A21 Solicitation 12_AUG_21.pdf

PDF 2 MB Posted

Attached to
Mark Twain Lake Facilities Maintenance
Solicitation number
W912P921B0002
Issued by

View the file

Other files

File Type Posted
BID ABSTRACT.pdf PDF
A21 Amendment 0001.pdf PDF
A21 Appendix E.pdf PDF
A21 Appendix J2.pdf PDF
A21 Appendix D2.pdf PDF
A21 Appendix M3.pdf PDF
A21 Appendix K.pdf PDF
A21 Appendix B2.pdf PDF
A21 Appendix M1.pdf PDF
A21 Appendix D1.pdf PDF
A21 Appendix M2.pdf PDF
A21 Appendix I.pdf PDF
A21 Appendix F.pdf PDF
A21 Appendix H.pdf PDF
A21 Appendix A1.pdf PDF
A21 Appendix N1.pdf PDF
A21 Appendix B1.pdf PDF
A21 Appendix L.pdf PDF
A21 Appendix C.pdf PDF
A21 Appendix J1.pdf PDF
A21 Appendix N2.pdf PDF
A21 Solicitation_12AUG21.pdf PDF
A21 Appendix G.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81C8X10545608

Facility Maintenance Contract located at Mark Tw ain Lake/Clarence Cannon Dam:

Description of Work: Work consists of furnishing all labor, material, vehicles, equipment, tolls, supervision, transportation, administration, building, and facilities required to perform facility maintenance as required at various locations at Mark Tw ain Lake, Missouri in accordance w ith Specif ications and Appendices.

The magnitude of this requirement is betw een $1,000,000.00 and $5,000,000.00.

This is a 100% Small Business Set-Aside Requirement, issued as an Indefinite Deliver-Indefinite Quantity Invitation for Bid (IFB). The requirement includes a Base plus Tw o Option Years, w ith a guaranteed minimum of $2000.00 for the Base Year, and each Option Year.

Davis Bacon Wage Determination No. MO2, Modification #9, dated July 23, 2021is applicable, and is incorporated into this solicitation.

X

LISA M WHITE 314 331-8518

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

12-Aug-2021

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________13 Sep 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

US ARMY ENGR DIST ST LOUIS

1222 SPRUCE STREET, RM 4.207

ST LOUIS MO 63103-2833

W912P9

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

314 331-8746FAX:TEL: TEL: FAX:

W912P921B0002 129

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912P921B0002

Section 00 10 00 - Solicitation

BID NOTES

Bid Schedule Notes

SECTION B

Bid Schedule Notes

This is an Indefinite Quantity Contract to furnish all labor, materials, vehicles, equipment, tools, supervision, transportation, administration, buildings, and facilities required to perform facility maintenance as required at various locations at Mark Twain Lake, Missouri in accordance with solicitation specifications and provisions.

NOTE 1: ESTIMATED QUANTITIES ARE TO BE USED FOR BID EVALUATION ONLY.

NOTE 2: ALL PRICES MUST BE ON A FIRM BASIS.

NOTE 3: LEGEND FOR UNIT OF MEASURE ABBREVIATIONS

EA = EACH; SQ = SQUARE; SY = SQUARE YARD; CY = CUBIC YARD;

FT = FOOT; SF = SQUARE FOOT; TN = TON;

NOTE 4: BIDDERS MUST BID ON ALL ITEMS. FAILURE TO BID ON ANY ITEM WILL BE CAUSE FOR

THE GOVERNMENT TO DETERMINE THE BID NON-RESPONSIVE.

NOTE 5. AMOUNT: GUARANTEED MINIMUM IS $2,000.00 FOR BASE YEAR AND $2,000.00 FOR

OPTION YEARS (IF EXERCISED). CUMULATIVE MAXIMUM CONTRACT CAPACITY IS $3,000,000.00.

PERFORMANCE PERIOD FOR EACH TASK ORDER ISSUED SEE CONTRACT CLAUSE 52.211-10.

NOTE 6. INFORMATION CONCERNING INDEFINITE QUANTITY CONTRACTS, AS WELL AS THE

ISSUANCE AND LIMITATIONS OF TASK ORDERS MAY BE FOUND IN SECTION 007000, CONTRACT

CLAUSES.

NOTE 7. THIS SOLICITATION CONTAINS AN OPTION TO EXTEND THE TERM OF THE CONTRACT

CLAUSE IN SECTION 007000. THE OPTION(S) ARE TO BE EXERCISED AT THE DISCRETION OF THE GOVERNMENT TO EXERCISE THE OPTION(S). BIDDERS ARE ADVISED THAT SUCH OPTIONS(S) AS MAY BE EXERCISED WILL BE EXERCISED AT THE UNIT PRICES BID FOR THE SPECIFIC OPTION

YEAR.

