contract award and within five (5) days after changes have been made (unless circumstances require otherwise and as directed by the Contracting Officer). The

COR will provide format and content for the log during the post award meeting. Note - CACs are Government property and must be accounted for.

1.6.2 Background Checks/Local National Screening Program (LNSP): Army in Europe (AE) Regulation 604-1 provides guidance pertaining to background checks for U.S. and background checks/ LNSP checks for Host Nation Contractors

1.6.2.1 U.S. Citizen: The Requiring Activity Manager will determine the extent of background checks required. The

Contractor employee may begin performance of the contract after receiving a favorable local background check. The Contractor agrees to replace the employee should results of the stateside background check, if required, be unfavorable as determined by the Requiring Activity Manager. The Contractor’s replacement of the employee with the unfavorable background check shall be within a timeframe provided by the Requiring Activity Manager. The Contractor shall also replace employees whose background check, during their tenure of employment, renders them with an unfavorable local or stateside background check, as determined by the Requiring Activity Manager. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each favorable background check within 3 days of receipt by the Contractor, identifying such with the appropriate contract number The Contractor shall forward a copy to the Contracting Officer via the COR and the

Requiring Activity Manager of each unfavorable background check within 24 hours of receipt by the Contractor, identifying such with the appropriate contract number When the Government awards a non-personal services contract directly to an individual, the failure of the individual to provide a favorable background check would be grounds for termination.

1.6.2.2 Local Nationals and Third Country Nationals: Local national and third country national Contractors are subject to background checks and LNSP checks as determined by the Requiring Activity Manager. As a minimum prior to beginning performance, Contractors employing local national and third country nationals shall furnish the Contracting Officer via the

COR and the Requiring Activity Manager a Polizeiliches Fuehrungszeugnis, issued within the previous three months, no later than 5 days after contract award. Forwarding correspondence from the Contractors shall identify the associated contract number. The Requiring Activity Manager will determine the favorability of the Polizeiliche Fuehrungszeugnis and notify the

Contractor. The Contractor shall forward a copy of unfavorable Polizeiliche Fuehrungszeugnis to the Contracting Officer via the COR and the Requiring Activity Manager within 3 days of receipt, identifying such with the appropriate contract number.

Local nationals and third country nationals agree to the same employee termination provisions as stated for U.S. Citizens (see paragraph 1.6.4.1 above, in particular, same requirements to replace the employee (and within timeframe noted) when results of background check are unfavorable).

1.6.3 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for

Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the

Army Physical Security Program (AR 190-13).

1.6.4 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.

1.7 Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Contractor’s Security Plan and the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any incidents of lost or duplicate keys to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from payment due to the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the payment due to the Contractor.

The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The

Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than

Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the

Contracting Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Quality

Control Plan.

1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the

Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.

1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the

Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of

Government property, and coordinate site entry of Contractor personnel.

1.10 Key Personnel: The following personnel are considered key personnel by the Government: Project/Contract Manager

(PM) and Deputy Project/Contract Manager (DPM). The Contractor shall provide a PM who shall be responsible for the performance of the work. The name and contact information of this person and the DPM, who shall act for the Contractor when the PM is absent, along with a Curriculum Vitae (CV) for each of these individuals, shall be provided in writing to the

KO and COR no later than 3 days after contract award. The PM and DPM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The PM and DPM shall be available 24 hours a day to the COR.

Qualifications for all key personnel are listed below:

a. Program Manager and Deputy Program Manager: The qualifications included on the CV for the PM and DPM must demonstrate 3 or more years of experience with maintenance project management, and familiarity with US Army regulations applicable to fleet maintenance, supply management, and must demonstrate a minimum of 3 years’ experience within the past 10 years working as a Program Manager or Deputy Program Manager.

b. Special Qualifications: The Contractor shall ensure the PM and DPM has a minimum of 3 years of experience with Global Combat Support System or equal SAP Modules – Army (GCSS-Army) Certificates or equal Certificates will be provided to the COR within 30 days of contract award or within 10 days of new hire date.

1.11 Identification of Contractor Employees: All Contractor and Subcontractor personnel attending meetings, answering

Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.11.1 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW

Contractor Identification (AE Reg. 27-715). “The Contractor (to include subcontractors) shall provide each of their employees an easily readable identification badge. The badge must include the employee’s name, the contractor’s company name, the functional area of assignment, and a recent color photograph of the employee. Companies with U.S. Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee. A listing of issued ID cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor personnel changes.

