ELINS_POL_Separators_2019_2023.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- POL Inspection and Maintenance Services
- Solicitation number
- W912PB19Q3094
About this file
ELINS for pricing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PB-19-Q-3094.pdf | ||
| PWS_POL_Separators.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELIN SCHEDULE BASIC PERIOD
ELIN Sheet FOR INSPECTION & MAINTENANCE OF POL SEPARATORS at USAG Bavaria, Hohenfels
| Basic Year Period: 01-SEP-2019 thru 31-AUG-2020 | |||||
| Inspection and Maintenance of POL Separators | |||||
| A001 | 12 | EA | € 0.00 | Monthly Maintenance and Inspection of Sludge Traps and POL Separators, recording, preparation of logbooks in accordance with the service description | € 0.00 |
| A002 | 145 | Net Ton | € 0.00 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufacturers and of different rated sizes, as well as the disposal of oil separator residues at certified disposal- and recycling plants in accordance with the PWS. This is a fixed unit price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | € 0.00 |
| A003 | 65 | EA | € 0.00 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. |
Cost per sample collected and analyzed.
| € 0.00 | ||||||
| A004 | 6 | EA | € 0.00 | Replacement of defective sensors for alarm systems, including all required labor, materials, tools, etc. | € 0.00 | |
| A005 | 2 | EA | € 0.00 | Replacement of defective alarm systems including all required labor, materials, tools, etc. | € 0.00 | |
| A006 | 2 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 3 to NG 10 | € 0.00 | |
| A007 | 3 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 15 to NG 20 | € 0.00 | |
| A008 | 1 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 30 to NG 40 | € 0.00 | |
| A009 | 1 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 50 to NG 130 | € 0.00 | |
| A010 | 1 | EA | € 0.00 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| € 0.00 | ||
| SUM: | € 0.00 | |
| SUM: | $0.00 |
ELIN SCHEDULE 1st OPTION PERIOD ELIN Sheet FOR INSPECTION & MAINTENANCE OF POL SEPARATORS at USAG Bavaria, Hohenfels
| 1st Option Period: 01-SEP-2020 thru 31-AUG-2021 | |||||
| Inspection and Maintenance of POL Separators | |||||
| B001 | 12 | EA | € 0.00 | Monthly Maintenance and Inspection of Sludge Traps and POL Separators, recording, preparation of logbooks in accordance with the service description | € 0.00 |
| B002 | 145 | Net Ton | € 0.00 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufacturers and of different rated sizes, as well as the disposal of oil separator residues at certified disposal- and recycling plants in accordance with the PWS. This is a fixed unit price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | € 0.00 |
| B003 | 65 | EA | € 0.00 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. |
Cost per sample collected and analyzed.
| € 0.00 | ||||||
| B004 | 6 | EA | € 0.00 | Replacement of defective sensors for alarm systems, including all required labor, materials, tools, etc. | € 0.00 | |
| B005 | 2 | EA | € 0.00 | Replacement of defective alarm systems including all required labor, materials, tools, etc. | € 0.00 | |
| B006 | 2 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 3 to NG 10 | € 0.00 | |
| B007 | 3 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 15 to NG 20 | € 0.00 | |
| B008 | 1 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 30 to NG 40 | € 0.00 | |
| B009 | 1 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 50 to NG 130 | € 0.00 | |
| B010 | 1 | EA | € 0.00 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| € 0.00 | ||
| SUM: | € 0.00 | |
| SUM: | $0.00 |
ELIN SCHEDULE 2nd OPTION PERIOD ELIN Sheet FOR INSPECTION & MAINTENANCE OF POL SEPARATORS at USAG Bavaria, Hohenfels
| 2nd Option Period: 01-SEP-2021 thru 31-AUG-2022 | |||||
| Inspection and Maintenance of POL Separators | |||||
| C001 | 12 | EA | € 0.00 | Monthly Maintenance and Inspection of Sludge Traps and POL Separators, recording, preparation of logbooks in accordance with the service description | € 0.00 |
| C002 | 145 | Net Ton | € 0.00 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufacturers and of different rated sizes, as well as the disposal of oil separator residues at certified disposal- and recycling plants in accordance with the PWS. This is a fixed unit price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | € 0.00 |
| C003 | 65 | EA | € 0.00 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. |
Cost per sample collected and analyzed.
| € 0.00 | ||||||
| C004 | 6 | EA | € 0.00 | Replacement of defective sensors for alarm systems, including all required labor, materials, tools, etc. | € 0.00 | |
| C005 | 2 | EA | € 0.00 | Replacement of defective alarm systems including all required labor, materials, tools, etc. | € 0.00 | |
| C006 | 2 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 3 to NG 10 | € 0.00 | |
| C007 | 3 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 15 to NG 20 | € 0.00 | |
| C008 | 1 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 30 to NG 40 | € 0.00 | |
| C009 | 1 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 50 to NG 130 | € 0.00 | |
| C010 | 1 | EA | € 0.00 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| € 0.00 | ||
| SUM: | € 0.00 | |
| SUM: | $0.00 |
ELIN SCHEDULE 3rd OPTION PERIOD ELIN Sheet FOR INSPECTION & MAINTENANCE OF POL SEPARATORS at USAG Bavaria, Hohenfels
| 3rd Option Period: 01-SEP-2022 thru 31-AUG-2023 | |||||
| Inspection and Maintenance of POL Separators | |||||
| D001 | 12 | EA | € 0.00 | Monthly Maintenance and Inspection of Sludge Traps and POL Separators, recording, preparation of logbooks in accordance with the service description | € 0.00 |
| D002 | 320 | Net Ton | € 0.00 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufacturers and of different rated sizes, as well as the disposal of oil separator residues at certified disposal- and recycling plants in accordance with the PWS. This is a fixed unit price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | € 0.00 |
| D003 | 65 | EA | € 0.00 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. |
Cost per sample collected and analyzed.
| € 0.00 | ||||||
| D004 | 6 | EA | € 0.00 | Replacement of defective sensors for alarm systems, including all required labor, materials, tools, etc. | € 0.00 | |
| D005 | 2 | EA | € 0.00 | Replacement of defective alarm systems including all required labor, materials, tools, etc. | € 0.00 | |
| D006 | 2 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 3 to NG 10 | € 0.00 | |
| D007 | 3 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 15 to NG 20 | € 0.00 | |
| D008 | 1 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 30 to NG 40 | € 0.00 | |
| D009 | 1 | EA | € 0.00 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Nominal size from NG 50 to NG 130 | € 0.00 | |
| D010 | 65 | EA | € 0.00 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| € 0.00 | ||
| SUM: | € 0.00 | |
| SUM: | $0.00 |