04_-_Attachment_II_Drawings.pdf
PDF 839 KB Posted
- Attached to
- Repair Interior of Building, USAG Bavaria
- Solicitation number
- W912PB-16-B-8109
About this file
W912PB-16-B-8109 Attachment II Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0001.pdf | ||
| Amendment_Information.pdf | ||
| 02_-_W912PB-16-B-8109.pdf | ||
| 01_-_IFB_Cover_Letter.pdf | ||
| 03_-_Attachment_I_Specification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE
James M. Beatty, Master Planning
PROJECT NO
DATE DESCRIPTION DRAWN BY APPROVED
PROJECT TITLE
USING UNITDATE
DATE
DATE
DATE
PROJECT ENGR CHECKED BY
SCALE
SHEET
OF
REV NO
NAME (PRINT) NAME (PRINT)
NAME (PRINT)NAME (PRINT)
SIGNATURE SIGNATURE
SIGNATURESIGNATURE
MASTER PLANNER
DRAWN BY
ENGR DIV
DESIGN / PROJ MGMT BR
INSTALLATION
USAG BAVARIA
Grafenwoehr Military Community - Tower Barracks
H.-J.H. FUCHS L. Gruenwald
MALE
TOILET
FEMALE
TOILET
TECHNIKRAUM
utilities room
MALE
TOILET
FEMALE
TOILET
TECHNIKRAUM
utilities room
MALE
TOILET
FEMALE
TOILET
TECHNIKRAUM
utilities room
+0,00-
MALE
TOILET
FEMALE
TOILET
+0,00-
CAMP AACHEN, USAG BAVARIA,
REPAIR INTERIOR OF BUILDING 1484,
19.04.2016 EZ-00996-5J
G. ARNOLD
+0,00-
+0,00-
+0,00-
A = 61,47 m†
U = 32,58 m
A = 10,05 m†
U = 13,94 m
A = 179,97 m†
U = 54,30 m
A = 18,11 m†
U = 17,60 m
A = 6,79 m†
U = 10,15 m
A = 7,38 m†
U = 11,48 m
A = 7,38 m†
U = 11,48 m
Trockenbauarbeiten / Decken
Dry construction work / ceilings - Scale / M. 1:100
Metallprofilen einbauen
Komplett neue Decke mit Mineralplatten inkl. konstruktiven including structural metal profiles
Install entirely new ceiling with mineral fiber panels
Trockenbauarbeiten / Waende
Dry construction work / walls - Scale / M. 1:100
Moeblierung / Bestuhlung furniture / chairs Scale / M. 1:100
Raumhoehe 2.60m streichen der Waende
Paint walls, room height 2.60m /
Raumhoehe 2.60m streichen der Waende
Paint walls, room height 2.60m / und durch neue Rigipselemente ersetzen vorhandene Wandbekleidung demontieren
Dismount existing wall cover; and replace by new sheetrock elements. /
Bodenbelagsarbeiten
FLoor covering work Scale / M.1:100 erneuern ausbauen und
Fliesenbelag
Dismount and replace tile covering /
Gitterrost erneuern
Replace grating /
Neue Mineralplatten in bestehende Tragkonstruktion einbauen
Install new mineral fiber panels in existing supporting structure /
PVC Boden einbauen
Install PVC floor /
Alu - Rahmentuere
Neue Tuere einbauen
Install new door. Aluminum frame door / einbauen einer neuen Alu - Rahmentuere bestehende Stahltuere ausbauen
Install new aluminum frame door. /
Dismount existing steel door.
Mauerwerk und Aussenputz sanieren
Repair masonry and exterior plaster /
Holzzaun streichen
Paint wooden fence /
FLOOR PLAN FOR BUILDING CONSTRUCTION WORK
Alle Masse sind am Objekt zu ueberpruefen!
CHECK ALL DIMENSIONS AT THE JOB SITE!
Room axis
Nebenarbeiten
Auxiliary work - Scale / M.1:100
Buero office
+0,00-
+0,00-
Buero office
+0,00-
RAUMHOEHE 2,60m room height 2,60m
KONFERENZRAUM
CONFERENC ROOM
+0,00-
RAUMHOEHE 2,60m room height 2,60m
KONFERENZRAUM
CONFERENC ROOM
Buero office
+0,00-
RAUMHOEHE 2,60m room height 2,60m
RAUMHOEHE 2,60m room height 2,60m
RAUMHOEHE 2,60m room height 2,60m
MALE
TOILET
FEMALE
TOILET
TECHNIKRAUM
utilities room8 .8
+0,00-
+0,00-
+0,00-
+0,00-
RAUMHOEHE 2,60m room height 2,60m
3.7824.16
.1
3315.65157.7033 243.2824
.0
.0
.8
.0
.4
.3
.0
153.69123.8933
2.29
1.04354.01
12.5872
2.19727.94
.7
.5
.1
Buero office
RAUMHOEHE 2,60m room height 2,60m
9 9 9
4 4 4 4
KONFERENZRAUM
CONFERENCE ROOM
+0,10 +0,50+0,20 +0,30 +0,40 +0,00 und Oeffnungen durch Gipskartonwand schliessen vorhandene Projektionswand demontieren gypsum board panels dismount existing projection wall and close openings by means of im rechten Bereich einbauen neuen PVC Belag im linken Bereich einbauen, neuen Teppichboden bestehenden Teppichboden ausbauen
Install new wall to wall carpet on the right side.
