Sheet1 Fall Protection Systems on Structures and Facilities within Tower Barracks Grafenwoehr 2015, Technical Exhibit 7.3
| Building No | | 101 | 170 | 295 | 329 | 453 | 453A | 547 | 695 | 696 | 700 | 800 | 801 | 805 | 810 | 811 | 820 | 821 | 825 |
| Data | | | | | | | | | | | | | | | | | | | |
| Manufacturer | | N/A | SALA | ABS | ST Quadrat | JOBARAND | JOBRAND | N/A | ABS Safety | N/A | ST Quadrat | N/A | N/A | INNOTECH | N/A | N/A | ST Quadrat | ST Qaudrat | ABS |
| Type | | N/A | N/A | ABS-Lock Fold | | | | | | | | | | | | | | | |
| 4 RB | LUX-top ASP | N/A | N/A | N/A | N/A | Secupoint | SZH Type Z | Secupoint | Secupoint | INNOTECH FALZ | Secupoint | Secupoint | LUX-top ASP | LUX-top ASP | ABS Lock Falz II ZAM | | | | | |
| Batch/Serial No | | N/A | 300226/2 | 1306448 | 0/906 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | 0/158 | N/A | N/A | 0/299 | N/A | 108001 |
| Installed by | | N /A | SALA | Schulte&Falk | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
| Year of Construction | | N/A | Mar-05 | Apr-14 | Sep-09 | N/A | N/A | 2013 | N/A | N/A | 2006 | 2009 | 2009 | Jan-09 | 2009 | 2009 | 2008 | 2008 | 2008 |
| Rope Length up & down | | ~ 60 m | ~ 161 + 180 m | ~153 m+canopy | | | | | | | | | | | | | | | |
| ~ 150.0 m | | | | | | | ~ 575.0 m | | | | | | | | | | | | | |
| Anchor points | | | | | 20 | 8 with cover | 8 with cover | 26 | 25 | 3 with cover | | 7 | 7 | | 7 | 7 | 7 | | |
| Anchor Support | | 6 | 10 | 6 | | | | | | | | | | | | | | | 22 |
| Cable Support up & down | | 15 | 28 + 24 | 27 + 26 wall hooks | | | | | | | 110 | | | | | | | | |
| Securants | | | | | | | | | | | | | | | | | | 7 | |
| Hooks (movable slides): | | | | | | | | | | | | | | 22 | | | | | |
| CE Classification available | | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | A+B+C |
| Concrete Ceiling | | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
| Roof Construction | | Pre-cast rein- | | | | | | | | | | | | | | | | | |
| forced con-crete segments on reinforced concrete columns | Steel beams | | | | | | | | | | | | | | | | | | | |
| on reinforced concrete columns | Steel beams on | | | | | | | | | | | | | | | | | | | |
| reinforced con-crete stilts with trapezoidal sheet | Steel con- | | | | | | | | | | | | | | | | | | | |
struction, trapezoidal
| sheet | Trapezoidal |
| sheet on gal-vanized steel construction | Trapezoidal |
| sheet on gal-vanized steel construction | Flat roof and |
| shed roofs in galvanized steel construction | Trapezoidal |
sheet on rein-
| forced steel girders | Saddle roof with rafters and | | | | |
| wodden boarding | Flat roof, tra- | | | | |
| pezoidal on steel beams on reinforced con-crete columns | Rafters with wooden boarding | Rafters with wooden boarding | Pre-cast rein- | | |
| forced concrete segments on re-inforced con-crete columns | Rafters with wooden boarding | Rafters with wooden boarding | Rafters with wooden boarding | Rafters with wooden boarding | Pre-cast rein- |
forced concrete segments on re-inforced con-crete columns Roof Covering fold metal Downwards, foil planted on timber form-work&wodden construction, upwards foil on trapezoidal sheet
| Level upwards | | | |
| fold metal roof. Roof covering canopy: wall, fold metal roof | Trapezoidal | | | |
| sheet roof | Bituminous | | | |
| roofing felt, black | Bituminous | | | |
| roofing felt, black | Trapezoidal | | | |
| sheet with bitumen roofing felt on flat roof, trapezoidal sheet on shed roofs | Fold metal | | | |
| sheet | Fold metal | | | |
| sheet | Foil roof, white | Fold metal roof | Fold metal roof | Trapezoidal |
| sheet and fold metal roof | Fold metal | | | |
| sheet | Fold metal | | | |
| sheet | Fold metal | | | |
| sheet | Fold metal | | | |
| sheet | Trapezoidal | | | |
sheet and fold metal roof
| Design available | | N/A | N/A | 1 roof scetch | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
