Specifications R-CH-O2D-15272-15
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| Attendance_List.pdf | ||
| O2D-15272-15_-_Specifications_-_Work_to_be_performed.pdf | ||
| W912PA-16-B-0003.pdf | ||
| HANGAR___6 _SECOND_FLOOR.pdf | ||
| HANGAR___6 _FIRST_FLOOR.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USAG BENELUX
ENGINEERING DIVISION
HANGAR # 6 - CHIEVRES AIR BASE
HAINAUT - BELGIUM
SPECIFICATIONS FOR
PROJECT R-CH-O2D-15272-15
LOCATION Building #20006 - Chièvres Air Base
TITLE The one time interior cleaning and painting.
DATE June 2016
PERFORMANCE PERIOD 250 calendar days
INDEX
CHAPTER I : GENERAL
CHAPTER II : TECHNICAL PROVISIONS
SECTION 1 : Cleaning SECTION 2 : Painting
CHAPTER I
GENERAL
G-01: SCOPE OF WORK
A) General work description
The purpose of this project is to interior clean and paint of the main area and hallways of Bldg. # 20006 at Chievres Air Base. The main area and hallways of Bldg. # 20006 need a full cleaning to remove damage caused work done by LRC (Logistics Readiness Center) and DPW (Directorate of Public Works). Cleaning will include all walls, ceiling and floor, repainting of walls and floor.
The site of work is located: Chievres Air Base
Bldg 20006 7950 Chievres
B) Principal features
Principal items to be performed to accomplish the work consist of the following:
1) See various sections on previous page.
The above general outline of principal features does not in any way limit the responsibility of the contractor to perform all work necessary to achieve the desired end results and to supply all materials and labour required by these specifications and drawing.
G-02: DRAWINGS AND STANDARDS
A) Drawings
All work under this contract shall be carried out in strict conformity with the following drawing, which forms a part of these specifications.
DRAWINGS # TITLE DATE
B215200061 Bldg # 20006 Plan view 1st Floor May 13 B215200062 Bldg # 20006 Plan view 2nd Floor May 13
B) Specific applicable standards
All Belgian norms and regulations (NBN (Bureau de Normalisation), EN (European Norm), etc. ) in force concerning the performance of this project shall be applicable.
All regulations in matter of environmental, safety and health will be applicable
- General Regulations for Work Protection (RGPT) and Code on the welfare of workers on the work place
- General Regulations for Electrical Installations (RGIE)
Not limited to those above.
G-03: GUARANTEE, WORKMANSHIP AND MATERIALS
A) Workmanship and materials
All work done by the contractor will be in strict conformance with the best practices of the trades involved.
The contractor will employ workmen who are skilled in their particular trades.
In particular, all works with potential risk of refrigerants release to the atmosphere should be conducted under the direct supervision or by a person with a category I certificate as specified in the EU regulation (EC) 303/2008 and valid for the Walloon Region area.
For safety purposes, during the execution of the work, the contractor’s workers will have to speak French or English.
All materials will be brand new.
The contractor will in no way use asbestos containing materials for the performance of his work.
The paints will be lead free.
All hazardous products brought on site by the contractor must be documented on an inventory list with safety data sheet.
B) Guarantee
The contractor will guarantee his workmanship and materials for a minimum period of 1 year after the date of final acceptance or for the period as specified by pertinent Belgian laws for the workmanship or materials in question, whichever is longer.
G-04: SCHEDULING OF WORK
Prior to starting any work, the contractor will furnish the contracting officer, for approval, a detailed schedule showing the successive phases of the work. All interruptions or disturbance in normal functioning of US Government organizations will also be indicated (road closure, water or utility cuts).
G-05: AS-BUILT DRAWINGS
The contractor will submit detailed as-built drawings after completion of the project and before submitting the final bill.
As-built drawings will be precise and accurate. They will be drawn on BENTLEY MICROSTATION v8 system or any other 100% compatible system. The CD-Rom of the basic project will be given to the contractor for correction at his request.
G-06: HOT WORK PERMIT
All security measures as stated in the “Règlement Général sur la Protection du Travail” will be complied with. Prior to starting the work, the contractor will ask a Hot Work Permit (for welding, cutting work, etc...) to the C.O.R.. This permit will be delivered by the U.S. Army Fire Officer.
In addition, no open fires or burning of trash will be allowed within the confines of the USAG Benelux (NSSG) Community.
Contractors, concessionaires or vendors performing work or conducting business on or in facilities under the jurisdiction of the USAG Benelux Military Community Commander AOR will conform to this regulation. The Contractor Officer’s Representative (COR) will ensure that a copy of the French or Dutch translation of this regulation is handed to contractors at pre-construction conferences and that all requirements therein are adhered to. Specific requirements and limitations are as follows:
1. Smoking will be prohibited in the vicinity of hazardous operations and locations.
2. Waste material and rubbish will not be stored or allowed to accumulate within the building or in the immediate vicinity, but will be removed from the site at least daily. Rubbish will not be burned on the site.
3. Contractor materials and equipment will not be stored in a location or manner which will create a fire exposure to facilities adjacent to the project site.
4. The contractor will provide fire extinguishers at all locations where work is carried out.
5. In every building operation where a shed, storage, or other shanty is placed, or room or space is used for storage or workshop, the contractor will provide at least one approved portable fire extinguisher in a accessible location.
6. Flammable liquids and other hazardous materials such as paints, paint thinner, gasoline, asphalt, and tar will be stored in small detached structure or out in the open and not inside main buildings. Low flash point liquid used within buildings will be handled only in approved safety cans.
