Solicitation Amendment - W912PB-16-R-3013-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 10_-_W912PB-16-R-3013-0002_(Amendment).pdf | ||
| 01_-_W912PB-16-R-3013.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See attached summary of changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 23
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PB-16-R-3013
X 9B. DATED (SEE ITEM 11)
22-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Aug-2016
CODE
ECC RCO BAVARIA
AMERIKANISCHE BESCHAFFUNGSSTELLE
GEB 542
92655 GRAFENWOEHR LAGER
GERMANY
W912PB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PB-16-R-3013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SOLICITATION AMENDMENT INFORMATION
General Information::
Regional Contracting Office POC:
Contract Specialist: SSG Kevin Brown Contracting Officer: CPT Ryan Oliver
TEL: +49 162 270 3266 TEL: 475-8508 / +49 09641 83 8508
E-mail: kevin.d.brown216.mil@mail.mil E-mail: ryan.e.oliver.mil@mail.mil
Short Description of Requirement: Engineer Support Services at Novo Selo Training Area, Bulgaria
SUMMARY OF CHANGES
The purpose of this amendment is to make corrections to the Performance Work Statement (PWS). All other terms and conditions remain unchanged.
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
PWS paragraph 1.5 has been changed from:
1.5. Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and two (2) 12-month option years. The period of performance is listed as follows and is subject to change based upon date of award.
Base Year: 30 September 2016 – 31 August 2017 Option Year I: 30 September 2017 – 31 August 2018
Option Year II: 30 September 2018 – 31 August 2019
To:
1.5. Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and two (2) 12-month option years. The period of performance is listed as follows and is subject to change based upon date of
Base Year: 30 September 2016 – 29 September 2017 Option Year I: 30 September 2017 – 29 September 2018
Option Year II: 30 September 2018 – 29 September 2019
PWS paragraph 1.6.15.1 has been changed from:
1.6.15.1. General Engineer Education and Experience: Engineering degree, 4 years, (Civil, Architectural, Structural, Mechanical, Electrical or applicable). Degree shall be from an accredited university recognized by the US or European Union. Minimum of 4 years’ experience in facilities engineering related to a large industrial complex. Minimum 1-year experience working with multi-national agencies or companies. Experience in AutoCAD or other internationally recognized CAD drafting software preferred. Experience in working/obtaining Accommodation Consignment Agreements, Certificate of Urbanization, and Construction Certificates highly preferred.
To:
1.6.15.1. General Engineer Education and Experience: Engineering degree, 4 years, (Civil, Architectural, Structural, Mechanical, Electrical or applicable). Degree shall be from an accredited university recognized by one of the following: United States (ABET – Accreditation Board for Engineering and Technology, Inc.), Europe (any national members of FEANI – European Federation of National Engineering Associations), or Europe (any agencies of ENAEE – European Network for Accreditation of Engineering Education). Minimum of 4 years’ experience in facilities engineering related to a large industrial complex. Minimum 1-year experience working with multi-national agencies or companies. Experience in AutoCAD or other internationally recognized CAD drafting software preferred. Experience in working/obtaining Accommodation Consignment Agreements, Certificate of Urbanization, and Construction Certificates highly preferred.
PWS paragraph 1.6.15.2 has been changed from:
1.6.15.2. Environmental Engineer Education and Experience: Environmental Engineer, or Environmental Sciences degree, 4 years. Degree shall be from an accredited university recognized by the US or European Union.
Minimum of 2 years’ experience providing environmental consultation services; may include soil/groundwater remediation studies, environmental protection projects, and/or waste management. Minimum 1-year experience working with multi-national agencies or companies.
To:
1.6.15.2. Environmental Engineer Education and Experience: Environmental Engineer, or Environmental Sciences degree, 4 years. Degree shall be from an accredited university recognized by one of the following: United States (ABET – Accreditation Board for Engineering and Technology, Inc.), Europe (any national members of FEANI – European Federation of National Engineering Associations), or Europe (any agencies of ENAEE – European Network for Accreditation of Engineering Education). Minimum of 2 years’ experience providing environmental consultation services; may include soil/groundwater remediation studies, environmental protection projects, and/or waste management. Minimum 1-year experience working with multi-national agencies or companies.