1.11.2 Contractor workspace (staging site, on-site office, desk or work area, etc.) shall contain a sign signifying the space is occupied by Contractor employee(s) to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the COR for review and acceptance within 10 calender days after contract award. Workspace sign location shall be coordinated with the COR. Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name.

Requirements for Contractor vehicles is addressed under Part 4 paragraph 4.4.

1.12 Contractor Travel: The Contractor shall be required to travel within the EUCOM, AFRICOM, or CENTCOM area of responsibility during the performance of this contract. The Contractor may be required to travel to off-site training locations in support of this PWS. A travel CLIN of $15,000 per year will be provided to cover expenses. The Contractor may be authorized travel expenses at rates no higher than the substantive provisions of the Joint Travel Regulation (JTR), IAW FAR Part 31.205-

46, and the limitation of funds specified in this contract. All travel requires Government approval by the COR and/or KO and authorization a minimum of 3 days prior to scheduled travel. Expenses for local travel within a 300 mile radius of

Graf/Hohenfels will not be reimbursed.

1.14 Other Direct Costs (ODCs): N/A

1.15 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the

Government. These documents and materials may not be used or sold by the Contractor without written permission from the

Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.17 The use of propaganda violates DoD Commercial Use of Imagery Guidelines stated at http://www.defenseimagery.mil/products/dodimagery/commercialuse.html The Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any marketing tools to include its company website.

1.19 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer http://www.defenseimagery.mil/products/dodimagery/commercialuse.html unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.20 Phase In /Phase Out Period: To minimize decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the fifteen (15) day phase in/ phase out periods.

During the phase in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date. To ensure a seamless transition from the incumbent contractor, the Program

Manager (PM) and/or (Deputy Program Manager (DPM) shall manage the transition.

1.20.1a. In addition, the Contractor shall brief the results of their initial transition assessment and plan to the Government within ten days of the contract transition start date. The assessment and plan shall address personnel, equipment, supplies, and procedures necessary to fully execute the program and ensure a smooth transition. The Contractor shall keep the Government fully informed of their transition status throughout the transition period and provide a weekly update. Throughout the phase-in/phase-out periods, it is essential that attention be given to minimize interruptions or delays to work in progress that would impact the mission.

1.20.1b. The Contractor shall work in coordination with the incumbent Contractor (if different) to ensure uninterrupted support of operations and seamless transfer of services. All lease arrangements shall include a three-month option beyond the term of the contract, assumable by a successor Contractor. The Government will provide any additional work space required during this period if available and approved by KO.

1.20.1c. The Contractor shall prepare and provide a Phase-out Plan to include detailed written instructions and procedures for accomplishing the efforts set forth below. The incumbent Contractor shall be required to provide transition information and coordination to the incoming Contractor. The Contractor's phase-out plan shall identify detailed written instructions and procedures for any ongoing or recurring activities that, in the best interest of the US Government, require continued oversight during phase-out availability. The Contractor shall ensure close coordination with the Government to ensure CAC and USAG

Bavaria post access requirements are maintained. The phase-out plan shall address the return of all applicable documentation, excluding Contractor internal operating procedures, such as manuals, external operating procedures, and identification of all required passwords to a COR by the Contractor during the final 20 working days of the contract. The Contractor shall then make no further changes to these passwords without notification to a COR.

1.20.2. Government Furnished Property (GFP) Phase-in/-out Effort

The Contractor shall prepare and provide a detailed Phase-in/out Plan for the inventory of all GFP 120 days prior to the end of the contract to the GPA and COR for Government review and approval. The Contractor and incoming Contractor shall perform a joint inventory with the Government of all GFP under this contract to be completed NLT 5 days prior to the contract start date. The Government, Contractor and incoming Contractor shall verify the quantity and condition of each item and property on active maintenance work requests that are out at a vendor for repair or calibration. Any item found not suitable for its intended purpose shall be recorded. The Contractor and the Government will reconcile all inventory discrepancies and update the GFP attachments thorough a modification to the contract.

1.21 Safety: The following provides information pertaining to Safety and Accident Prevention:

1.21.1 Host Nation Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention

(November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements

Manual (EM 385-1-1)), and applicable Host Nation Safety Laws and Regulations.

The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:

(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel. Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.

(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1).

file:///C:/Users/1232177302.civ/Documents/REVIEWS%20-%20PWS%20SOW/WORKING%20ON%20NEW%20SOPs/www.usace.army.mil

(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.

