W912PB-16-R-3006-0002_(30_AUG_2016).pdf
PDF 537 KB Posted
- Solicitation number
- W912PB-16-R-3006
About this file
SOLICITATION AMENDMENT 0002
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0010834453
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SEE SUMMARY OF CHANGES IN THE FOLLOWING PAGE(S):
1. CONTRACT ID CODE PAGE OF PAGES
J 1 72
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PB-16-R-3006
X 9B. DATED (SEE ITEM 11)
04-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Aug-2016
CODE
ECC RCO BAVARIA
AMERIKANISCHE BESCHAFFUNGSSTELLE
GEB 542
92655 GRAFENWOEHR LAGER
GERMANY
W912PB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PB-16-R-3006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
The purpose of this amendment is to highlight items covered during the Site Visit conducted on 23 August 2016 at the DFAC Illesheim. In addition, the amendment provides answers/clarifications to questions presented by the attendees.
1. Technical Exhibit listing – the technical exhibit listing has been verified/confirmed by the Requiring Activity. Any version otherwise provided, i.e. “DRAFT Solicitation”; is not valid. Consider only the data posted to FBO and reiterated in this amendment.
2. Deliverable Schedule – the deliverable schedule has been verified/confirmed by the Requiring Activity. Consider the due date and frequency outlined within the deliverable schedule when submitting your proposal.
3. Estimated Workload – the estimated workload pertains to the number of users (historical data).
4. Installation Access Clarification – Installation access is governed by Army Europe Regulation 190- 16 “Installation Access Control.” Below is an excerpt from the regulation in regards to background checks and/or who may gain access to a U.S. military installation.
As outlined in AER 190-16 (11 January 2010), Section III, paragraph 12, a. definition, b. type of pass authorized, e. background check.
Installation Access Privilege available to EU resident or NATO Member Country.
CONTRACTOR (RESIDENT OF EUROPEAN UNION (EU) OR NATO-MEMBER COUNTRY):
a. Definition. A Contractor (Resident of EU or NATO-Member Country) is an individual without NATO SOFA status who lives in the EU or a NATO-member country, is contracted to work for DOD in Europe, and is not a DOD ID cardholder. Contractors who are trying to establish a contract with DOD may be granted access only through an individual who has sign-in privileges or through access-roster procedures.
The temporary installation pass will be valid for the length of the contract or up to 90 days, whichever is less. The regular installation pass will be valid for the length of the contract, up to 2 years, or until the expiration date of the supporting document (for example, passport) that was used to obtain the installation pass, whichever is earliest.
Background check to work at DFAC (without access to government information network):
PGCC (Polizeiliches Führungszeugnis). This certificate is required before a temporary or regular installation pass may be issued.
MP Check. An MP check is required for U.S. citizens before a temporary or regular installation pass may be issued.
LNSP. LNSP screening applies to both non-U.S. citizens and U.S. citizens who have lived in Germany for more than 12 consecutive months without NATO SOFA status. This screening must be initiated before a temporary installation pass may be issued. The screening must be completed and returned negative with no entries before a regular installation pass may be issued.
Aufenthaltstitel. An Aufenthaltstitel may be required for non-host nation citizens unless the individual has an exception to this requirement (para 29c(6)).
Exceptions excerpt from AER 190-16, paragraph 29 (c) (6):
Citizens of the following EU countries DO NOT REQUIRE PERMITS TO RESIDE OR WORK in Germany: Austria, Belgium, Cyprus (Greek Part), Denmark, Finland, France, Germany, Greece, Ireland, Italy, Luxembourg, Malta, the Netherlands, Portugal, Spain, Sweden, and the United Kingdom.
Citizens of the following EU countries citizens DO NOT REQUIRE RESIDENCE PERMITS BUT ARE REQUIRED to have an EU WORK PERMIT (Arbeitserlaubnis-EU) authorizing them to work in Germany: Bulgaria, Czech Republic, Estonia, Hungary, Latvia, Lithuania, Poland, Romania, Slovakia, and Slovenia.
Background check (with access to government network):
Contract employees must comply with AR 25-2 Paragraph 3-3 (c) which states that "Users must have a favorable background investigation or hold a security clearance and access approvals commensurate with the level of information processed or available on the system". For Local and Foreign Nationals, the background check is called an LNSP. Regardless of nationality, Part III of the DD FORM 2875 will have to be completed and digitally signed by the supporting security manager. The DoD Information Assurance Awareness class is also required, per PWS section 1.16.12.6.
Regardless government network access (CAC), a 12-month residency requirement is REQUIRED AND MANDATORY FOR THIS REQUIREMENT to get a permanent base pass, NO
EXCEPTIONS.
5. AR 380-19 has been replaced by AR 25-2 “Information Assurance.” PWS has been updated as reflected below.
6. Why does the DFAC Manager & Assistant DFAC Manager have to speak German? Is there a reference to this bilingual requirement?
Bilingual requirement has been amended for all aplicable personnel.
7. The word “Army” has been deleted from provision FAR 52.212-2 Technical to match section
1.6.15.3 of the PWS. Food Management Information System in lieu of “Army Food Management Information System.”
8. Could the vendor provide alternate sources of food?
No. Only properly vetted food provided through authorized sources. The government is providing all the food supplies as outlined in the PWS.
9. Does the vendor require access to the Army Food Management System network?
Yes. The vendor would be responsible to provide qualified individuals capable of passing a background check to gain access to the network and other systems outlined in the PWS.
10. How many shifts are being offered in the current contract?
Two shifts. Number of personnel varies depending on the throughput. Recommended to offerors to read the PWS and make their own plan to meet the requirement as outlined in the PWS.
11. What is the expectation for the Health Certificate? Need to know German and EU equivalent in the event these are provided.
A certified statement provided by the contractor indicating that the health requirements outlined in TB 530-2 (Employee Health) have been met will suffice noting that the contractor (not the employee) will be held accountable for misleading or false information.
12. How many personnel are normally used for money collection?
It depends on the number of dinners.
13. Contractors were reminded to keep their SAM information up to date to include phone and email. This is the information used to send amendments or any other correspondence related to this requirement.
14. Does Germany Law 613a apply to this requirement?
The govenrment refers all contractors to DFARS 252.222-7002 "Compliance with Local Labor Laws (Overseas)." Your legal cousel should be able to provide further guidance.