NOTE 8: BIDDERS MUST PROVIDE FULL, ACCURATE, AND COMPLETE INFORMATION AS

REQUIRED BY THIS SOLICITATION AND ITS ATTACHMENTS. THE PENALTY FOR MAKING FALSE

STATEMENTS IN BIDS PRESCRIBED IN 18 USC 1001, (FAR 52.214-4)

ISSUING TASK ORDERS

1. Task Orders as necessary to accomplish the work required under this contract may be issued by the Contracting Officer or be an Ordering Officer duly appointed in writing to act as Ordering Officer specific to this contract.

2. Each task order shall have specific quantities with maximum allowable timeframes. Orders will be issued for a wide range of items and varying quantities within the realm of the contract. (Also see Contract Clause 52.216-19 entitled “Order Limitations”). Upon receipt of a task order by the Contractor, the Contractor shall have five normal workdays to begin work. During the contract period, aggregate totals for some bid items may exceed the original estimated totals indicated during the bid process. Some bid items may no be required during the contract period. Listed are delivery order schedules:

Dollar Ranges Maximum Allowable Time

$1,500.00 - $25,000.00 10 – 40 Work Days $25,000.01 - $60,000.00 41 – 70 Work Days

$60,000.01 - $225,000.00 71 – 100 Work Days $225,000.01 - $400,000.00 100 – 130 Work Days $400,000.01 - $500,000.00 130 – 160 Work Days

3. Performance periods for delivery orders are based on the schedule above. The schedule does not take into account weather delays which will be allowed when the weather or conditions resulting from weather severely impact or prohibit performance of specified work. The Contracting Officer shall be the sole judge of weather delays and determining severe impact; his/her decision will be final. Specified times in the schedule are based on normal workdays. Time stated for completion on delivery orders shall include site cleanup, as applicable.

BID SCHEDULE

A EXHIBIT A

Line Item

Area Quantity Unit Estimated Unit Price

Estimated Amount

Clearing and Grubbing (Items A001-A003)

A001 Clearing and Grubbing-Light 50 SY ________ ________

A002 Clearing and Grubbing-Moderate 10 SY

A003 Clearing and Grubbing-Heavy 5 SY ________ ________

A004 Site Grading 75 CY ________ ________

A005 Drain Aggregate 75 TN ________ ________

A006 Crushed Stone 75 TN ________ ________

A007 Relocation of Grills on Concrete Bases 10 EA

(Government-Furnished)

A008 Installation of Landscape Timbers 350 FT

(Contractor-Furnished)

A009 Installation of Landscape Timbers 350 FT ________ ________

A010 Relocation of Picnic Tables 10 EA

A011 Relocation of Lantern Hangers 10 EA

A012 Installation of Lantern Hangers 10 EA

A013 Installation of Grills 10 EA

A014 Replacement of Grills 10 EA

A015 Concrete Removal 400 SF ________ ________

A016 Concrete Anchor Removal 5 EA ________ ________

A017 Asphalt Removal 400 SF ________ ________

A018 Removal of Landscape Timbers 350 FT

A019 Removal of Drain Aggregate/Crushed 1000 SF

Stone

A020 Crib Wall Construction 100 FT ________ ________

A021 Establishment of Turf 1000 SY ________ ________

A022 Pea Gravel 30 TN ________ ________

Trenching (Items A023-A028)

A023 Trenching up to 26" 150 FT ________ ________

A024 Trenching 27"- 35" 500 FT ________ ________

A025 Trenching 36"- 48" 300 FT ________ ________

A026 Trenching Rock up to 26" 30 FT ________ ________

A027 Trenching Rock up to 27"-35" 30 FT

A028 Trenching Rock 36"-48" 30 FT ________ ________

Culvert Cleaning (Items A029-A030)

A029 Culvert Cleaning 8"-24" 100 FT ________ ________

A030 Culvert Cleaning 25"-36" 100 FT ________ ________

A031 Sand 250 TN ________ ________

A032 Base Rock (Type 1 Aggregate) 250 TN

A033 3-Inch Box Rock 200 TN ________ ________

A034 Type 2 Rock Ditch Liner 200 TN ________ ________

Horizontal Road Boring (Items A035-A037)

A035 2-Inch Conduit 100 FT ________ ________

A036 3-Inch Conduit 100 FT ________ ________

A037 4-InchConduit 100 FT ________ ________

Water Line Tap (Items A038-A040)

