B01. Bid Abstract 24B0008 - KO.pdf

PDF 712 KB Posted

Attached to
Wood River Sewer Separation Project Federal contract opportunity
Solicitation number
W912P924B0008
Issued by
Department of the Army Corps of Engineers Engineering District St Louis

About this file

This federal contract opportunity solicitation seeks firms to complete the Wood River Sewer Separation Project. The project involves separating sanitary and storm sewers in Wood River, Illinois, and is valued between $10-25 million. Interested parties must submit bids by January 16, 2024. The solicitation is a 100% small business set-aside issued by the Department of the Army Corps of Engineers Engineering District St Louis. The solicitation identifies the project scope of work, submission requirements, and contracting terms for a firm-fixed-price construction contract. Eligible bidders must have a NAICS code of 237110 for water and sewer line construction and not exceed the $45 million size standard.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: W912P924B0008 Date Issued: 12/12/2023 Amendments: 0001 Bids Due: 01/16/2024 10:00am CST Public Bid Opening: 01/16/2024 1:00pm CST

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

Bid received by due date/time? Yes Yes Yes Amendments Acknowledged? Yes Yes Yes Bid Security (Type and amount) Bid Bond $3m Bid Bond $3m Bid Bond $3m Grand Total Prices $17,059,700.50 $20,831,464.50 $20,825,313.22 $21,117,879.08

CLIN Description Quantity U/M Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount

A001 Mobilization and Demobilization Phase 1 1 JB $232,000.00 $232,000.00 1,200,000.00 $1,200,000.00 1,153,000.00 $1,153,000.00 $737,119.000 $737,119.00

A002 Temporary Traffic Control 1 JB $16,700.00 $16,700.00 40,000.00 $40,000.00 27,000.00 $27,000.00 $18,000.000 $18,000.00

A003 Tree Removal Over 15" Diameter 2 EA $1,910.00 $3,820.00 2,000.00 $4,000.00 3,325.00 $6,650.00 $1,000.000 $2,000.00

A004 Hot-Mix Asphalt Surface Removal 2" 1253 SY $5.40 $6,766.20 12.00 $15,036.00 9.50 $11,903.50 $11.550 $14,472.15

A005 Pavement Removal 1404 SY $15.90 $22,323.60 15.00 $21,060.00 28.80 $40,435.20 $17.400 $24,429.60

A006 Driveway Pavement Removal 395 SY $15.80 $6,241.00 14.00 $5,530.00 21.00 $8,295.00 $16.500 $6,517.50

A007 Sidewalk Removal 14756 SF $10.50 $154,938.00 2.00 $29,512.00 1.90 $28,036.40 $4.300 $63,450.80

A008 Combination Curb and Gutter Removal 2870 LF $13.60 $39,032.00 10.00 $28,700.00 9.00 $25,830.00 $6.200 $17,794.00

A009 Removing Manholes and Inlets 23 EA $721.00 $16,583.00 850.00 $19,550.00 805.00 $18,515.00 $1,000.000 $23,000.00

A010 Storm Sewer Removal 573 LF $40.40 $23,149.20 60.00 $34,380.00 55.00 $31,515.00 $38.750 $22,203.75

A011 Locate Existing Utilities 240 LF $94.50 $22,680.00 50.00 $12,000.00 206.00 $49,440.00 $33.750 $8,100.00

A012 Remove and Replace Trench Backfill 3095 CY $39.70 $122,871.50 50.00 $154,750.00 48.75 $150,881.25 $46.670 $144,443.65

A013 Seeding, Mulching, & Fertilizing 1 JB $3,500.00 $3,500.00 25,000.00 $25,000.00 23,955.00 $23,955.00 $8,300.000 $8,300.00

A014 Temporary Seeding 99 LB $24.50 $2,425.50 10.00 $990.00 6.75 $668.25 $2.900 $287.10

A015 Inlet and Pipe Protection 42 EA $3,750.00 $157,500.00 200.00 $8,400.00 221.00 $9,282.00 $100.000 $4,200.00

A016 Aggregate Base Course Type A, 8" 3130 SY $16.20 $50,706.00 18.00 $56,340.00 16.25 $50,862.50 $15.500 $48,515.00

A017 Aggregate Base Course Type B, 4" 633 SY $7.00 $4,431.00 18.00 $11,394.00 9.75 $6,171.75 $18.250 $11,552.25

A018 Subbase Granular Material Type B, 4" 1028 SY $11.70 $12,027.60 18.00 $18,504.00 10.00 $10,280.00 $13.750 $14,135.00

A019 Aggregate For Temporary Access, 4" 848 SY $8.50 $7,208.00 15.00 $12,720.00 10.45 $8,861.60 $17.250 $14,628.00

A020 Aggregate For Temporary Access 317 TN $41.90 $13,282.30 34.00 $10,778.00 33.50 $10,619.50 $51.250 $16,246.25

A021 Bituminous Materials (Prime Coat) 2819 LB $1.10 $3,100.90 1.00 $2,819.00 0.55 $1,550.45 $5.100 $14,376.90

A022 Bituminous Materials (Tack Coat) 382 LB $1.70 $649.40 1.00 $382.00 0.55 $210.10 $5.250 $2,005.50

A023 Hot-Mix Asphalt Surface Course, Mix "C", N50, 2" 235 TN $330.00 $77,550.00 300.00 $70,500.00 257.90 $60,606.50 $217.350 $51,077.25

A024 Temporary Ramps 161 SY $38.90 $6,262.90 25.00 $4,025.00 0.01 $1.61 $0.010 $1.61

A025 Portland Cement Concrete Driveway Pavement, 6" 633 SY $216.00 $136,728.00 150.00 $94,950.00 115.00 $72,795.00 $80.340 $50,855.22

A026 Portland Cement Concrete Pavement, 8" 1028 SY $158.00 $162,424.00 160.00 $164,480.00 144.00 $148,032.00 $119.350 $122,691.80

Wood River Sewer Separation Project Bid Abstract - Construction

Government Estimate

Offeror 1: Haier 301 N Elkton St. PO box 400 Okawville IL.

