A24Amendment01.pdf
PDF 215 KB Posted
- Attached to
- Clarence Cannon SetbacK Federal contract opportunity
- Solicitation number
- W912P9-19-B-0001
About this file
Amendment 01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B01._BID_SUMMARY_SHEET..pdf | ||
| MEMP15DrawingsAdment02_Part3.pdf | ||
| MEMP15DrawingsAdment02_Part2.pdf | ||
| MEMP15DrawingsAdment02_Part1.pdf | ||
| 2amspecs.pdf | ||
| CCNWRSetbackQuestions.pdf | ||
| A22W912P919B0001Amendment02.pdf | ||
| ContractorSignInSheet.pdf | ||
| CCNWRConstructionStatusJune2019Opt.pdf | ||
| CCNWRLiDAROpt.pdf | ||
| A02DrawingsPart2_Part2.pdf | ||
| A02DrawingsPart2_Part1.pdf | ||
| A02DrawingsPart1_Part1.pdf | ||
| A02DrawingsPart3.pdf | ||
| A02DrawingsPart1_Part2.pdf | ||
| A02CCNWRBermSetbackAdvspecs.pdf | ||
| A22W912P919B0001.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Jun-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P919B0001
X 9B. DATED (SEE ITEM 11)
14-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jun-2019
CODE
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 4.207
ST LOUIS MO 63103-2833
W912P9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P919B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The following have been added by full text:
AMENDMENT 01
The above construction solicitation is hereby being amended to include the following information from June 25, 2019 Pre-bid site visit notes, contractor sign-in sheet, and 2 maps that was used for discussion in the meeting.
The project site is currently flooded and expected to be unavailable for an on-site visit during the bidding process. A project discussion, in lieu of a project site visit, was held at 1300, 25 June on the 4th floor, Room 4.208 at the Robert A. Young Building at 1222 Spruce Street, St. Louis, MO.
Important Solicitation Notes:
***All questions about this solicitation should be submitted in writing and emailed to the Contracting Division of USACE*** Point of Contact for all solicitation questions is:
Angie Grimes at (314) 331-8965. Email Address is angie.l.grimes@usace.army.mil.
No new questions will be accepted after 5 July Bid Opening July 15, 2019 @10 am. Robert A Young Building 1222 Spruce Street St. Louis, MO 63103 RM 4.207.
Solicitation Number: W912P9-19-B-0001 This will be a Small Business Set-Aside, competitive procurement, resulting in an Indefinite Delivery, Indefinite Quantity (IDIQ) Contract for a two
(2) years. Individual task orders will be issued which detail the activities to be performed.
All interested parties MUST be registered in the System for Award Management (SAM) Database, www.sam.gov in order to receive a contract award.
Due to several factors including the current flooding at the project site, limitations on work described in Section 0800, Part 1.23 Order and Coordination of Work, and coordination with the State of Missouri, Notice to proceed for this work is anticipated to be given no earlier than January, 2020.
Clarence Cannon National Wildlife Berm Setback:
• The work consists of construction of levees, berms, river meander restorations, and berm and levee degrades. Work requires clearing and grubbing and stripping of existing vegetation;
construction of embankments and degrading of existing embankments; excavation of channels and filling of existing channels; placement of geotextile, stone surfacing, and stone protection;
and establishment of turf.
*** In the event of an error, the Pre-bid Site Visit notes contained herein and any discussions held do not take precedence over anything contained within the solicitation.
(End of Summary of Changes) mailto:angie.l.grimes@usace.army.mil
W912P919B0001
File details come from the government source that posted it.