A038 3/4-Inch Complete 3 EA ________ ________

A039 2-Inch Complete 3 EA ________ ________

A040 3/4" Saddle Tap ONLY 3 EA ________ ________

Sewer Line Tap (Items A041-A043)

A041 Sewer Line Tap 2'-5' 5 EA ________ ________

A042 Sewer Line Tap 5.1'-10' 4 EA ________ ________

A043 Sewer Line Tap 10.1'-15' 2 EA ________ ________

A044 Hydrant/Stop and Drain Valve Assembly 5 EA

Manhole (Items A041-A046)

A045 Manhole 1'-4' 10 FT ________ ________

A046 Manhole 4.1'-15' 10 FT ________ ________

Gravity Sewer (A047-A055)

A047 4" Gravity Sewer Less than 4' 200 FT ________ ________

A048 4" Gravity Sewer 4.1'-10' 100 FT ________ ________

A049 4" Gravity Sewer 10.1'-15' 50 FT ________ ________

A050 6" Gravity Sewer Less than 4' 200 FT ________ ________

A051 6" Gravity Sewer 4.1'-10' 300 FT ________ ________

A052 6" Gravity Sewer 10.1'-15' 100 FT ________ ________

A053 8" Gravity Sewer Less than 4' 200 FT ________ ________

A054 8" Gravity Sewer 4.1'-10' 200 FT ________ ________

A055 8" Gravity Sewer 10.1'-15' 100 FT ________ ________

A056 Waterline Installation 500 FT ________ ________

A057 Pressure Sewer Installation 300 FT ________ ________

Roofing (Items A058-A060)

A058 Asphalt or Fiberglass Shingle Roof 15 SQ

Removal & Installation

A059 Wood Shake Shingle Removal/Asphalt Shingle Installation

15 SQ

A060 Ridge Cap Installation 120 FT ________ ________

Concrete Slab (Items A061-A062)

A061 4-Inch 300 SF ________ ________

A062 6-Inch 300 SF ________ ________

A063 Concrete Sidewalk 500 SF ________ ________

A064 Concrete Stairs 150 SF ________ ________

A065 Aluminum Handrail 50 FT ________ ________

A066 Joint and Crack Sealing 750 FT ________ ________

A067 Caulking Compound 250 FT ________ ________

A068 Sealing Compound 150 FT ________ ________

Exterior Painting (Items A069-A077)

A069 Wood-Stain-Oil 10 SQ ________ ________

A070 Wood-Preservative 5 SQ ________ ________

A071 Wood-Paint-Alkyd Industrial Enamel 10 SQ

A072 Masonry Block-Paint-Alkyd Industrial Enamel 10 SQ

A073 Masonry Block-Sealer 2 SQ ________ ________

A074 Concrete-Sealer 5 SQ ________ ________

A075 Concrete-Epoxy 2 SQ ________ ________

A076 Metal (Ferroud)-Paint-Alkyd Industrial Enamel 2 SQ

A077 Metal (Non-Ferrous)-Paint-Alkyd Industrial Enamel

2 SQ

INTERIOR PAINTING (Items A078- A092)

A078 Wood-Stain-Oil 2 SQ ________ ________

A079 Wood-Epoxy-Anti-Graffiti 5 SQ ________ ________

A080 Wood-Paint-Alkyd Industrial Enamel 2 SQ

A081 Masonry Block-Paint-Acrylic 2 SQ

A082 Masonry Block & Concrete Floor- Epoxy-Anti Graffiti

10 SQ

A083 Masonry Block-Sealer 2 SQ ________ ________

A084 Mansonry Block-Paint-Alkyd Industrial Enamel 5 SQ

A085 Concrete Sealer 10 SQ ________ ________

A086 Drywall-Paint-Latex 2 SQ ________ ________

A087 Metal (Ferroud)-Paint-Alkyd 2 SQ ________ ________

A088 Metal (Non-Ferrous)-Paint-Acrylic 5 SQ

A089 Metal (Non-Ferrous)-Paint-Alkyd 5 SQ

A090 Metal (Non-Ferrous)-Paint-Epoxy 2 SQ

A091 Epoxy-Skid-Resistant Floor 2800 SF ________ ________

A092 Epoxy-Skid-Resistant Floor-Patch 20 SF

Base Year _________

B EXHBIT B

Mark Twain Project Office Option Yr 1

Line Item

Area Quantity Estimated Unit Price

Estimated Amount

Clearing and Grubbing (Items B001-B003)

