PWS_Gas_Lines.pdf

PDF 301 KB Posted

Attached to
Services on Gas Lines
Solicitation number
W912PB19Q3047
Issued by

About this file

Performance Work Statement (PWS)

View the file

Other files

File Type Posted
W912PB19Q3047.pdf PDF
Amendment_W912PB19Q3047-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISED, 29 Nov 18

PERFORMANCE WORK STATEMENT (PWS)

Inspection and Maintenance of Existing Gas Lines at USAG Ansbach

Part 1 General Information

1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide inspection and maintenance of existing gas lines at Operation Maintenance Army (OMA) areas within the United States Army Garrison (USAG) Ansbach.

1.2 Background: Leaks or poorly operated gas lines may result in loss of life or property. Proper check of gas lines is paramount to mitigate risk of explosion posed by the commodity of gas. The maintenance of gas lines is a requirement of Army Regulation 420-1.

1.3 Scope: This is a non-personal service(s) contract to provide inspection and maintenance of thirteen (13) total existing gas lines at Kaserne area, USAG Ansbach.

1.4 Objectives: The objective of this non-personal service contract is to provide inspection and maintenance services to the existing gas lines to ensure the lines are safe and operational.

1.5 General Information

1.5.1 Quality Control Plan (QCP): RESERVED

1.6.1.1 RESERVED

1.6.1.2 RESERVED

1.6.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.6.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.

1.6.3.1 U.S. Holidays: Work shall not be performed on U.S. holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.

New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in January Presidents Day 3rd Monday in February Memorial Day last Monday in May Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th

1.6.3.2 Host Nation Holidays: Work shall not be performed on local Host Nation holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.

1.6.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.

1.6.4.1 Government Facility Office Hours: The Government facility office hours are 0730 to 1600, Monday through Friday except U.S. Holidays identified in paragraph 1.6.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.6.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0730 to 1600 Monday through Friday. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.

1.6.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0730 to 1600, Monday through Friday. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.4.3.1 Contractor Work Plan: The Contractor shall prepare and maintain a Work Plan. The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.) The Contractor’s proposed Work Plan shall be submitted to the Contracting Officer via the COR for review within five (5) work days after date of contract award (Deliverable # 1). The Government will review and either accept or return their comments to the Contractor within ten (10) days. The Contractor shall then have three (3) days to submit a Final Work Plan. Any proposed change to the accepted Final Work Plan is required to be resubmitted via the COR for review and acceptance by the Contracting Officer at a minimum thirty

(30) days prior to implementation. The timeline noted above shall apply for review and acceptance for proposed changes.

1.6.5 Training Holidays: RESERVED

1.6.6 Place of Performance: The work to be performed under this contract will be performed in the Kaserne Area Katterbach, Shipton Kaserne, and Franken Kaserne Oberdachstetten.

1.7 Security Requirements: The following information is provided on security related matters:

1.7.1 Security Program: RESERVED

1.7.2 Personnel Security Clearance Requirements: RESERVED

1.7.3 Installation Access: Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances in accordance with Army in Europe (AE) Regulation 190-16 (AE Reg 190-16) Installation Access Control or (AE) Regulation 604-1 for Germany specific contracts, will be grounds for denying access to U.S. installations and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements. Should anything in this paragraph conflict with AE Reg 190-16 or (AE) Regulation 604-1, the regulation takes precedence.

The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.

The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.

AE Reg 190-16 (and AE 190-16-G German translation) can be found on the following website:

https://media.defense.gov/2017/May/01/2001921550/-1/-1/0/AEF190-16A.pdf

1.7.3.1 RESERVED

1.7.3.2 The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within three (3) days.

1.7.3.3 Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within three (3) days.

1.7.4 Background Checks: Army in Europe (AE) Regulation 604-1 provides guidance pertaining to background checks for U.S. and Host Nation Contractors

1.7.4.1 U.S. Citizen: RESERVED

1.7.4.2 Local Nationals and Third Country Nationals: RESERVED

1.7.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13).

1.7.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Government issued access badges shall not be worn outside designated facilities where visible to the general public.

1.8 Key Control: RESERVED

1.9 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.9.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.

1.10 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.

https://media.defense.gov/2017/May/01/2001921550/-1/-1/0/AEF190-16A.pdf

1.11 Key Personnel: The following personnel are considered key personnel by the Government: The Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person and an Alternate Contract Manager, who shall act for the Contractor when the Contract Manager is absent, shall be provided in writing to the Contracting Officer no later than five (5) after contract award (Deliverable 2). The Contract Manager and Alternate Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.