7. Adequate ventilation will be provided for paint spraying and operations involving the application of materials using adhesives containing flammable solvents. Such operations will be conducted remote from any potential source of ignition.
8. Asphalt and tar kettles will be located in a safe place outside of the building. Such kettles will not be placed on roofs or porches. Continuous supervision will be maintained while kettles are in operation. Metal covers will be provided for all kettles to smother flames in case of fire.
9. Electrical wiring and equipment for lighting, heating, and power purposes will be installed in compliance with current US and Host Nation Electrical Regulation requirements.
10. Cutting and welding will not be permitted unless:
a. A valid Hot Work Permit (welding permit) is available.
b. Combustibles have been safely covered or moved away.
c. A fire guard with a serviceable fire extinguisher is posted for the duration of the work and 30 minutes thereafter to assure that sparks or drops of hot material do not start fires.
11. Fire hydrants will only be used for firefighting and training of the local fire and Emergency Services. Water can only be taken from hydrants with the permission of the Community Fire and Emergency Services Office. Parking within 2.5 m (8 feet) of a hydrant is not permitted.
12. Vehicles and other equipment with fuel driven motors, with mounted and filled fuel tanks will be equipped with 2,5 kg or larger carbon dioxide or dry chemical fire extinguishers.
13. Gasoline, oil and grease shall not be disposed into drainage systems or public water systems. Oil contaminated areas will be covered with an absorbent material and removed in accordance with the Spill Contingency plan. Any POL spillage will be reported immediately to the DES Fire and Emergency Services Office, DSN 361-5401/5347.
14. Construction offices, huts, construction vehicles, trailers and supplies will be located at least 10 m from all adjacent buildings.
15. Access for fire fighting vehicles will be provided to the immediate job site at the start of construction and maintained until all construction is completed. Vehicle parking control measures will be established.
16. Free access from the street to fire hydrants and to outside connections for standpipes or other firefighting equipment, whether permanent or temporary, will be provided and maintained at all times. No materials or constructions will be placed within 10 feet of such hydrants or connections, or between fire hydrants and the center line of the street.
17. Scaffolding materials or equipment will not block fire escape routes or access routes during performance of projects in occupied buildings.
18. In all buildings over 30 feet in height at least one stairway will be provided in a usable condition at all times.
19. Notification and actions to be taken in case of a fire:
a. Persons who discover a fire shall immediately alarm all personnel in the area, and shall report the fire to the Community Military Police using the nearest telephone. Military telephone dial 117.
b. The fire shall be reported using the building number. If the fire is outside of a building, the nearest building number shall be given. Stay on the phone until the operator on duty has completely understood and does not have any further questions. After the notification you should immediately ensure all windows and doors are closed and that all personnel have left the area. The responding fire department must be informed if any special dangers exists; example: If gas and pressurized containers, or paint and other flammable material are within the range of the fire. Not only acute fires, but also fires which have been extinguished and did not cause any damage must be reported.
c. To ensure smooth notification and firefighting procedures, it is essential to show all employees the location of the nearest telephone, make sure they are familiar with the building number in which they are employed, and inform them of the locations of the fire extinguishers.
Also, for fire safety reasons, hot work permit will not be issued to perform cutting or welding operations before or after USAG BENELUX AOR regular duty hours.
G-07: ENVIRONMENTAL STEWARDSHIP
All measures will be taken to prevent occurrence of spills during works. When a leak is detected (i.e. fuel leak on field works vehicles or company vans), the contractor will proceed to the immediate clean-up of the spill. Should the spill characteristics exceed the contractors response capacities, the contractor will immediately contact:
1) The Contracting Officer Representative
2) The Chievres Air Base Fire Department (068/ 27 54 01).
3) The USAG Benelux Environmental Division (068 27 5704)
4) The Spill Response Coordinator (068 27 5906)
The Contractor shall comply with all US, European and Belgian Environmental Protection Standards.
Environmental Compliance Plan and Program: It is required that the project manager of this contract reads the USAG Benelux Environmental Policy that is available publicly on the USAG Benelux homepage (type ‘USAG Benelux’ into an online search engine, selects the first link and selects ‘Environmental Policy’ at the bottom of the U.S. Army Garrison Benelux homepage (ISO14001:2004 Standards, Annex A2).
Environmental Review:
# Activities Potential impact/ Proposed mitigation measure Comment
1 Production of solid waste (construction debris, paint bucket)
Proliferation of invasive wildlife
Evacuate waste quickly after generation, and in any case, NLT the last day of works.
Possible contamination of drainage system with sediments and leachates from the construction debris
In case a temporary waste storage area is needed, minimize waste pile size and choose its location to avoid runoff contamination.
Please not that contractors are not allowed to use the recycling center of the base.
Loss of salvageable materials
Recycle waste to the maximum extent possible.
2 Storage and handling of hazardous materials, POL or hazardous waste (fuel for vehicles stored on-site, detergent)
Potential spills and soil and water contamination
Store and handle hazardous materials, POL and Hazardous Waste away from storm drainage system, in properly established designed and designated areas.
Place containers on secondary containment as appropriate.
Store absorbent materials close to the Hazardous Materials, POL or Hazardous Waste storage for a timely response to spills.
Spills caused by the contractor shall be cleaned on the spot, at contractor’s costs. All spills above 20 L should be reported to the COR for communication to Env. Div.