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
PWS
| PERFORMANCE | WORK | STATEMENT | (PWS) |
| FULL | FOOD | SERVICE |
For DFAC – Flight Line Inn Dining Facility
| Storck | Barracks, | Building | 6628 | Illesheim, | Germany |
| HQ | USAREUR | G4 |
Part 1
General Information
| Vision | Statement: | The | primary | mission | of | the | dining | facility | is | to | provide | a | quality | services | in | support | of | the | |
| installation | food | service | program | that | supports | the | warfighter | with | flexible, | efficient | and | cost | effective | ||||||
| service. | The | service | outlined | in | this | requirement | encompasses | dining | facility | management | functions, | food | |||||||
| preparation, | facility | sanitation | and | janitorial | duties. | Performance | criteria | for | overall | dining | facility | duties | fall | ||||||
| under | contractor | responsibilities. |
| 1. | Introduction: | This | is | a | non‐personnel | services | contract | to | perform | the | requirements | described | in | the | |||
| PWS | and | contract. | The | Contractor | shall | provide | dining | facility | management, | food | preparation, | headcount, | |||||
| and | food | service | sanitation | services | at | the | Flight | Line | Inn | Dining | Facility | located | at | Storck | Barracks, | Illesheim, | |
| Germany. | The | Government | shall | not | exercise | any | supervision | or | control | over | the | contract | service | providers | |||
| performing | the | services | herein. | Such | contract | service | providers | shall | be | accountable | solely | to | the | Contractor | |||
| who, | in | turn | is | responsible | to | the | Government. |
| 1.1 | Background: | Illesheim, | Germany | is | home | to | the | future | USAREUR | reception, | integration, | and | training | ||||
| location | for | the | Aviation | Regionally | Aligned | Forces. | Food | service | operations | are | required | to | support | Soldiers | |||
| that | will | reside | at | the | location; | see | Technical | Exhibit | 4 | ‐ | Estimated | Workload. | COR | will | provide | quarterly |
projections.
| 1.2 | Responsibilities: | The | Contractor | shall | assume | total | responsibility | for | all | requirements | stated | herein | on | |||
| the | commencement | date | of | the | performance | period. | The | Contractor | shall | perform | as | specified | in | this | Contract | |
| and | under | the | direction | of | the | Contracting | Officer | (KO). | See | also. |
| 1.2.1 | Work | Responsibility: | The | Contractor | shall | perform | all | work | and | assume | responsibility | for | planning, | |||
| programming, | administering, | managing, | and | executing | all | functions | necessary | to | provide | the | services | |||||
| specified | in | this | PWS. | The | Contractor | shall | conduct | work | in | accordance | with | this | PWS | and | all | applicable |
| United | States | (U.S.), | German, | and | local | laws, | regulations, | standards, | provisions, | and | directives | to | include | |||
| applicable | publications | in | Part | 6. | The | Contractor | shall | ensure | that | all | work | meets | the | level | of | service, |
| performance | standards, | or | tolerances | specified | in | the | PWS | or | in | applicable | referenced | documents. | Some | |||
| services | under | this | Contract | may | be | performed | at | designated | facilities, | or | portions | of | installations, | by | in‐ | |
| house | Government | personnel | or | by | other | contractors. |
| 1.2.2 | Administrative | Responsibility: | The | Contractor | shall | perform | all | related | administrative | actions | |||||
| required | to | provide | services | or | perform | work | such | as | material | requisitioning, | quality | control | (QC), | financial | |
| control, | meetings, | and | correspondence. | The | Contractor | shall | also | maintain | accurate | and | complete | records, | |||
| files, | and | libraries | of | documents | to | include | all | U.S. | German, | and | local | regulations, | standards, | provisions, | codes, |
| laws, | technical | manuals, | and | manufacturers’ | instructions | and | recommendations | that | are | necessary | and | ||||
| related | to | the | functions | being | performed. | The | Contractor | shall | compile | historical | data, | prepare | required | ||
| reports, | and | submit | information | as | specified | by | the | Deliverable | List | presented | in | this | PWS. |
| 1.3 | Objectives: | Full | food | service | management, | food | preparation, | headcount, | and | food | service | sanitation | is | |||
| required | to | support | the | garrison. | The | contractor | shall | provide | all | personnel, | equipment, | supplies, | facilities, |
| transportation, | tools, | materials, | supervision, | and | other | items | and | non‐personal | services | necessary | to | perform | ||||||||||
| food | service | management, | food | preparation, | headcount, | and | food | service | sanitation | as | defined | in | this | |||||||||
| Performance | Work | Statement | except | for | those | items | specified | as | government | furnished | property | and | ||||||||||
| services. | The | contractor | shall | perform | to | the | standards | in | this | contract. | ||||||||||||
| 1.4 | Functional | Areas: | Services | includes | dining | facility | management, | administration | management, | |||||||||||||
| subsistence | management, | food | preparation, | headcount, | and | food | service | sanitation. | The | contractor | shall | |||||||||||
| accomplish | all | tasks | required | to | provide | quality, | nutritious | meals | as | defined | in | AR | 30‐22 | and | DA | PAM | 30‐ | 22. | ||||
| The | contractor | shall | accomplish | all | task | required | to | provide | food | service | sanitation | and | dining | facility | ||||||||
| attendants’ | services | as | defined | in | the | Performance | Work | Summary | (PWS) | and | TB | MED | 530. | Projected | ||||||||
| headcount | is | located | as | TE | 4. | |||||||||||||||||
| 1.5 | Period | of | Performance: | The | period | of | performance | shall | be | for | one | (1) | Base | period | of | 12 | months | and | 2 | |||
| twelve | month | option | periods. |
1.6 Management and Administration:
| 1.6.1 | Phase | In | /Phase | Out | Period: | In | order | to | allow | for | a | smooth | and | orderly | transfer | of | responsibility | for | ||
| the | dining | facility | and | dining | facility | food | operations | from | the | incumbent | Contractor | to | the | new | Contractor, | |||||
| the | Contractor | shall | participate | in | a | period | of | phase‐in | during | which | the | incumbent | Contractor | shall | continue | |||||
| to | perform | the | services. | This | period | will | commence | upon | award | of | the | contract | and | will | continue | for | a | |||
| period | not | to | exceed | thirty | (30) | calendar | days. | Within | fifteen | (15) | calendar | days | of | the | start | of | phase‐ | |||
| in | of | the | contract, | the | Contractor | shall | complete | all | hiring | actions | that | includes, | but | not | limited | to, | ||||
| initial | background | checks | and | provide | all | required | background | check | forms | and | installation | access | ||||||||
| forms | (in | accordance | with | Army | Europe | Regulation | (AER) | 604‐1, | Personnel | Security | Screening, | Local | ||||||||
| National | Screening | Program | (LNSP); | AR | 25‐2, | Information | Assurance; | and | AER | 190‐16, | Installation | |||||||||
| Access | Control | )to | the | COR, | eligibility | requirements, | etc. | for | all | personnel | required | to | perform | the | ||||||
| requirements | of | the | Contract | and | on‐board | by | the | start | of | full | performance. | During | the | phase | in | period, | ||||