B001 Clearing and Grubbing-Light 50 SY ________ ________

B002 Clearing and Grubbing-Moderate 10 SY

B003 Clearing and Grubbing-Heavy 5 SY ________ ________

B004 Site Grading 75 CY ________ ________

B005 Drain Aggregate 75 TN ________ ________

B006 Crushed Stone 75 TN ________ ________

B007 Relocation of Grills on Concrete Bases 10 EA

B008 Installation of Landscape Timbers 350 FT

B009 Installation of Landscape Timbers 350 FT

(Government-Furnished)

B010 Relocation of Picnic Tables 10 EA ________ ________

B011 Relocation of Lantern Hangers 10 EA

B012 Installation of Lantern Hangers 10 EA

B013 Installatin of Grills 10 EA ________ ________

B014 Replacement of Grills 10 EA ________ ________

B015 Concrete Removal 400 SF ________ ________

B016 Concrete Anchor Removal 5 EA ________ ________

B017 Asphalt Removal 400 SF ________ ________

B018 Removal of Landscape Timbers 350 FT

B019 Removal of Drain Aggregate/Crushed 1000 SF

Stone

B020 Crib Wall Construction 100 FT ________ ________

B021 Establishment of Turf 1000 SY ________ ________

B022 Pea Gravel 30 TN ________ ________

Trenching (Items B023-B028)

B023 Trenching up to 26" 150 FT ________ ________

B024 Trenching 27"- 35" 500 FT ________ ________

B025 Trenching 36"- 48" 300 FT ________ ________

B026 Trenching Rock up to 26" 30 FT ________ ________

B027 Trenching Rock up to 27"-35" 30 FT

B028 Trenching Rock 36"-48" 30 FT ________ ________

Culvert Cleaning (Items B029-B030)

B029 Culvert Cleaning 8"-24" 100 FT ________ ________

B030 Culvert Cleaning 25"-36" 100 FT ________ ________

B031 Sand 250 TN ________ ________

B032 Base Rock (Type 1 Aggregate) 250 TN

B033 3-Inch Box Rock 200 TN ________ ________

B034 Type 2 Rock Ditch Liner 200 TN ________ ________

Horizontal Road Boring (Items B035-B037)

B035 2-Inch Conduit 100 FT ________ ________

B036 3-Inch Conduit 100 FT ________ ________

B037 4-InchConduit 100 FT ________ ________

Water Line Tap (Items B038-B040)

B038 3/4-Inch Complete 3 EA ________ ________

B039 2-Inch Complete 3 EA ________ ________

B040 3/4" Saddle Tap ONLY 3 EA ________ ________

Sewer Line Tap (Items B041-B043)

B041 Sewer Line Tap 2'-5' 5 EA ________ ________

B042 Sewer Line Tap 5.1'-10' 4 EA ________ ________

B043 Sewer Line Tap 10.1'-15' 2 EA ________ ________

B044 Hydrant/Stop and Drain Valve Assembly 5 EA

Manhole (Items B041-B046)

B045 Manhole 1'-4' 10 FT ________ ________

B046 Manhole 4.1'-15' 10 FT ________ ________

Gravity Sewer (1047-1055)

B047 4" Gravity Sewer Less than 4' 200 FT ________ ________

B048 4" Gravity Sewer 4.1'-10' 100 FT ________ ________

B049 4" Gravity Sewer 10.1'-15' 50 FT ________ ________

B050 6" Gravity Sewer Less than 4' 200 FT ________ ________

B051 6" Gravity Sewer 4.1'-10' 300 FT ________ ________

B052 6" Gravity Sewer 10.1'-15' 100 FT ________ ________

B053 8" Gravity Sewer Less than 4' 200 FT ________ ________

B054 8" Gravity Sewer 4.1'-10' 200 FT ________ ________

B055 8" Gravity Sewer 10.1'-15' 100 FT ________ ________

B056 Waterline Installation 500 FT ________ ________

B057 Pressure Sewer Installation 300 FT ________ ________ Roofing (Items B058-B060)

B058 Asphalt or Fiberglass Shingle Roof 15 SQ

Removal & Installation

B059 Wood Shake Shingle Removal/Asphalt 15 SQ

B060 Ridge Cap Installation 120 FT ________ ________

Concrete Slab (Items B061-B062)

B061 4-Inch 300 SF ________ ________

B062 6-Inch 300 SF ________ ________

B063 Concrete Sidewalk 500 SF ________ ________

B064 Concrete Stairs 150 SF ________ ________

B065 Aluminum Handrail 50 FT ________ ________

B066 Joint and Crack Sealing 750 FT ________ ________

B067 Caulking Compound 250 FT ________ ________

B068 Sealing Compound 150 FT ________ ________

Exterior Painting (Items B069-B077)