3 Various works on a building containing referenced in the Asbestos inventory
Possible encounter of Asbestos Containing Material (ACM) during works
The Asbestos inventory has been consulted to identify possible ACM in the building(s) concerned by this JOR. According to information provided by project proponent/project designer, works will be operated outside of the areas where ACM have been identified:
- Level 2 # 210A & B Computer room, old floor covering under the actual thermoglued linoleum covering
- Boiler room # 121 & roof near # 220B, chimney manhole
- Roof near # 220B, chimney pipe extending probably in the building
G-08: SITE MAINTENANCE AND FINAL CLEANING
During performance of works, all measures should be taken to avoid improper temporary storage of waste generated by works. In particular, emphasis will be put on POL (Petroleum, Oil and Lubricants) containing equipment or soiled waste/hazardous waste (scrap metal, contaminated soil) As soon as the work is finished, the contractor shall remove all his equipment, excess materials, debris, etc. generated by his work and will evacuate them outside US Government installations.
G-09: COORDINATION IN MATTER OF SAFETY AND HEALTH
1. The law of 04 August 1996 related to the welfare of workers during the execution of their work and the royal decree of 25 January 2001 concerning temporary or mobile work sites are applicable for this project.
In accordance with article 71, §3, of above mentioned royal decree, a project-coordination as foreseen in section III, 1st sub section, of this royal decree has been set up during the elaboration of this project. Therefore, there is a safety and health plan related to this project for these specifications.
The contractor will comply with the recommendations of this safety and health plan (available upon request to the “Engineering Plans and Services Division”, Hangar # 6, Chievres Air Base (David Diricq, EPS Division, tel.068/27.54.46). These recommendations are part of this project.
In application of the same article 71, §3, an execution-coordinator will be designated by the C.O.R. for the coordination in matter of safety and health during the execution of this project.
Within 15 days after contract award, the contractor will submit at least 4 proposals of execution-coordinator to the C.O.R.’s approval with:
the necessary documents for the verification of the compliance with the conditions to exercise the coordinator function (art. 56 to 64 of R.D. dated 25.01.2001 completed by the royal decree of 19.12.2001)
No proposal may emanate from a coordinator working for the awarding firm or for an office on which the contractor has a supervisory position.
The C.O.R. has 10 calendar days to choose the execution-coordinator.
The coordinator’s fee is at the contractor’s charge.
2. The contractor has 15 days from the selection of the coordinator to make up and transmit to the C.O.R. and to the execution-coordinator a document with all the complementary elements to his bid that could be claimed by the coordinator.
3. The execution-coordinator does not act as a substitute for the C.O.R. He plays the role of an advisor of the awarding party. His mission is the following:
3.1. General obligations from the law of 04 August 1996 and royal decree of 25 January 2001
1. to coordinate the implementation of the general prevention principles described at article 5 of the law of 04 August 1996, during the technical or planning selections, in order to schedule the various simultaneous or consecutive works or phases of work, as well as during the expectation of the duration of these various works or phases of work;
2. to coordinate the implementation of relevant provisions in order to ensure that the contractors properly implement the general prevention principles and execution principles described at articles 4, 5 and 15 of the law of 04 August 1996;
3. to draw up a coordination logbook comprising the elements described at article 33 of the royal decree of 25 January 2001, except for elements dealing with the design of the project, and to update it;
4. to write down the deficiencies of the various parties in the logbook and to notify the C.O.R.;
5. to write down contractors’ remarks in the coordination logbook and leave them for information to the parties concerned;
6. to call and be the chairman of the coordination structure when such a structure has to be set up in accordance with article 37 of the royal decree of 25 January 2001;
7. to draw up an ulterior performance file whose content conforms with article 36 of the royal decree of 25 January 2001;
8. to organize the cooperation and coordination of activities between contractors, including those who follow one another, in order to ensure the protection of workers and the prevention of accidents and professional health hazards, as well as their mutual information;
9. to coordinate the supervision of the proper application of work procedures;
10. to take all necessary precautions so that only authorized people have access to the work site.
11. at the provisional acceptance of the work, to hand over the updated logbook and the ulterior performance file to the C.O.R., and to notify this delivery in a record attached to the ulterior performance file.
3.2. Special obligations within the scope of this project
1. to read and understand these specifications related to the work to be executed, especially the article concerning the safety and health measures to be implemented on the work site in application of the law of 4 August 1996 about the welfare of workers during the execution of their work, and of R.D. of 25 January 2001 about temporary or mobile work sites;
2. to give advice to the C.O.R. and to make proposals in due time concerning the implementation and adaptations of the document described at item 2 of above mentioned article, during the previous phase described in that item 2 as well as during the execution of the work;
3. to participate in any meeting to which he is invited by the C.O.R., and to set up himself any useful meeting with the C.O.R., the contractor or any intervening party on the work site, for the execution of his mission;
4. to control the application of the hazards prevention measures described at item 3 of the above mentioned additional article;
5. to write down the contractor’s obligations deficiencies as foreseen in above mentioned item 3 in the logbook.
4. The contractor applies the hazards prevention measures foreseen in the document described at item 2, adapted if necessary. He has the sections of this document applied by the possible sub-contractors if they apply to them.
5. During the execution of the work, the contractor updates the document described at item A, either on his own initiative, when the progress of the work, the identification of unforeseen or insufficiently known hazards, the incoming or outgoing of some parties, or any modification brought to the project or the work justifies, or at the C.O.R.’s request. If some update occurs on his own initiative, he informs the awarding party and the execution-coordinator. He takes into account any possible remark expressed by the C.O.R.