| the | Contractor | shall | become | familiar | with | performance | requirements | in | order | to | commence | full | performance | |||||||
| of | services | on | the | contract | start | date. | The | government | will | provide | training | for | the | web | based | systems | to | be | ||
| used | by | the | Manager, | Ration | and | Administration | Clerks, | and | Headcount | Personnel. | The | phase | in | period | will | |||||
| only | be | for | the | Dining | Facility | Manager, | Ration | Clerks, | Administration | Clerks | and | Headcount | ||||||||
| Personnel. | It | will | be | for | the | period | of | 14 | November | 2016 | to | 14 | December | 2016. | Prior | to | completion | of | the | |
| phase‐in | period, | the | COR | will | assess | the | Contractor’s | ability | to | perform | the | mission. | The | Contractor | shall | |||||
| complete | the | necessary | steps | for | assumption | of | the | operation | during | the | phase‐in | period | and | shall | meet | all | ||||
| requirements | as | specified | in | the | contract | with | the | beginning | of | full | performance. |
| 1.6.2 | Contractor | Management: | The | Contractor | shall | perform | continual | management | of | the | functional | |||||||
| areas | contained | in | this | PWS | and | shall | provide | a | Dining | Facility | Manager | physically | present | on‐site | during | |||
| normal | duty | hours. | The | Dining | Facility | Manager | shall | conduct | overall | management | coordination | and | shall | be | ||||
| the | central | point | of | contact | (POC) | with | the | government | for | performance | of | all | work | under | the | PWS. | At | the |
| Post | Award | conference | or | 5 | calendar | days | after | contract | award | (which | occurs | first), | the | Contractor | ||||
| shall | submit | to | the | COR, | in | writing, | the | name, | title, | office, | home | and | mobile | telephone | number | of | the | |
| Dining | Facility | Manager. | A | Contractor | employee | shall | be | designated | to | act | for | the | Dining | Facility | Manager | |||
| when | work | is | being | performed | outside | of | duty | hours, | or | during | the | Dining | Facility | Manager’s | absence. | Both | ||
| the | Dining | Facility | Manager | and | the | Contractor | employee | filling | in | for | the | Dining | Facility | Manager, | shall | have | ||
| full | authority | to | act | for | the | contractor | on | all | Contract | matters | relating | to | daily | operation | of | this | Contract | |
| (Deliverable | 0001). |
| 1.6.3 | Contractor | Responsiveness: | The | Dining | Facility | Manager | or | designated | assistant | shall | be | available | ||||||
| for | telephone | communication | or | site | attendance, | with | the | COR, | 0530 | to | 1930, | Monday | – | Friday; | and | between | ||
| the | hours | of | 0730 | to | 1930, | Saturday, | Sunday, | and | Holidays, | except | when | the | government | facility | is | closed | due | |
| to | local | or | national | emergencies, | administrative | closings, | or | similar | government | directed | facility | closings | ||||||
| during | the | week | and | Holidays. | A | personal | answering | service | is | permitted | at | other | than | normal | Contract | |||
| workdays | and | work | hours | for | receipt | of | COR | emergency | response | work | requirements, | provided | that | the | ||||
| Dining | Facility | Manager | or | designee | responds | to | all | calls | within | a | time | not | to | exceed | (2) | two | hours | after |
| notification | of | the | call | by | the | answering | machine | and/or | service. | The | Dining | Facility | Manager | and | any | ||||
| individuals | designated | to | act | in | that | capacity | shall | have | full | authority | to | contractually | bind | the | Contractor | for | |||
| prompt | action | on | matters | pertaining | to | execution | of | the | PWS. | In | the | event | of | the | replacement | of | the | Dining | |
| Facility | Manager | or | designated | assistant, | the | Contractor | shall | submit | proposed | substitution(s) | to | the | COR, | in | |||||
| writing | No | Later | Than | (NLT) | five | (5) | working | days | before | the | event. |
| 1.6.3.1 | Personnel | Hiring | Actions | and | Training | Determination: | Federal | Acquisition | Regulation | (FAR) | ||||||||
| Part | 52.204‐9, | Personal | Identity | Verification | of | Contractor | Personnel, | establishes | criteria | for | Contractors | |||||||
| who | require | a | Common | Access | Card | (CAC) | for | either | physical | access | to | an | installation | or | access | to | ||
| government | information | technology | (IT) | systems. | The | government | requires | Personnel | Security | |||||||||
| Investigations | (PSI) | to | establish | that | applicants | or | incumbents | either | employed | by | the | government | or | |||||
| working | for | the | government | under | contract | are | suitable | for | the | job | and | are | eligible | for | a | public | trust | or |
| sensitive | position. |
| 1.6.3.1.1 | Personnel | Clearance | Determination: | The | Contractor | shall | initiate | background | check | |||||||
| requirements | for | all | Contractor | employees | IAW | DOD, | HQDA, | USEUCOM, | USAREUR, | and | local | policy. | Upon | |||
| favorable | review | and | initiation | of | the | PSI, | the | government | may | grant | contractor | personnel | temporary | access | ||
| pending | final | adjudication | of | the | PSI. | The | Contractor | shall | request | Information | Technology | (IT) | ||||
| eligibility | for | an | employee | requiring | access | and | passwords | to | the | government‐furnished | data | |||||
| systems, | within | two | (2) | days | after | receipt | of | CAC. | The | Contractor | shall | ensure | Local | Nationals | (LNs), | |
| who | are | or | who | are | not | residents | of | Germany | meet | the | minimum | 12 | consecutive | month | German | |
| residency | requirement; | and | U.S. | applicants | who | meet | the | Standard | Form | (SF) | 85P | suitability | requirement, | |||
| are | in | compliance | with | the | Army | Europe | Regulation | (AER) | 604‐1, | Personnel | Security | Screening, | Local | |||
| National | Screening | Program | (LNSP); | AR | 25‐2, | Information | Assurance; | and | AER | 190‐16, | Installation | |||||
| Access | Control, | by | the | time | their | applications | are | received | by | the | government. | The | 12 | consecutive | month | |
| Germany | residency | requirement | applies | to | all | contractor | employees. | The | Contractor | shall | complete | all | ||||
| hiring | actions | that | includes | but | not | limited | to | initial | background | checks, | meeting | suitability | ||||
| requirements, | etc. | no | later | than | fifteen | (15) | calendar | days | after | contract | award. | For | any | replacement | ||
| contractor | employees, | the | fifteen | (15) | calendar | day | requirement | also | applies | for | submission | of | ||||
| background | check | forms | to | the | COR. |
| 1.6.3.1.2 | Contingency | Plan: | The | Contractor | shall | provide | a | contingency | plan | NLT | than | ten | (10) | calendar | ||
| days | prior | to | the | start | of | full | contract | performance | (Deliverable | 0002). | The | purpose | of | the | contingency | |
| plan | is | to | provide | the | methodology | and | processes | for | assessing | the | situation, | determining | the | appropriate | ||
| response, | achieving | recovery, | and | meeting | performance | standards | when | there | is | a | disruption | in | normal | |||
| workload. | The | Contractor | shall | describe | in | the | contingency | plan | the | methods | and | capabilities | to | assure | ||