(End of Summary of Changes)
PERFORMANCE WORK STATEMENT (PWS)
Bulgarian Local National Engineer Support Services
Part 1
General Information
1. Introduction: This is a non-personnel services contract to provide Bulgarian Local National Engineer Support Services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1. Background: In order for United States Army to comply with US Construction and Host Nation Construction Standards, local Engineers are required to assist USG in following local construction standards and practices. Local Engineers must be educationally qualified and have relevant work experience in the host nation. Contract will be to provide TWO qualified Engineers (one General Engineer and one Environmental Engineer) for support the Black Sea Area Support Team’s (BS-AST) Directorate of Public Works (DPW) with duty in the Novo Selo Training Area, Bulgaria.
1.2. Responsibilities: The Contractor shall assume total responsibility for all requirements stated herein on the commencement date of the performance period. The Contractor shall perform as specified in this Contract and under the direction of the Contracting Officer (KO).
1.2.1. Work Responsibility: The Contractor shall perform all work and assume responsibility for planning, programming, administering, managing, and executing all functions necessary to provide the services specified in this PWS. The Contractor shall conduct work in accordance with this PWS and all applicable United States (U.S.), Bulgarian, and local laws, regulations, standards, provisions, and directives to include applicable publications in Part
6. The Contractor shall ensure that all work meets the level of service, performance standards, or tolerances specified in the PWS or in applicable referenced documents. Some services under this Contract may be performed at designated facilities, or portions of installations, by in-house Government personnel or by other contractors.
1.2.2. Administrative Responsibility: The Contractor shall perform all related administrative actions required to provide services or perform work such as material requisitioning, quality control (QC), financial control, meetings, and correspondence. The Contractor shall also maintain accurate and complete records, files, and libraries of documents to include all U.S. German, and local regulations, standards, provisions, codes, laws, technical manuals, and manufacturers’ instructions and recommendations that are necessary and related to the functions being performed. The Contractor shall compile historical data, prepare required reports, and submit information as specified by the Deliverable List presented in this PWS.
1.3. Objectives:
1. Provide One (1) General Engineer (Civil, Architectural, Structural, Mechanical, Electrical or applicable).
2. Provide One (1) Environmental Engineer (Environmental Engineer, or Environmental Sciences)
1.4. Functional Areas: Majority of the work to be performed will be at Novo Selo Training Area, Bulgaria.
1.5. Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and two (2) 12-month option years. The period of performance is listed as follows and is subject to change based upon date of
Base Year: 30 September 2016 – 29 September 2017 Option Year I: 30 September 2017 – 29 September 2018 Option Year II: 30 September 2018 – 29 September 2019
1.6. Management and Administration:
1.6.1. Phase In /Phase Out Period: N/A
1.6.2. Contractor Management: The Contractor shall perform continual management of the functional areas contained in this PWS and shall be responsible for the performance of the work. The Contract Manager shall conduct overall management coordination and shall be the central point of contact (POC) with the Government for performance of all work under the PWS. At the Post Award conference, the Contractor shall submit to the COR, in writing, the name, title, office, home and mobile telephone number of the Contract Manager. A Contractor employee shall be designated to act for the Contract Manager during the Contract Manager’s absence.
Both the Contract Manager and the Contractor employee filling in for the Contract Manager, shall have full authority to act for the contractor on all Contract matters relating to daily operation of this Contract.
*NOTE: The Contractor shall only provide two individuals in support of this requirement: One (1) General Engineer and One (1) Environmental Engineer. It is acceptable that one of these individuals is appointed and performs the functions of Contract Manager.
1.6.3. Contractor Responsiveness: The Contract Manager or designated alternate shall be available for telephone communication or site attendance, with the COR, as required by the COR, between 8:00 a.m. to 5:00 p.m., Monday thru Friday except recognized local holidays. A personal answering service is permitted at other than normal Contract workdays and work hours for receipt of COR emergency response work requirements, provided that the Contract Manager or designee responds to all calls within a time not to exceed two hours after notification of the call by the answering machine and/or service.