In particular, he also provides the following information to the C.O.R. with a copy to the execution-coordinator:
− name of the subcontractor(s), with their certificate, the nature and cost of the work they are responsible for, the expected starting date and duration;
− traffic rules and road signs for the work site, for the public traffic area (automobiles, bicycles, handicapped people…) and for the area reserved for the work and workers, and the access rules;
− storage procedures and evacuation of materials and debris;
− work planning.
6. The contractor must cooperate to the coordination as described above. To that purpose, he will give to the execution-coordinator, spontaneously or at his request, any information that is indispensable for the good execution of his mission. He will invite him at any meeting where his presence is necessary for the accomplishment of his task. He will participate in meetings where he is invited by the C.O.R. or the coordinator.
The contractor will have the obligations of previous paragraph applied by possible subcontractors.
7. The compliance with the obligations described in items 2, 5 and 6 above is an integral part of this project.
The application of hazards prevention measures described at item 4 is also an integral part of the project, provided that these measures do not exceed the general obligations that the law of 4 August 1996 and the R.D. of 25 January 2001 impose to contractors, in particular articles 7 and 15 of the law, and section VI, sub section IV of the decree.
8. The full text related to the coordination in matter of safety and health concerning this project can be consulted upon request to the “Engineering Plans and Services Division”, Hangar # 6, Chievres Air Base (David Diricq, EPS Division, tel.068/27.54.46).
G-10: ANTITERRORISM/OPERATION SECURITY REVIEW
Access and General Protection/Security Policy and Procedures.
The contractor and all associated subcontractor employees will comply with applicable installation, facility, and area commander installation/facility access and local security policy and procedures (provided by Government representative). The contractor will also provide all information required for background checks to meet installation-access requirements to be accomplished by the installation provost marshal office, director of emergency services, or security office. The contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the force protection condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
G-11: FINAL ACCEPTANCE OF WORKS
The final acceptance of the work will be done in the presence of the COR and the contractor.
CHAPTER II
TECHNICAL PROVISIONS
SECTION 1
CLEANING
TP-1: Cleaning
TP-1-01 Cryogenic cleaning Cryogenic cleaning is a process similar to sandblasting but with solid CO2 or carbon ice. Carbon ice is projected on surfaces to be cleaned in a compressed air flux.
The principle of this cleaning is based on three simultaneous effects occurring when carbon ice comes into contact with the polluted surface.
The thermal effect comes from the difference of temperature between carbon ice (-78.2oC) and the surface to be cleaned. This difference provokes a thermal shock that will crack and shrink the pollution, which will get loose from the surface.
The kinetic effect, or mechanic effect, comes from the impact of carbon ice on the pollution. The resulting effect is a mechanic embrittlement of the pollution.
The physical effect of sublimation comes from the physical characteristics of CO2. The change of state of CO2 – from -78.2oC to 20oC (regular temperature) is a change from solid to gas without passing through the liquid phase. This is called sublimation. CO2 expands up to 500 times its volume and expels the pollution, already fragile, from its support. This very efficient process is a dry process which does not generate secondary waste. It preserves the surface of the supports by its very soft mechanical action. It is 2 to 4 times faster than the classical methods.
Safety equipment Cryogenic cleaning requires following safety equipment:
Ear plugs. As during cryogenic cleaning, the sound level can sometimes exceed 85 dB(A), it is recommended to wear ear plugs.
Gloves. Wearing gloves is recommended to prevent any risk of freezing due to carbon ice grains.
Protective glasses. To protect the eyes from volatile particles, it is recommended to wear protective glasses. It is also recommended to wear full equipment with helmet, visor and ear plugs.
Respiratory protection. According to the presence of dust or generated concentration of CO2, slight or heavy respiratory protection measures are necessary.
Long sleeve clothing. The temperature of dry ice may cause burns to the operator.
Carbon dioxide warning device. To detect the concentration of CO2 in the air, the personnel in charge with the cryogenic cleaning must wear an individual CO2 detector. It releases an alarm as soon as it reaches a critical concentration. Always ensure that there is adequate ventilation in order to prevent the build-up of a dangerous concentration of carbon dioxide.
Concern: Roof, beams, columns & crane including all items & appliances attached to these elements (i.e. cables, light fixtures, outlets, switches, etc…)
TP-1-02: General cleaning The contractor will remove all grease, film, dirt, smudges, dry soil, food remnants, water spots and other foreign matters, such as chewing gum residue from all the surfaces to be cleaned, table tops and underneath table tops and table legs. All movable items will be moved if needed. After cleaning, the surfaces will have a clean, uniform appearance with no streaks and stains. All moveable items will be moved back to their original position. No wipe marks will be visible after cleaning.
Damp and wet wiping to remove all dust, lint, liner, dry soil, oily film, etc. from the horizontal and vertical surfaces. After damp and wet wiping, all such horizontal and vertical surfaces shall have a uniform appearance, free of streaks, smudges, dust, lint, liner, etc.
All the debris will be evacuated outside of the Base to an authorized public dump.
Concern: All surfaces to be cleaned: Walls, Ceilings, Floors, Wire mesh, handrail, Roofs above storage/offices, Exhaust system & catwalk, shelving’s & carpenter vacuum including all items & appliances attached to these elements (i.e. cables, light fixtures, outlets, switches, electrical panels, raceways, ducts, doors, windows, etc…)
TP-1-03: Vacuum Cleaning The surfaces to be cleaned shall be maintained free of soil, dirt, debris, litter and other foreign matter by effective routine vacuuming. Vacuum cleaners shall offer high airflow, high efficiency particulate air filter (HEPA filter), and an adjustable rotating brush agitation for effective soil removal. Custodial personnel must make every effort to minimize the generation of dust, both inside and outside of the building. Any spots and/or spills shall be removed by the carpet manufacturer’s approved methods or other commercially accepted practices as soon as noticed. Tears, burns, and raveling shall be brought to the attention of the facility manager. Moveable items (chairs, trash receptacles, any and all easily moved item) shall be tilted or moved to access the floor surface for vacuum underneath these items. Moved items shall be returned to their original position after cleaning.