B069 Wood-Stain-Oil 10 SQ ________ ________

B070 Wood-Preservative 5 SQ ________ ________

B071 Wood-Paint-Alkyd Industrial Enamel 10 SQ

B072 Masonry Block-Paint-Alkyd Industrial Enamel 10 SQ

B073 Masonry Block-Sealer 2 SQ ________ ________

B074 Concrete-Sealer 5 SQ ________ ________

B075 Concrete-Epoxy 2 SQ ________ ________

B076 Metal (Ferroud)-Paint-Alkyd Industrial Enamel 2 SQ

B077 Metal (Non-Ferrous)-Paint-Alkyd Industrial Enamel

2 SQ

INTERIOR PAINTING (Items B078- B092)

B078 Wood-Stain-Oil 2 SQ ________ ________

B079 Wood-Epoxy-Anti-Graffiti 5 SQ ________ ________

B080 Wood-Paint-Alkyd Industrial Enamel 2 SQ

B081 Masonry Block-Paint-Acrylic 2 SQ

B082 Masonry Block & Concrete Floor-Epoxy, Anti- Grafitti

10 SQ

B083 Masonry Block Sealer 2 SQ ________ ________

B084 Mansonry Block-Paint-Alkyd Industrial 5 SQ

B085 Concrete Sealer 10 SQ ________ ________

B086 Drywall-Paint-Latex 2 SQ ________ ________

B087 Metal (Ferroud)-Paint-Alkyd 2 SQ ________ ________

B088 Metal (Non-Ferrous)-Paint-Acrylic 5 SQ

B089 Metal (Non-Ferrous)-Paint-Alkyd 5 SQ

B090 Metal (Non-Ferrous)-Paint-Epoxy 2 SQ

B091 Epoxy-Skid-Resistant Floor 2800 SF ________ ________

B092 Epoxy-Skid-Resistant Floor-Patch 20 SF

Opt Yr 1

C EXHIBIT C

Mark Twain Project Office Option Yr 2

Line Item

Area Quantity Estimated Unit Price

Estimated Amount

Clearing and Grubbing (Items C001-C003)

C001 Clearing and Grubbing-Light 50 SY ________ ________

C002 Clearing and Grubbing-Moderate 10 SY

C003 Clearing and Grubbing-Heavy 5 SY ________ ________

C004 Site Grading 75 CY ________ ________

C005 Drain Aggregate 75 TN ________ ________

C006 Crushed Stone 75 TN ________ ________

C007 Relocation of Grills on Concrete Bases 10 EA

C008

Installation of Landscape Timbers

FT

C009 Installation of Landscape Timbers 350 FT

C010 Relocation of Picnic Tables 10 EA ________ ________

C011 Relocation of Lantern Hangers 10 EA

C012 Installation of Lantern Hangers 10 EA

C013 Installatin of Grills 10 EA ________ ________

C014 Replacement of Grills 10 EA ________ ________

C015 Concrete Removal 400 SF ________ ________

C016 Concrete Anchor Removal 5 EA ________ ________

C017 Asphalt Removal 400 SF ________ ________

C018 Removal of Landscape Timbers 350 FT

C019 Removal of Drain Aggregate/Crushed Stone 1000 SF

C020 Crib Wall Construction 100 FT ________ ________

C021 Establishment of Turf 1000 SY ________ ________

C022 Pea Gravel 30 TN ________ ________

Trenching (Items C023-C028)

C023 Trenching up to 26" 150 FT ________ ________

C024 Trenching 27"- 35" 500 FT ________ ________

C025 Trenching 36"- 48" 300 FT ________ ________

C026 Trenching Rock up to 26" 30 FT ________ ________

C027 Trenching Rock up to 27"-35" 30 FT

C028 Trenching Rock 36"-48" 30 FT ________ ________

Culvert Cleaning (Items C029-C030)

C029 Culvert Cleaning 8"-24" 100 FT ________ ________

C030 Culvert Cleaning 25"-36" 100 FT ________ ________

C031 Sand 250 TN ________ ________

C032 Base Rock (Type 1 Aggregate) 250 TN

C033 3-Inch Box Rock 200 TN ________ ________

C034 Type 2 Rock Ditch Liner 200 TN ________ ________

Horizontal Road Boring (Items C035-C037)

C035 2-Inch Conduit 100 FT ________ ________

C036 3-Inch Conduit 100 FT ________ ________

C037 4-Inch Conduit 100 FT ________ ________

Water Line Tap (Items C038-C040)

C038 3/4-Inch Complete 3 EA ________ ________

C039 2-Inch Complete 3 EA ________ ________

C040 3/4" Saddle Tap ONLY 3 EA ________ ________

Sewer Line Tap (Items C041-C043)