1.6.4. Meetings, Conferences, and Briefings: The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.
Meetings may start or end outside of regular duty hours.
1.6.5. Hours of Operation: The contractor is responsible for conducting business, between the hours of 8 AM to 5 PM Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons.
The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.6. Recognized Holidays: See local clause 5152.204-4000 U.S. AND HOST NATION HOLIDAYS (March 2005)
1.6.7. Training Holidays: USAREUR has historically granted military personnel Training Holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training Holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday. However, announced training holidays or exodus of military personnel may provide the Contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.
1.6.8. Quality Control: N/A
1.6.9. Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.10. Place of Performance: The work to be performed under this contract will be performed at Novo Selo Training Area (NSTA), Bulgaria.
1.6.11. Type of Contract: The government will award a Firm Fixed Price contract.
1.6.12. Security Program:
1.6.12.1. AT Level I Training. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas will complete AT Level I awareness training within 30 calendar days after the contract start-date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor will submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after training is completed by all employees and subcontractor personnel. AT Level I awareness training is available online at https://atlevel1.dtic.mil/at.
1.6.12.2. AT Awareness Training for Contractor Personnel Traveling Overseas. Specific AOR training content may be directed by the USEUCOM Commander, with the USAREUR ATO being the local POC.
1.6.12.3. Access and General Protection/Security Policy and Procedures. The contractor and all associated subcontractor employees will comply with applicable installation, facility, and area commander installation/facility access and local security policy and procedures (provided by Government representative). The contractor will also provide all information required for background checks to meet installation-access requirements to be accomplished by the installation provost marshal office, director of emergency services, or security office. The contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the force protection condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.12.4. iWATCH/iSALUTE Training. The contractor and all associated subcontractors will brief all employees on the local iWATCH/iSALUTE program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training will be completed within 30 calendar days after the contract is awarded and within 30 calendar days after new employees commence contract performance, with the results reported to the COR within 30 calendar days after the contract is awarded.
1.6.12.5. For Contracts That Require Performance or Delivery in a Foreign Country. DFARS 252.225-7043.
The clause will be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non-contingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor's compliance with combatant commander and subordinate task-force commander policy and directives.
1.6.12.6. Contractor Employees Who Require Access to Government Information Systems. All contractor employees with access to a Government information system must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services, and must successfully complete DOD information assurance awareness training before access to the information system and then annually thereafter.
1.6.12.7. For Contracts That Require an OPSEC Standing Operating Procedure/Plan. N/A
1.6.12.8. For Contracts That Require OPSEC Training. According to AR 530-1, new contractor employees must complete Level I OPSEC training within 30 calendar days after they report for duty. All contractor employees must complete annual OPSEC awareness training.
1.6.12.9. For Information Assurance (IA)/Information Technology (IT) Training. All contractor employees and associated subcontractor employees must complete DOD information assurance awareness training before issuance of network access and annually thereafter.
1.6.12.10. For Information Assurance (IA)/Information Technology (IT) Certification. N/A
1.6.13. Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.14. Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons.
NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. Key Control will be in accordance with Army Regulation 190-51.
1.6.15. Special Qualifications: A verifiable Curriculum Vitae (CV) of all personnel performing work must be submitted to the Contracting Officer with offers. The contractor is responsible for ensuring all related professional accreditations and certifications are valid during the execution of this contract. The contractor personnel performing the tasks specified here in shall be able-bodied and possess the following qualifications, as a minimum:
1.6.15.1. General Engineer Education and Experience: Engineering degree, 4 years, (Civil, Architectural, Structural, Mechanical, Electrical or applicable). Degree shall be from an accredited university recognized by one of the following: United States (ABET – Accreditation Board for Engineering and Technology, Inc.), Europe (any national members of FEANI – European Federation of National Engineering Associations), or Europe (any agencies of ENAEE – European Network for Accreditation of Engineering Education). Minimum of 4 years’ experience in facilities engineering related to a large industrial complex. Minimum 1-year experience working with multi-national agencies or companies. Experience in AutoCAD or other internationally recognized CAD drafting software preferred. Experience in working/obtaining Accommodation Consignment Agreements, Certificate of Urbanization, and Construction Certificates highly preferred.
