R-CH-ZKD-17291-17 - REPAIR ROOF # 20104

PRICE SCHEDULE

Ref. Items QTY U U.P. T.P.

TP-1-03 Dismounting 1 LS

TP-2-01 Old Roof Removal and Cleaning 375 M2

TP-2-03 Evacuation in container 10m3 8 EA

TP-3-01 Substrate 1 LS

TP-3-02 Concrete cemented roof walls - cornice 1 LS

TP-3-02 Concrete cemented roof walls - other surfaces 1 LS

TP-3-02 Concrete cemented roof walls - anti-carbonation paint

(full treatment of cornices, other surfaces)

50 M2

TP-4-01 Sloped insulation system 375 M2

TP-5-01 First layer 375 M2

TP-5-01 Finishing layer 375 M2

TP-6-01

TP-6-02

Upstands and special profiles 70 LM

TP-7-01 Connection membrane – PVC and inlet filter 1 LS

TP-7-03 Water downspouts - reinstallation 5 EA

TP-7-03 Repairs + cleaning of manholes 1 LS

TP-7-04 Rainwater shoe (reinstallation) 5 EA

G-05 As-built drawings 1 LS

TOTAL:

Legend: LS – Lump Sum; M2 - Squared Meters; LM – Linear Meters; EA - Each