| Building Height | | ~ 5.0 m to 8.0 m | ~ 7.0 m | ~ 8.0 m | ~ 6.5 m | ~ 7.0 m | ~ 7.0 m | ~ 6.0 m to ~ 9 m | ~3.5m to ~5.5 | ~3.5m to ~5.5 | ~ 8.0 m | ~ 7.0 m | ~ 7.0 m | ~ 9.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 9.0 m |
| Roof accessable | | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* |
| Max. number of people | | 1 | 1 | Level upwards 3, Level downwards 2 | 3 per anchor | | | | | | | | | | | | | | |
| point | N/A | N/A | N/A | N/A | N/A | 3 | N/A | N/A | 3 | N/A | N/A | N/A | N/A | 3 | | | | | | |
| no* | Contractor has to provide adequate climbing aids (ladders) or service platform to perform desribed inspections. Required equipment has to be calculated and incorporated/offered with in the lump sum price. |
| N/A | Data not available |
| Building No | 830 | 831 | 840 | 841 | 850 | 851 | 855 | 860 | 861 | 901 | 902 | 903 | 904 | 905 | 910 | 911 | 912 | 913 |
| Data | | | | | | | | | | | | | | | | | | |
| Manufacturer | ST Quadrat | ST Quadrat | DWS Pohl | DWS Pohl | DWS Pohl | DWS Pohl | DWS Pohl | DWS Pohl | DWS Pohl | DWS Pohl | DWS Pohl | DWS Pohl | DWS Pohl | DWS Pohl | DWS Pohl | DWS Pohl | DWS Pohl | DWS Pohl |
| Type | LUX-top | LUX-top | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
| Batch/Serial No | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
| Installed by | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
| Year of Construction | 2008 | 2008 | 2008 | 2008 | N/A | N/A | 2008 | 2008 | N/A | N/A | N/A | N/A | N/A | Jan-07 | N/A | N/A | N/A | N/A |
| Rope Length | | | | | | | | | | | | | | | | | | |
| Anchor points | | | | | | | | | | | | | | | | | | |
| Anchor Support | | | | | | | | | | | | | | | | | | |
| Cable Support | | | | | | | | | | | | | | | | | | |
| Securants | 7 ea with cover | 7 ea with cover | 7 ea with cover | 7 ea with cover | 7 ea with cover | 7 ea with cover | 7 ea with cover | 7 ea with cover | 7 ea with cover | 7 ea with cover | 7 ea with cover | 7 ea with cover | 7 ea with cover | 7 ea with cover | 7 ea with cover | 7 ea with cover | 7 ea with cover | 7 ea with cover |
| Hooks | | | | | | | | | | | | | | | | | | |
| CE Classification available | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
| Concrete Ceiling | reinforced | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
concrete Roof Construction rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden boarding
| Roof Covering | Fold metal |
| roof | Fold metal | |
| roof | Fold metal | |
| roof | Fold metal | |
| roof | Fold metal | |
| roof | Fold metal | |
| roof | Fold metal | |
| roof | Fold metal | |
| roof | Fold metal | |
| roof | Fold metal | |
| roof | Fold metal | |
| roof | Fold metal | |
| roof | Fold metal | |
| roof | Fold metal | |
| roof | Fold metal | |
| roof | Fold metal | |
| roof | Fold metal | |
| roof | Fold metal | |
roof
| Design available | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes |
| Building Height | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m |
| Roof accessable | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* |
| Max. number of people | | | | | | | | | | | | | | | | | | |
| no* | Contractor has to provide adequate climbing aids (ladders) or service platform to perform desribed inspections. Required equipment has to be calculated and incorporated/offered with in the lump sum price. |
| N/A | Data not available |
| Building No | | 915 | 920 | 921 | 925 | 926 | 927 | 930 | 931 | 932 | 933 | 935 | 945 | 9010 | 9080 | 9090 | RG11230 | RC600 |
| Data | | | | | | | | | | | | | | | | | | |
| Manufacturer | | ABS | DWS Pohl | DWS Pohl | N/A | N/A | N/A | DWS Pohl | DWS Pohl | DWS Pohl | DWS Pohl | ABS | INNOTECH FALZ | ST Qudrat | ABS | ABS | ABS | ABS |
| Type | | ABS-Lock Falz | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ABS-Lock Falz | N/A | Secupoint | Rope KalZip- | | | |
| Roof anchor A1 | N/A | ABS Lock VI | ABS Lock III | | | | | | | | | | | | | | | | |