1.6.15.2. Environmental Engineer Education and Experience: Environmental Engineer, or Environmental Sciences degree, 4 years. Degree shall be from an accredited university recognized by one of the following: United States (ABET – Accreditation Board for Engineering and Technology, Inc.), Europe (any national members of FEANI – European Federation of National Engineering Associations), or Europe (any agencies of ENAEE – European Network for Accreditation of Engineering Education). Minimum of 2 years’ experience providing environmental consultation services; may include soil/groundwater remediation studies, environmental protection projects, and/or waste management. Minimum 1-year experience working with multi-national agencies or companies.
1.6.15.3. Experience working with U.S. Department of Defense (DoD) or other U.S. government agency preferred, not mandatory.
1.6.15.4. Familiarity with Novo Selo Training Area (NSTA) military base desirable, not mandatory.
1.6.15.5. C2 level proficiency in speaking, reading, and writing both English and Bulgarian based on the Common European Framework of Reference for Languages' (CEFR) Common Reference Levels.
1.6.15.6 Proficient computer literacy skills to include proficiency in Microsoft Outlook, Office, Word, and Excel.
1.6.15.7. No criminal record or adverse history that would limit the applicant’s ability to apply for access to enter a U.S., Host Nation, or NATO military base.
1.6.16. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.17. Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:
perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.18. Key Personnel: The following personnel are considered key personnel by the government:
Contract Manager: See PWS paragraph 1.6.2
1.6.19. Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel shall not be required to obtain and wear badges in the performance of this service.
1.6.20. Contractor Travel: N/A
1.6.21. Other Direct Costs: N/A
1.6.22. Data Rights: The Government has unlimited rights to all documents/material produced under this contract.
All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.6.23. Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.24. Safety: Contractor personnel shall comply with US Army Europe, and all Black Sea Area Support Team Safety Rules and Regulations
1.6.24.1. Safety Plan and Program: Contractor personnel shall comply with US Army Europe, and all Black Sea Area Support Team Safety Rules and Regulations. The contractor shall forward one completed copy of accident reports (local contractors submit copy of locally required accident report; American contractors submit copy of DA Form 285, Feb 09, (Technical Report of United States Army Ground Accident) to the Contracting Officer NLT 3 workdays after occurrence for all personal injury accidents.
1.6.25. Environmental Compliance: Contractor shall meet all US, Bulgarian, and local environmental regulations.
1.6.25.1. Environmental Compliance Plan and Program: N/A
1.6.26. Physical Capability: Contractor personnel should be able to perform duties outdoors throughout the year, be able to lift and move 15 kilograms for a short distance.
PART 2
DEFINITIONS & ACRONYMS
2. Definitions And Acronyms:
2.1. Definitions:
Contractor - A supplier or vendor awarded a contract to provide specific supplies or service to the government.
The term used in this contract refers to the prime.
Contracting Officer - A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
Contracting Officer's Representative (COR) - An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Defective Service - A service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable - Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Key Personnel - Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
Physical Security - Actions that prevent the loss or damage of Government property.
Quality Assurance - The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
Quality Assurance Surveillance Plan (QASP) - An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
Quality Control - All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Subcontractor - One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
Work Day - The number of hours per day the Contractor provides services in accordance with the contract.
Work Week - Monday through Friday, unless specified otherwise.
2.2. Acronyms:
ACOR Alternate Contracting Officer's Representative AE Army Europe AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CAD Computer Aided Design CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit URVS USAREUR Requirements Validation System USAREUR United States Army Europe
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. Government Furnished Items and Services
3.1. Services: N/A
3.2. Facilities: The Government will provide the necessary workspace for the contractor staff to provide the support outlined in the PWS to include desk space, telephones, computers, and other items necessary to maintain an office environment. The contractor shall instruct employees to maintain their workspace in a neat, organized, professional manner.
3.3. Utilities: The Government will provide all utilities in the facility, which will be available for the contractor’s use in performance of tasks outlined in this PWS. Since utilities will be furnished, the following is required: The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
3.4. Equipment: The Government will provide access to government computers, monitors, scanners, copiers, printers, and telephones. The contractor shall instruct employees on maintaining proper care of all government furnished equipment.
3.5. Materials: N/A
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Items And Responsibilities:
4.1. General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2. Secret Facility Clearance: N/A
4.3. Materials: N/A
4.4. Equipment: N/A
PART 5
SPECIFIC TASKS
5.1. Basic Services: The contractor shall provide services for Black Sea Area Support Team Directorate of Public Works, by providing one General Engineer and one Environmental Engineer.
5.2. Recurring Services: The contractor shall provide the following services on a recurring basis. For all tasks, Contractor will not be making any decisions, cannot provide direction to other contractors or government employees, but will work in close coordination with Government officials.
5.2.1. Objective: Provide technical report interpreting the results of third party contracted water quality tests.
Standard: Technical Bulletin 577 ALP: For each third party water test submitted, the technical report shall be submitted within one (1) work day and be 100% accurate
5.2.2. Objective: Document Work Order Log within 1 day after Work Order receipt.
Standard: Logged work orders shall be 97% accurate
5.2.3. Objective: Provide written translation of utility and construction-related bills.
Standard: Within 2 working days after receipt or bills, grammatically correct, and 100% accurate
5.2.4. Objective: As required, provide written assessment (technical report) of utility systems, buildings, and other facilities and make recommendations for repair and/or upgrade.
Standard: In accordance with (IAW) USAREUR, Base Camp Facilities Standards ALP: Relevant, grammatically correct and within format and timeframe provided by the Government
5.3. On-Demand Services: As required, the contractor shall provide the following services on-demand basis. For all tasks, Contractor will not be making any decisions, cannot provide direction to other contractors or government employees, but will work in close coordination with Government officials.
5.3.1. Objective: Provide technical assistance to DPW in developing plans and projects. Includes conducting field surveys, accompanying US Government officials on site visits, providing basic technical drawing(s), and providing local material/manpower cost analysis.
Standard: IAW USAREUR, Base Camp Facilities Standards ALP: Relevant, grammatically correct and within format and timeframe provided by the Government
5.3.2. Objective: Using local and European practices and standards, provide technical assessment on construction and maintenance of buildings and structures; HVAC, electrical, natural gas, water, and wastewater systems; roads and grounds; custodial services; refuse removal; pest control; housing/billeting; and work control.
Standard: Relevant, grammatically correct and within format and timeframe provided by the Government
5.3.3. Objective: Provide technical advice on contractor or government furnished environmental reports with emphasis on construction and land usage.
Standard: Relevant, grammatically correct and within format and timeframe provided by the Government
5.3.4. Objective: Evaluate contractor or government furnished construction plans by providing written technical assessment, and advising the Government on environment and technical compliance based on local and EU standards.
Standard: Relevant, grammatically correct and within format and timeframe provided by the Government
5.3.5. Objective: Conduct facility inspections and complete written inspection report to the Government.
Standard: Report shall be submitted within one (1) work day after inspection, relevant, grammatically correct and within format provided by the Government
5.3.6. Objective: Provide technical assessment and translation services on real estate transactions, construction related permits; to include assisting the Government with the local real estate process.
Standard: 100% accurate, grammatically correct, and within format and timeframe provided by the Government
5.4. Functional Areas: Majority of the work to be performed will be at Novo Selo Training Area, Bulgaria.
5.5. Task Heading: N/A
5.6. Enterprise-Wide Contractor Manpower Reporting Application (eCMRA): The contractor shall ensure ALL contractor labor hours (including subcontractor labor hours) required for the performance of services provided under this contract are reported via a secure data collection site.