| continuity | of | operations | during | adverse | situations | or | disruptions | to | normal | workload. | The | Contractor’s | ||||
| contingency | plan | shall | address | at | a | minimum | the | following: |
| 1. Primary | issues. | |||||||||||||
| 2. Primary | and | assistant | points | of | contact. | |||||||||
| 3. Process | to | achieve | recovery | and | resumption | of | full | service. | ||||||
| 4. Approach | to | recruitment | and | hiring | of | personnel | on | short | notice | for | immediate | replacement | of | the |
| loss | of | personnel. | |||||||||||
| 5. Assessment | of | the | local | labor | market | and | the | Contractor’s | ability | to | hire | qualified | personnel. |
| 6. Process | to | be | used | to | hire | personnel. | |||||||
| 7. Critical | skills | and | transactional | systems | knowledge | required | to | maintain | performance | and |
| contingency | for | immediate | loss | of | skills | and | knowledge. | |||||||
| 8. Strategy | for | maintaining | a | trained | workforce | in | Dining | Facility | Operations. | |||||
| 9. The | Contractor | shall | continue | to | update | and | maintain | the | plan | semi‐annually | or | as | required. | As |
| changes | occur, | submit | proposed | changes | to | the | COR | for | review | and | acceptance. | ||||||
| 10. Strike. | In | the | event | of | a | strike | by | Contractor | personnel, | the | Contractor | shall | be | responsible | for | the |
cost of any increased security as determined necessary by the Installation Commander/Director. The
| Contractor | shall | provide | a | strike | contingency | plan | NLT | than | ten | (10) | calendar | days | prior | to | the |
| start | of | full | contract | performance. |
| 1.6.3.1.3 | Weekly | Report: | The | Contractor | shall | provide | an | accurate | and | timely | weekly | report | summary | of | |||
| personnel | actions | to | the | COR | seven | (7) | calendar | days | after | the | start | of | phase‐in | (Deliverable | 0003) | and | |
| every | week | on | Mondays | thereafter | until | the | end | of | the | contract. | The | Contractor | shall | include | in | the | |
| weekly | report | a | summary | of | personnel | actions, | completed | and | pending. | The | summary | shall | include, | but | not | ||
| limited | to, | name | of | employees, | position, | certifications, | licensing, | and | training | requirements, | status | of | hiring | ||||
| actions, | status | of | interim | personnel | clearances, | and | the | Army | Food | Management | Information | System | |||||
| (AFMIS) | access | (both | temporary | and | permanent). |
| 1.6.3.1.4 | DoD | Common | Access | Card | (CAC)/Access | Identification | Badge | (ID | Badge): | Every | Contractor | ||||||||
| employee | shall | obtain | and | possess | an | Access | ID | Badge | and/or | a | DoD | Common | Access | Card | (CAC), | as | |||
| required | by | HSPD‐12 | and | Directed‐Type | Memorandums | (DTM) | 08‐003 | and | DODI‐1000.13. | DoD | CAC | is | only | ||||||
| required | for | the | Manager, | Ration | and | Administration | Clerks, | and | Headcount | Personnel. | Upon | favorable | |||||||
| review | and | initiation | of | the | PSI | to | establish | the | suitability | of | an | employee | for | the | job | and | the | approval | for |
| Information | Technology | (IT) | access | pending | final | adjudication | of | the | PSI, | the | Contractor | shall | submit | to | the | ||||
| COR | a | request | for | the | DoD | CAC | using | the | Trusted | Agent | Sponsorship | System | (TASS) | located | at | ||||
| https://www.dmdc.osd.mil/tass/consent?continueToUrl=%2Ftass%2Findex.jsp | (Deliverable | 0004). |
| The | Contractor | shall | safeguard | all | CAC | and/or | ID | Badges. | Contractor | employees | shall | not | share | CAC | and/or | ||||
| ID | Badges. | Each | Contractor | employee | shall | wear | the | ID | Badges(s) | conspicuously | on | his | or | her | outer | ||||
| clothing | above | the | waist | at | all | times | while | working | on | the | installation. | Dining | Facility | Manager’s | title | shall | |||
| be | identified | as | a | title | under | the | name | on | the | ID | Badge. | Contractor | employees | not | wearing | the | ID | Badge, | |
| shall | be | challenged, | removed | from | the | work | area, | and/or | denied | access | to | the | host | installation. | The | ||||
| Contractor | shall | not | display | or | use | any | badge | as | a | means | of | personal | identification | outside | the |
installation.
| Contractor | employees | attending | meetings, | answering | government | telephones, | and | working | in | other | |||||||
| situations | where | their | contractor | status | is | not | obvious | to | third | parties | shall | identify | themselves | as | such | to | |
| avoid | creating | an | impression | in | the | minds | of | members | of | the | public | that | they | are | Government | officials. | They |
| must | also | ensure | that | all | documents | or | reports | produced | by | contractors | are | suitably | marked | as | contractor | ||
| products | or | that | contractor | participation | is | appropriately | disclosed. | Contractor | employees | shall | obtain | and | |||||
| wear | badges | in | the | performance | of | this | service. |
| In | the | event | that | a | Contractor | employee | damages | or | loses | his | or | her | CAC | and/or | ID | Badge, | the | Contractor | |
| shall | report | the | lost | or | damaged | CAC | and/or | ID | Badge | within | two | (2) | working | hours | of | damage | or | loss | to |
| the | COR. | The | Contractor | shall | arrange | for | a | replacement | CAC | and/or | ID | Badge. | The | Contractor | shall | return | |||
| all | government‐furnished | CAC | and/or | ID | Badge | (s) | to | the | government | either | within | 24 | hours | of | the | ||||
| completion | of | the | contract | or | upon | termination | of | an | individual’s | employment, | whichever | comes | first. |
| 1.6.3.2 | Information | System | Security: | All | Contractor | personnel | provided | with | access | to | government‐ | |||||||
| furnished | computers | and | systems | shall | observe | IT | security | policies | and | procedures | as | provided | by | the | COR. | |||
| The | Contractor | shall | notify | the | COR | within | twenty | four | (24) | hours | when | Contractor | personnel | no | longer | |||
| require | access | to | government | systems | (personnel | resignation, | reassignment, | termination, | or | completion | of | |||||||
| portions | of | the | contract). | The | Contractor | shall | observe | all | copyright | agreements. | In | the | interest | of | ||||
| protecting | government | systems | from | computer | viruses, | the | Contractor | shall | neither | use | public | domain | ||||||
| software | nor | shall | Contractor | personnel | download | software | from | public | bulletin | boards | or | Internet | ||||||
| websites | when | using | government‐Furnished | Data | Systems. | The | Contractor | shall | use | only | government‐ | |||||||
| furnished | software | in | performance | of | the | contract | requirements. | Should | the | introduction | of | a | computer | |||||
| virus | or | malicious | destruction | of | computer | software, | stored | information, | or | hardware | result | from | the | use | of | |||
| public | domain | software | or | from | software | taken | from | a | public | bulletin | board | or | Internet | website, | the | |||
| Contractor | shall | be | required | to | notify | the | COR | within | one | (1) | hour | of | incident | for | repair | of | the | damage |
| and | shall | incur | all | damage | costs | to | the | government. | The | Contractor | shall | ensure | there | is | no | impact | on |
delivery schedules.