The Contract Manager or Alternate Contract Manager shall be available between 0730 – 1600 h

1.11.1 Qualifications for all key personnel are listed below:

a. Contract Manager and Alternate Contract Manager:

Special Qualifications: The contractor shall perform all work as a certified gas technician which shall be registered by the City of Ansbach. Proof of this certification shall be submitted to the Contracting Officer at time of proposal.

1.12 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.12.1 RESERVED

1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). (For services at Child, Youth, and School Services where children are present, recommend personnel wear identification when children are present.) The Contractor (to include subcontractors) shall provide each of their employees an easily readable identification badge. The badge must include the employee’s name, the contractor’s company name, the functional area of assignment, and a recent color photograph of the employee. Companies with U.S. Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee. A listing of issued ID cards shall be furnished to the Contracting Officer five (5) days prior to the contract performance date and updated as needed to reflect Contractor personnel changes. (Deliverable 3)

1.13 Contractor Travel: RESERVED

1.14 Other Direct Costs (ODCs): RESERVED

1.15 Data Rights: RESERVED

1.16 Non-Disclosure Requirements: RESERVED

1.17 Non-Disclosure Statements: RESERVED

1.18 Organizational Conflict of Interest (OCI): RESERVED

1.19 Phase In /Phase Out Period: RESERVED

1.20 Safety: Contractor shall comply with all respective Safety Regulations. Accident Prevention-, Safety- and Fire Prevention Regulations.

1.20.1 Host Nation Safety Laws and Regulations: RESERVED

1.21 Environmental Compliance: The following provides information on Environmental Compliance.

1.21.1 Environmental Compliance Plan and Program: The Contractor’s work under this contract shall confirm with all operational controls identified in the applicable agency or facility Environmental Management Systems and provide monitoring and measurement information necessary for the Government to address environmental performance relative to the goals of the Environmental Management Systems. The USAG Ansbach, DPW Environmental Division will provide information and awareness training to the contractor.

1.21.2 Environmental Compliance Plan and Program: The Contractor shall develop and submit for approval to the KO no later than thirty (30) days after award of the Contract the Contractor’s Environmental Plan and Program applicable to this Contract in compliance with above regulations and standards. (Deliverable # 4)

1.22 Required Training: The following provides information on training requirements:

1.22.1 Anti-Terrorism (AT) Level I Training: RESERVED

1.22.2 OPSEC Training: RESERVED

1.22.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR.

This training shall be completed within thirty (30) days after the contract is awarded and within thirty (30) days after new employees commence contract performance, with the results reported to the COR within thirty (30) days after the contract is awarded and within thirty (30) days after new employees commence contract performance (Deliverable #5). Verification of the training shall be provided to the COR within ten (10) days after completion of the training (Deliverable #5). Training slides can be found on the Army OneSource we site:

http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx.

1.22.4 Information Assurance (IA) Training RESERVED

1.23 Authorization to Perform Services in Germany

1.23.1 Contractors performing services in the Federal Republic of Germany (FRG) shall comply with German law. The Contractor shall determine whether performance requires registration with German authorities or authorization to do business in Germany and, if so, shall comply with all requirements. Whether or not registration or authorization to do business is required, the Contractor shall determine what documents or authorization its employees and any subcontractor employees must possess to work in Germany. The Contractor shall ensure affirmatively that its employees and subcontractor employees possess such documents or authorizations.

1.23.2 Contractor employees who: (a) are not nationals of Germany or other European Union countries; (b) are not members of the force, the civilian component or their dependents; or c) do not have assimilated status under Articles 71, 72, or 73 of the Supplementary Agreement to the NATO SOFA shall possess work and residence permits.

1.23.3 By acceptance of and performance under this contract, the Contractor affirms that it has complied with the requirements above. Compliance with this requirement and German law is a material contract requirement. Noncompliance by the Contractor or subcontractor at any tier shall be grounds for issuing a negative past performance evaluation and terminating this contract for default.

1.24 Notice to Proceed: RESERVED

1.25 Electromagnetic Compatibility Directive: RESERVED

1.26 Government Property and Services: RESERVED

1.27 Conventional Forces Europe (CFE) Treaty Verification Inspection: RESERVED http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx

PART 2

DEFINITIONS & ACRONYMS

2. Definitions and Acronyms

2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.

