1.

1 st Floor inside arms Room

25 1

1.

A

B

B

Section B-B

A

Stainless steel angle 60/60Fittings welded Stainless steel rods and bars

Section A-A

Elevation

All fittings welded

Bar protection for air intake opening adjust existing carpet base frame of arms room door

325/825 mm Existing Ventilation shaft existing wall shorten existing plastic cable duct

1871876 6

5 1 87 1 87 1 87 1 87 1 87 1 87 1 6 elevation 1 elevation 2

A A

425 425

29 29 ap pr ox ap pr ox accurate location of cage must be adjusted to fire protection flap maximum distance of cage to ceiling 100 mm separate ventilation duct from fire protection flap and reconnect baseplate will be between fire protection flap and ventilation duct to determine accurate location of opening for ventilation duct and cage take measurement at construction site

Section A-A

Baseplate stainless steel 10 mm opening in baseplate Ø approx. 220 mm within opening welded stainless steel bars Ø 10 mm

Cage for fire protection flap in arms room existing fire protection flap existing ventilation duct

Ceiling wall wall

Ceiling wall wall frame, doweled to concrete wall approx. approx.

1 89 1 89 1 89 1

1 89 1 89 1 89 1

ARMS

ROOM

Fire protection flap at ceiling demolition of existing vault door

Install arms room door and day gate air intake opening copy of existing drawing former vault room II in Bldg 700 air intake opening existing vault room door

DATE PROJECT NO

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

SCALE

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

INSTALLATION

USAG BAVARIA

Grafenwoehr Military Community - Rose Barracks

Peter Lehner Peter Lehner Benno Meier

B.Meier, C/Design Section Vilseck

David A. Tasker, Master Planning

John A. Howard, C/Engr. Div

Lage der vorhandenen und geplanten baulichen Anlagen sind nicht structures are not binding and can change due to local conditions.

cross sections and location of existing and planned physical The purpose of this drawing is to ease calculation. Dimensions, Dieser Plan dient nur als Kalkulationshilfe. Maße, Querschnitte und bindend und können sich auf Grund örtlicher Gegebenheiten ändern.

Detail Drawing

26.06.2018 1

Install Arms Room Door

(and protection cage in Bldg 700)

LL- 8579-8J

1/10, 1/50 m, cm