Install new PVC covering on the left side.
Dismount wall - to - wall carpet.
+0,10
+0,10
1.701.501.501.501.50
.8
.8
John A. Howard, C/Engr Div
L. Gruenwald, C/Design & Proj Mgmt Branch
1: 100
Douglas M. Garretson, C/Engr Div
DATE PROJECT NO
PROJECT TITLE
USING UNITDATE
DATE
DATE
DATE
PROJECT ENGR CHECKED BY
SCALE
SHEET
OF
NAME (PRINT) NAME (PRINT)
NAME (PRINT)NAME (PRINT)
SIGNATURE SIGNATURE
SIGNATURESIGNATURE
MASTER PLANNER
DRAWN BY
ENGR DIV
DESIGN / PROJ MGMT BR
INSTALLATION
USAG BAVARIA
Grafenwoehr Military Community - Tower Barracks
L. Gruenwald, C/Design Section & Proj Mgmt Br
TECHNIKRAUM
utilities room
EXIT
FIB
FEL
FEL
FEL
FEL
FEL
FWP
FWP
FWP
FWP
exist./best.
exist./best.
exist./best.
RV-BMA
UV1, exist./UV1, best.
HV, exist./HV, best.
exist./best.
Room # 1, 2, 3, 4 and 7: Outlets (230V, 110V and Data) will stay
Room # 6: Lighting System and Outlets will stay
Raum # 1, 2, 3, 4 und 7: Steckdosen (230V, 110V und Daten) bleiben bestehen
Raum # 6: Beleuchtung und Steckdosen bleiben bestehen
C E
E
A e x is t.
/b e s t.
R
R
E X I
T
EXIT
E X I
T
EXIT
E E E E
EEEE
E X I
T
NVS
exist./best.
Tableau, exist./Tableau, best.
exist./best.
exist./best.
FEL
UV2
NG-BMA
RV-BMA
KOP
FIB
FEL
FWP
R
E
EXIT
Legend /Legende
W. Morgeneier W. Morgeneier
19.04.2016
L. Gruenwald
1: 50 / o. M.
2EZ-00996-5J
CAMP AACHEN, USAG BAVARIA
REPAIR INTERIOR OF BUILDING 1484,
ELECTRICAL INSTALLATION AND DISTRIBUTIONS
40/0.03A x
63A
Sub Distribution UV1 / Unterverteilung UV1
D A
L I
S t e u e r g e r a e t
D A
C o n t r l
D e v i c e
D A e u e r g e r a e t
D A n t r v i c e
+HK
6AB
+HK
10AB
R e s e r v e
S p a r e
+HK
40/0.03A
+HK
6AB
+HK
10AB
R e s e r v e
S p a r e x
10AB
R a u m
R i h e
R o o m w x
10AB
R a u i h e
R o o m w x
10AB
R a u i h e
R o o m w x
+HK
10AB
R a u i h e
R o o m w x
+HK
10AB
R a u i h e
R o o m w x
+HK
10AB
R a u i h e n
R o o m w s x
+HK
10AB
R a u u f e n
R o o m e p s x
+HK
10AB
R a u i h e
R o o m w
Distribution Scheme UV2 / Verteilungsschema UV2
N e t z u e b e r w a c h u n g s r e l a i s
P o w r
M n i t o r i n g l a y x x
40/0.03A
16AB
R e s e r v e
S p a r e x
16AB
R a u
B i l e r
R o o m i l e r x
16AB
R a u i l e r
R o o m i l e r
40/0.03A x
16AC
M u l t i m e d i a
S c h r a n k
M u l t i m e d i a b i n e t x
16AB
R a u m
R o o m x
16AB
R a u m
R o o m x
16AB
R a u m
R o o m x
16AB
R a u m
R o o m
40/0.03A x
16AB
R a u m
R o o m x
16AB
R a u m
R o o m x
16AB
R a u m
R o o m x
16AB
R a u i l e r
R o o m i l e r x
16AB
S I
P c h r a n k
S I b i n e t x
16AB
C o a l i t i h r a n k
C o a l i t i b i n e t
40/0.03A x
16AB
R a u
W n d
R o o m l l x
16AB
R a u n d
R o o m l l x
16AB
R a u n d
R o o m l l x
16AB
R a u n d
R o o m l l x
32AB
I h r a n k
I b i n e t
40/0.03A 40/0.03A40/0.03A
32AC
R a u m
R o o m x
32A
CEE
40/0.03A
10AB
R e s e r v e
S p a r e x
10AB
R a u m
R o o m x
10AB
R a u m
R o o m
10AB
R e s e r v e
S p a r e
E x
10AB
J a l o u s i e n
J a l o u s i e s x
Main Distribution / Hauptverteilung x