Contracting Officer – means a person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. Department of Defense Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart

202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, contracting officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing support personnel to assist the COR, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”

Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

Contractor-acquired property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract, and to which the Government has title.

Day – means, unless otherwise specified, a calendar day.

Defective Service – means service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable – means anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

Government-furnished property - means property furnished to the contractor the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes Contractor-acquired property if the Contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

COR – Government Point of Contact.

Government property - means all property owned or leased by the Government. Government property includes both Government-furnished property and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.

High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.

Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.

Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.

Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document, and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS).

It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.

Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.

Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.

Work Day - The number of hours per day the Contractor provides services in accordance with the contract.

Work Week - Monday through Friday, unless otherwise specified.

2.2 Acronyms: Although not inclusive of every term used within this PWS, the following provides a list of acronyms used throughout this PWS or commonly used in the acquisition field.

ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CFE Conventional Forces Europe CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement

DMDC Defense Manpower Data Center DoD Department of Defense DVWG Deutscher Verein des Gas- und Wasserfaches FAR Federal Acquisition Regulation FRG Federal Republic of Germany GFP Government Furnished Property HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Awareness IAC Installation Access Control IACO Installation Access Control Office ID Identification IGCE Independent Government Cost Estimate IT Information Technology JTR Joint Travel Regulation JPAS Joint Personnel Adjudication System KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OMA Operation Maintenance Army OPSEC Operations Security PA Property Administrator PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office SIGE Safety and Health Protection Plan TE Technical Exhibit TRGI Technische Regeln fuer Gasinstallation TUEV Technischer Ueberwachungsverein USAG United States Army Garrison USAREUR U.S. Army Europe UOM Unit of Measure

PART 3

GOVERNMENT PROPERTY (GP) AND SERVICES

3. Government Property and Services

3.1 Services: RESERVED

3.2 Facilities: RESERVED

3.3 Utilities: The Government will provide Water and electrical power will be made available to the contractor during performance of his services. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves, light switches, etc. after using the required amount to accomplish tasks requiring the use of the utilities.

3.4 Equipment: RESERVED

3.5 Special Tooling and Test Equipment: RESERVED

3.6 Materials: RESERVED

3.7 Training: RESERVED

3.8 Common Access Cards (CAC): RESERVED

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. Contractor Furnished Property and Services

4.1 General: The Contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services.

4.2 Secret Facility Clearance: RESERVED

4.3 Materials: The Contractor shall provide all supplies and materials needed in the performance of this contract

4.4 Vehicles and Equipment: The Contractor shall provide all necessary vehicles (no GSA vehicles provided to Contractor for use on this contract) and equipment to perform the work described in this PWS. All Contractor provided vehicles and equipment shall have the company name prominently displayed on both sides of the vehicle or equipment and present a neat, professional appearance. Contractor's vehicles and equipment used in the performance of this contract shall meet all local and Host Nation traffic, safety, and environmental requirements. Vehicles and equipment found to be unsafe shall be removed from the installation and replaced within 24 hrs. The Contractor shall not use any Government-owned tools, materials, or parts to maintain Contractor vehicles and equipment without prior written approval of the Contracting Officer. The COR may inspect the Contractor’s vehicles and equipment at any time.

4.5 Background Checks: RESERVED

PART 5

SPECIFIC TASKS

5.1 Basic Services: The contractor shall provide inspection and maintenance of existing gas supply lines for leaks at USAG Ansbach. Below are specific locations and equipment that require inspection and maintenance:

5.2 Tasks:

5.2.1 Bldg # 5817 C, Katterbach Heliport Kaserne: Thirteen (13) each dryers shall be inspected for the following: tightness, is 100% functional, and meets the required gas capacity (gas quantity) IAW the below technical data, ensuring that each dryer has zero gas leaks.

5.2.1.1 Prior to inspection, the contractor shall ensure that each dryer is separated from the supply line and that the connection point is closed. After the performance of testing, each dryer is ventilated and put back into 100% functional operation.

Technical data:

Gas drying tumbler 30 GCI, 240V, 50 Hz, NAT GAS, BURNER 27, 105,000 BTU/hrs.

5.2.2 Bldg # 5817 C, Katterbach Heliport Kaserne: the contactor shall inspect the gas supply and distribution lines, approx.