C041 Sewer Line Tap 2'-5' 5 EA ________ ________

C042 Sewer Line Tap 5.1'-10' 4 EA ________ ________

C043 Sewer Line Tap 10.1'-15' 2 EA ________ ________

C044 Hydrant/Stop and Drain Valve Assembly 5 EA

Manhole (Items C041-C046)

C045 Manhole 1'-4' 10 FT ________ ________

C046 Manhole 4.1'-15' 10 FT ________ ________

Gravity Sewer (C047-C055)

C047 4" Gravity Sewer Less than 4' 200 FT ________ ________

C048 4" Gravity Sewer 4.1'-10' 100 FT ________ ________

C049 4" Gravity Sewer 10.1'-15' 50 FT ________ ________

C050 6" Gravity Sewer Less than 4' 200 FT ________ ________

C051 6" Gravity Sewer 4.1'-10' 300 FT ________ ________

C052 6" Gravity Sewer 10.1'-15' 100 FT ________ ________

C053 8" Gravity Sewer Less than 4' 200 FT ________ ________

C054 8" Gravity Sewer 4.1'-10' 200 FT ________ ________

C055 8" Gravity Sewer 10.1'-15' 100 FT ________ ________

C056 Waterline Installation 500 FT ________ ________

C057 Pressure Sewer Installation 300 FT ________ ________

Roofing (Items C058-C060)

C058 Asphalt or Fiberglass Shingle Roof 15 SQ

Removal & Installation

C059 Wood Shake Shingle Removal/Asphalt 15 SQ

C060 Ridge Cap Installation 120 FT ________ ________

Concrete Slab (Items C061-C062)

C061 4-Inch 300 SF ________ ________

C062 6-Inch 300 SF ________ ________

C063 Concrete Sidewalk 500 SF ________ ________

C064 Concrete Stairs 150 SF ________ ________

C065 Aluminum Handrail 50 FT ________ ________

C066 Joint and Crack Sealing 750 FT ________ ________

C067 Caulking Compound 250 FT ________ ________

C068 Sealing Compound 150 FT ________ _________

Exterior Painting (Items C069-C077)

C069 Wood-Stain-Oil 10 SQ ________ ________

C070 Wood-Preservative 5 SQ ________ ________

C071 Wood-Paint-Alkyd Industrial Enamel 10 SQ

C072 Masonry Block-Paint-Alkyd Industrial 10 SQ

Enamel

C073 Masonry Block-Sealer 2 SQ ________ ________

C074 Concrete-Sealer 5 SQ ________ ________

C075 Concrete-Epoxy 2 SQ ________ ________

C076 Metal (Ferroud)-Paint-Alkyd Industrial 2 SQ

Enamel

C077 Metal (Non-Ferrous)-Paint-Alkyd 2 SQ

Industrial Enamel

INTERIOR PAINTING (Items C078- C092)

C078 Wood-Stain-Oil 2 SQ ________ ________

C079 Wood-Epoxy-Anti-Graffiti 5 SQ ________ ________

C080 Wood-Paint-Alkyd Industrial Enamel 2 SQ

C081 Masonry Block-Paint-Acrylic 2 SQ

C082 Masonry Block & Concrete Floor- 10 SQ

C083 Masonry Block Sealer 2 SQ ________ ________

C084 Mansonry Block-Paint-Alkyd Industrial 5 SQ

Enamel Concrete-Sealer

C085 10 SQ ________ ________

C086 Drywall-Paint-Latex 2 SQ ________ ________

C087 Metal (Ferroud)-Paint-Alkyd 2 SQ ________ ________

C088 Metal (Non-Ferrous)-Paint-Acrylic 5 SQ

C089 Metal (Non-Ferrous)-Paint-Alkyd 5 SQ

C090 Metal (Non-Ferrous)-Paint-Epoxy 2 SQ

C091 Epoxy-Skid-Resistant Floor 2800 SF ________ ________

C092 Epoxy-Skid-Resistant Floor-Patch 20 SF

Option Year 2 ___________________

Total Base and 2 Option Years__________________________

SCR-203-11

Enclosure 1

(S-102) CONTRACTOR SUPPLY and USE OF ELECTRONIC SOFTWARE FOR PROCESSING DAVIS- BACON ACT CERTIFIED LABOR PAYROLLS (April2011)

The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE WITH DAVIS-BACON AND RELATED ACT

REGULATIONS.

If the contractor elects to use an electronic Davis-Bacon payroll processing system, then the contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Davis-Bacon and related Act regulations. When the contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the contractor chooses to use an electronic Davis-Bacon payroll system, then the contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.