(d) The Contractor shall discuss the plans in conferences convened by the Contracting Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within fifteen (15) calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than fifteen (15) calendar days prior to initiation of work on each major phase.

(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the

Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:

(i) Short sleeve shirt.

(ii) Long trousers.

(iii) Steel-toed safety boots.

(iv) Hard hat.

1.21.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes. In particular, within the requirements of the German Safety and Health Protection Regulation for

Construction Sites, Baustellenverordnung (BaustellV) (current version in effect), the Contractor shall coordinate all work at the site, including development of plans and providing advance notices.

The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract. For the compliance with host nation laws and regulations, the Contractor shall comply with the non-exclusive list of duties described in this paragraph. If the Contractor determines that additional activities are required to fully comply, the Contractor shall ensure that compliance with the laws is complete. The duties include:

(a) Conditions of construction and operational activities to be considered include but are not limited to:

(i) For all construction activities meeting the following criteria: the work is scheduled to last longer than 30 working days and more than 20 workers are occupied simultaneously, or the volume of work is scheduled to exceed 500 person days, or the work presents particular tasks, e.g. excavations deeper than 5 meters, falls from a height of greater than 7 meters, exposures to hazardous chemical or biological substances, work at less than 5 meters from high voltage lines, underground earth works or tunnels, danger of drowning, diving, use of compressed air, work with ionizing radiation, explosives, or work involving assembly or dismantling of heavy prefabricated components (10 tons or greater).

(b) If the Contractor determines that the BaustellV, dated 10 June 1998, applies, the Contractor shall prepare a Safety and Health Protection Plan (SIGE) as required under that regulation. The SIGE shall be submitted two weeks prior to mobilization. In addition, the Contractor shall appoint a qualified Safety Coordinator who will ensure that safety measures are implemented during construction. The Safety Coordinator must meet minimum training and experience requirements required under Host Nation laws.

(c) The SIGE will be written in a comprehensive form and explained in language the workers understand and shall contain the following minimum information:

(i) Maintenance of tools and equipment.

(ii) Provisions for the storage and disposal of materials and waste, particular hazardous materials and substances.

(iii) Modifying performance periods for such work, taking into consideration the site conditions.

(iv) Organizing cooperation between different employers and Contractors without employees.

(v) Interaction between work at the site and other operational activities in the area, on which or near which the first identified work will be performed, and taking into consideration the instructions and advice of the coordinator as well as safety and health plans.

1.21.1.2 The Contractor shall complete and provide safety notifications required by host nation authorities and will provide documented proof to the COR no later than 10 caldender days after contract start date that such notifications were made.

1.22 Environmental Compliance: The following provides information on Environmental Compliance.

1.22.1 The Contractor shall be responsible for environmental compliance within its scope of operations and appoint an

Environmental Control Officer. The Contractor’s program shall comply with the U.S. Government, Host Nation, and

Environmental Protection Agency (EPA) instructions and regulatory requirements.

1.22.2 The Contractor shall maintain a clean and safe working area to include immediate clean-up of any hazardous material spill or other hazards in the Contractor’s work area or caused by the Contractor. The Contractor shall conform to unit Hazardous

Material (HAZMAT) Standard Operating Procedures (SOPs) and utilize Safety Data Sheets (SDS) for handling and storage of hazardous materials. Hazardous material and waste shall be turned in to a designated and authorized collection point only. The point of contact (POC) is the JMRC Environmental Control Office.

1.22.3 The Contractor shall be able to properly handle, store, and prepare for disposal of all hazardous materials used in performance of maintenance services IAW U.S. Government and Host Nation hazardous material handling procedures.

1.22.4 Environmental Compliance Plan and Program: The Contractor’s Environmental Compliance Plan and Program shall be routed through the Installation Environmental Protection Agency (EPA) office via the COR to ensure compliance is met. This shall be provided to the COR within 30 days of contract award for submission to the Installation EPA office

1.23 Required Training: The following provides information on training requirements.

1.23.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 calendar days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a

COR is not assigned) within 30 days after completion of this training by all employees and subcontractor personnel. AT Level

I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies

If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT

Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within 30 days after completion of the training.

1.23.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within

30 days of employment under this contract.Verification of the training shall be provided to the COR within 30 days after completion of the training. OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html.

Contractor personnel must complete refresher training every 12 months. Verification of the training shall be provided to the

COR within 30 days after completion of the training.

If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC

Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the

COR within 30 days after completion of the training.

1.23.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 days after the contract is awarded and within 30 days after new employees commence contract performance, with the results reported to the COR within 30 days after the contract is awarded and within 30 days after new employees commence contract performance. Verification of the training shall be provided to the COR within 30 days after completion of the training. Training slides can be found on the Army OneSource we site:

http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx.

1.23.4 Information Assurance (IA) Training

https://jkodirect.jten.mil/ http://www.cdse.edu/catalog/elearning/GS130.html http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx

1.23.4.1 All Contractor employees, including subcontractors, requiring access to Government information systems shall complete the Department of Defense (DoD) Information Assurance (IA) Cyber Awareness Training within 30 days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 days after employment of new personnel. Verification of the training shall be provided to the COR within 30 days after completion of the training.

1.23.4.2 All Contractor employees, including subcontractors, working information technology (IT)/IA functions shall comply with DoD and Army training requirements per Information Assurance Training Certification and Workforce Management DoD

Directive (DoDD) 8570.01, Information Assurance Workforce Improvement Program DoD 8570.01-M, and Information

Assurance AR 25-2 within thirty (30) calendar days of employment. Training is available at https://ia.signal.army.mil/DoDIAA/default.asp.

1.23.4.3 All Contractor employees, including subcontractors, performing services under this contract with access to a

Government information system must be registered in the Army Training Certification Tracking System (ATCTS), the web address is https://atc.us.army.mil/iastar/index.php. Verification of registration shall be provided to the COR within 30 days after registration. Contractor personnel must complete refresher training every twelve (12) months. Verification of the training shall be provided to the COR within 30 days after completion of the training

1.23.5 Personally Identifiable Information (PII): Contractor employees, including subcontractors, performing services under this contract with access to PII and Government information shall complete “Identifying and Safeguarding PII” within

30 calendar days of employment. Contractor personnel shall complete refresher training every twelve (12) months from initial completion. The Contractor shall provide the COR a copy of the training certificates for its employees no later than five (5) days after completion. Training is available at http://iatraining.disa.mil/eta/piiv2/launchPage.htm

1.24 Authorization to Perform Services in Germany

1.24.1 Contractors performing services in the Federal Republic of Germany (FRG) shall comply with German law. The

Contractor shall determine whether performance requires registration with German authorities or authorization to do business in Germany and, if so, shall comply with all requirements. Whether or not registration or authorization to do business is required, the Contractor shall determine what documents or authorization its employees and any subcontractor employees must possess to work in Germany. The Contractor shall ensure affirmatively that its employees and subcontractor employees possess such documents or authorizations.

1.24.2 Contractor employees who: (a) are not nationals of Germany or other European Union countries; (b) are not members of the force, the civilian component or their dependents; or c) do not have assimilated status under Articles 71, 72, or 73 of the

Supplementary Agreement to the NATO SOFA shall possess work and residence permits.

1.24.3 By acceptance of and performance under this contract, the Contractor affirms that it has complied with the requirements above. Compliance with this requirement and German law is a material contract requirement. Noncompliance by the

Contractor or subcontractor at any tier shall be grounds for issuing a negative past performance evaluation and terminating this contract for cause.

1.25 Notice to Proceed: N/A

1.26 Electromagnetic Compatibility Directive: The Contractor certifies that all electrical and electronic equipment and appliances furnished are in compliance with the Electromagnetic Compatibility Directive 2014/30/EU. For radio transmitting and telecommunication devices furnished in the Federal Republic of Germany, the Contractor certifies that all such items have been approved by the Bundesamt fuer Zulassungen. Any penalties for noncompliance imposed by the Government of the

European country where the equipment or appliances are delivered or product liability claims caused by interference generated by furnished appliances or equipment are solely the responsibility of the Contractor.

1.27 Conventional Forces Europe (CFE) Treaty Verification Inspection: Contractor-owned or controlled structures and containers located on U.S. Government installations are subject to short-notice inspections by CFE treaty inspection teams.

The Government will endeavor to provide the Contractor as much notice as possible in the event of such inspections. The contractor shall provide access to such structures and containers at the request of the Government. The Contractor shall https://ia.signal.army.mil/DoDIAA/default.asp https://atc.us.army.mil/iastar/index.php http://iatraining.disa.mil/eta/piiv2/launchPage.htm report such inspections to the COR in writing within ten (10) calendar days of completion of the inspection. Contractor-owned or controlled structures and/or containers on U.S. installations may have to be inspected to comply with the CFE treaty even if Contractor personnel are unavailable to provide access.

This is the start of the file's text. The full file is on GovTribe.