30 lm - from house entrance (fire plug) to the dryers - (DN 15/25/32/40/50) for tightness according to the latest edition of TRGI Regulations.

5.2.2.1 Lines shall be disconnected from dryers and gas burning devices upon completion of testing and sections shall be ventilated. The contractor shall put back into operation the gas lines, dryers, and gas burning devices.

5.2.3 Bldg # 8010, Shipton Kaserne: the contractor shall check interior gas feeder line, DN 80, from building entrance (fire cock) up to the ball cock before the gas pressure control, approx. 12 lm, shall be checked for tightness according to the latest technical standards according to regulations and directives IAW DVWG-TRGI guides and DVWG-work sheets.

5.2.3.1 Lines shall be disconnected armatures and checked for tightness. The contractor shall re-connect the armatures to the lines after tightness check, aerating and putting back in operation of the three (3) ea gas burners.

5.2.3.2 The contractor shall replace 100% of all gaskets.

5.2.4 Bldg # 27, Franken Kaserne Oberdachstetten: The contractor shall check interior gas feeder line, DN 80-50, ca. 16,5 lm for two (2) each gas burners, otherwise same as paragraph 5.2.3 above.

5.2.5 Gas meters in buildings stated below shall be disconnected and reconnected by the City Works Ansbach/N-Ergie AG Nürnberg. The contractor shall be responsible for costs associated with this task. The exact disconnection and reconnection schedules shall be coordinated with the City Works directly by the contractor and submitted to the COR. (Deliverable # 6)

- Bldg # 5817 (1 each gas meter) : Lines shall be aerated and the system put back in operation.

Technical Data: Make ROMBACH G 25, DN 50, Qmax 40 cbm/hr, Qmin = 0.25 cbm/hr, Pmax = 0.1 bar

- Bldg # 8010 (1 each gas meter): Electronically wheel gas meter make Ernest, RVG 160, DN 80, Qmax = 250 cbm/hr., Pmax = 10 bar

- Bldg # 27 (1 each gas meter): make: Elster, AT 65, output 0,1 m3, DN 65

5.2.6 Bldg # 5924 (Katterbach Heliport Kaserne): The contractor shall check and execute a tightness test of liquid gas units for classroom/laboratory in the school. Two liquid gas cylinders, 2 x 11kg, installed outside of school, and the underground supply/feed lines shall be checked for tightness according to Technical Rules Liquid Gas (TRF) and German Association of Gas and Water (DVGW) guidelines, by a certified expert. The connecting lines to four classrooms in the building including equipment and armatures, fuse box, and existing emergency switch shall be tested as well.

5.2.7 The contractor shall prepare and submit required measuring- and test certificates (2 each) to the COR and to the City Works Ansbach/N-Ergie AG, Nürnberg. (Deliverable # 7)

5.2.8 TUEV inspection shall be made by an official licensed expert (TUEV), including fess assumption external inspection of underground holding tank for Natural gas, year of manufacture 97, manufacturer # 118959, capacity 25,400 ltr

5.3 Contractor Manpower Reporting

5.3.1 Enterprise-Wide Contractor Manpower Reporting Application (eCMRA): The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Check and maintenance of Gas Lines contract via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil and then click on “Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from the contracted services. Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2019. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website at: mailto:dod.ecmra-army-support-desk@mail.mil or mailto:usarmy.pentagon.hqda-asa-mra.mbx.samr-fm-cmra@mail.mil. If contract period of performance ends prior to September 30, the Contractor has 30 calendar days from end date of the contract to complete the eCMRA requirement.

STD: All information provided by the Contractor shall be accurate, complete, and not exceed suspense dates noted in corresponding paragraph above.

AQL: 100% Compliant {Deliverable # 8} http://www.ecmra.mil/ mailto:dod.ecmra-army-support-desk@mail.mil mailto:usarmy.pentagon.hqda-asa-mra.mbx.samr-fm-cmra@mail.mil mailto:usarmy.pentagon.hqda-asa-mra.mbx.samr-fm-cmra@mail.mil

PART 6

APPLICABLE PUBLICATIONS

6. Applicable Publications (Current Editions): The following publications, manuals, regulations, etc. are mentioned in this PWS and are listed below.