| Batch/Serial No | | 108002 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | 109002 | N/A | N/A | 0/410746 | N/A | A09006 | N/A |
| Installed by | | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | Dresdner In-dustry&Bldg. Company | N/A | N/A | N/A |
| Year of Construction | | 2008 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | Jan-08 | N/A | Dec-07 | N/A | 2009 | Aug-14 |
| Rope Length | | | | | ~ 100.0 m | ~ 88.0 m | ~ 52.0 m | | | | | | | | ~ 69.0 m | | | ~ 5.0 m |
| Anchor Support | | | | | | | | | | | | | | | | | 15 | |
| Cable Support | | | | | 26 | 26 | 18 | | | | | | | | 12 | | | |
| Securants | | | 7 ea with | | | | | | | | | | | | | | | |
| cover | 7 ea with | | | | | | | | | | | | | | | | | | |
| cover | | | | 7 ea with | | | | | | | | | | | | | | | |
| cover | 7 ea with | | | | | | | | | | | | | | | | | | |
| cover | 7 ea with | | | | | | | | | | | | | | | | | | |
| cover | 7 ea with | | | | | | | | | | | | | | | | | | |
| cover | | | 1 | | 5 ea with | | | | | | | | | | | | | | |
| cover | | 26 | | | | | | | | | | | | | | | | | |
| Hooks (movable slides) | | 22 | | | | | | | | | | 21 | 17 | | 20 | | 15 | |
| CE Classification available | | A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | A+B+ C | CE 0/158 | N/A | A | N/A | A + B | |
| Concrete Ceiling | | N/A | reinforced | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | N/A | N/A | N/A | reinforced | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | reinforced | | | | | | | | | | | | | | | | | | |
| concrete | N/A | N/A | N/A | N/A | N/A | N/A | N/A | | | | | | | | | | | | |
| Roof Construction | | Pre-cast rein- | | | | | | | | | | | | | | | | |
| forced con-crete segments on reinforced concrete columns | rafters with | | | | | | | | | | | | | | | | | | |
wodden boarding rafters with wodden
| boarding | Pre-cast rein- |
| forced concrete segments on reinforced concrete columns | Galvanized |
| steel structure | Galvanized |
| steel structure | rafters with |
wodden boarding rafters with wodden boarding rafters with wodden boarding rafters with wodden
| boarding | Pre-cast rein- |
| forced con-crete segments on reinforced concrete columns | Pre-cast rein- |
| forced con-crete segments on reinforced concrete columns | Rafters with |
wodden
| boarding | Pre-cast rein- | |
| forced con-crete segments on reinforced concrete columns | Galvanized steel | |
| structure with trapezoidal sheet roof | Steel structure | wodden |
framework with wood boarding
| Roof Covering | | Trapezoidal sheet,and fold metal roof | Fold metal roof | Fold metal roof | Trapezoidal sheet,and fold metal roof | Trapezoidal |
| sheet roof | Trapezoidal | | | | | | |
| sheet roof | Fold metal roof | Fold metal | | | | | |
| roof | Fold metal | | | | | | |
| roof | Fold metal roof | Trapezoidal sheet, and fold metal roof | Trapezoidal sheet, and fold metal roof | Foil roof with | | | |
| gravel cover | Fold metal roof and roof with foil and gravel | Foil roof, | | | | | |
| white | Trapezoidal | | | | | | |
| sheet roof | Bitumen roof | | | | | | |
with gravel
| Design available | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
| Building Height | ~ 9.0 m | ~ 7.0 m | ~ 7.0 m | ~5.0m to~9.0m | ~ 8.0 m | ~ 6.00 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 7.0 m | ~ 9.0 m | ~ 9.;0 m | ~ 6.0 m | ~ 5.0 m | ~ 6.0 m | ~ 6.0 m | ~ 5.0 m |
| Roof accessable | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | no* | yes |
| Max. number of people | 3 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | 3 | 3 | N/A | 4 and 1 | N/A | 1 | 3 |
| no* | Contractor has to provide adequate climbing aids (ladders) or service platform to perform desribed inspections. Required equipment has to be calculated and incorporated/offered with in the lump sum price. | |
| N/A | Data not available | aufgestellt: Harald Reichinger, 16 February 2016, USAG Bavaria, Grafenwoehr Military Community |