Questions and Answers Pertaining to W912PB‐17‐T‐3050 MHE rental with Operator

Q1. Invoicing will be done per daily rate per actual usage. Hours of operation are 0600 ‐ 2000 or later (par. 1.6.5 on page 55; par. 5.4.1 on page 62). Should the daily rate include 14h or 24h of work?

A1.The rate should be based on the hours of operation 0600 ‐2000.

Q2. If possible, please advise on the expected frequency of usage.

A2. Expected usage is 3 ‐5 times per month.

Q3. May the MHE units be stored on site while not in use?

A3. Yes, MHE may be stored onsite.

Q4. Are the measurement units of 40K metric or imperial?

A4. Metric

Q5. Must the Forklift be telescopic (telehandler)? If so, is there any minimum requirement for the boom length?

A5. Yes, Telescopic no minimum length for the boom.

Q6. Must the Forklift and Crane both be rough terrain?

A6. Yes, both must be able to be used on rough terrain.

Q7. Is one time of usage expected to be a day or several days in a row?

A7. Depends on mission requirements. Unit POC will give no less than 24hrs notice to contractor about upcoming movements, which will determine how many days of use.

Q8. What height should the mast have for the crane? (or general estimate of max height lift)

A8. 15‐20FT

Q9. What spread should the fork have? (3,5m acceptable?)

A9. Yes

Q10. Will the forklift be operating on a paved or hardened surface or mud/gravel?

A10. Both

Q11. The description states: Short Description of Requirement: Material Handling Equipment one (1) 40 K Forklifts and one (1) crane with minimal lifting capability of 40 Tons with operators to support on load and offload of shipping containers in and around the Bemowo Piskie Training Area (BPTA) to include the railhead at Orzysz, Poland.

Is all of the work expected solely for shipping containers? If so, we may be able to present more cost effective and available option than the 40K forklift (will be expensive to bring in).

A11. Shipping containers which contain SI, which is very heavy.