W912PB19Q3069pwsfinal.pdf
PDF 782 KB Posted
- Attached to
- Grease and Starch Separators Federal contract opportunity
- Solicitation number
- W912PB19Q3069
About this file
PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912PB19Q3069elingraf.pdf | ||
| W912PB19Q3069.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grease and Starch Separator TB and RB
PERFORMANCE WORK STATEMENT (PWS) [TEMPLATE]
Cleaning, Maintenance and Inspection of Grease and Starch Separators at
United States Army Bavaria Tower Barracks and Rose Barracks
Part 1
General Information
1. GENERAL: This is a non-personal service contract under which the personnel rendering the service are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction This is a non-personal service contract to provide
Cleaning, Maintenance, and Inspection of Grease and Starch Separators at USAG Bavaria/*Rose
Barracks Vilseck and Tower Barracks Grafenwoehr including Netzaberg. The Government shall not exercise supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.2 Background: According to DIN 4040-100 Grease and Starch Separators have to be served, maintained and inspected in timely determined cycles by specialized personnel. System has to be inspected for its safe operation condition and adjusted/repaired if required. This contract covers the inspection and maintenance of grease and starch separators, as well as the pumping of grease and starch separator residues, the transportation and the disposal of residues certified recycling – or disposal plants.
1.3 Scope: The Contractor shall provide all necessary specialized personnel, tools, material, equipment, and vehicles for the cleaning, loading, transportation, and disposal of grease and starch separator residues. This contract must be performed in accordance with all ordinances, regulations, and laws valid at the time of performance. The contractor shall dispose of all residues at certified recycling or disposal plants.
1.4 Objectives: The grease and starch separators at USAG Bavaria/Rose Barracks Vilseck and
Tower Barracks Grafenwoehr to include Netzaberg shall be cleaned, maintained, and inspected.
The contractor shall dispose the residue collected at certified recycling or disposal plants.
1.5 General Information:
1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The
Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the
Contracting Officer’s Representative (COR) for review within ten (10) days after date of contract award (Ref. Technical Exhibit B).
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within ten (10) days. If the Government has provided comments, the Contractor shall then have three (3) days)} to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the
Contracting Officer no later than thirty (30) days) prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:
a. A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's
Quality Control Team.
b. How will the Contractor monitor work to ensure that performance complies with all deliverables (etc. timelines, deadlines, and goals)?
c. How will the Contractor monitor work to ensure that performance complies with all specifications and requirements of the contract, including clauses?
d. How will the Contractor monitor and ensure staff qualifications remain current and valid including DOCPER processes/approvals throughout contract performance?
e. How will the Contractor ensure all keys issued will remain controlled items?
f. How will the Contractor inventory and track maintenance of all Government Provided
Equipment / Materials?
g. How will the Contractor identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future?
h. How will the Contractor file and save all Quality Control related documents for the life of the contract plus 5 years?
1.5.1.1 An Analysis of Quality Control and Timeliness of Submittals (i.e. deliverables) shall be provided to the COR within thirty 30 days upon completion of each option period or Task Order
(Ref. Technical Exhibit B).
1.5.1.2 The Contractor shall inform the COR of issues or potential issues that might affect the performance within two (2) working hours of identifying those issues. Verbal reports shall be followed up by written reports within five (5) days (Ref. Technical Exhibit B).
1.5.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)
deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.
1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following
Monday, respectively.
New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in January
Presidents Day 3rd Monday in February Memorial Day last Monday in May
Independence Day July 4th Labor Day 1st Monday in September
Columbus Day 2nd Monday in October Veteran’s Day November 11th
Thanksgiving Day 4th Thursday in November Christmas Day December 25th
1.5.3.2 Host Nation Holidays: Work shall not be performed on local Host Nation holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. The
Contractor is responsible to inform itself about local Host Nation Holidays of the
Area/Country the work will be performed.
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the
Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.
1.5.4.1 Government Facility Office Hours: The Government facility office hours are 07.30 hrs
– 16.00 hrs except U.S. Holidays identified in paragraph 1.6.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar
Government directed facility closings.
1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0730 to 1600 Monday thru Friday. The Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings
1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of
0730 to 1600 Monday thru Friday. The Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The
Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. For other than firm fixed price contracts, the Contractor will not be reimbursed when the Government facility is closed for the above reasons.
1.5.4.3.1 Contractor Work Plan: The Contractor shall prepare and maintain a Work Plan. The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.) The Contractor’s proposed Work Plan shall be submitted to the
Contracting Officer via the COR for review within seven (7) days after date of contract award
(Ref. Technical Exhibit B). The Government will review and either accept or return their comments to the Contractor within ten (10) days. The Contractor shall then have three (3) days to submit a Final Work Plan. Any proposed change to the accepted Final Work Plan is required to be resubmitted via the COR for review and acceptance by the Contracting Officer at a minimum thirty
(30) days prior to implementation. The timeline noted above shall apply for review and acceptance for proposed changes.
A copy of the recognition and the authorization for recycling of grease separator sediments of the utilization plant shall be handed over to the COR two (2) weeks after contract award.
1.5.5 Training Holidays: USAREUR has historically granted military personnel Training
Holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training Holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday. However, announced training holidays or exodus of military personnel may provide the contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.
1.5.6 Place of Performance: The work to be performed under this contract will be performed at
USAG Bavaria Military Communities Tower Barracks Grafenwoehr and Rose Barracks Vilseck.
1.5.6.1 USAG Bavaria Tower Barracks Grafenwoehr is located between the towns
Nürnberg and Weiden app. 70km north-east of Nürnberg, Federal Republic of Germany.
1.5.6.2 USAG Bavaria Rose Barracks Vilseck is located between the towns Nürnberg and Weiden app. 50km north-east of Nürnberg, approx. 30 km south-west of Tower Barracks
Grafenwöhr, Federal Republic of Germany.
1.6. Security Requirements: The following information is provided on security related matters.
1.6.1 Security Program: Contractor personnel performing work under this contract must have attended the AT/OPSEC and iWATCH IAW paragraph 1.22 at time of the proposal submission, and must maintain the level of security required for the life of the contract. The security requirements are IAW with the Department Of Defense Contract Security Classification
Specification (DD Form 254), which is currently accessible at the following link:
http://www.dtic.mil/whs/directives/forms/eforms/dd0254.pdf
1.6.2 Personnel Security Clearance Requirements: Reserved
1.6.3 Installation Access: Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances in accordance with Army in Europe (AE) Regulation 190-16 (AE Reg 190-16)
Installation Access Control, will be grounds for denying access to U.S. installations and controlled areas. The Contractor is responsible to ensure that any subcontractor used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements. Should anything in this paragraph conflict with AE Reg 190-16, the regulation takes precedent.
The Contractor shall be aware of and comply with the requirements associated with Installation
Access Control. The Government is not liable for any costs associated with performance delays http://www.dtic.mil/whs/directives/forms/eforms/dd0254.pdf due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
AE Reg 190-16 (and AE 190-16-G German translation) can be found on the following website:
http://www.eur.army.mil/aepubs/publications/AER190-16-G.pdf?publisheddate=20170427 http://www.eur.army.mil/aepubs/
This website is part of the IACS clause of the contract.
Below is the responsible Organizational Sponsor & IACO for this contract:
Organizational Sponsor: Mr. Michel Ohm
Location: Grafenwoehr, DPW/SCMB
Building 433
DSN Phone: 475-5165
Commercial Phone: +49 9641 83 516
Installation Access Control Office:
Location: Grafenwoehr, Building 244, Room 129
DSN Phone: 475-8414 or 8415
Commercial Phone: +49 9641 83 8414 or 8415
1.6.3.1 In addition, the Contractor shall provide the Contracting Officer, via the COR, an Initial
Installation Pass Log within fifteen (15) calendar days after contract award (Ref. Technical Exhibit
B). The log must at a minimum contain the following information: first and last name, date of birth, Identification Card Number, Country of Citizenship and the place of residence of the employee. The log shall be updated as employees are added or removed. The Updated Installation
Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log (Ref. Technical Exhibit B).
1.6.3.2 The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within three (3) working days. (Ref. Technical Exhibit B)
1.6.3.3 Upon termination or cancellation of this contract, the Contractor is responsible for collection of all outstanding installation access passes and returning them to the issuing office within five (5) working days (Ref. Technical Exhibit B).
1.6.3.4 Common Access Cards (CAC): Reserved
1.6.4 Background Checks: Army in Europe (AE) Regulation 604-1 provides guidance pertaining to background checks for U.S. and Host Nation Contractors
1.6.4.1 U.S. Citizen: Reserved
1.6.4.2 Local Nationals and Third Country Nationals: Reserved
1.6.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical
Security Program (AR 190-13).