Main Distribution / Hauptverteilung
63A 32A
40/0.03A 40/0.03A
16AB
R e s e r v e
S p a r e x
16AB
R a u n d
R o o m l l x
16AB
R a u n d
R o o m l l x
16AB
R a u d e n
R o o m
F o o r x
16AB
R a u d e n
R o o m o o r x
16AB
R a u d e n
R o o m o o r x
16AB
R a u m
R o o m x
16AB
R a u m
R o o m x
16AB
R a u m
R o o m
D02
25A x
U V
B e l e u c h t u u m
U V
L i g h t i o m
N e t z u e b e r w a c h u n g s r e l a i s
P o w r n i t o r i l a y
Electrical Installation / Elektroinstallation - Massstab / Scale 1:50
ABC
NVS
Distr. Scheme UV1-110V / Verteilungsschema UV1-110V
Raum # 5: Bodenkanäle mit Auslässen bleiben bestehen
Room # 5: Floor Ducts with Outlets will stay x
16AC
R a u d e n
R o o m o o r x
16AC
R a u d e n
R o o m o o r x
16AC
R a u d e n
R o o m o o r x
16AC
R a u d e n
R o o m o o r x
16AC
R a u
T s c h e
R o o m s k s x
16AC
R a u s c h e
R o o m s k s x
16AC
R a u s c h e
R o o m s k s x
16AC
R a u s c h e
R o o m s k s x
16AC
R a u s c h e
R o o m s k s x
16AC
R a u s c h e
R o o m s k s x
16AC
R a u s c h e
R o o m s k s x
16AC
R a u s c h e
R o o m s k s x
16AC
R a u s c h e
R o o m s k s x
16AC
R a u s c h e
R o o m s k s
16AB
R e s e r v e
S p a r e
Data1, exist./Data1, best.
Data2, exist./Data2, best.
h=2.5m h=2.5m h=2m h=2m x
16AB
R a u n d
R o o m l l bestehender Lüftungsauslaß existing Ventilation Outlet
Schutzrohr oberhalb der Decke Protection Duct above the Ceiling bestehender Bodenkanal existing Floor Duct
Steckdose 110V Receptacle 110V
Steckdose 230V Receptacle 230V
Ausschalter Off-Switch
Jalousieschalter Jalousie Switch
Bodentank für Revision Floor Case for Revision
Bodentank mit Netzwerkanschluß Floor Case with Network Connection
Bodentank mit Stromanschluß Floor Case with Power Connection
Tasterkombination Push-Button Combination
Elektroanschluss Allgemein Electrical Connection General
Verteilung Distribution Panel
Leuchte Light Fixture
Bewegungsmelder Motion Sensor
Leuchte mit Bewegungsmelder Light Fixture with Motion Sensor
Leuchte 1x28/54 W Light Fixture 1x28/54 W
LED Leuchte LED Light Fixture
Leuchte 3x14/24 W Light Fixture 3x14/24 W
Notlichtversorgungssystem Emergency Light Supply System
Notleuchte Emergency Light Fixture
Notausgangsleuchte Emergency Exit Light Fixture
Blitzleuchte Flash Light Fixture
Alarmhorn Alarm Horn
Druckknopfmelder Manual Fire Button
Rauchmelder im Hohlraumboden Smoke Detector in Hollow Floor
Rauchmelder Smoke Detector
Fluchtwegsplan Escape Route Plan
Feuerlöscher Fire Extinguisher
Feuerwehr Info- und Bedientableau Fire Department Info and Operation Tableau
Koppler Coupler
Rangierverteiler Brandmeldeanlage Cross Connection Distr. Cabinet Fire Alarm System
Netzgerät Brandmeldeanlage Power Supply Unit Fire Alarm System
Distribution Scheme UV1-230V / Verteilungsschema UV1-230V
John A. Howard, Acting Chief Master Planning
| BLDG1484_REPAIR INTERIOR OF BUILDING |
| b1484(0996-15)el |
File details come from the government source that posted it. Updated .