| 1.6.3.3 | Government‐Furnished | Data | Systems: | The | Government | will | furnish | and | the | Contractor | shall | use | ||
| the | Government‐Furnished | Data | Systems | in | the | performance | of | the | contract | requirements. | The | Contractor | ||
| shall | request | IT | access | for | employees | requiring | access | and | passwords | to | the | Government‐Furnished | Data | |
| Systems. | The | Government | is | responsible | for | the | upgrade | and | maintenance | of | Government‐Furnished, | non‐ | ||
| commercially | available | systems. | Contractor | access | to | Government‐Furnished | IT | data | systems | shall | be | |||
| granted | on | a | “need‐to‐know” | basis, | IAW | IA | Management | Controls | and | IA | Technical | Controls | to | Contractor |
| personnel | who | will | perform | data | input | and | retrieval | functions. |
| 1.6.4 | Meetings, | Conferences, | and | Briefings: | The | Contractor | shall | attend, | participate | in, | and | furnish | input | |||
| to | scheduled | and | unscheduled | meetings, | conferences, | and | briefings | that | relate | to | the | functions | and | services | ||
| herein | as | required | by | the | Government | to | provide | effective | communication | and | impart | necessary | information. | |||
| The | Project | Manager | or | designated | representative | shall | attend | meetings | as | requested | by | the | Government. | |||
| Meeting | attendees | shall | at | times | include | Contractor | managerial, | supervisory, | and | other | personnel | |||||
| knowledgeable | of | the | subject | matter. | Meetings | may | start | or | end | outside | of | regular | duty | hours. |
| 1.6.5 | Hours | of | Operation: | The | Contractor | is | responsible | for | conducting | business | seven | (7) | days | per | week, | ||||
| between | the | hours | of | 0515 | to | 1930, | Monday | – | Friday; | and | between | the | hours | of | 0615 | to | 1830, | Saturday, | |
| Sunday, | and | Holidays, | and | Training | Holidays, | except | when | the | Government | facility | is | closed | due | to | local | or | |||
| national | emergencies, | administrative | closings, | or | similar | Government | directed | facility | closings | during | the | ||||||||
| week | and | Holidays. | The | hours | of | operation | for | the | DFAC | Meal | Schedule | are | shown | below. | For | other | than | firm | |
| fixed | price | contracts, | the | contractor | will | not | be | reimbursed | when | the | government | facility | is | closed | for | the | |||
| above | reasons. | The | Contractor | must | at | all | times | maintain | an | adequate | workforce | for | the | uninterrupted | |||||
| performance | of | all | tasks | defined | within | this | PWS | when | the | Government | facility | is | not | closed | for | the | above | ||
| reasons. | When | hiring | personnel, | the | Contractor | shall | keep | in | mind | that | the | stability | and | continuity | of | the | |||
| workforce | are | essential. |
Meal Serving Hours – Flight Line Inn Dining Facility Storck Barracks, Building 6628 Illesheim, Germany
| Mon‐Fri: | Breakfast | 0700‐0845, | Lunch | 1130‐1300, | Dinner | 1700‐1830 | ||||||
| Sat, | Sun | & | Holidays | and | Training | Holidays: | Breakfast | 0800‐0930, | Lunch | 1130‐1300, | Dinner | 1600‐1730 |
| 1.6.5.1 | Expanded | Serving | Hours. | Expanded | meal | serving | hours | may | be | required. | In | the | event | such | ||
| expanded | hours | are | needed, | they | will | be | ordered | and | invoiced | in | accordance | with | the | CLIN | entitled | |
| “Expanded | Services.” |
1.6.6 Recognized Holidays: The contractor is required to perform services on German and American holidays.
| NAME | OF | AMERICAN | HOLIDAY | DATE | |||
| New | Year | Day | January | 1st | |||
| Martin | Luther | King | Memorial | Day | 3rd Monday | in | January |
| President | Day | 3rd Monday | in | February | |||
| Memorial | Day | Last | Monday | in | may | ||
| Independence | Day | July | 4th | ||||
| Labor | Day | 1st Monday | in | September | |||
| Columbus | Day | 2nd Monday | in | October | |||
| Veteran’s | Day | November | 11th | ||||
| Thanksgiving | Day | 4th Thursday | in | November | |||
| Christmas | Day | December | 25th |
NAME OF GERMAN NATIONAL AND DATE
| LOCAL | HOLIDAY | ||||
| New | Year | January | 1st | ||
| Epiphany | January | 6th | |||
| Good | Friday | Varies | yearly | ||
| Easter Sunday Varies | yearly | ||||
| Easter | Monday | Varies | yearly | ||
| Labor | Day | May | 1st | ||
| Ascension | Varies | yearly | |||
| Whit Sunday Varies | yearly | ||||
| Whit | Monday | Varies | yearly | ||
| Corpus | Christi | Varies | yearly | ||
| Day | of | German | Unity | October | 3rd |
| All | Saints' | Day | November | 1st | |
| Christmas | December | 25th | |||
| St. | Stephen's | Day | December | 26th |
| 1.6.7 | Training | Holidays: | USAREUR | has | historically | granted | military | personnel | Training | Holidays | as | |||||
| compensation | for | time | that | they | spent | in | field | training. | These | are | typically | combined | with | regular | holiday | |
| leave | schedules | (for | example, | Christmas | half | days | or | day | on | day | off | schedules). | Training | Holidays | may | affect |
| access | to | military | operated | facilities. | If | scheduled | work | or | access | to | facilities | is | required, | coordination | with | |
| occupants | will | be | necessary | or | the | work | in | affected | facilities | shall | be | rescheduled | after | the | training | holiday. |
| However, | announced | training | holidays | or | exodus | of | military | personnel | may | provide | the | Contractor | with | an | ||
| opportunity | for | unrestricted | access | to | facilities | and | areas. | The | Contractor | shall | take | full | advantage | of | such | |
| opportunities | by | planning | maintenance | or | actions | that | are | better | accomplished | when | such | areas | are | vacant. |
| 1.6.8 | Quality | Control: | The | contractor | shall | develop | and | maintain | an | effective | quality | control | program | to | |||||
| ensure | services | are | performed | in | accordance | with | this | PWS. | The | contractor | shall | develop | and | implement | |||||
| procedures | to | identify, | prevent, | and | ensure | non‐recurrence | of | defective | services. | The | contractor’s | quality | |||||||
| control | program | is | the | means | by | which | he | assures | himself | that | his | work | complies | with | the | requirement | of | the | |
| contract. | The | Quality | Control | Plan | is | due | within | 30 | days | after | contract | award | to | the | KO | and | COR | and | |
| within | 5 | working | days | when | changes | are | made | thereafter | (Deliverable | 0005). | After | acceptance | of | the | |||||
| quality | control | plan | the | contractor | shall | receive | the | contracting | officer’s | acceptance | in | writing | of | any | |||||
| proposed | change | to | his | QC | system. | At | a | minimum, | the | contractor's | QC | plan | shall | contain | the | following: |
| 1.6.8.1 | Provisions: | ||||||||||||
| 1. Organization | chart | which | provides | for | QC | personnel | to | have | direct | accountability | to | the | Contractor's |
| top | management. | ||||||||||||||
| 2. An | inspection | system | covering | all | tasks | and | services | required | by | this | contract. | ||||
| 3. A | schedule | shall | include | areas | to | be | inspected | on | a | routine | or | unscheduled | basis, | frequency | of |
| inspections, | documentation | forms, | and | individuals | that | will | perform | the | inspections | and | the | follow‐ |
| up | procedures. |
| 4. Method | of | identifying | deficiencies | in | the | quality | of | services | performed | before | the | level | of |
| performance | becomes | unacceptable. |
| 5. Method | of | documenting | and | enforcing | QC | operations. | ||||
| 6. Process | action | plan | to | correct | and | prevent | continuous | deficiencies | and | defects. |
| 7. Methods | of | communication | with | the | Government | regarding | quality | and | contract | performance. |