Concern: All surfaces to be cleaned: Walls, Ceilings, Floors, Wire mesh, handrail, Roofs above storage/offices, Exhaust system & catwalk, shelving’s & carpenter vacuum including all items & appliances attached to these elements (i.e. cables, light fixtures, outlets, switches, electrical panels, raceways, ducts, doors, windows, etc…)
TP-1-04: Sweep Floors The entire area, to include stairways, landings, riser’s entrances, vestibules, lobbies and all walking surfaces to be swept shall be thoroughly cleaned to remove dust, dry soil, and other litter. After the floor has been swept, the floor surface including corners and abutments, shall be free of streaks, litter, and spots caused by spills, with no visible dust, soil, or other litter. Moveable items (chairs, trash receptacles, any and all easily moved items) shall be tilted or moved to access the floor surface to sweep underneath these items. Moved items shall be returned to their original position after cleaning. Sweeping shall follow the week after the wet-mop services.
TP-1-05: Wet Mop Use proper wet floor signage. All hard floors, to include stairways, landings, risers entrances, vestibules, lobbies and all walking surfaces. Sweep, vacuum or dust mop the floors and baseboards to remove any large debris prior to wet mopping. Apply the floor cleaning chemical according to the manufacturer’s directions. After wet mopping, all stains and soils which are water soluble should be removed from the floor, leaving a clean, fresh floor. Floors must have a clean, uniform glossy appearance free of soil, film and stains, streaks, swirl marks, or standing water and/or contamination. All exposed surfaces as baseboards and furnishings must be also free of splash marks and streaks. No mop streaks must remain in the area. Moveable items (chairs, trash receptacles, any and all easily moved items) shall be tilted or moved to access the floor surface to wet mop underneath these items. Moved items shall be returned to their original position after cleaning. All floor drains shall be cleared of soils and debris, be cleaned and thoroughly rinsed with clean fresh water, leaving a 100% full with fresh water floor drain.
Same procedure for all vertical surfaces.
Concern: All surfaces to be cleaned: Walls, Ceilings, Floors, Wire mesh, handrail, Roofs above storage/offices, Exhaust system & catwalk, shelving’s & carpenter vacuum including all items & appliances attached to these elements (i.e. cables, light fixtures, outlets, switches, electrical panels, raceways, ducts, doors, windows, etc…)
TP-1-06: Dusting & High Dusting Dusting. Shall be defined as the removal of all dust, lint, liner, dry soil, etc. from the horizontal surfaces of desks, chairs, file cabinets, and other types of office furniture and equipment and from horizontal ledges, window sills, ventilation/AC diffusers, sun blinds, heating radiators, hand rails, light fixtures, utility ducts, etc. below 1.8 meters from the top of the floor surfaces. After dusting, all such horizontal surfaces shall have a uniform appearance, free of streaks, smudges, dust, lint, liner, etc. Dusting shall be accomplished by removal of soil from the area, not by moving it from one surface to another.
High Dusting. High dusting shall be defined as the removal of dust, lint, liner, cobwebs, oily film, etc., from all fixtures and surfaces above 1.8 meters from the top of the floor surfaces. This includes lights, grills, light fixtures, pipes, sprinkler system, cables, ledges, walls, ceilings, vents, air diffusers(heating and A/C) etc. After high dusting, all areas and surfaces above 1.8 meters from the top of the floor surface shall be free from all types of soil removable by damp wiping and shall blend in with the area below 1.8 meters high.
Concern: All surfaces to be cleaned: Walls, Ceilings, Floors, Wire mesh, handrail, Roofs above storage/offices, Exhaust system & catwalk, shelving’s & carpenter vacuum including all items & appliances attached to these elements (i.e. cables, light fixtures, outlets, switches, electrical panels, raceways, ducts, doors, windows, etc…)
TP-1-07: Wash Interior Glass Wash Interior Glass. Wash interior glass shall be defined as the complete removal of smudges, tape, oily film, and other types of soil from all glass and its frames, in interior partitions, walls, doors, display cases, directory boards and other interior glass areas.
The glass and glass frames shall be rinsed to remove any detergent solution residue. After washing, the glass areas shall be free of dust, smudges, oily film, tape, and all other types of soil, streaks, and watermarks. Glass cleaner splash and drip marks shall be removed from all adjacent surfaces.
TP-1-08: Wash Exterior Glass Wash Exterior Glass. Wash exterior glass shall be defined as the complete removal of smudges, tape, oily film, cobwebs, dust, and other types of soil from both sides of the glass, frames, and sills of exterior window, doors, vestibules, etc. The glass and shall be rinsed to remove any detergent solution residue. After washing, the glass areas shall be free of smudges, tape, oily film, cobwebs, dust and all other types of soil, streaks, and watermarks. Glass cleaner splash and drip marks shall be removed from all adjacent surfaces.
TP-1-09: Clean Doors and Doorframes Doors and Doorframes. In and outside doors shall be cleaned and sanitized, including the top of the doors and top of doorframes.
After cleaning, doors, doorframes, door glass, door kick-plates and all door hardware(handles, locks, hinges, closers, emergency push bars, doorstops) shall be free/have no tract of streaks, marks, finger prints, heel marks, swirl, dust, or any other contamination, have a polished look and be sanitized.
TP-1-10: Scrub Walls and Woodwork Woodwork. Wooden baseboards, wooden display/info boards, etc. All visible woodwork surfaces shall be damp wiped, polished and sanitized. After cleaning, all wood work and its hardware shall be free of streaks, marks, finger prints, swirl, dirt, smudges, water, or any other contamination, and be sanitized.
Walls. All inside walls, the mirrors and hardware attached to the walls. Contractor shall use neutral soap that will not damage or fade the wall paints or laminations. After cleaning all walls, wall mirrors, and wall hardware shall be free of dust, heel marks, streaks, marks, swirl, dirt, smudges, water, or any other contamination.
SECTION 2
PAINTING
TP-2: Painting
TP-2-01: Painting of the floor
A. Description of the work
The work includes:
• Cleaning and drying of the support (removal of dust, stains, grease, etc…) according to TP-1.
• Blasting of the floor and removal of existing paint
• painting of primer, type Epoxy Sikafloor 161 or equal
• painting of one base coat, type Epoxy Sikafloor 263 SL or equal
• spreading of structured quartz sand
• vacuum cleaning of Abradur granulates in excess
• application of a sealing coat, type Sikafloor 264 or equal. RAL to be submitted to the COR
Before executing the work, a test area of 21m2 must be approved by the COR.
Before ordering, the contractor will submit to the COR’s approval a technical documentation for each proposed material, with a detailed description of all characteristics.
Coordination of Operations. All coordination during execution of the contract will be with the COR or authorized representative.
Work will be phased so that only one-half of the building is turned over to the contractor at one time. Any equipment or material temporarily stored will be moved by government personnel upon reasonable notice of at least 5 days of intent to work in the area.
Protection and Cleanup. The contractor will protect areas adjacent to surface preparation and coating operations, and will protect the work area with barricades, warning tape, and signs. When work is complete, the contractor will remove these items (including masking tape); and will remove accumulated debris.
Non-painted Areas. Areas, devices, or items not to be coated must be masked off. The contractor will provide proper masking material, masking tape, polyethylene sheet, or other materials as required to protect areas from overspray, splatter, foot tracking, and spills.
Warranty. The contractor will warrant the applied floor coating system with a safety non-slip surface for a period of not less than two years against defects such as: peeling; loss of adhesion; loss of static dissipative properties; film softening; or failure from chemicals or fluids used in hangar operations. The contractor will warrant the coating materials free of formulation or manufacturing defects.
B. Technical specifications
Description. The system, type structured Sikafloor-263SL, is a cast non-slip floor covering with epoxy resin basis. This system is designed for average or heavy traffic floor covering. This structured floor covering, colored in the mass, has a total thickness of 2- 4mm.
Certificates. This floor covering has following agreements:
• Products complying with norm EN 13813 “Screed materials and screeds”
• Products complying with norm EN 1504-2 “Concrete surface protection systems”
• Products complying with the 2010 limits of provision 2004/42 of the UE VOC – Deco paint Provision
• Products complying with LEED requirements: VOC content < 100 g/l
• European fire classification according to norm EN 13501-1: Bfl-S1
• Alimentary environment: ISEGA compliance certificates
The resin supplier will have the ISO 9001 and ISO 14001 certification.
The firm that will apply the coating must be a specialized firm in this field, and must be certified by the resin supplier.
C. Technical characteristics.
1. Primer coating, type Sikafloor-161 or equal
Chemical nature: Epoxy resin with two components Density: Component A: ~ 1.6 kg/l Component B: ~ 1.0 kg/l Mix A+B: ~ 1.4 kg/l (DIN EN ISO2811-1) All values are measured at +23oC Volume dry extract: ~100% (in volume and weight) Adherence: >1.5N/mm2 (break in concrete) (ISO 4624) Shore D hardness: ~76 (7 days/+23oC/50% h.r.) (DIN 53 505)
2. Powdered basic coat, type Sikafloor-263SL or equal
Chemical nature: Colored epoxy resin with two components Density: Component A: ~ 1.5 kg/l Component B: ~ 1.0 kg/l Mix A+B: ~ 1.4 kg/l Mix A+B: C = 1 : 1 : ~ 1.84 kg/l All values are measured at +23oC Volume dry extract: ~100% (in volume and weight)
Compressive strength: Resin ~ 60 N/mm2 (7 days/+23oC) (EN 196-1) Tensile strength by bending: Resin ~ 30 N/mm2 (7 days/+23oC) (EN 196-1) Abrasion resistance: 70mg (CS 10/1000/1000) (8 days/+23oC)
(DIN 53 109 (Taber Abrader Test))
3. Sealing coat, type Sikafloor-264 or equal
Chemical nature: Colored epoxy resin with two components Density: Component A: ~ 1.64 kg/l Component B: ~ 1.0 kg/l (DIN EN ISO 2811-1) Mix A+B: ~ 1.4 kg/l
All values are measured at +23oC Volume dry extract: ~100% (in volume and weight)
Compressive strength: Resin ~ 60 N/mm2 (7 days/+23oC) (EN 196-1) Tensile strength by bending: Resin ~ 30 N/mm2 (7 days/+23oC) (EN 196-1) Abrasion resistance: 70mg (CS 10/1000/1000) (8 days/+23oC)
(DIN 53 109 (Taber Abrader Test))
D. Preparation of support. Concrete supports must be mechanically prepared by shot blasting, milling or any other appropriate method, in order to remove chalking and get an open, adhering and clean surface.