1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. If applicable, government issued access badges shall not be worn outside designated facilities where visible to the general public. The Contractor shall immediately report suspicious activities to security personnel.
1.7 Key Control: Reserved
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings, the Contracting Officer will apprise the Contractor of how the
Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The
Contract Manager or designated representative shall attend meetings as requested by the
Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer.
The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.10 Key Personnel: The following personnel are considered key personnel by the Government:
Contract Manager (CM) / Alternate Contract Manager (A/CM) and Site Foreman. The Contractor shall provide a CM and A/CM who shall be responsible for the performance of the work. The
Contractor shall assign an on-site Site Foreman (SF) who shall be responsible to conduct overall management coordination and furnish liaison with the Government during regular business hours.
The name of these persons, who shall act for the Contractor along with a Curriculum Vitae (CV) for each of these individuals, shall be provided in writing to the Contracting Officer (KO) no later than five (5) days after contract award. (Ref. Technical Exhibit B). Acceptance of the CV by the
KO is required before these individuals are permitted to perform any task on this contract. The
CM and A/CM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The CM or A/CM shall be available between 0730-1600 hrs.
Qualifications for all key personnel are listed below:
a. Contract Manager and Alternate Contract Manager: must demonstrate a minimum of 5 years’ experience within the past 10 years, working as a Contract Manager.
b. Site Foreman: must demonstrate a minimum of 5 years’ experience within the past 10 years, working as a Site Foreman.
c. Special Qualifications: Key Personnel shall be able to communicate in English. The
Contractor shall ensure all employees possess and maintain current Information Assurance
Technician (IAT) Level I professional certification during the execution of this contract.
1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.12.1 Reserved
1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). Contractor personnel shall wear standard uniform/clothing with contractor’s company name, optional with contractor employee’s name.
1.13 Contractor Travel: Reserved
1.14 Other Direct Costs (ODCs): Reserved
1.15 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government.
These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.16 Non-Disclosure Requirements: Reserved
1.17 Non-Disclosure Statements: Reserved
1.18 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The
Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI (Ref. Technical Exhibit B).
The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.19 Phase In /Phase Out Period: Reserved
1.20 Safety: In the event of an emergency, the Contractor shall inform the responsible CPOC.
Responsible POCs are accessible during normal Government workdays from Monday through
Friday, from 0730 - 1600 hours, except American or German holidays.
After Government work hours, on Saturdays, Sundays and on American or German holidays, the contractor shall contact the Grafenwoehr Fire Department at military telephone 475-8972, civilian telephone (09641)-83 or Emergency #117.
1.20.1 Host Nation Safety Laws and Regulations:
The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:
(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the
Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel (Ref. Technical Exhibit B). Specific requirements for development of the Accident
Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.
(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1).
(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.
(d) The Contractor shall discuss the plans in conferences convened by the Contracting
Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas.
The plan for accomplishing the initial work phase shall be submitted within 15 calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than
15 calendar days prior to initiation of work on each major phase.
file:///C:/Users/1232177302.civ/Documents/REVIEWS%20-%20PWS%20SOW/WORKING%20ON%20NEW%20SOPs/www.usace.army.mil
(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:
(i) Short sleeve shirt.
(ii) Long trousers.
(iii) Steel-toed safety boots.
(iv) Hard hat.
1.20.1.1 In addition to other requirements for accident prevention specified in this contract, the
Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes. In particular, within the requirements of the German Safety and Health Protection Regulation for Construction
Sites, Baustellenverordnung (BaustellV) (current version in effect), the Contractor shall coordinate all work at the site, including development of plans and providing advance notices.
The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract. For the compliance with host nation laws and regulations, the
Contractor shall comply with the non-exclusive list of duties described in this paragraph. If the
Contractor determines that additional activities are required to fully comply, the Contractor shall ensure that compliance with the laws is complete. The duties include:
(a) Conditions of construction and operational activities to be considered include but are not limited to:
(i) For all construction activities meeting the following criteria: the work is scheduled to last longer than 30 working days and more than 20 workers are occupied simultaneously, or the volume of work is scheduled to exceed 500 person days, or the work presents particular tasks, e.g.
excavations deeper than 5 meters, falls from a height of greater than 7 meters, exposures to hazardous chemical or biological substances, work at less than 5 meters from high voltage lines, underground earth works or tunnels, danger of drowning, diving, use of compressed air, work with ionizing radiation, explosives, or work involving assembly or dismantling of heavy prefabricated components (10 tons or greater).
(b) If the Contractor determines that the BaustellV, dated 10 June 1998, applies, the
Contractor shall prepare a Safety and Health Protection Plan (SIGE) as required under that regulation. The SIGE shall be submitted two weeks prior to mobilization. In addition, the
Contractor shall appoint a qualified Safety Coordinator who will ensure that safety measures are implemented during construction. The Safety Coordinator must meet minimum training and experience requirements required under Host Nation laws.
(c) The SIGE will be written in a comprehensive form and explained in language the workers understand and shall contain the following minimum information:
(i) Maintenance of tools and equipment.
(ii) Provisions for the storage and disposal of materials and waste, particular hazardous materials and substances.
(iii) Modifying performance periods for such work, taking into consideration the site conditions.
(iv) Organizing cooperation between different employers and Contractors without employees.
(v) Interaction between work at the site and other operational activities in the area, on which or near which the first identified work will be performed, and taking into consideration the instructions and advice of the coordinator as well as safety and health plans.
1.20.1.2 Reserved
1.20.1.3 Reserved
1.21 Environmental Compliance: The Contractor shall ensure that services covered under this contract are performed IAW U.S., German, Department of the Army, and Garrison
Environmental Plans and Requirements. The Contractor shall ensure that any operations will not cause environmental damage. The Contractor shall notify the COR immediately upon hazardous material spillage. At the Contractor’s expense, the Contractor shall be responsible for the prompt and proper cleanup and disposal of non-hazardous or hazardous material spills. The Contractor shall ensure non-hazardous and hazardous material is disposed at an authorized disposal site and
IAW host nation waste disposal laws.
1.21.1 Environmental Compliance Plan and Program: Prior to contract completion, the
Contractor shall remove all hazardous materials and dispose of all hazardous waste (HW) generated in accordance with Final Governing Standards Germany and applicable German environmental laws/standards. A copy of the HW disposal documents must be forwarded to the
HW program manager at the DPW Environmental Division.
The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor must immediately report any hazardous substance spills to the
Garrison Fire Department at CIV 0611-705-117.
Current Environmental Policy (Garrison policy Number 22) is available at the Garrison website:
http://www.wiesbaden.army.mil/policies/22EnvironmentalManagementSystem.pdf
Current Prohibited Refuse Disposal Practices Policy (Garrison policy Number 27) is available at the Garrison website:
http://www.wiesbaden.army.mil/policies/27Prohibited_Refuse_Disposal_Practices.pdf
1.22 Required Training: The following provides information on training requirements.
1.22.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I
Training within thirty (30) days (Ref. Technical Exhibit B) after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or thirty (30) days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion (Ref.
Technical Exhibit B) for each affected Contractor employee and subcontractor employee to the
COR (or to the Contracting Officer, if a COR is not assigned) within three (3) days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training (Ref.
http://www.wiesbaden.army.mil/policies/22EnvironmentalManagementSystem.pdf http://www.wiesbaden.army.mil/policies/27Prohibited_Refuse_Disposal_Practices.pdf https://jkodirect.jten.mil/
Technical Exhibit B) every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies.
1.22.1.1 If training cannot be conducted on the website, the Contractor shall coordinate with the
COR who will contact the local AT Officer at their assigned location for classroom training.
Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within three (3) days after completion of the training (Ref. Technical Exhibit B).
1.22.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete
Level I OPSEC training within thirty (30) days of employment under this contract (Ref. Technical
Exhibit B). Verification of the training shall be provided to the COR within three (3) days after completion of the training (Ref. Technical Exhibit B). OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every 12 months (Ref. Technical Exhibit B). Verification of the training shall be provided to the COR within three (3) days after completion of the training (Ref. Technical
Exhibit B).
1.22.2.1 If training cannot be conducted on the website, the Contractor shall coordinate with the
COR, who will contact the local OPSEC Officer at their assigned location for classroom training.
Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR within three (3) days after completion of the training (Ref. Technical
Exhibit B).
1.22.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity
ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within thirty (30) days after the contract is awarded and within seven (7) days after new employees commence contract performance, with the results reported to the COR within thirty
(30) days after the contract is awarded and within seven (7) days after new employees commence contract performance (Ref. Technical Exhibit B). Verification of the training shall be provided to the COR within three (3) days after completion of the training (Ref. Technical Exhibit B).
Training slides can be found on the Army OneSource we site:
http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx.
1.22.4 Information Assurance (IA) Training Reserved
1.22.5 Personally Identifiable Information (PII): Reserved
1.23 Authorization to Perform Services in Germany
1.23.1 Contractors performing services in the Federal Republic of Germany (FRG) shall comply with German law. The Contractor shall determine whether performance requires registration with
German authorities or authorization to do business in Germany and, if so, shall comply with all requirements. Whether or not registration or authorization to do business is required, the
Contractor shall determine what documents or authorization its employees and any subcontractor http://www.cdse.edu/catalog/elearning/GS130.html http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx employees must possess to work in Germany. The Contractor shall ensure affirmatively that its employees and subcontractor employees possess such documents or authorizations.
1.23.2 Contractor employees who: (a) are not nationals of Germany or other European Union countries; (b) are not members of the force, the civilian component or their dependents; or c) do not have assimilated status under Articles 71, 72, or 73 of the Supplementary Agreement to the
NATO SOFA shall possess work and residence permits.
1.23.3 By acceptance of and performance under this contract, the Contractor affirms that it has complied with the requirements above. Compliance with this requirement and German law is a material contract requirement. Noncompliance by the Contractor or subcontractor at any tier shall be grounds for issuing a negative past performance evaluation and terminating this contract for default.
1.24 Notice to Proceed: Reserved
1.25 Electromagnetic Compatibility Directive: Reserved
1.26 Government Property and Services: Reserved
1.27 Conventional Forces Europe (CFE) Treaty Verification Inspection: Contractor-owned or controlled structures and containers located on U.S. Government installations are subject to short-notice inspections by CFE treaty inspection teams. The Government will endeavor to provide the Contractor as much notice as possible in the event of such inspections. The contractor shall provide access to such structures and containers at the request of the
Government. The Contractor shall report such inspections to the KO through the COR in writing within ten (10) calendar days of completion of the inspection. Contractor-owned or controlled structures and/or containers on U.S. installations may have to be inspected to comply with the
CFE treaty even if Contractor personnel are unavailable to provide access. Any costs borne by the Contractor or any impact on contract performance as a result of the inspection will be a matter of negotiation between the Contractor and the KO.
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms
2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.
Contracting Officer – means a person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. Department of Defense Instruction (DoDI) 5000.72, Part II
Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference
(f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, contracting officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing support personnel to assist the COR, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the
Contracting Officer as alternate CORs.”
Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Contractor-acquired property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract, and to which the Government has title.
Day – means, unless otherwise specified, a calendar day.
Defective Service – means service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable – means anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Government-furnished property - means property furnished to the contractor the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes Contractor-acquired property if the Contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Government property - means all property owned or leased by the Government. Government property includes both Government-furnished property and Contractor-acquired property.
Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.
High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown
Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.
Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.
Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document, and is applied to Performance-Based Service Contracting (PBSC).
The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the
Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.
Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on
“what” is to be accomplished; however they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.
Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
Work Day - The number of hours per day the Contractor provides services in accordance with the contract.
Work Week - Monday through Friday, unless otherwise specified.
2.2 Acronyms: Although not inclusive of every term used within this PWS, the following provides a list of acronyms used throughout this PWS or commonly used in the acquisition field.