| 8. Customer/diner | feedback. | |||||||||
| 9. Monthly | reporting | system | to | the | Contractor's | home | office. |
| 1.6.8.2 | Elements | of | the | Plan: |
| 1. Personnel | health | and | hygiene. |
2. Safety.
3. Fire prevention and evacuation.
| 4. Environmental | protection. | ||||||
| 5. Energy | conservation. | ||||||
| 6. Sanitation | training. | (Ref. | 5.1.2.1 | PWS) | |||
| 7. HAZMAT | Program. | ||||||
| 8. Hazard | communication | standards | (OSHA) | for | use | of | chemicals |
| 9. Hazard | Analysis | Critical | Control | Point | (HACCP). | ||
| 10. Government | Property. |
11. Security.
12. Key control.
1.6.8.3 Inspection Techniques:
| 1. Random | sampling | (inspections) |
| 2. Planned | sampling | (inspection) |
| 3. Customer | surveys |
| 1.6.9 | Quality | Assurance: | The | government | shall | evaluate | the | contractor’s | performance | under | this | contract | ||||
| in | accordance | with | the | Quality | Assurance | Surveillance | Plan. | This | plan | is | primarily | focused | on | what | the | |
| Government | must | do | to | ensure | that | the | contractor | has | performed | in | accordance | with | the | performance | ||
| standards. | It | defines | how | the | performance | standards | will | be | applied, | the | frequency | of | surveillance, | and | the | |
| minimum | acceptable | defect | rate(s). |
| 1.6.10 | Place | of | Performance: | The | work | to | be | performed | under | this | contract | will | be | performed | at | ||
| Illesheim, | Germany, | Storck | Barracks, | Building | 6628. | ||||||||||||
| 1.6.11 | Type | of | Contract: | See | provision | FAR | 52.216‐1. |
| 1.6.12 | Security | Program: | The | Contractor | or | any | representative | of | the | Contractor | entering | DoD, | USAREUR, | ||||||
| or | local | locations | to | perform | contract | requirements | shall | abide | by | all | security | regulations | and | may | be | subject | |||
| to | security | inspections | IAW | AE | Regulation | 525‐13, | Military | Operations, | Antiterrorism. | Contractor | personnel | ||||||||
| and | property | shall | be | subject | to | search | and | seizure | upon | entering, | while | on, | and | upon | leaving | the | DoD, | ||
| USAREUR, | or | local | locations | pursuant | to | regulatory | guidance. | ||||||||||||
| All | Contractor | personnel | shall | conduct | themselves | IAW | acceptable | business | decorum | at | all | times. | The | ||||||
| Contractor | shall | remove | any | individual | from | the | site | whose | continued | presence | or | employment | on | this | |||||
| contract | is | deemed | by | the | KO | or | COR | to | be | contrary | to | the | public | interest, | deemed | to | adversely | affect | health, |
| morale, | welfare, | or | good | order | and | discipline | on | the | installation, | or | inconsistent | with | the | best | interests | of | |||
| national | security. |
| 1.6.12.1 | AT | Level | I | Training. | All | contractor | employees, | including | subcontractor | employees, | requiring | ||||
| access | to | Army | installations, | facilities, | and | controlled‐access | areas | shall | complete | AT | Level | I | awareness | ||
| training | within | fifteen | (15) | calendar | days | after | the | contract | start‐date | or | within | 30 | calendar | days | of |
| new | employees' | commencing | performance. | The | contractor | shall | submit | certificates | of | completion | for | each | |||
| affected | contractor | employee | and | subcontractor | employee | to | the | COR | AT | Level | I | awareness | training | is | |
| available | online | at | https://atlevel1.dtic.mil/at. | (Deliverable | 0006). |
| 1.6.12.2 | iWATCH | Training. | The | contractor | and | all | associated | subcontractors | shall | brief | all | employees | on | ||
| the | local | iWATCH | program | IAW | the | training | standards | provided | by | the | Antiterrorism | Officer. | This | locally | |
| developed | training | shall | inform | contractor | employees | of | the | types | of | behavior | to | watch | for | and | instruct |
| contractor | employees | to | report | suspicious | activity | to | the | COR. | This | training | shall | be | completed | within | ten |
| (10) | calendar | days | after | contract | award | and | within | fifteen | (15) | calendar | days | after | new | employees | |
| commence | contract | performance. |
| 1.6.12.3 | Access | and | General | Protection/Security | Policy | and | Procedures | ‐ | ||||
| The | contractor | and | all | associated | subcontractor | employees | will | comply | with | applicable | installation, | facility, |
| and | area | commander | installation/facility | access | and | local | security | policies | (often | more | restrictive) | and |
| procedures | (provided | by | Government | representative). | The | contractor | will | also | provide | all | information | ||||||
| required | for | background | checks | to | meet | installation‐access | requirements | to | be | accomplished | by | the | |||||
| installation | provost | marshal | office, | director | of | emergency | services, | security | office, | site | commander, | or | as | ||||
| established | by | any | form | of | governing | agreements. | The | COR | is | responsible | to | inform | the | contractor | of | the | |
| requirements | and | associated | lead | time | needed | to | grant | access | to | contracted | employees. | The | contractor | ||||
| workforce | must | comply | with | all | personal | identity | verification | requirements | as | directed | by | DOD, | HQDA, | ||||
| USEUCOM, | USAREUR, | and | local | policy. | In | addition | to | the | changes | otherwise | authorized | by | the | changes | clause | ||
| of | this | contract, | should | the | force | protection | condition | (FPCON) | at | any | individual | facility | or | installation | change | ||
| or | more | stringent | access | control | measures | be | directed, | the | Government | may | require | changes | in | contractor | |||
| security | matters | or | processes | including | searches, | access | restrictions, | or | additional | controls. | Additionally, | ||||||
| Commanders | at | all | levels | retain | the | authority | to | revoke | access | for | reasons | not | only | limited | to | security |
concerns.