6.1.1 Army Physical Security Program (AR 190-13)

6.1.2 Contractor Identification (AE Reg 27-715)

6.1.3 TRGI Regulations (DN 15/25/32/40/50)

6.1.4 Installation Access Control (AE Reg 190-16)

6.1.5 DVWG-TRGI

6.1.6 USAG Ansbach Environmental Program

6.1.7 49 CFR 192

6.1.8 TM 5-652 Steam, Hot Water and Gas Distribution Systems: Repairs and Utilities

6.1.9 TM 5-653 Steam, Hot Water and Gas Distribution Systems: Inspection and Preventative Maintenance Services

6.1.10 UFGS 33 51 15 Natural Gas/Liquid Petrol Gas Distribution

PART 7

ATTACHMENT AND TECHNICAL EXHIBIT LISTING

7. Attachment and Technical Exhibit List

7.1 Technical Exhibit A – Performance Requirements Summary

7.2 Technical Exhibit B – Deliverables Schedule

TECHNICAL EXHIBIT A

Performance Requirements Summary (PRS)

PERFORMANCE OBJECTIVE STANDARD PERFORMANCE

THRESHOLD

ACCEPTABLE QUALITY

LEVELS (AQLs)

METHOD OF SURVEILLANCE

1) PWS Part 1 General Information Contractor shall comply with PWS provisions relating to Management and Administration

Inspection Checklist and Surveillance Summary Report Pass / Fail criteria Document Number:

>100% Percent Total Overall PRS Inspection Checklist Compliant Rate

100% Inspection Using COR Inspection Checklist and Surveillance Summary Report

2) PWS Part 1 General Information Contractor shall comply with PWS provisions relating to Management and Administration processes

Surveillance Process Audits

0 Safety or Environmental Discrepancies < 1 Technical Discrepancies

Periodic Inspection

3) PWS Part 3 Government Property and Services Contractor shall comply with PWS provisions relating to Government Furnished Item and Services

Inspection Checklist and Surveillance Summary Report Pass / Fail criteria Document Number:

>95 Percent Total Overall PRS Inspection Checklist Compliant Rate

100% Inspection Using COR Inspection Checklist and Surveillance Summary Report

4) PWS Part 3 Government Property and Services Contractor shall comply with PWS provisions relating to Government Furnished Items and Services processes

Surveillance Process Audits

0 Safety or Environmental Discrepancies < 1 Technical Discrepancies

Periodic Inspection

5) PWS Part 4 Contractor Furnished Items and Services Contractor shall comply with PWS provisions relating to Contractor Furnished Items and Services

Inspection Checklist and Surveillance Summary Report Pass / Fail criteria Document Number:

>95 Percent Total Overall PRS Inspection Checklist Compliant Rate

100% Inspection Using COR Inspection Checklist and Surveillance Summary Report

6) PWS Part 4 Contractor Furnished Items and Services Contractor shall comply with PWS provisions relating to Contractor Furnished Items and Services processes

Surveillance Process Audits

0 Safety or Environmental Discrepancies < 1 Technical Discrepancies

Periodic Inspection

7) PWS Part 5 Specific Tasks Contractor shall comply with PWS provisions relating to Specific Tasks processes

Surveillance Process Audits

0 Safety or Environmental Discrepancies < 1 Technical Discrepancies

Periodic Inspection

TECHNICAL EXHIBIT B

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To #1) Para 1.6.4.3.1 Contractor Work Plan

Once within five (5) days after contract award

2 Electronic delivery via email using Microsoft Office Word or Power Point

COR

#2) Para 1.11 Key Personnel

Once within five (5) days after contract award

2 Electronic delivery via email using Microsoft Office

#3) Para 1.12.2 Contractor Identification Badges List

Five (5) days prior to contract start date

2 Electronic delivery via email using Microsoft Office

#4) Para 1.21.2 Environmental Compliance Plan and Program

Within thirty (30) days after award

1 Electronic delivery via email using Microsoft Office

#5) Para 1.22.3 iWATCH Training

Thirty (30) days after contract award

2 Electronic delivery via email using Microsoft Office

#6) Para 5.2.5 Disconnect and reconnection schedules

After coordination with City of Ansbach

1 Electronic delivery via email using Microsoft Office

#7) Para 5.2.7 Measuring and Test Certifications

Within Five (5) days after inspection

2 Electronic delivery via email using Microsoft Office

COR and City Works Ansbach

#8) Para 5.3 CMRA NLT 31 Oct of each calendar year

1 Electronic delivery via email

File details come from the government source that posted it.