Non-adhering concrete must be eliminated, and damaged areas such as gravel nests and holes must be completely cleared.
The repair of the support and filling of holes must be carried out with products of the same manufacturer.
Concrete supports must be coated with a primer or “drawn to zero” in order to get a plane surface.
Protruding parts must be eliminated, by sandblasting or else.
Dust and friable particles must be removed, preferably with an industrial vacuum cleaner.
E. Application temperature / Conditions / Limitations
• Room temperature : minimum + 10oC / maximum +30oC
• Temperature of the support: minimum + 10oC / maximum +30oC
• Relative humidity degree ≤ 80%
• Dew point: during application and hardening, the temperature of the support must be minimum 3oC above dew point
F. Application of the Paint. Before application of the paint, the humidity content of the support must be ≤ 4%.
1. Primer coat.
Application of an adhering primer coat with two-component epoxy resin. On the support, previously prepared as indicated above, apply the primer coat with a brush, roller or scraper. Be careful to apply a continuous, undamaged coat on the entire surface. If necessary, apply two coats of primer.
2. Basic coat
Apply self-leveling coat of two-component colored epoxy resin powdered with quartz sand.
Mix: 1 part of resin (A+B) + 1 part of quartz sand (0.1 – 0.30mm) Powdering: To refusal with granulates to be defined.
After complying with the covering time, spread the mixture uniformly with a plane or notched scraper, and directly pass the roller crossways to facilitate the leveling of the poured mass and so avoid air bubbles. Powder with quartz sand.
3. Sealing coat
After complying with the covering time and after elimination of sand in excess with a brush and an industrial vacuum cleaner, application of a two-component colored epoxy resin sealing coat.
Spread the resin with a hard rubber scraper and smoothen (crossways) with a microfiber roller with short plushy hairs.
TP-2-02: Traffic marking
A. Description of the work
• The cleaning and drying of the support (removal of dust, stains, grease, etc…)
• Preparation work for the marking (layout, schedule, masking tape, etc…)
• Application of a paint coat compatible with the new floor epoxy paint. RAL to be submitted to the COR.
Before ordering, the contractor will submit to the COR’s approval a technical documentation for each proposed material with a detailed description of the characteristics.
TP-2-03: Interior painting
A. Description of the work
The work includes:
B. Priming, “acrylic latex” type, on plastering, cement, wall papers (walls or ceilings)
• Cleaning and wiping of the support (removal of dust, stains, grease, etc…)
• Touch-ups to obtain a good support
• Coat of paint
• If necessary, dismounting and reinstallation of hardware, electrical outlets, etc…
• Color to be chosen by the C.O.R. on presentation of a color chart
Characteristics Insulating acrylic primer for inside walls Coverable after about 16 hours Colors: exists in various colors (various available bases) Density: approx. 1.19 +/-0.05 kg/dm3 Law COV 2010: max. 30g/l COV
Type: Alphacryl Primer from SIKKENS or equal.
C. Interior paint, “Acrylic latex” type, on plastered surfaces, cement, wall papers (walls or ceilings)
This work includes:
• The cleaning and wiping of the support (dust removal, skimming, degreasing, etc...)
• The necessary touch-ups to obtain a good support
• A paint coating
• If necessary, disassembling and reinstallation of hardware, electrical outlets, etc...
• Colour to be chosen by the C.O.R. on view of a full colour chart from the manufacturer
Characteristics:
Inside wall paint in aqueous phase with solvent-free copolymer dispersion basis.
DIN EN 13300: min. class 2 washable, min. class 2 covering power.
Coverable after approx. 4 hours.
Colors: exists in various colors (various available bases).
Density: approx. 1.37 +/-0.05 kg/dm3 Law COV 2010: max. 30g/l COV
Type: SIKKENS ALPHATEX from SIKKENS or equal.
D. Interior paint, “enamel” type, on plastered surfaces, cement, wall papers (walls or ceilings)
• The touching-up of scratches and defaults
• A fine sandpapering
• The application of a satin enamelled coating
• If required, the disassembling and reinstallation of hardware, electrical outlets, etc…
• Colour to be chosen by the C.O.R. on view of a full colour chart from the manufacturer
Satin lacquer with high resistance to scratch and wear in aqueous phase with polyurethane dispersion basis.
Coverable after approx. 6 hours.
Colors: exists in various colors (various available bases).
Density: approx. 1.25 +/-0.05 kg/dm3 Dry extract: ca. 50% in weight – ca. 35% in volume Law COV 2010: max. 130g/l COV
Type RUBBOL BL from SIKKENS or equal.
E. Protection varnish
• The application of a colourless satin polyurethane varnish
• If required, the disassembling and reinstallation of hardware, electrical outlets, etc…
Dull polyurethane varnish, colorless and not becoming yellow Coverable after approx. 12 hours.
Colors: not pigmented Density: approx. 1.03 +/-0.05 kg/dm3
Dry extract: approx. 29% in weight, approx. 32% in volume Law COV 2010: max. 130g/l COV
Type: PU-Siegel satin from HERBOL or equal.
F. Anti-rust treatment
• The stripping, brushing, sandpapering, etc… of the support to find the original aspect
• The application of a rust inhibitive, rustproof, finish product
Paint for synthetic metal, satin, multilayer, high quality Coverable after approx. 24 hours.
Colors: exists in various colors Density: approx. 1.2 +/-0.05 kg/dm3
Dry extract: approx. 70% in weight, approx. 53% in volume Law COV 2010: max. 500g/l COV
Type: Protector from Herbol or equal.
G. Tack coat on masonry
• The necessary touch-ups to obtain a good support
• The application of a tack coat on supports such as masonry, concrete etc…
Colorless fixing paint with acrylic copolymer solution basis to fix powder surfaces and chalking paint.
Coverable after evaporation of the solvent.
Colors: colorless Density: approx. 0.08 +/-0.05 kg/dm3
Dry extract: approx. 12% in weight, approx. 8.5% in volume Law COV 2010: max. 750g/l COV
Type: Globaprim Fix from TRIMETAL or equal.
H. Tack coat on various supports
• the cleaning and wiping of the support (dust removal, skimming, degreasing, etc...)
• the necessary touch-ups to obtain a good support
• the application of a tack coat on supports such as zinc, galvanized steel, copper, aluminium, PVC, plexiglass, etc…
Characteristics Tack coat for various supports with solution acrylic resin basis..
Coverable after approx. 16 hours Colors: exists in various colors Density: approx. 1.23 +/-0.05 kg/dm3
Dry extract: approx. 50% in weight, approx. 35% in volume Law COV 2010: max. 500g/l COV
Type: Redox AC Multi primer from SIKKENS or equal.
I. Painting of various metallic items (handrail, ladders, catwalk, doors, interior doors and inside of exterior doors, windows, interior windows and inside of exterior windows, radiators, grills, etc)
• The cleaning, removal of dust and degreasing of support
• The touch-ups at rusted locations by means of an appropriate paint
• A slight sandpapering if necessary
• The application of a paint compatible with the support and its usage, installation and possible reinstallation of hardware, electrical outlets, etc…
• Colours: at COR’s choice.
Satin lacquer with high resistance to scratch and wear with alkyd resin poor in solvent.
Coverable after approx. 18 hours.
Colors: exists in various colors (various available bases).
Density: approx. 1.27 kg/dm3 Dry extract: ca. 76% in weight – ca. 64% in volume Law COV 2010: max. 300g/l COV
Type : Rubbol SATURA plus from SIKKENS or equal.
J. Paint on wood (Doors, windows, casing, baseboards, etc...)
• the cleaning and wiping (dust removal, skimming, degreasing, etc...)
• the touching-up of scratches and defaults
• a fine sandpapering
• the application of an appropriate coating
• if required, disassembling and reinstallation of hardware, switches, outlets, etc….
• colours: at COR’s choice
Satin lacquer with high resistance to scratch and wear in aqueous phase with polyurethane dispersion basis.
Coverable after approx. 6 hours.
Colors: exists in various colors (various available bases).
Density: approx. 1.25 kg/dm3 Dry extract: ca. 50% in weight – ca. 35% in volume Law COV 2010: max. 130g/l COV
Type : Rubbol BL from SIKKENS or equal.
Characteristics of the varnish:
Dull polyurethane varnish, colorless and not becoming yellow, dilutable with water, for inside painting Coverable after approx. 12 hours.
Colors: not pigmented Density: approx. 1.03 +/-0.05 kg/dm3
Dry extract: approx. 29% in weight, approx. 32% in volume Law COV 2010: max. 130g/l COV
Type : PU-Siegel satin from HERBOL or equal.
K. Repair of plastered surfaces
This work includes the scraping of the damaged coat, cleaning of the joints in order to ensure a good adherence, connection with existing coat by means of appropriate material, removal and transport of debris outside of the Base.
| Contractors, concessionaires or vendors performing work or conducting business on or in facilities under the jurisdiction of the USAG Benelux Military Community Commander AOR will conform to this regulation. The Contractor Officer’s Representative (C... |
| 1. Smoking will be prohibited in the vicinity of hazardous operations and locations. |
| 2. Waste material and rubbish will not be stored or allowed to accumulate within the building or in the immediate vicinity, but will be removed from the site at least daily. Rubbish will not be burned on the site. |
| 3. Contractor materials and equipment will not be stored in a location or manner which will create a fire exposure to facilities adjacent to the project site. |
| 4. The contractor will provide fire extinguishers at all locations where work is carried out. |
| 5. In every building operation where a shed, storage, or other shanty is placed, or room or space is used for storage or workshop, the contractor will provide at least one approved portable fire extinguisher in a accessible location. |
| 6. Flammable liquids and other hazardous materials such as paints, paint thinner, gasoline, asphalt, and tar will be stored in small detached structure or out in the open and not inside main buildings. Low flash point liquid used within buildings wil... |
| 7. Adequate ventilation will be provided for paint spraying and operations involving the application of materials using adhesives containing flammable solvents. Such operations will be conducted remote from any potential source of ignition. |
| 8. Asphalt and tar kettles will be located in a safe place outside of the building. Such kettles will not be placed on roofs or porches. Continuous supervision will be maintained while kettles are in operation. Metal covers will be provided for all... |
| 9. Electrical wiring and equipment for lighting, heating, and power purposes will be installed in compliance with current US and Host Nation Electrical Regulation requirements. |
| 10. Cutting and welding will not be permitted unless: |
| a. A valid Hot Work Permit (welding permit) is available. |
| b. Combustibles have been safely covered or moved away. |
| c. A fire guard with a serviceable fire extinguisher is posted for the duration of the work and 30 minutes thereafter to assure that sparks or drops of hot material do not start fires. |
| 11. Fire hydrants will only be used for firefighting and training of the local fire and Emergency Services. Water can only be taken from hydrants with the permission of the Community Fire and Emergency Services Office. Parking within 2.5 m (8 feet) ... |