ACOR Alternate Contracting Officer's Representative
AE Army in Europe
AFARS Army Federal Acquisition Regulation Supplement
AHA Activity Hazard Analysis
AOR Area of Responsibility
AR Army Regulation
AT Anti-terrorism
ATCTS Army Training Certification Tracking System
CAC Common Access Card
CCE Contracting Center of Excellence
CFE Conventional Forces Europe
CFR Code of Federal Regulations
CONUS Continental United States (excludes Alaska and Hawaii)
COR Contracting Officer’s Representative
COTS Commercial-Off-the-Shelf
DA Department of the Army
DD250 Department of Defense Form 250 (Receiving Report)
DD254 Department of Defense Contract Security Requirement List
DFARS Defense Federal Acquisition Regulation Supplement
DMDC Defense Manpower Data Center
DOD Department of Defense
FAR Federal Acquisition Regulation
FRG Federal Republic of Germany
GFP Government Furnished Property
HLO High Level Objective
HIPAA Health Insurance Portability and Accountability Act of 1996
IA Information Awareness
IAC Installation Access Control
IACO Installation Access Control Office
ID Identification
IGCE Independent Government Cost Estimate
IT Information Technology
JTR Joint Travel Regulation
JPAS Joint Personnel Adjudication System
KO Contracting Officer
LfU Landesamt fuer Umweltschutz/Environmental Control Office
OCI Organizational Conflict of Interest
OCONUS Outside Continental United States (includes Alaska and Hawaii)
ODC Other Direct Costs
OPSEC Operations Security
PA Property Administrator
PII Personally Identifiable Information
PIPO Phase In/Phase Out
POC Point of Contact
PRS Performance Requirements Summary
PWS Performance Work Statement
QA Quality Assurance
QAP Quality Assurance Program
QASP Quality Assurance Surveillance Plan
QC Quality Control
QCP Quality Control Program
RA Requiring Activity
RB Rose Barracks
RCO Regional Contracting Office
SIGE Safety and Health Protection Plan
TB Tower Barracks
TE Technical Exhibit
USAREUR U.S. Army Europe
UOM Unit of Measure
PART 3
GOVERNMENT PROPERTY (GP) AND SERVICES
3. Government Property and Services
3.1 Services: Any damages to U.S. Government property caused by the Contractor or his personnel shall be repaired or replaced immediately and at no cost to the U.S. Government.
Arrangements for repairs to U.S. property shall be made by the Contractor and not by the U.S.
Government. The Government will provide access to all locations that need servicing.
Government in-house personnel will accompany contractor personal during services.
3.2 Facilities: (not applicable)
3.3 Utilities: The Government will provide electricity, heat, water, and sewage at no cost. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
3.3.1 In RB water can be taken at the hydrant located at # 148.
3.4 Equipment: Reserved
3.5 Special Tooling and Test Equipment: Reserved
3.6 Materials: Reserved
3.7 Training: The Government will provide the following training:
- AT Level I Awareness
- OPSEC
- iWATCH
3.8 Common Access Cards (CAC): (not applicable)
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Property and Services
4.1 General: The Contractor shall furnish at no additional cost all facilities, equipment, materials and services necessary in the performance of this contract.
4.1.1 The contractor shall not be separately reimbursed for vehicles, parts, measuring devices and services supporting the contracted service, which also includes, but not limited to, administrative office supplies, custodial supplies, communication equipment, vehicle fuel, and lubricants, etc.
4.1.2 The contractor shall prepare, apply for, and pay for all proof and supporting documents necessary for transportation and recycling in accordance with all appropriate laws and regulations.
4.2 Secret Facility Clearance: Reserved
4.3 Materials: Contractor shall provide all necessary specialized personnel, tools, material and equipment. The Contractor is responsible for ordering and maintaining sufficient materials/repair parts to perform the work within the allocated timeframe, as stated in the PWS.
All necessary stand pipes, hoses, connections, safety devices IAW DIN 1717, Type BA, shall be provided and maintained by the contractor. All leaking hoses, defective connections, etc. have to be exchanged immediately by the contractor.
During the cleaning of the grease separators the contractor must consider, that possibly up to approximately 20 meters hoses may have to be used at miscellaneous grease separators.
4.4 Vehicles and Equipment: The Contractor shall provide but not limited to the following equipment:
Vehicle for the cleaning, loading, transportation, and disposal of grease and starch residues.
Pressure Washers/Sprayers and equipment.
The Contractor shall furnish all necessary tools, test/diagnostics equipment, specialized test and analysis equipment, repair/replacement parts and service vehicles to perform the service specified in this PWS under this contract. Contract shall supply all necessary equipment to get the free utilities IAW the Government requirements.
4.5 Background Checks): Reserved
PART 5
SPECIFIC TASKS
5. The Contractor shall provide all necessary specialized personnel, tools, material, equipment, and vehicles for the cleaning, loading, transportation, and disposal of grease and starch separator residues. This contract must be performed in accordance with all ordinances, regulations, and laws valid at the time of performance. The contractor shall dispose of all residues at certified recycling or disposal plants.
5.1 Basic Services: The contractor shall refer to Attachments 1 and 2 for the list of separators requiring servicing at both locations. All separators listed in the attachments shall be pumped, cleaned, checked, and maintained by the contractor IAW DIN 4040-100. Residue collected shall be transported to a licensed recycling or disposal plant and disposed of.
5.1.1 The contractor…