| Until | access | is | authorized, | the | installation, | site, | or | facility | will | be | responsible | to | establish | procedures | to | escort |
| and | control | the | circulation | of | contractors | and | employees | IAW | with | applicable | requirements. |
| 1.6.12.4 | OPSEC | SOP/Plan | requirements. | The | contractor | shall | develop | an | OPSEC | Plan/SOP | within | 90 | |||||||||
| calendar | days | of | contract | award | to | be | reviewed | and | approved | by | the | responsible | Government | OPSEC | |||||||
| officer, | per | AR | 530‐1, | Operations | Security. | The | SOP/Plan | will | include | the | government’s | critical | information, | ||||||||
| why | it | needs | to | be | protected, | where | it | is | located, | who | is | responsible | for | it, | and | how | to | protect | it. | In | addition, |
| the | contractor | shall | identify | an | individual | who | will | be | an | OPSEC | Coordinator. | The | Contractor | shall | comply | ||||||
| with | all | applicable | Department | of | Defense | (DoD) | security | regulations | and | procedures | during | the | performance | ||||||||
| of | this | contract. | The | Contractor | shall | not | disclose | and | must | safeguard | procurement | sensitive | information, | ||||||||
| computer | systems | and | data, | Privacy | Act | data, | and | government | personnel | work | products | that | are | obtained | or | ||||||
| generated | in | the | performance | of | this | contract. | Neither | the | Contractor | nor | any | of | its | contract | service | providers | |||||
| shall | disclose | or | cause | to | disseminate | any | information | concerning | operations | of | military | activities. | Such | ||||||||
| action(s) | could | result | in | violation | of | the | contract | and | possible | legal | actions. | (DELIVERABLE | 0028) |
| 1.6.12.5 | OPSEC | Training | ‐ | Per | AR | 530‐1, | Operations | Security, | new | contractor | employees | must | complete | |||
| Level | I | OPSEC | training | within | 30 | calendar | days | of | reporting | for | duty. | All | contractor | employees | must | complete |
| annual | OPSEC | awareness | training. | Training | will | be | provided | by | the | requiring | activity. | |||||
| 1.16.12.6. | Access | to | Government | Information | Systems. | All | contractor | employees | with | access | to | a | ||||
| government | info | system | must | be | registered | in | the | ATCTS | (Army | Training | Certification | Tracking | ||||
| System) | at | commencement | of | services, | and | must | successfully | complete | the | DOD | Information | |||||
| Assurance | Awareness | prior | to | access | to | the | information | system | and | then | annually | thereafter. | ||||
| 1.16.12.7. | AT | Awareness | Training | for | Contractor | Personnel | Traveling | Overseas. | U.S. | based | contractors | |||||
| will | comply | with | DFARS | clause | 252.225‐7043. | Information | and | guidance | pertaining | to | DoD | |||||
| antiterrorism/force | protection | can | be | obtained | from | the | Illesheim | Anti | Terrorism | Officer. |
| 1.6.13 | Physical | Security: | The | Contractor | shall | ensure | the | physical | security | of | all | Government | property, | ||||||||
| accountable | property | or | information | provided | under | this | contract | is | secured | and | protected | against | theft, | ||||||||
| sabotage, | or | other | acts | constituting | illegal | destruction. | The | Contractor | shall | control | access | by | locking | or | |||||||
| unlocking | the | areas | or | facilities | provided | for | the | Contractor’s | use | in | the | performance | of | the | contract | ||||||
| requirements. | The | Contractor | shall | lock | all | overhead | doors, | cages, | vaults, | warehouse | doors, | windows, | and | ||||||||
| other | areas | for | reasons | of | internal | security | before | leaving | an | area | unattended | and | prior | to | the | conclusion | of | ||||
| any | working | day. | In | the | event | a | Contractor | area | is | found | unsecured | or | there | is | a | response | to | an | alarm | during | |
| non‐duty | hours, | the | Contractor’s | Point | of | Contact | (POC) | will | be | contacted | to | secure | the | area. | The | Contractor | |||||
| shall | inform | the | COR | of | the | results | of | the | alarm | response. | The | Contractor | shall | report | any | facility | security | ||||
| violations | to | the | COR | within | one | (1) | hour | of | discovery. |
| 1.6.14 | Key | and | Lock | Control | of | Contractor | Operated | Facilities: | The | Contractor | shall | establish | and | |||||
| maintain | a | Key | and | Lock | Control | Program | as | part | of | the | Quality | Control | Plan. | The | Contractor | shall | safeguard | |
| keys | furnished | to | the | Contractor | by | the | government. | The | Contractor | shall | utilize | an | automated | key | control | |||
| system | or | an | equivalent | substitute | as | a | means | of | key | control. | The | Contractor | shall | designate | in | writing | to |
| the | COR | a | key | custodian | to | manage | the | key | control | program | by | the | start | of | full | performance | at | the |
| post | award | conference | or | within | 5 | calendar | days | after | contract | start | (which | occurs | first). | (Deliverable | ||||
| 0007 | and | 0008). |
1.6.15 Qualifications:
1.6.15.1 Health and Hygiene Standards
| 1.6.15.1.1 | Health | Examinations | ||||||||||||||||
| The | Contractor | shall | provide | health | certificates | for | each | employee | prior | to | working | in | Food | Service | ||||
| Operations. | These | certificates | must | be | updated | 10 | calendar | days | prior | to | contract | start | date | and | annually | on | ||
| the | date | contract | was | awarded | (DELIVERABLE | 0011). | Personnel | with | evidence | of | communicable | disease, | ||||||
| infected | wounds, | open | sores, | or | acute | respiratory | infection, | shall | be | referred | to | a | doctor | to | receive | written | ||
| clearance | before | returning | to | work. | Personnel | with | a | health | problem(s) | shall | not | be | permitted | to | work | in | any | |
| capacity | where | there | is | likelihood | of | food | or | food | contact | surface | contamination | with | pathogenic | organisms | ||||
| or | transmitting | disease | agents | to | others. |
| 1.6.15.2 | Personnel | Health | and | Hygiene | |||||||||||||||||
| Personnel | shall | maintain | compliance | with | sanitation | and | food | safety | standards. | The | Contractor | shall | notify | ||||||||
| the | COR | in | writing | any | time | an | employee | is | diagnosed | with | an | illness | due | to | Salmonella | Typhi, | Shigella, | Spp, | |||
| Excherichia | coli, | 0157:H7, | or | hepatitis | A | virus. | Personnel | with | these | or | other | health | problems, | i.e. | persistent | ||||||
| sneezing, | coughing, | or | runny | nose | shall | not | be | permitted | to | work | in | the | dining | facility. | Personnel | relieved | of | ||||
| work | due | to | illness | must | have | doctor’s | clearance | before | returning | to | work. | The | Contractor | shall | provide | a | |||||
| copy | to | the | COR | immediately | upon | notification | (Deliverable | 0012). | Contractor | personnel | shall | wash | their | ||||||||
| hands | before | handling | clean | utensils, | equipment | or | starting | food | preparation | and | between | the | handling | of | |||||||
| raw | and | cooked | or | other | ready | to | eat | foods. | Contractor | personnel | shall | also | wash | their | hands | after | smoking | ||||
| tobacco | products. | Maintain | and | keep | fingernails | clean, | cut | short | and | devoid | of | nail | polish | and | other | nail | |||||
| products. | Tobacco | of | any | form | shall | not | be | used | in | or | near | the | dining | facility. | The | use | of | alcoholic | beverages | ||
| or | illegal | drugs | by | Contractor | personnel, | while | on | duty, | is | strictly | forbidden. | Standards | specified | in | TB | MED | |||||
| 530 | apply. |
1.6.15.3 Dining Facility Manager and Assistant Dining Facility Manager
Qualifications/Duties
| ‐Dining | Facility | Manager | and | Assistant | Dining | Facility | Manager | shall | pass | a | background | check, | be | able | to |
| maintain | a | CAC | and | password | to | access | government | IT | systems. |
| ‐The | Contractor | shall | ensure | the | Dining | Facility | Manager | and | Assistant | Dining | Facility | Manger | complete | all | |||||
| personnel | clearance | actions, | training; | government | systems | access | requirements, | and | installation | access | |||||||||
| requirements | IAW | Section | 1.6 | in | this | PWS. | In | order | to | avoid | any | delays | in | permanent | base | access | the | 12 | |
| month | residency | requirement | is | mandatory. |
| ‐The | Contractor | shall | ensure | that | Dining | Facility | Manager | and | Assistant | Dining | Facility | Manager | understand, | ||
| operate, | and | have | user | accounts | for | the | Army | Food | Management | Information | System | (AFMIS), | Army | Record | |
| Management | Information | (ARMIS), | and | Over | the | Counter | Channel | (OTCnet) | IAW | but | not | limited | to, | AR | 30‐ |
| 22, | AIS | Manual | 25‐L37‐AJK‐ATT‐EM‐4, | AR | 25‐400‐2, | DA | PAM | 30‐22, | TM4‐41‐11, | and | TM | 4‐41‐12. |
| ‐The | Contractor | shall | ensure | that | Dining | Facility | Manager | and | Assistant | Dining | Facility | Manager | shall | ||
| have | language | proficiency | equal | to | Level | 3, | i.e. | Personnel | must | speak | and | write | the | English | language |
| correctly | and | fluently. | They | must | be | able | to | communicate | effectively | on | complex | matters | and | compose | |
| correspondence | and | other | written | communications | about | the | work | for | which | they | are | responsible. | As | a | |
| minimum, | the | Dining | Facility | Manager/Assistant | Facility | Manager | shall | within | the | last | ten | (10) | years, | have | |
| five | (5) | years’ | experience | working | in | a | food | service | operation | providing | cafeteria | style | or | multi‐entree | |
| operation | providing | complete | meal | service | (breakfast, | lunch | and | dinner), | three | (3) | years’ | experience | as | an |
| assistant | manager | or | manager | of | a | United | States | Army | DFAC | or | at | least | eight | (8) | years | of | progressive |
| management | experience | working | in | a | large | food | service | operation | providing | cafeteria | style | or | multi‐ | ||||
| entree | operation | that | provides | complete | meal | service | similar | in | size | and | complexity | to | the | operation | offered | ||
| in | this | contract. | Progressive | management | experience | is | defined | as | "having | performed; | managed | or | |||||
| supervised | the | jobs | described | in | this | PWS. | Experience | shall | also | include | as | a | minimum | two | (2) | years’ | |
| experience | using | automated | food | management | systems | within | the | past | five | (5) | years. | Military | food | ||||
| service | experience | in | the | pay | grade | of | E‐7 | or | above | may | be | credited | as | management | experience | for | this |
| position. | The | dining | facility | manager | and | assistant | shall | be | a | high | school | graduates | or | above, | shall | ||
| have | completed | a | Food | Protection | Certification | (IAW | TB | MED | 530). | The | Food | Protection | Certification | ||||
| shall | be | current | IAW | the | certifying | agency. | The | dining | facility | manager | and | assistant | shall | possess | the | ||
| knowledge | and | skills | required | to | plan, | control, | manage, | and | be | responsible | for | the | successful | completion | of | ||
| the | work. | The | dining | facility | manager | and | assistant | shall | provide | overall | supervision | for | the | Contractor | |||
| employees | to | include, | but | not | limited | to, | planning | and | managing | the | contract | professionally, | ensuring | that | |||
| work | is | scheduled | properly | to | obtain | maximum | use | of | resources; | ensuring | that | accurate | and | timely | reports | ||
| are | provided; | effective | supervision | to | prevent | inefficient | or | wasteful | methods | in | the | performance | of | services | |||
| ordered; | and | execute | cost | saving | factors | and | quality | controls | to | ensure | work | is | performed | as | scheduled. | The | |
| dining | facility | manager | and | assistant | shall | provide | management | coordination | and | serve | as | the | central | POC | |||
| with | the | government | for | all | work | under | the | contract. |
| The | following | functional | requirements | have | to | be | met | in | order | to | qualify | for | this | position | and | shall | be |
| provided | 10 | calendar | days | prior | to | start | of | contract | and | annually | on | contract | award | date. | This | ||
| documentation | shall | be | provided | by | medical | doctor. | (DELIVERABLE | 0013) |
| 1. | Heavy | lifting, | 45 | pounds | and | over | |||||||||||
| 2. | Heavy | carrying, | 45 | pounds | and | over | |||||||||||
| 3. | Prolonged | standing, | 50 | minutes | continuous. | ||||||||||||
| 4. | Must | be | able | to | pass | physical/fit | for | duty | exam | within | last | 90 | days | before | contract | award | date. |
1.6.15.4 Lead Cooks
Qualifications/Duties:
‐Contractor Lead Cooks shall pass a background check, be able to maintain an ID Badge for Installation access.
| ‐Contractor | shall | provide | Lead | Cooks | that | shall | support | the | Dining | Facility | Manager | and | Assistant | Dining |
| Facility | Manager | that | meet | performance | standards. |
| ‐The | Contractor | shall | ensure | Lead | Cooks | complete | all | personnel | clearance | actions, | training, | and | installation |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .