07_1 Attachment IV Questions from Industry.doc

DOC document 31 KB Posted

Attached to
Maintenance of Family Housing Quarters, USAG Bavaria, Grafenwoehr Military Community - Tower Barracks
Solicitation number
W912PB20B8003
Issued by

View the file

Other files

File Type Posted
07_4 Solicitation W912PB20B8003-0001.pdf PDF
07_3 Envelope Label revised.docx DOCX document
07_2 Amendment General Information.docx DOCX document
07 Amendment 0001.pdf PDF
04 Site Visit Invitation.pdf PDF
05 Attachment II Price Schedule.xlsx XLSX spreadsheet
04 Attachment I Specification 11Dec19.pdf PDF
01 Cover Letter.pdf PDF
02 Envelope Label.docx DOCX document
03 Solicitation W912PB20B8003.pdf PDF
06 Attachment III Totals.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912PB20B8003

Amendment 0001

Attachment IV

QUESTIONS FROM INDUSTRY

Question 1:

IFB: Clause 52.211-12: What is meant by Liquidated Damages €332.30 per quarter? I understand daily for stairwells.

Answer 1: 52.211-12 (a) states: If the contractor fails to complete the work within the time specified in the contract, the contractor shall pay liquidated damages in the amount of Euro 332.20 for each quarter for each calendar day of delay until the work is completed or accepted. This means that if the work in a house/apartment etc is not completed in time, the amount of Euro 332.20 will be assessed for each day of delay from until the house/apartment is completed.

Question 2:

Request the contract number and name of contractor who has the contract at the moment?

Answer 2: Contract Number: W912PB18D8100

Contractor: Frank GmbH, Roemweg 2,92358 Seubersdorf Question 3:

Specification Item 003BF: The removal is only 5 cm thick, but application is over 6 cm thick, which would mean it comes higher than before, example: doors may have to be shortened etc. these items would then be paid extra?

Answer 3: The item description is correct. The item specifies that 6 cm up to 8 cm will be removed (5 cm concrete floor screed plus 1 cm up to 3 cm insulation).

New installation is 6 cm up to 9 cm thick.

Question 4:

Specification Item 004AT: Per the price schedule, you have 500 jobs per year. Is this a good figure?

Answer 4: This is the Government’s estimate.

Question 5:

Specification Item 004BU: (We are using this item as an example, there are many more items like this) Are there any Brand names or Equal or is it left up to the contractor to decide what he installs?

Answer 5: There are no “Brand names or Equal“ items in the specification. The quality of work and products must comply with the description in the specification.

Question 6:

Historical data of the Task Orders issued for the previous full year (12 month) for all of types/rates of works

Answer 6: In fiscal year 2019, 146 task orders were issued. Individual types of work cannot be provided, as the specification items of the current contract and the solicitation do not correspond. There is not enough personnel to perform the time consuming request to compare all the ordered items of each task order with the current contract and the solicitation.

Question 7:

What is the peak time of the Task Orders issued (the period of the year or month)

Answer 7: May through September Question 8:

What is the number of collective quarters supposed to be maintained, along the number of single apartments?

Answer 8: There are currently 1743 leased quarters, 300 On Post Quarters and 75 Single Soldier Quarters, however those numbers can change any time.

Question 9:

What is the number of leased quarters (private houses) supposed to be maintained?

Answer 9: Currently there are 1743 leased quarters, however that number can change any time.

Question 10:

Percentage of the total workload spread as per the following example:

- collective quarters

- leased quarters (private houses) Answer 10: A percentage cannot be given.