This document outlines requirements for grounds maintenance services at Clarence Cannon Dam and Mark Twain Lake in Missouri. The contractor shall provide all personnel, equipment, tools and supervision necessary to maintain healthy grass, trees, shrubs and plants and ensure a clean, neat appearance. The master work plan must include equipment and materials used, supervisor contact information, quality control inspection methods and response times for deficiencies, and accident prevention programs. For each mowing cycle the contractor must submit a work plan specifying employee numbers and assignments, crew schedules, and work schedules for each contract area including expected dates, times and cell phone contact. Questions are due by June 13, 2022 to the Department of the Army Corps of Engineers Engineering District St Louis.

View the file

Other files

File Type Posted
A11_22R0004_Revised Combined Synopsis Solicitation.pdf PDF
A02_016 Frank Russell Campground.pdf PDF
A02_042_Indian_Creek_West_Campground.pdf PDF
A02_010_Overlook.pdf PDF
A02_015_Project_Office.pdf PDF
A02_Appendix A.pdf PDF
A02_035_Ray_Behrens_LBS_CR.pdf PDF
A02_026_HF_13.pdf PDF
A02_013_North_Spillway.pdf PDF
A02_036_Ray_Behrens_Deer_Run.pdf PDF
A02_040_Indian_Creek_Group_Campground.pdf PDF
A02_appendix F-2.pdf PDF
A02_004_Duane_Wheelan.pdf PDF
A02_018_Frank_Russell_Campground.pdf PDF
A02_014_Clarence_Cannon_Dam.pdf PDF
A02_046_Indian_Creek_East_Campground.pdf PDF
A02_032_Ray_Behrens_Ent_Lick_Creek_Trailhead.pdf PDF
A02_022_John_F_Spalding_DayUse.pdf PDF
A02_Vegetation Control Area Chart.docx DOCX document
A02_001_Elk_Fork.pdf PDF
A02_048_Typical_HF_Lot.pdf PDF
A02_033_Ray_Behrens_Day_USe.pdf PDF
A02_008_Briscoe_Group_Use.pdf PDF
A02_039_Indian_Creek_West_Boat_Ramp.pdf PDF
A02_006_HF_60.pdf PDF
A02_028_HF_30.pdf PDF
A02_017 ArcheryRange.pdf PDF
A02_Appendix H.pdf PDF
A02_0053_Hickory_Bluff_Trail.pdf PDF
A02_009_Visitors_Center.pdf PDF
A02_023_HF_70.pdf PDF
A02_Appendix B KEY.pdf PDF
A02_054 Disc Golf Course.pdf PDF
A02_041_Indian_Creek_West_Water_Tower.pdf PDF
A02_050_Typical_Campsite.pdf PDF
A02_012_Lick Creek-Trailhead.pdf PDF
A02_047_Indian_Creek_Hike_In_Campground.pdf PDF
A02_011_South_Spillway.pdf PDF
A02_027_HF_15.pdf PDF
A02_029_Stoutsville_Boat_Ramp.pdf PDF
A02_031_HF_20.pdf PDF
A02_APPENDIX E.pdf PDF
A02_038_Indian_Creek_Main_Roadway.pdf PDF
A02_020_Spalding_Sewage_Treatment_Plant.pdf PDF
A02_021_John_F_Spalding_Boat_Ramp.pdf PDF
A02_051_HF_Lot_Locations.pdf PDF
A02_037_Indian_Creek_STP.pdf PDF
A02_025_HF_11.pdf PDF
A02_045_Indian_Creek_Beach_East_Boat_Ramp.pdf PDF
A02_002_South_Fork.pdf PDF
Show 40 more

Latest 50 of 64 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX I

Master Work Plan The Master Work Plan shall include at a minimum the following:

1. The equipment and materials to be used,

2. The name and telephone number(s) of supervisor(s) to whom deficiencies should be reported,

3. The name(s) and telephone number(s) of supervisor(s) who can be contacted on a daily basis,

4. The telephone number(s) and mailing address of the Contractor through which he can normally be contacted on a daily basis,

5. The telephone number(s) where persons of authority within the Contractor’s organization can be reached during non-duty hours,

6. The Contractor’s Quality Control Plan including:

a. Identification of authorized Quality Control Inspectors (QCI), whose duty shall be to verify contractor compliance, their vehicles, and work/ inspection schedule.

b. An inspection method identifying deficiencies in the quality of services performed before the level of performance is unacceptable.

c. A method and response time for correcting minor deficiencies and unacceptable work that the Contractor is requested to re-perform.

d. Quality Control Report covering the bid items completed, which shall include, as a minimum, the following:

1. Inspector’s name

2. Contractor/contract number

3. Date

4. Time/Duration of inspection

5. Items/Areas inspected

6. Defects encountered

7. Corrective actions taken

8. Actions to prevent future occurrence

9. Safety/Security violations

10. Unusual conditions

(Note: Quality Control Report shall be maintained by the Contractor for the duration of the contract and may be requested by the Government at any time. The Quality Control Report shall be filled out by the Contractor representative during time of actual services. The Quality Control Report shall be submitted to the Government upon completion of each task order.)

7. The Contractor’s Accident Prevention Program, as required by EM 385-1-1, including:

a. The Administrative Plan, see Appendix E, and

b. The Activity Hazard Analysis, see Appendix E

The Contractor shall submit a Work Plan for each mowing cycle, which shall include, at a minimum the following: -

1. The number of employees and how employees are to be used,

2. The work schedule of each crew,

3. The schedule of work for each contract area including expected dates and times of work to be performed.

4. The cell phone number of the Contractor and the Contractor’s supervisor.