62271 Cage Code: 0EJV5

Offeror 3: Keller 22 Illini Drive Glen Carbon IL 62034

Cage Code: 5U4T9

Offeror 2: Kamadulski 4336 Hwy 162 Granite City IL. 62040

Cage Code: 1FHH3

Whitney Dee Contracting Officer

BASE - EXHIBIT A

A027 Portland Cement Concrete Sidewalk, 4" 12522 SF $31.90 $399,451.80 15.00 $187,830.00 11.00 $137,742.00 $10.130 $126,847.86

A028 Detectable Warnings 346 SF $70.00 $24,220.00 41.00 $14,186.00 44.30 $15,327.80 $51.080 $17,673.68

A029 Combination Concrete Curb and Gutter, Type B-6.18 2838 LF $48.60 $137,926.80 70.00 $198,660.00 58.00 $164,604.00 $46.000 $130,548.00

A030 Combination Concrete Curb and Gutter, Type B-6.24 437 LF $60.00 $26,220.00 71.00 $31,027.00 63.00 $27,531.00 $54.350 $23,750.95

A031 Water Service Line, 3/4" 7 EA $1,120.00 $7,840.00 1,500.00 $10,500.00 1,950.00 $13,650.00 $958.000 $6,706.00

A032 Water Service Line, 1" 1 EA $1,770.00 $1,770.00 1,500.00 $1,500.00 2,050.00 $2,050.00 $1,070.000 $1,070.00

A033 Water Service Line, 2" 3 EA $1,940.00 $5,820.00 2,500.00 $7,500.00 2,050.00 $6,150.00 $1,375.000 $4,125.00

A034 Remove and Reset Fire Hydrant 1 EA $1,910.00 $1,910.00 4,800.00 $4,800.00 7,800.00 $7,800.00 $3,245.000 $3,245.00

A035 Sanitary Lateral Adjustment 669 LF $141.00 $94,329.00 100.00 $66,900.00 358.00 $239,502.00 $110.000 $73,590.00

A036 Manholes To Be Adjusted 2 EA $698.00 $1,396.00 1,500.00 $3,000.00 1,400.00 $2,800.00 $1,065.000 $2,130.00

A037 Sanitary Manhole Reconstruction 1 EA $33,700.00 $33,700.00 12,000.00 $12,000.00 9,300.00 $9,300.00 $6,940.000 $6,940.00

A038 Support Blocks 12 EA $1,590.00 $19,080.00 1,200.00 $14,400.00 2,300.00 $27,600.00 $855.000 $10,260.00

A039 48" x 30° Bend 2 EA $4,620.00 $9,240.00 7,000.00 $14,000.00 7,050.00 $14,100.00 $7,075.000 $14,150.00

A040 Storm Sewers, Rubber Gasket, Class A, Type III - 72" 1126 LF $807.00 $908,682.00 750.00 $844,500.00 720.00 $810,720.00 $585.000 $658,710.00

A041 Storm Sewers, Rubber Gasket, Class B, Type I - 12" 482 LF $53.40 $25,738.80 83.00 $40,006.00 82.00 $39,524.00 $127.500 $61,455.00

A042 Storm Sewers, Rubber Gasket, Class B, Type II - 12" 119 LF $64.40 $7,663.60 83.00 $9,877.00 94.00 $11,186.00 $157.500 $18,742.50

A043 Storm Sewers, Rubber Gasket, Class B, Type II - 18" 311 LF $87.50 $27,212.50 138.00 $42,918.00 101.00 $31,411.00 $135.000 $41,985.00

A044 Storm Sewers, Rubber Gasket, Class B, Type III - 30" 34 LF $159.00 $5,406.00 245.00 $8,330.00 354.00 $12,036.00 $237.500 $8,075.00

A045 Storm Sewers, Rubber Gasket, Class B, Type II - 48" 477 LF $195.00 $93,015.00 340.00 $162,180.00 240.00 $114,480.00 $256.000 $122,112.00

A046 Storm Sewers, Rubber Gasket, Class B, Type III - 54" 456 LF $303.00 $138,168.00 405.00 $184,680.00 318.00 $145,008.00 $317.000 $144,552.00

A047 Storm Sewers, Rubber Gasket, Class B, Type III - 60" 1376 LF $360.00 $495,360.00 485.00 $667,360.00 472.00 $649,472.00 $410.500 $564,848.00

A048 Storm Sewers (Water Main Requirements) 12" 108 LF $207.00 $22,356.00 320.00 $34,560.00 214.00 $23,112.00 $210.750 $22,761.00

A049 Inlets, Type A, Type 3 Frame and Grate 20 EA $3,290.00 $65,800.00 2,000.00 $40,000.00 2,980.00 $59,600.00 $3,700.000 $74,000.00

A050 Inlets, Type A, Type 23 Frame and Grate 1 EA $3,550.00 $3,550.00 2,000.00 $2,000.00 2,835.00 $2,835.00 $3,600.000 $3,600.00

A051 Inlets, Type B, Type 3 Frame and Grate 1 EA $4,510.00 $4,510.00 2,700.00 $2,700.00 3,395.00 $3,395.00 $3,800.000 $3,800.00

A052 Inlets, Special No. 2 2 EA $2,630.00 $5,260.00 4,000.00 $8,000.00 5,135.00 $10,270.00 $6,500.000 $13,000.00

A053 Manholes, Type A 4' DIA Type 1 Frame and Lid 1 EA $4,660.00 $4,660.00 3,400.00 $3,400.00 3,355.00 $3,355.00 $5,800.000 $5,800.00

A054 Manholes, Type A 5' DIA Type 1 Frame and Lid 1 EA $6,950.00 $6,950.00 4,359.00 $4,359.00 4,590.00 $4,590.00 $7,400.000 $7,400.00

A055 Manholes, Type A 7' DIA Type 1 Frame and Lid 3 EA $20,400.00 $61,200.00 12,452.00 $37,356.00 22,815.00 $68,445.00 $16,000.000 $48,000.00

A056 Manholes, Type A 7' DIA Type 3 Frame and Lid 0 EA $0.00 $0.00 15,000.00 $0.00 $0.00 $0.000 $0.00

A057 Manholes, Type A 8' DIA Type 1 Frame and Lid 5 EA $22,600.00 $113,000.00 20,000.00 $100,000.00 28,961.00 $144,805.00 $24,000.000 $120,000.00

A058 Manholes, Type A 8' DIA Type 3 Frame and Grate 1 EA $21,000.00 $21,000.00 20,000.00 $20,000.00 29,040.00 $29,040.00 $24,000.000 $24,000.00

A059 Manholes, Type A 9' DIA Type 1 Frame and Lid 1 EA $27,600.00 $27,600.00 27,000.00 $27,000.00 34,360.00 $34,360.00 $47,500.000 $47,500.00

A060 Manholes, Type A 9' DIA Type 3 Frame and Grate 1 EA $24,800.00 $24,800.00 27,000.00 $27,000.00 34,510.00 $34,510.00 $48,000.000 $48,000.00

A061 Manholes, Type A 10' DIA Type 1 Frame and Lid 3 EA $43,100.00 $129,300.00 43,000.00 $129,000.00 46,000.00 $138,000.00 $48,900.000 $146,700.00

A062 Phasing Termination 6 EA $2,820.00 $16,920.00 1,500.00 $9,000.00 5,900.00 $35,400.00 $1,350.000 $8,100.00

BASE EXHIBIT A SUBTOTAL $4,275,955.60 $5,016,329.00 $5,029,108.41 $4,054,579.32

B001 Mobilization and Demobilization Phase 2 1 JB $131,000.00 $131,000.00 1,100,000.00 $1,100,000.00 1,030,000.00 $1,030,000.00 $1,132,700.000 $1,132,700.00

B002 Temporary Traffic Control 1 JB $16,700.00 $16,700.00 35,000.00 $35,000.00 55,400.00 $55,400.00 $34,750.000 $34,750.00

B003 Clearing and Grubbing 2 AC $6,490.00 $12,980.00 5,600.00 $11,200.00 14,275.00 $28,550.00 $13,500.000 $27,000.00

B004 Demolition North Detention Pond 1 JB $131,000.00 $131,000.00 50,000.00 $50,000.00 31,600.00 $31,600.00 $41,900.000 $41,900.00

B005 Hot-Mix Asphalt Surface Removal 2" 2702 SY $6.10 $16,482.20 12.00 $32,424.00 9.50 $25,669.00 $11.550 $31,208.10

B006 Pavement Removal 1994 SY $15.00 $29,910.00 15.00 $29,910.00 28.85 $57,526.90 $17.000 $33,898.00

BASE - EXHIBIT B

B007 Driveway Pavement Removal 211 SY $17.80 $3,755.80 14.00 $2,954.00 20.95 $4,420.45 $19.000 $4,009.00

B008 Sidewalk Removal 270 SF $12.90 $3,483.00 2.00 $540.00 1.90 $513.00 $5.000 $1,350.00

B009 Combination Curb and Gutter Removal 250 LF $13.60 $3,400.00 10.00 $2,500.00 9.40 $2,350.00 $8.500 $2,125.00

B010 Fence Removal 889 LF $26.70 $23,736.30 20.00 $17,780.00 38.75 $34,448.75 $12.000 $10,668.00

B011 Remove and Restore Fence 120 LF $103.00 $12,360.00 100.00 $12,000.00 140.00 $16,800.00 $110.000 $13,200.00

B012 Removing Manholes and Inlets 4 EA $721.00 $2,884.00 850.00 $3,400.00 805.00 $3,220.00 $950.000 $3,800.00

B013 Storm Sewer Removal 74 LF $40.40 $2,989.60 60.00 $4,440.00 98.00 $7,252.00 $38.000 $2,812.00

B014 Locate Existing Utilities 115 LF $113.00 $12,995.00 200.00 $23,000.00 206.00 $23,690.00 $34.500 $3,967.50

B015 Controlled Low-Strength Material 10 CY $383.00 $3,830.00 350.00 $3,500.00 340.00 $3,400.00 $186.000 $1,860.00

B016 Excavation and Disposal - North Pond 1 JB $359,000.00 $359,000.00 350,000.00 $350,000.00 212,990.00 $212,990.00 $504,000.000 $504,000.00

B017 Excavation and Disposal - South Pond 1 JB $299,000.00 $299,000.00 260,000.00 $260,000.00 179,000.00 $179,000.00 $442,000.000 $442,000.00

B018 Remove and Replace Trench Backfill 1457 CY $39.80 $57,988.60 45.00 $65,565.00 55.00 $80,135.00 $47.700 $69,498.90

B019 Slope Repair 1390 SY $6.50 $9,035.00 9.20 $12,788.00 11.00 $15,290.00 $6.000 $8,340.00

B020 Grading and Shaping Ditches 325 LF $14.30 $4,647.50 25.00 $8,125.00 24.00 $7,800.00 $12.500 $4,062.50

B021 Seeding Class 3A 2 AC $6,580.00 $13,160.00 2,000.00 $4,000.00 4,330.00 $8,660.00 $2,650.000 $5,300.00

B022 Seeding Class 4B 2 AC $5,390.00 $10,780.00 2,200.00 $4,400.00 5,980.00 $11,960.00 $5,350.000 $10,700.00

B023 Seeding, Mulching, & Fertilizing 1 JB $2,330.00 $2,330.00 2,500.00 $2,500.00 41,266.00 $41,266.00 $3,800.000 $3,800.00

B024 Temporary Seeding 926 LB $24.50 $22,687.00 4.00 $3,704.00 6.00 $5,556.00 $2.900 $2,685.40

B025 Inlet and Pipe Protection 16 EA $3,750.00 $60,000.00 250.00 $4,000.00 225.00 $3,600.00 $100.000 $1,600.00

B026 Temporary Ditch Check 3 EA $1,290.00 $3,870.00 260.00 $780.00 320.00 $960.00 $235.000 $705.00

B027 Riprap on Filter Fabric 159 SY $44.50 $7,075.50 65.00 $10,335.00 65.00 $10,335.00 $38.000 $6,042.00

B028 Restore Existing Riprap 15 SY $33.10 $496.50 50.00 $750.00 150.00 $2,250.00 $44.000 $660.00

B029 Erosion Control Blanket 23534 SY $3.00 $70,602.00 2.80 $65,895.20 2.80 $65,895.20 $1.850 $43,537.90

B030 Heavy Duty Erosion Control Blanket 983 SY $5.80 $5,701.40 3.10 $3,047.30 3.25 $3,194.75 $2.200 $2,162.60

B031 Turf Reinforcement Mat 98 SY $6.80 $666.40 7.50 $735.00 6.50 $637.00 $7.650 $749.70

B032 Stone Dumped Riprap, Class A3 200 SY $40.30 $8,060.00 60.00 $12,000.00 68.00 $13,600.00 $32.000 $6,400.00

B033 Filter Fabric Under Pavement 512 SY $7.00 $3,584.00 4.00 $2,048.00 4.00 $2,048.00 $6.000 $3,072.00

B034 4" Cellular Confinement Mat with Aggregate Infill 213 SY $50.80 $10,820.40 60.00 $12,780.00 68.00 $14,484.00 $42.500 $9,052.50

B035 Aggregate Base Course Type A, 8" 2607 SY $16.00 $41,712.00 18.00 $46,926.00 16.00 $41,712.00 $16.500 $43,015.50

B036 Aggregate Base Course Type B, 4" 418 SY $8.60 $3,594.80 15.00 $6,270.00 15.70 $6,562.60 $14.000 $5,852.00

B037 Aggregate Base Course Type B, 6" 512 SY $11.10 $5,683.20 15.00 $7,680.00 13.30 $6,809.60 $22.500 $11,520.00

B038 Aggregate for Temporary Access, 4" 891 SY $8.30 $7,395.30 15.00 $13,365.00 10.60 $9,444.60 $16.500 $14,701.50

B039 Aggregate for Temporary Access 813 TN $45.00 $36,585.00 34.00 $27,642.00 36.00 $29,268.00 $45.000 $36,585.00

B040 Temporary Detour Road 1925 SY $30.60 $58,905.00 42.00 $80,850.00 75.75 $145,818.75 $32.000 $61,600.00

B041 Aggregate Shoulder Type B, 6" 303 SY $13.80 $4,181.40 25.00 $7,575.00 28.25 $8,559.75 $15.000 $4,545.00

B042 Bituminous Materials (Prime Coat) 8134 LB $1.10 $8,947.40 1.00 $8,134.00 0.55 $4,473.70 $5.100 $41,483.40

B043 Bituminous Materials (Tack Coat) 1333 LB $1.70 $2,266.10 1.00 $1,333.00 0.55 $733.15 $5.250 $6,998.25

B044 Hot-Mix Asphalt Surface Course, Mix "C", N50, 2" 505 TN $330.00 $166,650.00 320.00 $161,600.00 258.00 $130,290.00 $217.350 $109,761.75

B045 Hot-Mix Asphalt Binder Course, IL-19.0, N50, 6" 348 TN $272.00 $94,656.00 320.00 $111,360.00 258.00 $89,784.00 $215.250 $74,907.00

B046 Portland Cement Concrete Driveway Pavement, 6" 418 SY $216.00 $90,288.00 160.00 $66,880.00 117.00 $48,906.00 $56.200 $23,491.60

B047 Combination Concrete Curb and Gutter, Type B-6.18 148 LF $48.60 $7,192.80 70.00 $10,360.00 64.00 $9,472.00 $69.000 $10,212.00

B048 Combination Concrete Curb and Gutter, Type B-6.24 54 LF $60.00 $3,240.00 80.00 $4,320.00 68.00 $3,672.00 $66.000 $3,564.00

B049 Chain Link Fence, 6' 1552 LF $66.10 $102,587.20 38.00 $58,976.00 36.00 $55,872.00 $49.670 $77,087.84

B050 Chain Link Fence, 12' Gate 3 EA $9,040.00 $27,120.00 2,350.00 $7,050.00 2,215.00 $6,645.00 $1,837.500 $5,512.50

B051 Chain Link Fence, 20' Gate 2 EA $14,000.00 $28,000.00 3,300.00 $6,600.00 2,715.00 $5,430.00 $2,220.750 $4,441.50

B052 Waterline Adjustment, 6" 20 LF $169.00 $3,380.00 400.00 $8,000.00 830.00 $16,600.00 $420.000 $8,400.00

B053 Waterline Adjustment, 8" 20 LF $189.00 $3,780.00 450.00 $9,000.00 836.00 $16,720.00 $805.000 $16,100.00

B054 Sanitary Lateral Adjustment 86 LF $141.00 $12,126.00 450.00 $38,700.00 358.00 $30,788.00 $204.000 $17,544.00

B055 Manholes To Be Adjusted 2 EA $698.00 $1,396.00 1,200.00 $2,400.00 1,455.00 $2,910.00 $1,065.000 $2,130.00

B056 Support Blocks 2 EA $1,590.00 $3,180.00 1,200.00 $2,400.00 2,915.00 $5,830.00 $1,165.000 $2,330.00

B057 Storm Sewers, Rubber Gasket, Class A, Type I - 15" 15 LF $130.00 $1,950.00 100.00 $1,500.00 127.00 $1,905.00 $205.000 $3,075.00

B058 Storm Sewers, Rubber Gasket, Class A, Type I - 30" 38 LF $207.00 $7,866.00 260.00 $9,880.00 167.00 $6,346.00 $298.000 $11,324.00

B059 Storm Sewers, Rubber Gasket, Class A, Type I - 36" 31 LF $272.00 $8,432.00 380.00 $11,780.00 284.00 $8,804.00 $293.000 $9,083.00

B060 Storm Sewers, Rubber Gasket, Class A, Type II - 36" 89 LF $287.00 $25,543.00 380.00 $33,820.00 284.00 $25,276.00 $316.000 $28,124.00

B061 Storm Sewers, Rubber Gasket, Class A, Type II - 48" 217 LF $437.00 $94,829.00 390.00 $84,630.00 338.00 $73,346.00 $418.000 $90,706.00

B062 Storm Sewers, Rubber Gasket, Class A, Type III - 72" 942 LF $807.00 $760,194.00 740.00 $697,080.00 733.00 $690,486.00 $605.000 $569,910.00

B063 Storm Sewers, Class B, Type II - 12" 104 LF $64.60 $6,718.40 70.00 $7,280.00 95.00 $9,880.00 $155.000 $16,120.00

B064 Storm Sewers, Class B, Type II - 15" 150 LF $67.90 $10,185.00 80.00 $12,000.00 86.00 $12,900.00 $149.000 $22,350.00

B065 Storm Sewers, Class B, Type II - 48" 120 LF $195.00 $23,400.00 350.00 $42,000.00 180.00 $21,600.00 $285.000 $34,200.00

B066 Storm Sewers, Class B, Type III - 48" 282 LF $232.00 $65,424.00 350.00 $98,700.00 238.00 $67,116.00 $276.000 $77,832.00

B067 Precast Concrete Box Culverts 7'x4' 110 LF $756.00 $83,160.00 1,200.00 $132,000.00 1,000.00 $110,000.00 $1,292.000 $142,120.00

B068 Inlets, Type A, Type 3 Frame and Grate 2 EA $3,290.00 $6,580.00 2,200.00 $4,400.00 2,900.00 $5,800.00 $3,291.000 $6,582.00

B069 Inlets, Type B, Type 3 Frame and Grate 1 EA $4,510.00 $4,510.00 2,700.00 $2,700.00 3,250.00 $3,250.00 $3,640.000 $3,640.00

B070 Precast Reinforced Concrete End Sections 15" 1 EA $1,100.00 $1,100.00 1,200.00 $1,200.00 1,966.00 $1,966.00 $1,200.000 $1,200.00

B071 Precast Reinforced Concrete End Sections 30" 2 EA $1,270.00 $2,540.00 2,800.00 $5,600.00 3,615.00 $7,230.00 $2,900.000 $5,800.00

B072 Precast Reinforced Concrete End Sections 36" 2 EA $1,400.00 $2,800.00 3,000.00 $6,000.00 4,135.00 $8,270.00 $3,620.000 $7,240.00

B073 Precast Reinforced Concrete End Sections 48" 1 EA $3,100.00 $3,100.00 4,500.00 $4,500.00 4,360.00 $4,360.00 $3,900.000 $3,900.00

B074 Concrete End Section, Standard 542001, 48", 1:3 2 EA $3,940.00 $7,880.00 4,500.00 $9,000.00 11,305.00 $22,610.00 $10,000.000 $20,000.00

B075 Box Culvert End Sections, Culvert No. 1 1 EA $3,100.00 $3,100.00 6,500.00 $6,500.00 6,510.00 $6,510.00 $10,900.000 $10,900.00

B076 Manholes, Type A 5' DIA Type 3 Frame and Grate 1 EA $13,300.00 $13,300.00 5,200.00 $5,200.00 5,055.00 $5,055.00 $7,600.000 $7,600.00

B077 Manholes, Type A 7' DIA Type 3 Frame and Grate 2 EA $21,800.00 $43,600.00 13,000.00 $26,000.00 19,288.00 $38,576.00 $16,300.000 $32,600.00

B078 Special Manhole M 6.1 1 EA $25,200.00 $25,200.00 33,000.00 $33,000.00 40,000.00 $40,000.00 $65,250.000 $65,250.00

B079 Special Manhole M 8.1 0 EA $0.00 $0.00 50,000.00 $0.00 $0.00 $0.000 $0.00

B080 Manholes, Type A 10' DIA Type 1 Frame and Lid 2 EA $47,000.00 $94,000.00 46,000.00 $92,000.00 43,300.00 $86,600.00 $48,200.000 $96,400.00

B081 Special Manhole M 8.3 1 EA $34,400.00 $34,400.00 52,000.00 $52,000.00 50,400.00 $50,400.00 $69,000.000 $69,000.00

B082 Control Structure, South Pond Outfall 1 JB $51,700.00 $51,700.00 150,000.00 $150,000.00 140,000.00 $140,000.00 $201,000.000 $201,000.00

B083 Phasing Termination 1 EA $2,820.00 $2,820.00 1,200.00 $1,200.00 50,000.00 $50,000.00 $1,725.000 $1,725.00

BASE EXHIBIT B SUBTOTAL $3,454,207.80 $4,369,491.50 $4,179,088.20 $4,589,079.94

BASE SUBTOTAL (EXHIBIT A & B) $7,730,163.40 $9,385,820.50 $9,208,196.61 $8,643,659.26

C001 Mobilization and Demobilization Phase 3 1 JB $438,000.00 $438,000.00 700,000.00 $700,000.00 442,505.00 $442,505.00 $608,300.000 $608,300.00

C002 Railroad Plan Review, Permit Fees, & Right of Entry Costs 1 JB $300,000.00 $300,000.00 300,000.00 $300,000.00 300,000.00 $300,000.00 $120,000.000 $120,000.00

C003 Railroad Protective Liability Insurance 1 JB $132,000.00 $132,000.00 45,000.00 $45,000.00 27,700.00 $27,700.00 $22,400.000 $22,400.00

C004 Railroad Inspection Fees 1 JB $120,000.00 $120,000.00 130,000.00 $130,000.00 120,000.00 $120,000.00 $330,000.000 $330,000.00

C005 Construction Access Roads Phase 3 1 JB $169,000.00 $169,000.00 165,000.00 $165,000.00 150,000.00 $150,000.00 $170,000.000 $170,000.00

C006 Temporary Traffic Control 1 JB $25,100.00 $25,100.00 15,000.00 $15,000.00 11,075.00 $11,075.00 $10,900.000 $10,900.00

C007 Clearing and Grubbing 1 AC $6,490.00 $6,490.00 8,000.00 $8,000.00 17,125.00 $17,125.00 $24,000.000 $24,000.00

C008 Locate Existing Utilities 50 LF $94.50 $4,725.00 100.00 $5,000.00 206.00 $10,300.00 $34.000 $1,700.00

OPTION 1 - EXHIBIT C

C009 Agricultural Soil Removal and Stockpiling 7100 CY $8.50 $60,350.00 5.20 $36,920.00 4.40 $31,240.00 $2.750 $19,525.00

C010 Agricultural Soil Spreading 7100 SY $1.50 $10,650.00 6.20 $44,020.00 5.95 $42,245.00 $3.750 $26,625.00

C011 Slope Repair 435 SY $6.50 $2,827.50 30.00 $13,050.00 44.90 $19,531.50 $21.000 $9,135.00

C012 Seeding, Mulching, & Fertilizing 1 JB $1,490.00 $1,490.00 20,000.00 $20,000.00 41,265.00 $41,265.00 $3,800.000 $3,800.00

C013 Temporary Seeding 207 LB $24.50 $5,071.50 2.00 $414.00 7.00 $1,449.00 $3.000 $621.00

C014 Inlet and Pipe Protection 9 EA $3,750.00 $33,750.00 300.00 $2,700.00 225.00 $2,025.00 $100.000 $900.00

C015 Stone Dumped Riprap, Class A4 501 SY $58.10 $29,108.10 75.00 $37,575.00 96.00 $48,096.00 $64.000 $32,064.00

C016 Concrete Pad 66 SY $164.00 $10,824.00 185.00 $12,210.00 178.00 $11,748.00 $119.000 $7,854.00

C017 Force Main Repair 100 LF $165.00 $16,500.00 400.00 $40,000.00 328.00 $32,800.00 $345.000 $34,500.00

C018 Jack and Bore Steel Casing 60" 533 LF $3,290.00 $1,753,570.00 3,800.00 $2,025,400.00 4,357.00 $2,322,281.00 $6,900.000 $3,677,700.00

C019 48" Carrier Pipe in Casing 603 LF $230.00 $138,690.00 340.00 $205,020.00 402.00 $242,406.00 $345.000 $208,035.00

C020 Storm Sewers, Rubber Gasket, Class A, Type I - 42" 24 LF $351.00 $8,424.00 400.00 $9,600.00 375.00 $9,000.00 $390.000 $9,360.00

C021 Storm Sewers, Rubber Gasket, Class A, Type II - 60" 271 LF $609.00 $165,039.00 420.00 $113,820.00 440.00 $119,240.00 $520.000 $140,920.00

C022 Storm Sewers, Class B, Type II - 60" 241 LF $259.00 $62,419.00 380.00 $91,580.00 398.00 $95,918.00 $383.000 $92,303.00

C023 Storm Sewers, Class B, Type III - 60" 719 LF $301.00 $216,419.00 380.00 $273,220.00 441.00 $317,079.00 $404.000 $290,476.00

C024 Precast Reinforced Concrete End Sections 60" 1 EA $5,030.00 $5,030.00 5,000.00 $5,000.00 6,690.00 $6,690.00 $6,700.000 $6,700.00

C025 Special Manhole M 1.1 1 EA $19,700.00 $19,700.00 27,000.00 $27,000.00 25,000.00 $25,000.00 $49,600.000 $49,600.00

C026 Special Manhole M 1.2 1 EA $29,300.00 $29,300.00 28,000.00 $28,000.00 25,500.00 $25,500.00 $48,200.000 $48,200.00

C027 Special Manhole M 2.1 1 EA $27,300.00 $27,300.00 27,000.00 $27,000.00 25,550.00 $25,550.00 $48,000.000 $48,000.00

C028 Special Manhole M 3.1 1 EA $28,400.00 $28,400.00 29,000.00 $29,000.00 26,000.00 $26,000.00 $48,000.000 $48,000.00

C029 Special Manhole M 4.1 1 EA $29,300.00 $29,300.00 21,000.00 $21,000.00 25,000.00 $25,000.00 $40,400.000 $40,400.00

C030 Special Manhole M 4.2 1 EA $20,500.00 $20,500.00 26,000.00 $26,000.00 27,300.00 $27,300.00 $48,330.000 $48,330.00

C031 Special Manhole M 4.3 1 EA $18,500.00 $18,500.00 27,000.00 $27,000.00 27,300.00 $27,300.00 $46,100.000 $46,100.00

OPTION 1 - EXHIBIT C SUBTOTAL $3,888,477.10 $4,483,529.00 $4,603,368.50 $6,176,448.00

D001 Mobilization and Demobilization Phase 4 1 JB $232,000.00 $232,000.00 900,000.00 $900,000.00 1,164,000.00 $1,164,000.00 $707,000.000 $707,000.00

D002 Temporary Traffic Control 1 JB $16,700.00 $16,700.00 25,000.00 $25,000.00 55,000.00 $55,000.00 $15,800.000 $15,800.00

D003 Tree Pruning 2 EA $293.00 $586.00 1,000.00 $2,000.00 2,050.00 $4,100.00 $1,310.000 $2,620.00

D004 Tree Root Pruning 2 EA $533.00 $1,066.00 1,000.00 $2,000.00 2,050.00 $4,100.00 $315.000 $630.00

D005 Hot-Mix Asphalt Surface Removal 2" 13538 SY $6.10 $82,581.80 12.00 $162,456.00 9.50 $128,611.00 $11.550 $156,363.90

D006 Pavement Removal 3843 SY $15.10 $58,029.30 22.00 $84,546.00 28.80 $110,678.40 $22.600 $86,851.80

D007 Driveway Pavement Removal 70 SF $1.90 $133.00 25.00 $1,750.00 25.25 $1,767.50 $14.750 $1,032.50

D008 Sidewalk Removal 3203 SF $10.50 $33,631.50 2.00 $6,406.00 2.00 $6,406.00 $3.900 $12,491.70

D009 Combination Curb and Gutter Removal 925 LF $13.60 $12,580.00 10.00 $9,250.00 9.40 $8,695.00 $6.800 $6,290.00

D010 Removing Manholes and Inlets 39 EA $721.00 $28,119.00 850.00 $33,150.00 805.00 $31,395.00 $1,000.000 $39,000.00

D011 Storm Sewer Removal 803 LF $40.40 $32,441.20 100.00 $80,300.00 96.00 $77,088.00 $36.500 $29,309.50

D012 Locate Existing Utilities 530 LF $94.50 $50,085.00 150.00 $79,500.00 206.00 $109,180.00 $33.000 $17,490.00

D013 Remove and Replace Trench Backfill 2089 CY $39.20 $81,888.80 45.00 $94,005.00 56.00 $116,984.00 $50.500 $105,494.50

D014 Seeding, Mulching, & Fertilizing 1 JB $7,000.00 $7,000.00 20,000.00 $20,000.00 40,000.00 $40,000.00 $10,590.000 $10,590.00

D015 Temporary Seeding 197 LB $24.50 $4,826.50 2.00 $394.00 14.00 $2,758.00 $2.900 $571.30

D016 Inlet and Pipe Protection 87 EA $3,750.00 $326,250.00 300.00 $26,100.00 225.00 $19,575.00 $100.000 $8,700.00

D017 Aggregate Base Course Type A, 8" 4344 SY $18.00 $78,192.00 20.00 $86,880.00 16.70 $72,544.80 $18.180 $78,973.92

D018 Aggregate Base Course Type B, 4" 119 SY $7.50 $892.50 18.00 $2,142.00 10.00 $1,190.00 $27.000 $3,213.00

D019 Aggregate for Temporary Access, 4" 3655 SY $7.60 $27,778.00 18.00 $65,790.00 10.75 $39,291.25 $15.150 $55,373.25

OPTION 2 - EXHIBIT D

D020 Aggregate for Temporary Access 75 TN $49.50 $3,712.50 40.00 $3,000.00 36.00 $2,700.00 $52.250 $3,918.75

D021 Bituminous Materials (Prime Coat) 30461 LB $1.10 $33,507.10 1.00 $30,461.00 0.55 $16,753.55 $5.100 $155,351.10

D022 Bituminous Materials (Tack Coat) 1672 LB $1.70 $2,842.40 1.00 $1,672.00 0.55 $919.60 $5.250 $8,778.00

D023 Hot-Mix Asphalt Surface Course, Mix "C", N50, 2" 1926 TN $330.00 $635,580.00 340.00 $654,840.00 257.00 $494,982.00 $217.350 $418,616.10

D024 Hot-Mix Asphalt Binder Course, IL-19.0, N50, 6" 10 TN $242.00 $2,420.00 340.00 $3,400.00 257.00 $2,570.00 $215.250 $2,152.50

D025 Portland Cement Concrete Driveway Pavement, 6" 119 SY $216.00 $25,704.00 180.00 $21,420.00 117.00 $13,923.00 $110.000 $13,090.00

D026 Portland Cement Concrete Sidewalk, 4" 2945 SF $31.90 $93,945.50 16.00 $47,120.00 9.75 $28,713.75 $13.000 $38,285.00

D027 Detectable Warnings 130 SF $69.70 $9,061.00 60.00 $7,800.00 45.00 $5,850.00 $61.750 $8,027.50

D028 Combination Concrete Curb and Gutter, Type B-6.18 868 LF $48.60 $42,184.80 75.00 $65,100.00 60.00 $52,080.00 $62.000 $53,816.00

D029 Combination Concrete Curb and Gutter, Type B-6.24 237 LF $60.00 $14,220.00 80.00 $18,960.00 65.00 $15,405.00 $58.500 $13,864.50

D030 V-Curb 369 LF $38.20 $14,095.80 65.00 $23,985.00 56.00 $20,664.00 $53.250 $19,649.25

D031 Waterline Adjustment, 4" 40 LF $148.00 $5,920.00 400.00 $16,000.00 830.00 $33,200.00 $400.000 $16,000.00

D032 Waterline Adjustment, 6" 20 LF $169.00 $3,380.00 600.00 $12,000.00 830.00 $16,600.00 $465.000 $9,300.00

D033 Water Service Line, 3/4" 31 EA $1,110.00 $34,410.00 1,500.00 $46,500.00 1,970.00 $61,070.00 $1,050.000 $32,550.00

D034 Water Service Line, 1" 3 EA $1,770.00 $5,310.00 1,200.00 $3,600.00 2,050.00 $6,150.00 $1,090.000 $3,270.00

D035 Water Service Line, 2" 2 EA $1,940.00 $3,880.00 2,300.00 $4,600.00 2,050.00 $4,100.00 $1,475.000 $2,950.00

D036 Remove and Reset Fire Hydrant 2 EA $1,880.00 $3,760.00 4,500.00 $9,000.00 7,500.00 $15,000.00 $3,130.000 $6,260.00

D037 Sanitary Lateral Adjustment 894 LF $141.00 $126,054.00 400.00 $357,600.00 358.00 $320,052.00 $140.000 $125,160.00

D038 Manholes To Be Adjusted 24 EA $698.00 $16,752.00 1,800.00 $43,200.00 1,455.00 $34,920.00 $1,065.000 $25,560.00

D039 Support Blocks 19 EA $1,590.00 $30,210.00 1,500.00 $28,500.00 2,915.00 $55,385.00 $875.000 $16,625.00

D040 Storm Sewers, Class B, Type I - 12" 775 LF $53.40 $41,385.00 100.00 $77,500.00 83.00 $64,325.00 $147.000 $113,925.00

D041 Storm Sewers, Class B, Type II - 12" 872 LF $64.50 $56,244.00 100.00 $87,200.00 95.00 $82,840.00 $138.000 $120,336.00

D042 Storm Sewers, Class B, Type I - 15" 210 LF $56.80 $11,928.00 120.00 $25,200.00 104.00 $21,840.00 $134.000 $28,140.00

D043 Storm Sewers, Class B, Type I - 18" 93 LF $76.50 $7,114.50 125.00 $11,625.00 90.00 $8,370.00 $143.000 $13,299.00

D044 Storm Sewers, Class B, Type II - 18" 2053 LF $87.50 $179,637.50 125.00 $256,625.00 90.00 $184,770.00 $128.000 $262,784.00

D045 Storm Sewers, Class B, Type II - 24" 1636 LF $107.00 $175,052.00 170.00 $278,120.00 100.00 $163,600.00 $187.000 $305,932.00

D046 Storm Sewers, Class B, Type III - 24" 315 LF $135.00 $42,525.00 170.00 $53,550.00 100.00 $31,500.00 $180.000 $56,700.00

D047 Storm Sewers, Class B, Type II - 30" 784 LF $131.00 $102,704.00 250.00 $196,000.00 125.00 $98,000.00 $212.000 $166,208.00

D048 Storm Sewers, Class B, Type III - 30" 151 LF $159.00 $24,009.00 250.00 $37,750.00 167.00 $25,217.00 $228.000 $34,428.00

D049 Storm Sewers, Class B, Type II - 36" 37 LF $155.00 $5,735.00 280.00 $10,360.00 190.00 $7,030.00 $294.000 $10,878.00

D050 Storm Sewers, Class B, Type III - 36" 1186 LF $187.00 $221,782.00 280.00 $332,080.00 190.00 $225,340.00 $261.000 $309,546.00

D051 Storm Sewers, Class B, Type III - 48" 298 LF $232.00 $69,136.00 300.00 $89,400.00 220.00 $65,560.00 $273.000 $81,354.00

D052 Storm Sewers, (Water Main Requirements) 12" 155 LF $207.00 $32,085.00 230.00 $35,650.00 220.00 $34,100.00 $225.000 $34,875.00

D053 Inlets, Type A, Type 1 Frame and Lid 1 EA $3,480.00 $3,480.00 3,000.00 $3,000.00 2,550.00 $2,550.00 $3,580.000 $3,580.00

D054 Inlets, Type A, Type 3 Frame and Grate 43 EA $3,290.00 $141,470.00 3,000.00 $129,000.00 2,655.00 $114,165.00 $3,580.000 $153,940.00

D055 Inlets, Type A, Type 23 Frame and Grate 0 EA $0.00 $0.00 $0.00 $0.00 $0.000 $0.00

D056 Inlets, Type B, Type 3 Frame and Grate 9 EA $4,510.00 $40,590.00 3,000.00 $27,000.00 3,025.00 $27,225.00 $4,140.000 $37,260.00

D057 Inlets, Type B, Type 23 Frame and Grate 2 EA $4,770.00 $9,540.00 3,000.00 $6,000.00 3,035.00 $6,070.00 $3,900.000 $7,800.00

D058 Manholes, Type A 4' DIA Type 1 Frame and Lid 18 EA $7,560.00 $136,080.00 4,200.00 $75,600.00 3,600.00 $64,800.00 $5,760.000 $103,680.00

D059 Manholes, Type A 5' DIA Type 1 Frame and Lid 6 EA $14,700.00 $88,200.00 5,200.00 $31,200.00 4,800.00 $28,800.00 $7,490.000 $44,940.00

D060 Manholes, Type A 6' DIA Type 1 Frame and Lid 9 EA $22,400.00 $201,600.00 8,000.00 $72,000.00 7,400.00 $66,600.00 $9,400.000 $84,600.00

D061 Manholes, Type A 7' DIA Type 1 Frame and Lid 1 EA $18,000.00 $18,000.00 17,500.00 $17,500.00 20,200.00 $20,200.00 $17,700.000 $17,700.00

D062 Paint Pavement Marking - Line 4" 20 LF $284.00 $5,680.00 70.00 $1,400.00 84.00 $1,680.00 $2.600 $52.00

OPTION 2 - EXHIBIT D SUBTOTAL $3,795,706.70 $4,934,187.00 $4,538,983.85 $4,302,976.07

E001 Mobilization and Demobilization Phase 5 1 JB $131,000.00 $131,000.00 250,000.00 $250,000.00 1,040,000.00 $1,040,000.00 $481,000.000 $481,000.00

E002 Temporary Traffic Control 1 JB $16,700.00 $16,700.00 18,000.00 $18,000.00 15,000.00 $15,000.00 $15,800.000 $15,800.00

E003 Hot-Mix Asphalt Surface Removal 2" 4645 SY $6.00 $27,870.00 12.00 $55,740.00 9.50 $44,127.50 $11.550 $53,649.75

E004 Pavement Removal 1744 SY $15.30 $26,683.20 22.00 $38,368.00 28.90 $50,401.60 $21.350 $37,234.40

E005 Sidewalk Removal 2262 SF $10.60 $23,977.20 2.00 $4,524.00 1.90 $4,297.80 $4.300 $9,726.60

E006 Combination Curb and Gutter Removal 1030 LF $13.60 $14,008.00 15.00 $15,450.00 8.40 $8,652.00 $11.000 $11,330.00

E007 Removing Manholes and Inlets 27 EA $721.00 $19,467.00 800.00 $21,600.00 805.00 $21,735.00 $1,030.000 $27,810.00

E008 Storm Sewer Removal 577 LF $40.40 $23,310.80 100.00 $57,700.00 55.00 $31,735.00 $32.750 $18,896.75

E009 Locate Existing Utilities 205 LF $90.50 $18,552.50 200.00 $41,000.00 206.00 $42,230.00 $33.000 $6,765.00

E010 Seeding, Mulching, & Fertilizing 1 JB $2,330.00 $2,330.00 20,000.00 $20,000.00 20,000.00 $20,000.00 $4,265.000 $4,265.00

E011 Temporary Seeding 100 LB $24.50 $2,450.00 2.00 $200.00 12.00 $1,200.00 $2.800 $280.00

E012 Inlet and Pipe Protection 34 EA $3,750.00 $127,500.00 300.00 $10,200.00 225.00 $7,650.00 $100.000 $3,400.00

E013 Aggregate Base Course Type A, 8" 1927 SY $16.40 $31,602.80 18.00 $34,686.00 17.00 $32,759.00 $19.250 $37,094.75

E014 Subbase Granular Material Type B, 4" 133 SY $11.40 $1,516.20 16.00 $2,128.00 10.00 $1,330.00 $11.000 $1,463.00

E015 Aggregate for Temporary Access, 4" 1130 SY $7.30 $8,249.00 16.00 $18,080.00 10.50 $11,865.00 $14.000 $15,820.00

E016 Bituminous Materials (Prime Coat) 10452 LB $1.10 $11,497.20 1.00 $10,452.00 0.55 $5,748.60 $5.000 $52,260.00

E017 Bituminous Materials (Tack Coat) 1117 LB $1.70 $1,898.90 1.00 $1,117.00 0.55 $614.35 $5.250 $5,864.25

E018 Hot-Mix Asphalt Surface Course, Mix "C", N50, 2" 647 TN $330.00 $213,510.00 350.00 $226,450.00 258.00 $166,926.00 $217.350 $140,625.45

E019 Hot-Mix Asphalt Binder Course, IL-19.0, N50, 6" 227 TN $272.00 $61,744.00 350.00 $79,450.00 258.00 $58,566.00 $215.250 $48,861.75

E020 Temporary Ramps 41 SY $38.90 $1,594.90 2.00 $82.00 0.01 $0.41 $0.000 $0.00

E021 Portland Cement Concrete Pavement, 8" 133 SY $159.00 $21,147.00 180.00 $23,940.00 140.00 $18,620.00 $125.000 $16,625.00

E022 Portland Cement Concrete Sidewalk, 4" 2611 SF $31.90 $83,290.90 16.00 $41,776.00 13.00 $33,943.00 $11.000 $28,721.00

E023 Detectable Warnings 123 SF $70.40 $8,659.20 60.00 $7,380.00 50.00 $6,150.00 $56.500 $6,949.50

E024 Combination Concrete Curb and Gutter, Type B-6.18 278 LF $48.60 $13,510.80 75.00 $20,850.00 60.00 $16,680.00 $59.000 $16,402.00

E025 Combination Concrete Curb and Gutter, Type B-6.24 253 LF $60.00 $15,180.00 80.00 $20,240.00 68.00 $17,204.00 $50.000 $12,650.00

E026 Waterline Adjustment, 8" 60 LF $189.00 $11,340.00 800.00 $48,000.00 700.00 $42,000.00 $380.000 $22,800.00

E027 Waterline Adjustment, 12" 20 LF $194.00 $3,880.00 1,200.00 $24,000.00 900.00 $18,000.00 $625.000 $12,500.00

E028 Water Service Line, 3/4" 3 EA $1,110.00 $3,330.00 1,100.00 $3,300.00 2,050.00 $6,150.00 $1,075.000 $3,225.00

E029 Water Service Line, 1" 3 EA $1,770.00 $5,310.00 1,200.00 $3,600.00 2,050.00 $6,150.00 $1,095.000 $3,285.00

E030 Water Service Line, 2" 2 EA $1,940.00 $3,880.00 2,500.00 $5,000.00 2,050.00 $4,100.00 $1,400.000 $2,800.00

E031 Sanitary Lateral Adjustment 285 LF $141.00 $40,185.00 230.00 $65,550.00 358.00 $102,030.00 $191.000 $54,435.00

E032 Manholes To Be Adjusted 10 EA $698.00 $6,980.00 2,500.00 $25,000.00 1,500.00 $15,000.00 $1,065.000 $10,650.00

E033 Sanitary Manhole Reconstruction 1 EA $33,700.00 $33,700.00 3,000.00 $3,000.00 9,260.00 $9,260.00 $7,850.000 $7,850.00

E034 Support Blocks 5 EA $1,590.00 $7,950.00 1,500.00 $7,500.00 2,260.00 $11,300.00 $875.000 $4,375.00

E035 Storm Sewers, Rubber Gasket, Class A, Type I - 12" 35 LF $124.00 $4,340.00 90.00 $3,150.00 170.00 $5,950.00 $150.000 $5,250.00

E036 Storm Sewers, Rubber Gasket, Class A, Type III - 18" 33 LF $171.00 $5,643.00 140.00 $4,620.00 191.00 $6,303.00 $162.000 $5,346.00

E037 Storm Sewers, Class B, Type I - 6" PVC 11 LF $175.00 $1,925.00 45.00 $495.00 250.00 $2,750.00 $188.000 $2,068.00

E038 Storm Sewers, Class B, Type I - 12" 546 LF $53.40 $29,156.40 100.00 $54,600.00 83.00 $45,318.00 $157.000 $85,722.00

E039 Storm Sewers, Class B, Type II - 12" 65 LF $64.40 $4,186.00 100.00 $6,500.00 83.00 $5,395.00 $169.000 $10,985.00

E040 Storm Sewers, Class B, Type I - 15" 161 LF $56.70 $9,128.70 100.00 $16,100.00 83.00 $13,363.00 $163.000 $26,243.00

E041 Storm Sewers, Class B, Type II - 15" 150 LF $67.90 $10,185.00 100.00 $15,000.00 83.00 $12,450.00 $159.000 $23,850.00

E042 Storm Sewers, Class B, Type I - 18" 74 LF $76.40 $5,653.60 170.00 $12,580.00 90.00 $6,660.00 $153.000 $11,322.00

E043 Storm Sewers, Class B, Type II - 18" 1256 LF $87.50 $109,900.00 170.00 $213,520.00 90.00 $113,040.00 $147.000 $184,632.00

OPTION 3 - EXHIBIT E

E044 Storm Sewers, Class B, Type II - 48" 491 LF $195.00 $95,745.00 360.00 $176,760.00 240.00 $117,840.00 $270.000 $132,570.00

E045 Storm Sewers, Class B, Type III - 48" 144 LF $232.00 $33,408.00 360.00 $51,840.00 220.00 $31,680.00 $282.000 $40,608.00

E046 Storm Sewers, (Water Main Requirements) 12" 135 LF $207.00 $27,945.00 300.00 $40,500.00 218.00 $29,430.00 $135.000 $18,225.00

E047 Inlets, Type A, Type 3 Frame and Grate 10 EA $3,290.00 $32,900.00 3,000.00 $30,000.00 2,700.00 $27,000.00 $3,500.000 $35,000.00

E048 Inlets, Type A, Type 23 Frame and Grate 3 EA $3,550.00 $10,650.00 3,000.00 $9,000.00 2,800.00 $8,400.00 $3,500.000 $10,500.00

E049 Inlets, Type B, Type 3 Frame and Grate 14 EA $4,510.00 $63,140.00 3,000.00 $42,000.00 3,180.00 $44,520.00 $3,700.000 $51,800.00

E050 Manholes, Type A 4' DIA Type 1 Frame and Lid 8 EA $5,940.00 $47,520.00 4,500.00 $36,000.00 3,600.00 $28,800.00 $5,700.000 $45,600.00

E051 Manholes, Type A 5' DIA Type 1 Frame and Lid 4 EA $10,400.00 $41,600.00 5,400.00 $21,600.00 4,800.00 $19,200.00 $7,300.000 $29,200.00

E052 Manholes, Type A 6' DIA Type 1 Frame and Lid 1 EA $16,500.00 $16,500.00 5,600.00 $5,600.00 7,400.00 $7,400.00 $9,700.000 $9,700.00

E053 Manholes, Type A 7' DIA Type 1 Frame and Lid 2 EA $16,000.00 $32,000.00 13,000.00 $26,000.00 20,200.00 $40,400.00 $15,900.000 $31,800.00

E054 Special Manhole M 25.1 1 EA $20,100.00 $20,100.00 30,000.00 $30,000.00 20,900.00 $20,900.00 $46,800.000 $46,800.00

E055 Paint Pavement Marking - Line 4" 1360 LF $4.80 $6,528.00 10.00 $13,600.00 4.00 $5,440.00 $2.630 $3,576.80

E056 Paint Pavement Marking - Line 12" 600 LF $12.00 $7,200.00 20.00 $12,000.00 15.00 $9,000.00 $11.550 $6,930.00

E057 Paint Pavement Marking - Line 24" 105 LF $59.00 $6,195.00 20.00 $2,100.00 20.00 $2,100.00 $15.750 $1,653.75

OPTION 3 - EXHIBIT E SUBTOTAL $1,645,353.30 $2,027,928.00 $2,474,764.26 $1,994,795.75

$17,059,700.50 $20,831,464.50 $20,825,313.22 $21,117,879.08TOTAL BASE SCHEDULE AND OPTIONS SCHEDULE