The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria: commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://www.rmssupport.com/guides.aspx) for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's Resident Management System (RMS); demonstrated security of data and data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data; ability to identify erroneous entries and track the data/time of all versions of the certified Davis Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.

All contractor-incurred costs related to the contractor's provision and use of an electronic payroll processing service shall be included in the contractor's price for the overall work under the contract. The costs for Davis- Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this contract.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

FACILITY MAINTENANCE-

FFP

BASE YEAR - SEE EXHIBIT A

-In accordance with Scope of Work, Drawings and Appendices.

------PROJECT 107134

FOB: Destination

MILSTRIP: W81C8X10545608

PURCHASE REQUEST NUMBER: W81C8X10545608

PSC CD: Z1JZ

NET AMT

1001 1 Job

OPTION FACILITY MAINTENANCE

FFP

OPTION YEAR 1 - SEE EXHIBIT B

-In accordance with Scope of Work, Drawings and Appendices.

------PROJECT 107134

FOB: Destination

MILSTRIP: W81C8X10545608

2001 1 Job

OPTION FACILITY MAINTENANCE

FFP

OPTION YEAR 2 - SEE EXHIBIT C

-In accordance with Scope of Work, Drawings and Appendices.

------PROJECT 107134

FOB: Destination

MILSTRIP: W81C8X10545608

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 27-SEP-2021 TO

26-SEP-2022

N/A MARK TWAIN LAKE PROJECT

JENNIFER D TORRENCE

US ARMY ENGR DIST ST LOUIS

20642 HIGHWAY J

MONROE CITY MO 63456-2949

573-735-4097 FOB: Destination

966462

1001 POP 27-SEP-2022 TO

26-SEP-2023

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 27-SEP-2023 TO

26-SEP-2024

N/A (SAME AS PREVIOUS LOCATION)

Section 00 70 00 - Conditions of the Contract

LOCAL CLAUSES

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)

252.204-7007 ALTERNATE A, ANNUAL REPRESENTATION & CERTIFICATIONS (MAY 2021)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237990.

(2) The small business size standard is $36.5M.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at FAR 52.204-7, System for Award Management, is included in this solicitation, paragraph

(e) of this provision applies.

(2) If the provision at FAR 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (e) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

_X__ (i) Paragraph (e) applies.

___ (ii) Paragraph (e) does not apply and the Offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless–

(A) The acquisition is to be made under the simplified acquisition procedures in part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that-

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services-Representation. This provision applies to all solicitations.

(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations-Representation.

(viii) 52.209-5, CertificationRegarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(x) 52.214-14, Place of Performance-Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.

(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xvi) 52.222-38, Compliance with Veterans’ Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA–designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA–designated items.

(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-Representation.

This provision applies to solicitations that include the clause at 52.204-7.)

(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xxi) 52.225-4, Buy American-Free Trade Agreements-Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $83,099, the provision with its Alternate II applies.

(D) If the acquisition value is $83,099 or more but is less than $100,000, the provision with its Alternate III applies.

(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan-Certification. This provision applies to all solicitations.

(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certifications. This provision applies to all solicitations.

(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

__ (i) 52.204-17, Ownership or Control of Offeror.

__ (ii) 52.204-20, Predecessor of Offeror.

__ (iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

__ (iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment- Certification.

__ (v) 52.222-52, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Certification.

__ (vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA– Designated Products (Alternate I only).

__ (vii) 52.227-6, Royalty Information.

__ (A) Basic.

__ (B) Alternate I.

__ (viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d)(1) The following representations or certifications in the SAM database are applicable to this solicitation as indicated:

(i) 252.204-7016 , Covered Defense Telecommunications Equipment or Services—Representation. Applies to all solicitations.

(ii) 252.216-7008 , Economic Price Adjustment—Wage Rates or Material Prices Controlled by a Foreign Government. Applies to solicitations for fixed-price supply and service contracts when the contract is to be performed wholly or in part in a foreign country, and a foreign government controls wage rates or material prices and may during contract performance impose a mandatory change in wages or prices of materials.

(iii) 252.225-7042 , Authorization to Perform. Applies to all solicitations when performance will be wholly or in part in a foreign country.

(iv) 252.225-7049 , Prohibition on Acquisition of Certain Foreign Commercial Satellite Services—Representations.

Applies to solicitations for the acquisition of commercial satellite services.

(v) 252.225-7050 , Disclosure of Ownership or Control by the Government of a Country that is a State Sponsor of Terrorism. Applies to all solicitations expected to result in contracts of $150,000 or more.