The contractor (and all subcontractors providing direct labor under this contract) shall report complete and accurate data for the labor executed during the period of performance during each Government fiscal year (FY), which runs from October 1 to September 30. The Contractor shall input the data into the appropriate eCMRA reporting tool, which can be accessed via a secure web site at http://www.ecmra.mil/. There are four separate eCMRA tools: Army, Air Force, Navy and All Other Defense Components. The appropriate eCMRA reporting tool to use is determined by the requiring activity being supported (e.g., if DISA awards a contract for an Air Force requiring activity, the contractor shall load the required reporting data in the “Department of Air Force CMRA” tool). While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. The contractor shall completely fill in all required data fields. The contractor shall enter initial data into the appropriate eCMRA tool to establish the basic contract record no later than 15 working days after receipt of contract award or contract modification incorporating this clause. The contractor shall notify the COR when the basic contract record has been established in the appropriate eCMRA tool.
eCMRA User Manuals and Frequently Asked Questions (FAQs) are available at http://www.ecmra.mil/ Contractors may direct technical questions to the eCMRA help desk at dodcmra@pentagon.af.mil
PART 6
APPLICABLE PUBLICATIONS
6. Applicable Publications (Current Editions):
6.1. Contractor Adherence:
AR 385-10, The Army Safety Program
AR 385-40, Accident Reporting and Records
DA Pamphlet 385-8, Safety Back Injury Prevention
Army Europe Regulation 55-1, United States Army Motor Vehicle Operations on Public Roads
Army Europe Regulation 385-40, Accident Reporting and Records
USAREUR Regulation 385-55, Prevention of Motor Vehicle Accidents
Technical Bulletin 577, Sanitary Control and Surveillance of Field Water Supplies
USAREUR, Base Camp Facilities Standards
AR 190-51, Security of Unclassified Army Property (Sensitive and Non-sensitive)
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. Attachment/Technical Exhibit List:
7.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary
7.2 Attachment 2/Technical Exhibit 2 – Deliverables Schedule
7.3 Attachment 3/Technical Exhibit 3 – Estimated Workload Data (N/A)
TECHNICAL EXHIBIT 1
Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
PERFORMANCE OBJECTIVE STANDARD PERFORMANCE
THRESHOLD
METHOD OF
SURVEILLANCE
1) PWS Part 1 Management and Administration Contractor shall comply with PWS provisions relating to Management and Administration operations.
Monthly COR PRS inspection checklist Pass / Fail criteria.
>95 Percent Total Overall PRS Inspection Checklist Compliant Rate
100% Inspection of
COR PRS
Inspection Checklist.
2) PWS Part 1 Management and Administration Contractor shall comply with PWS provisions relating to Management and Administration processes.
Surveillance Process Audits
0 Safety or Environmental Discrepancies < 1 Technical Discrepancies
Periodic Inspection
3) PWS Part 3 Government Furnished Item and Services Contractor shall comply with PWS provisions relating to Government Furnished Item and Services operations.
Monthly COR PRS inspection checklist Pass / Fail criteria.
>95 Percent Total Overall PRS Inspection Checklist Compliant Rate
100% Inspection of
COR PRS
Inspection Checklist.
4) PWS Part 3 Government Furnished Items and Services Contractor shall comply with PWS provisions relating to Government Furnished Items and Services processes.
Surveillance Process Audits
0 Safety or Environmental Discrepancies < 1 Technical Discrepancies
Periodic Inspection
5) PWS Part 4 Contractor Furnished Items and Services Contractor shall comply with PWS provisions relating to Contractor Furnished Items and Services operations.
Monthly COR PRS inspection checklist Pass / Fail criteria.
>95 Percent Total Overall PRS Inspection Checklist Compliant Rate
100% Inspection of
COR PRS
Inspection Checklist.
6) PWS Part 4 Contractor Furnished Items and Services Contractor shall comply with PWS provisions relating to Contractor Furnished Items and Services processes.
Surveillance Process Audits
0 Safety or Environmental Discrepancies < 1 Technical Discrepancies
Periodic Inspection
7) PWS Part 5 Specific Tasks Contractor shall comply with PWS provisions relating to Specific Tasks operations.
Monthly COR PRS inspection checklist Pass / Fail criteria.
>95 Percent Total Overall PRS Inspection Checklist Compliant Rate
100% Inspection of
COR PRS
Inspection Checklist.
8) PWS Part 5 Specific Tasks Contractor shall comply with PWS provisions relating to Specific Tasks processes.
Surveillance Process Audits
0 Safety or Environmental Discrepancies < 1 Technical Discrepancies
Periodic Inspection
PERFORMANCE OBJECTIVE STANDARD PERFORMANCE
THRESHOLD
METHOD OF
SURVEILLANCE
9) PWS Part 6 Applicable Publications Contractor shall comply with PWS provisions relating to Applicable Publications operations.
Monthly COR PRS inspection checklist Pass / Fail criteria.
>95 Percent Total Overall PRS Inspection Checklist Compliant Rate
100% Inspection of
COR PRS
Inspection Checklist.
10) PWS Part 6 Applicable Publications Contractor shall comply with PWS provisions relating to Applicable Publications processes.
Surveillance Process Audits
0 Safety or Environmental Discrepancies < 1 Technical Discrepancies
Periodic Inspection
11) PWS Part 7 Technical Exhibit Listing Contractor shall comply with PWS provisions relating to Technical Exhibit Listing operations.
Monthly COR PRS inspection checklist Pass / Fail criteria.
>95 Percent Total Overall PRS Inspection Checklist Compliant Rate
100% Inspection of
COR PRS
Inspection Checklist.
12) PWS Part 7 Technical Exhibit Listing Contractor shall comply with PWS provisions relating to Technical Exhibit Listing processes.
Surveillance Process Audits
0 Safety or Environmental Discrepancies < 1 Technical Discrepancies
Periodic Inspection
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To The Contractor shall submit to the COR, in writing, the name, title, office, home and mobile telephone number of the Contract Manager and Alternate
See PWS para. 1.6.2
At post award conference
Electronic
Document / Print out
COR
AT Level I Training Certificates
See PWS para. 1.6.12.1
30 calendar days after start of contract
1 Print out KO and COR iWATCH Training Completed
See PWS para. 1.6.12.4
30 days after start of contract
30 calendar days after new employee commences work results reported to the COR within 30 calendar days after the contract is awarded
1 Print out KO and COR
OPSEC Training Certificates
See PWS para. 1.6.12.8
30 days after start of contract and repeated annually
1 Print out KO and COR
Information Assurance (IA)/Information Technology (IT) Training
See PWS paragraph 1.6.12.9
Training before issuance of network access and annually thereafter
1 Print Out KO and COR
CV of all personnel
See PWS para. 1.6.15
With offers 1 Document /
Print out
KO
Safety Plan and Program, See PWS para. 1.6.24.1
3 days after occurrence for all personal injury accidents
Document /
Print out
KO
The contractor shall enter initial data into the appropriate eCMRA tool to establish the basic contract record
See PWS para. 5.6
No later than 15 working days after receipt of contract award or contract modification.
1 Website COR eCMRA
See PWS para. 5.6
NLT 31 October of each calendar year
Website / Print out
COR
Provide technical report interpreting the results of third party contracted water quality tests.
For each third party water test submitted, the technical report
Electronic Document
COR
See PWS para 5.2.1 shall be submitted within one (1) work day
Provide written translation of utility and construction-related bills
See PWS para 5.2.3
Within 2 working days after receipt or bills
Electronic Document
COR
Provide written assessment (technical report) of utility systems, buildings, and other facilities and make recommendations for repair and/or upgrade.
See PWS para 5.2.4
As required 1 Electronic Document
COR
Provide technical assistance to DPW in developing plans and projects.
Includes conducting field surveys, accompanying US Government officials on site visits, providing basic technical drawing(s), and providing local material/manpower cost analysis.
See PWS para 5.3.1
As required 1 Electronic Document
COR
Using local and European practices and standards, provide technical assessment on construction and maintenance of buildings and structures; HVAC, electrical, natural gas, water, and wastewater systems;
roads and grounds; custodial services; refuse removal; pest control; housing/billeting; and work control.
See PWS para 5.3.2
As required 1 Electronic Document
COR
Provide technical advice on contractor or government furnished environmental reports with emphasis on construction and land usage.
See PWS para 5.3.3
As required 1 Electronic Document
COR
Evaluate contractor or government furnished construction plans by providing written technical assessment, and advising the Government on environment and technical compliance based on local and EU standards.
See PWS para 5.3.4
As required 1 Electronic Document
COR
Conduct facility inspections and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .