A22_Solicitation_W912P918B0015..pdf
PDF 892 KB Posted
- Attached to
- Shoreline Revetment at Lake Shelbyville
- Solicitation number
- w912p918b0015
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01._BIDSUMMARYSHEET.pdf | ||
| A02SullivanBeach.jpg | JPG image | |
| A02DrawingBreakwaterSection.pdf | ||
| A02LithiaSprings.jpg | JPG image | |
| A02ILHistoryPrairie.jpg | JPG image | |
| A02CoonCreek.jpg | JPG image | |
| A02WolfCreekPrairie.jpg | JPG image | |
| A02OkawBluffHouses.jpg | JPG image | |
| A02SullivanMarina.jpg | JPG image | |
| A02LonePoint.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81C8X80182877
Shoreline Revetment at Lake Shelbyville
The works consists of furnishing all labor, equipment, and materials necessary for the excavation, site preparation, backfilling and placement of riprap along the shoreline from the water via barge and/or boat. Riprap shall be contractor and/or Government furnished. Riprap shall be RR4 in gradation and have a quality designation of A as per Illinois Department of Transportation (IDOT) standards.
The Magnitude of this project is between $500,000.00 and $1,000,000.00.
This acquisition is Small Business Set-aside.
X
ANGIE L GRIMES 314 331-8965
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
09-Mar-2018
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______10 calendar days and complete it within ________365 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________ 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 09 Apr 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 180 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIVISION
USARMY ENGR DIST ST LOUIS
1222 SPRUCE ST RM 4.207
ST LOUIS MO 63103-2833
W912P9
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
314-331-8746 FAX: TEL:314-331-8500 TEL: FAX:
W912P918B0015 48
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY: 26. ADMINISTERED BY
(Include ZIP Code) 14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14) 16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this 28. NEGOTIATED AGREEMENT
(Must be fully completed by offeror) OFFER
W912P918B0015
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
ODS (71518) SHORELINE REVETMENT
FFP
FOB: Destination
MILSTRIP: W81C8X80182877
PURCHASE REQUEST NUMBER: W81C8X80182877
NET AMT
0002 1 Job
ODS (4358) SHORELINE REVETMENT
FFP
FOB: Destination
0003 1 Job
ODS (71519) SHORELINE REVETMENT
FFP
FOB: Destination
BID SCHEDULE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE TOTAL PRICE
0001 Placement of Riprap (RR4) *12,500 TN ______________ _____________
The Contractor shall provide all labor, equipment and materials necessary for the placement of Government supplied RR4 along the shoreline anywhere within Lake Shelbyville project boundaries. Contract Specification 4.1.
*Estimated.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE TOTAL PRICE
0002 Supply, deliver and place Riprap (RR4) *5,000 TN ___________ _____________
The Contractor shall provide all labor, equipment and materials necessary for the supply, delivery and placement of RR4 anywhere within Lake Shelbyville project boundaries. Contract Specification 4.1. *Estimated.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE TOTAL PRICE
0003 Mobilization, de-mob, site preparation 1 LS ___________ _____________
The Contractor shall provide all labor, equipment and materials necessary for the mobilization, de-mobilization and site preparation as described within the contract specifications. Contract Specification 4.1.2.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE TOTAL PRICE
0004 Supply, deliver and place Geotextile Fabric *5,000 SY ___________ _____________
The Contractor shall provide all labor, equipment and materials necessary for the supply, delivery and placement of geotextile fabric as per contract specifications. Contract Specifications 4.1.5, 4.1.6 and 4.1.7. *Estimated.
Section 00 70 00 - Conditions of the Contract
SOW
SPECIFICATIONS
SHORELINE REVETMENT
LAKE SHELBYVILLE
1. GENERAL
1.1. Scope. The Contractor shall furnish all labor, equipment, and materials necessary for the excavation, site preparation, backfilling and placement of riprap along the shoreline from the water via barge and/or boat. Riprap shall be contractor and/or Government furnished. Riprap shall be RR4 in gradation and have a quality designation of A as per Illinois Department of Transportation (IDOT) standards.
1.2. Contracting Officer. The term "Contracting Officer" (KO) means the person executing this contract on behalf of the Government, and any other officer or civilian employee who is properly designated Contracting Officer, and the term includes, except as otherwise provided in this contract, the authorized representative of the Contracting Office (COR) acting within the limits of his authority.
1.3. Safety Requirements. Following are accident prevention requirements specifically applicable to this work.
However, they should not be construed to be all-inclusive. EM 385-1-1, Safety and Health Requirements Manual, dated November 2014, is mandatory and pertinent provisions will be applied to all work under the jurisdiction of the Corps of Engineers. EM 385-1-1 and its changes are available at http://www.hq.usace.army.mil (at the HQ homepage, select Safety and Occupational Health). Paragraph references are to EM 385-1-1.
a. Report all accidents resulting in lost time and property damage incidents resulting in $350.00 or more to the Contracting Officer's Representative within two (2) working days. Loss of life, incidents with the public or accidents regardless of consequences if it is suspected that it will result in unfavorable criticism of the Corps of Engineers is to be immediately reported to the Contracting Officer, Section 01.D.
b. No alcohol or drugs permitted during working hours. Paragraph 01.C.02.
c. Protective footwear, such as rubber boots, protective covers, ice crampons, or safety boots, shall be worn by all persons exposed to hazards to the feet (including, but not limited to, impact, puncture, slipping, electrical, or chemical hazards). (Footwear providing protection against impact and compressive forces, conduction hazards, electrical hazards, and sole puncture shall meet the applicable requirements of ANSI Z41.), section 05.A.
d. Employees shall wear clothing suitable for the weather and work conditions. The minimum shall be short sleeve shirt, long trousers and leather or other protective work shoes or boots, section 05.A.
e. It shall be the contractor’s responsibility to contact JULIE (811) before any digging begins, section 11.
f. It shall be the contractor’s responsibility to ensure all employees are wearing the appropriate personal flotation devices when on or around the water in accordance with section 05.J.
g. It shall be the contractor’s responsibility to maintain a safe and secure jobsite throughout the entire process of this contract.
1.4. Work Period. The period of performance for this project shall be completed within 120 working days from the notice of award date. Normal working days for the contractor shall be Monday through Friday 0700 - 1630 hours.
1.4.1. Schedule Delays. Delays in the work schedule due to rock availability shall not result in added cost to the Government. The contractor will be compensated for time only.
1.5. Contract Area(s). The following areas are potential worksites located around Lake Shelbyville but more may be identified at a later date. The Illinois history prairie located near Bruce, IL. The Wolf creek prairie located near Findlay, IL. There are areas in coon creek campground, lone point campground, Lithia springs marina, Sullivan marina, Sullivan beach and Okaw bluff. All worksites are in open recreation areas. Public use should be expected.
1.6. Vehicle Use. The Contractor shall not drive off the paved access roads without prior approval of the KO.
The repair of any vegetative damage, rutting, or other impairment, to its original condition shall be the responsibility of the contractor. The contractor's vehicles shall be identified with the company name prominently displayed on the outside of both front doors of each vehicle in such a manner as to provide a readily visible means of identification.
1.7. Adverse Conditions. At the discretion of the COR one day will be added to the time allocated for this contract for each day that work is delayed due to adverse weather.
1.8. Pre-bid site visit. It is not required but highly recommended that all interested bidders shall visit each of the described work sites prior to submitting a bid. This will ensure better communication and expectations between the Government and Contractor.
1.9. Pre-work Conference. The successful bidder or his representative shall attend a pre-work conference with the COR at the Lake Shelbyville Project Office. The COR will notify the successful bidder of the time and date of the pre-work conference. No work shall commence before the pre-work conference has been held.
1.10. Required Documentation. At the pre-work conference the successful bidder shall provide a copy of the required insurance.
2. CONTRACTOR FURNISHED EQUIPMENT, MATERIALS, SUPPLIES AND PERSONNEL.
2.1. Equipment. The Contractor shall furnish and maintain sufficient equipment suitable to perform the work.
All equipment shall be maintained in a safe operating condition in accordance with EM 385-1-1.
2.2. Materials and Supplies. The contractor shall be responsible for all materials, labor, and equipment/tools required for the work described within this contract.
2.3. Approval of Equipment, Supplies, and Materials. The COR reserves the right to inspect any and all equipment and materials prior to and during the award period of this contract. The COR prior to the commencement of work and prior to implementing changes must approve all materials, equipment, and operating procedures.
3. GOVERNMENT FURNISHED MATERIALS AND SUPPLIES
3.1. Materials and Supplies. The Government’s intent is to supply approximately 12,500 tons of RR4 however this will depend on the line item price(s) of this contract. The placement cost line item will determine the quantity to which we shall place.
4. DESCRIPTION OF WORK
4.1. General. Line Item 0001 and 0002. Riprap shall be placed according to the attached drawing (specifically in reference to meeting the 600’ and 601.5’ mean sea level requirements). Riprap shall be placed from the water utilizing a vessel that is equal to or better than a Macoupin 400 series boat.
4.1.1. Temporary erosion control measures such as silt fence will be required at the mobilization site for any disturbed areas and shall be included as an incidental cost for mobilization and site preparation.
4.1.2. Line Item 0003. The mobilization, de-mobilization and site preparation shall include the installation of a suitable, stable, rectangular loading platform that extends into the water to a 4.0 ft. water depth to allow for riprap barge access and material deployment and shall have a surface elevation of 1.5 feet above the normal lake elevation. The interior of the platform shall be filled with gradation RR3 riprap at the bottom and covered with clean 3” stone at the surface. It shall be sufficiently sized to accommodate a level loading platform capable of supporting a front-end loader (4 CY bucket capacity) for loading operations during the project. After completion of the project the loading platform shall be removed and the area returned back to the state it was prior to the contract work.
4.1.3. The work shall consist of furnishing all labor, materials, tools, equipment and incidentals necessary to clear and grub all trees, stumps, hedges, and incidental vegetation within the project limits that interfere with the placement of the rip rap. All tree clearing shall be pre-approved by the Government. All vegetation that is removed shall be disposed of off Government property.
4.1.4. All stone for riprap material shall be in accordance with IDOT standard specifications. It shall be gradation No. 4 with a quality designation of A. The stone riprap shall be trucked to the unloading/loading site and transferred to boat or barge for water transport to the work areas indicated in the drawings. The same area may also be used for riprap storage during the project. Any damage to the pavement and/or curbs shall be the responsibility of the contractor to repair after the project is complete. The contractor shall make every effort to minimize damage due to the heavy material loadings necessary for riprap delivery and deployment.
4.1.5. Line Item 0004. Prior to installation of stone riprap on contractor installed geotextile fabric the area of application shall be cleared of debris, sharp objects, and fallen trees and brush. Fallen trees that provide sufficient under-clearance to permit installation of stone riprap may be left in place. All sites indicated in the drawings for shoreline protection work shall be accessed by water only using suitable watercraft designed for the work at hand.
No access from the land side of such work areas will be permitted except where the Government deems it to be necessary. Placement of stone riprap on the contractor furnished geotextile fabric shall be in accordance with all manufacturer’s recommendations. Riprap may be placed by machine transfer or by hand. In all placement operations stone riprap shall be placed in a controlled manner to eliminate all displacement, tearing, puncturing or other damage to the prepared geotextile fabric. Sorting of material by size or weight for ease of application shall not be permitted. It is intended that the final configuration of stone riprap erosion prevention sections shall be of well graded material within the size ranges as specified herein. Configuration of the existing shoreline and underwater topography requires the use of two differing typical sections for certain shoreline areas. Where adjacent sections indicate the use of differing shoreline protection typical sections the contractor shall leave a break between sections changing from the offshore breakwater section to the eroded shoreline section in accordance with the configuration of the bottom topography between the location of surveyed cross sections. At all locations the entire shoreline as indicated by the stationing shall receive shoreline protection utilizing one of the indicated typical cross sections or a transition section as discussed above. Although not indicated on the drawings it is anticipated that at the end points of areas receiving the offshore breakwater protection section it may be advantageous to connect the offshore section to the actual shoreline to preclude additional shoreline damage from future wave action. These adjustments will be made in the field in consultation by the contactor and the Government and will be paid for in accordance with the unit prices bid for geotextile fabric and stone riprap.
4.1.6. Line Item 0004. Contractor will provide geotextile fabric for placement under all stone riprap shoreline protection. Geotextile fabric shall be nonwoven, spun-bonded and needle-punched and shall meet or exceed the following requirements:
1. Thickness (mils) 60 (ASTM D 177)
2. Grab Strength (lbs.) 110 – 135 (ASTM D 4632)
3. Tensile Elongation (%) 70 - 85 (ASTM D 4632)
4. Puncture Strength (lbs.) 50 - 60 (ASTM D 3787)
5. Trapezoid Tear (lbs.) 50 - 60 (ASTM D 4533)
6. Mullen Burst (psi) 210 (ASTM D-3786)
7. Equivalent Opening Size 60 – 100 (U.S. Standard Sieve No.)
(Corps of Engineers CW-02215)
8. Water Permeability (cm/sec) 0.3 (ASTM D 4491)
4.1.7. Line Item 0004. Geotextile fabric shall be delivered to the job site in such a manner as to facilitate handling and incorporation into the work without damage. Material shall be stored in such a manner as to prevent exposure to direct sunlight and damage by other construction activities. Prior to the installation of the fabric the application surface shall be cleared of debris, sharp objects and trees. Tree stumps shall be cut to the level of the ground surface. If the stumps cannot be cut to the ground level they shall be completely removed. Fallen trees or other debris shall be removed prior to placement of fabric unless the fabric and subsequent stone riprap can be worked into place under such objects. Fabric may be installed on the application surface either by hand or mechanical methods provided that the fabric is not torn or the surface rutted. Fabric of insufficient width or length to fully cover the specified area shall be lapped or sewn. The following are minimum laps for each (lap only 24", sewn 4"). Install securing pins as indicated by the manufacturer. Securing pins shall not be required if fabric installation and stone riprap placement are done concurrently and after demonstration that the fabric will not be displaced by such placement. Placement of stone riprap and installed geotextile fabric shall be done in a controlled manner so as to avoid displacement, puncture, or other damage to the installed fabric. Fabric which is damaged during installation or subsequent placement of granular material due to failure of the contractor to comply with these provisions shall be repaired or replaced at the contractor’s expense including costs of removal and replacement of the granular material. Torn fabric may be patched in-place by cutting and placing a piece of the same fabric over the tear. The dimensions of the patch shall be at least 2 feet larger than the largest dimension of the tear and it shall be weighted or otherwise secured to prevent the granular material from causing lap separation.
4.1.8. All work as shown on the drawings which includes any land clearing, grading or earthwork activities must be in place and approved by the Government prior to beginning any other work on this project. The work shall consist of constructing temporary erosion control measures as shown on the drawings as ordered by the Government during the life of the contract to control erosion and sediment damage to the roadway, retention dike embankments, adjacent properties and water resources through the use of straw bales and other erosion control devices or methods.
Any temporary erosion control methods ordered by the Government shall be coordinated with the permanent erosion control features specified elsewhere in the contract to the extent practical to assure economical, effective and continuous erosion control throughout the construction and post construction period. Straw bales shall be installed with a minimum of two (2) wooden stakes. Rebar or other metallic stakes will not be allowed. Safety fence shall be installed to support the downstream face of straw bales. All erosion control measures shall be maintained until the final seeding has been completed by the contractor.
4.2. Existing utilities. It shall be the contractor’s responsibility to locate or have located all private, public and/or government utilities. If any damage should occur to any utility from the operations of this contract it shall be the contractor’s responsibility to make all repairs with no cost to the government.
4.3. Excess materials. The contractor shall remove all unwanted excavated materials from Government property once the job is complete.
4.4. Cleanup. The Contractor shall be responsible for the cleanup and removal of any construction trash, debris, etc. as a result of this contract off of Government property. This also includes backfilling, leveling, seed and straw any disturbed soil associated with this contract.
5. ENVIRONMENTAL PROTECTION
5.1. Scope. This section prescribes action required for the prevention of environmental pollution during and as the result of operations under this contract. For the purpose of this specification, environmental pollution is defined as the presence of chemicals, physical, or biological elements of agents, which adversely affect human health or welfare; unfavorably alter ecological balances of importance to man; or degrade the utility of the environment for aesthetic and recreational purposes. The control of environmental pollution requires consideration of air, water and land, and involves noise, solid waste management and management of radiant energy and radioactive materials as well as other pollutants.
5.2. Protection of Land Resources. The work areas on which the work is to be performed under this contract and the land resources adjacent thereto should be preserved in their present condition.
5.3. Protection of Water Resources.
5.3.1. Contamination of Water. Lakes, ditches, rivers, canals, waterways, or reservoirs shall not be polluted with fuels, oil, bituminents, calcium chloride, insecticides, herbicides, or other similar materials harmful to fish, shell fish, of wildlife; nor shall they be polluted with materials which may be detrimental to outdoor recreation.
5.3.2. Disposal of Materials. The methods and locations of disposal of materials, wastes effluents, trash, garbage, oil, grease, chemicals, etc., within the right-of-way limits shall be such that harmful debris will not enter lakes, ditches, rivers, canals, waterways, or reservoirs by erosion.
5.3.3. Permits and Responsibilities. The contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable federal, state, and municipal laws, codes, and regulations; in connection with prosecution of the work. The contractor shall be similarly responsible for all damages to persons or property that occur as a result of his/her fault or negligence;
shall take proper safety and health precautions to protect the work, the workers, the public, and all the property of others; and shall also be responsible for all materials delivered and work performed until completion and acceptance of the contract.
6. Method of Payment. Payment may be made by Government VISA or EFT if deemed to be in the best interest of the Government.
6.1. Billing Procedures. The Contractor shall supply 2 copies of invoices for equipment, materials, and supplies within three working days of Government request. No additional payments will be made for incidental supplies, materials, and equipment furnished by the Contractor. The invoice shall include the line item number, item description, unit of measurement, unit price and total amount. The invoice shall also include the contract number, contract name and the task order number. The Contractor shall provide with the invoice, daily reports, payroll documentation, certified weight and load certificates, and if requested, documentation showing the catalog sheets for materials or products furnished.
7. INSPECTION AND ACCEPTANCE. The work will be conducted under the general direction of the COR and is subject to inspection by his appointed inspectors to insure strict compliance with the terms of the contract. No inspector is authorized to change any provision of the specifications without written authorization of the KO, nor shall the presence or absence of an inspector relieve the contractor from any requirements of the contract. Formal acceptance will be made by the KO for and on behalf of the Government.
8. DELIVERIES AND TRANSPORTATION. The Contractor will notify the COR at least 72 hours in advance before work begins.
9. CONTRACT ADMINISTRATION DATA. Payment will be made for the work actually performed and:
(1) Upon receipt of the correct invoice in quadruplicate. Invoice shall contain the following information:
Contractor's name and address: contract number; item number; contract description of supplies or services as specified in Section 2: quantities and extended totals and (2)Upon submission to the COR a complete accounting of all man-hours used to accomplish the job (including administration time).
10. SPECIAL PROVISIONS
10.1. Contractor's Responsibility. It is understood and agreed to by the Contractor that he assumes full responsibility for the safety of his employees, plant damages and materials, and for any damage of injury done by or to them from any source or cause. The contractor will be responsible for gaining authority from all county and/or township road officials to haul the materials over county roads and township roads. Any liability incurred by damage to these public roads is the responsibility of the Contractor.
10.2. Protection of Buildings, Equipment, and Vegetation. The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of his/her operations. Care shall be used to avoid damage to existing structures, equipment, and vegetation in the recreational areas and other areas of Government property.
Any such damage shall be repaired, or the items replaced as directed by the Contracting Officer at no cost to the Government. If the Contractor does not make such repairs or replacements, the cost thereof will be deducted from payments to be made to him. The Contractor shall advise the Contracting Officer of any damage to the facilities due to vandalism or other causes on the day he/she first notices such damage.
10.3. Contract Performance. During the progress of the contract if it becomes apparent that the Contractor is unable or unwilling to perform the work in accordance with Contract specifications, he will acquire additional supplies, equipment, and personnel as may be required by the Contracting Officer or his/her authorized representative to ensure that the work is accomplished. If any work performed is not in conformity with the requirements of this contract, the Government will have the right to require the Contractor to immediately take all necessary steps to insure future performance of the services in conformity with the requirement of the contract; and reduce the contract price to reflect the reduced value of the services performed. In the event the Contractor fails to promptly take necessary steps to insure future performance of the services in conformity with the requirements of the contract, the Government will have the right to by contract or otherwise have the services performed in conformity with the contract requirements and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such services.
10.4. Required Insurance. The Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:
Workmen's Compensation. Amounts required by applicable jurisdictional statutes.
Employer's Liability Insurance. $100,000
Comprehensive General Liability Insurance.
Bodily Injury - $500,000 per occurrence
Comprehensive Automobile Insurance.
Bodily Injury - $200,000 each person
$500,000 each accident Property Damage - $ 20,000 each accident
(CAUTION: Certain standard insurance certificated are not acceptable without alteration. ACORD 25 and similar forms do not assure notice of "any material change" and contain unacceptable wording such as "will endeavor" and "failure to mail such notice shall impose no obligation or liability; of any kind upon this company"; "this certificate is issued as a matter of information only and confers no rights upon the certificate holder"; and "This certificate does not amend, extend or alter the policies listed below.")
The contractor shall furnish to the COR, prior to the commencement of work, a certificate of the required insurance. Certificate of insurance should be submitted to the following address:
Department of Army St. Louis District, Corps of Engineers
Lake Shelbyville Project Office 1989 State Highway 16
Shelbyville, Illinois 62565
10.5 Security
Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something).
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
Pre-screen candidates using E-Verify Program. (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative.
This Form will be provided to the Contracting Officer and shall become part of the official contract file.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013 52.203-2 Certificate Of Independent Price Determination APR 1985 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-11 Certification And Disclosure Regarding Payments To
Influence Certain Federal Transactions
SEP 2007
52.203-12 Limitation On Payments To Influence Certain Federal Transactions
OCT 2010
52.204-3 Taxpayer Identification OCT 1998 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-6 Unique Entity Identifier OCT 2016 52.204-7 System for Award Management OCT 2016 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2016
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.211-5 Material Requirements AUG 2000 52.211-13 Time Extensions SEP 2000 52.211-18 Variation in Estimated Quantity APR 1984 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-12 Preparation Of Bids APR 1984 52.214-13 Alt I Telegraphic Bids (Apr 1984) - Alternate I NOV 1988 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-27 Price Reduction for Defective Certified Cost or Pricing Data -
Modifications - Sealed Bidding
AUG 2011
52.214-28 Subcontracting Certified Cost Or Pricing Data-- Modifications--Sealed Bidding
OCT 2010
52.215-19 Notification of Ownership Changes OCT 1997 52.215-20 Requirements for Certified Cost or Pricing Data or
Information Other Than Certified Cost or Pricing Data
OCT 2010
52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications
OCT 2010
52.216-9 Fixed Fee--Construction JUN 2011 52.219-2 Equal Low Bids OCT 1995 52.219-8 Utilization of Small Business Concerns NOV 2016 52.219-16 Liquidated Damages-Subcontracting Plan JAN 1999 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards- Overtime
Compensation
MAY 2014
52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work
MAY 2014
52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-22 Previous Contracts And Compliance Reports FEB 1999
52.222-26 Equal Opportunity SEP 2016 52.222-38 Compliance With Veterans' Employment Reporting
Requirements
FEB 2016
52.222-50 Combating Trafficking in Persons MAR 2015 52.223-1 Biobased Product Certification MAY 2012 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-2 (Dev) Affirmative Procurement of Biobased Products Under Service and Construction Contracts (Deviation)
SEP 2013
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-11 Ozone-Depleting Substances and High Global Warming
Potential Hydrofluorocarbons.
JUN 2016
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-20 Prohibition on Conducting Restricted Business Operations in
Sudan--Certification
AUG 2009
52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.