(vi) 252.229-7012 , Tax Exemptions (Italy)—Representation. Applies to solicitations and contracts when contract performance will be in Italy.

(vii) 252.229-7013 , Tax Exemptions (Spain)—Representation. Applies to solicitations and contracts when contract performance will be in Spain.

(ix) 252.247-7022 , Representation of Extent of Transportation by Sea. Applies to all solicitations except those for direct purchase of ocean transportation services or those with an anticipated value at or below the simplified acquisition threshold.

(2) The following representations or certifications in SAM are applicable to this solicitation as indicated by the Contracting Officer: [Contracting Officer check as appropriate.]

___ (i) 252.209-7002 , Disclosure of Ownership or Control by a Foreign Government.

___ (ii) 252.225-7000 , Buy American—Balance of Payments Program Certificate.

___ (iii) 252.225-7020 , Trade Agreements Certificate.

___ Use with Alternate I.

___ (iv) 252.225-7031 , Secondary Arab Boycott of Israel.

___ (v) 252.225-7035 , Buy American—Free Trade Agreements—Balance of Payments Program Certificate.

___ Use with Alternate I.

___ Use with Alternate II.

___ Use with Alternate III.

___Use with Alternate IV.

___ Use with Alternate V.

___ (vi) 252.226-7002 , Representation for Demonstration Project for Contractors Employing Persons with Disabilities.

___ (vii) 252.232-7015 , Performance-Based Payments—Representation.

(e) The Offeror has completed the annual representations and certifications electronically via the SAM website at https://www.acquisition.gov/. After reviewing the SAM database information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in FAR 52.204-8(c) and paragraph (d) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer, and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [Offeror to insert changes, identifying change by provision number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

Any changes provided by the Offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications located in the SAM database.

FAR/DFARS Provision # Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications located in the SAM database.

(End of provision)

(S-102) CONTRACTOR SUPPLY and USE OF ELECTRONIC SOFTWARE FOR PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS (April2011)

The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE WITH DAVIS-BACON AND

RELATED ACT REGULATIONS.

If the contractor elects to use an electronic Davis-Bacon payroll processing system, then the contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Davis-Bacon and related Act regulations. When the contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the contractor chooses to use an electronic Davis-Bacon payroll system, then the contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.

The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria: commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://www.rmssupport.com/guides.aspx) for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's Resident Management System (RMS); demonstrated security of data and data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data; ability to identify erroneous entries and track the data/time of all versions of the certified Davis Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.

All contractor-incurred costs related to the contractor's provision and use of an electronic payroll processing service shall be included in the contractor's price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this contract.

SUSTAINABILITY

SUSTAINABILITY GUIDANCE –

Bio-Preferred Program:

The United States Department of Agriculture (USDA) designates certain biobased products for federal procurement and specifies minimum biobased content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred’s minimum biobased content level.

Visit the BioPreferred web site (https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml) for the complete listof designated products and the associated minimum biobased content level requirements.

EPA-Designated:

Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials, and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program.

Visit http://www.epa.gov/epawaste/conserve/tools/cpg/products for a complete list of designated products and the associated recommended content levels. Offerors must be able to demonstrate that each offered product meets minimum content levels upon request.

ADDITIONAL CLAUSES

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

As prescribed in 23.406(b), insert the following clause:

Affirmative Procurement of Biobased Products Under Service and Construction Contracts (Sept 2013)

(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless-

(1) The product cannot be acquired-

(i) Competitively within a time frame providing for compliance with the contract performance schedule;

(ii) Meeting contract performance requirements; or

(iii) At a reasonable price.

(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:

(i) Spacecraft system and launch support equipment.

(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.

(b) Information about this requirement and these products is available at http://www.biopreferred.gov.

(c) In the performance of this contract, the Contractor shall-

(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and

(2) Submit this report no later than-

(i) October 31 of each year during contract performance; and

(ii) At the end of contract performance.

(End of clause)

52.223-3 Hazardous Material Identification and Material Safety Data.

As prescribed in 23.303 , insert the following clause:

Hazardous Material Identification and Material Safety Data (Feb 2021)

(a) "Hazardous material," as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No.313 (including revisions adopted during the term of the contract).

(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety Data Sheet submitted under this contract.

Material (If none, insert None) Identification No.

(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.

(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Material Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard

No.313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No.313, whether or not the apparently successful offeror is the actual manufacturer of these items. Failure to submit the Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.

(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No.313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.

(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.

(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.

(h) The Government’s rights in data furnished under this contract with respect to hazardous material are as follows:

(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to-

(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;

(ii) Obtain medical treatment for those…