OCT 2015
52.227-1 Authorization and Consent DEC 2007 52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-2 Payments Under Fixed-Price Research And Development
Contracts
APR 1984
52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-11 Extras APR 1984 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.233-1 Disputes MAY 2014 52.233-2 Service Of Protest SEP 2006 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984
52.236-13 Accident Prevention NOV 1991 52.236-15 Schedules for Construction Contracts APR 1984 52.236-16 Quantity Surveys APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.244-5 Competition In Subcontracting DEC 1996 52.244-6 Subcontracts for Commercial Items NOV 2017 52.246-4 Inspection Of Services--Fixed Price AUG 1996 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2015 52.249-2 Termination For Convenience Of The Government (Fixed-
Price)
APR 2012
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7006 Billing Instructions OCT 2005 252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7031 Secondary Arab Boycott Of Israel JUN 2005 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.236-7002 Obstruction of Navigable Waterways DEC 1991 252.236-7006 Cost Limitation JAN 1997 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.246-7000 Material Inspection And Receiving Report MAR 2008 252.247-7022 Representation Of Extent Of Transportation Of Supplies By
Sea
AUG 1992
252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
REQUIRED INSURANCE
(a) As required by the Contract Clause entitled "Insurance—Work on a Government Installation", the Contractor shall furnish to the Contracting Officer, prior to the commencement of work, a certificate or written statement as evidence of the minimum insurance listed below. The Contractor shall procure and maintain such types and amounts of insurance during the entire period of his performance under this contract. The Contractor shall assure that the certificate or written statement is in accordance with required wording indicated in paragraph b of the aforementioned Contract Clause.
(1) Workmen's Compensation – Amounts required by applicable jurisdictional statutes.
(2) Employer's Liability Insurance – $100,000.00
(3) Comprehensive General Liability Insurance – (No property damage liability insurance is required.)
Bodily Injury — $500,000 per occurrence
(4) Comprehensive Automobile Insurance –
Bodily Injury — $200,000 each person $500,000 each accident Property Damage — $ 20,000 each accident
(b) Certificates of insurance should be submitted to the following address:
Department of the Army St. Louis District, Corps of Engineers Contracting Division (CEMVS-CT-Y) 1222 Spruce St.
St. Louis, MO 63103-2833
(End of clause)
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within TEN (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than ONE (1) YEAR. * The time stated for completion shall include final cleanup of the premises.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $500.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.214-15 PERIOD FOR ACCEPTANCE OF BIDS (APR 1984)
In compliance with the solicitation, the bidder agrees, if this bid is accepted within ONE HUNDRED EIGHTY
(180) calendar days (from the date specified in the solicitation for receipt of bids, to furnish any or all items upon which prices are bid at the price set opposite each item, delivered at the designated point(s), within the time specified in the Schedule.
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a FIRM FIXED PRICE (FFP) contract resulting from this solicitation.
(End of provision)
52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014) - ALTERNATE I (SEPT 2015)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237990.
(2) The small business size standard is $5,000,000.00.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b) Representations. (1) The offeror represents as part of its offer that it ( ___ ) is, ( ___ ) is not a small business concern.
(2) (Complete only if the offeror represented itself as a small business concern in paragraph (b)(1) of this provision.)
The offeror represents, for general statistical purposes, that it ( ___ ) is, ( ___ ) is not a small disadvantaged business concern as defined in 13 CFR 124.1002.
(3) (Complete only if the offeror represented itself as a small business concern in paragraph (b)(1) of this provision.)
The offeror represents as part of its offer that it ( ___ ) is, ( ___ ) is not a women-owned small business concern.
(4) Women-owned small business (WOSB) concern eligible under the WOSB Program. [Complete only if the offeror represented itself as a women-owned small business concern in paragraph (b)(3) of this provision.] The offeror represents as part of its offer that--
(i) It ( ___ ) is, ( ___ ) is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and
(ii) It [ ___ ] is, [ ___ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (b)(4)(i) of this provision is accurate for each WOSB concern eligible under the WOSB Program participating in the joint venture. [The offeror shall enter the name or names of the WOSB concern eligible under the WOSB Program and other small businesses that are participating in the joint venture: ---- ___ ------.] Each
WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB representation.
(5) Economically disadvantaged women-owned small business (EDWOSB) concern. [Complete only if the offeror represented itself as a women-owned small business concern eligible under the WOSB Program in (b)(4) of this provision.] The offeror represents as part of its offer that--
(i) It ( ___ ) is, ( ___ ) is not an EDWOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and
(ii) It [ ___ ] is, [ ___ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (b)(5)(i) of this provision is accurate for each EDWOSB concern participating in the joint venture. [The offeror shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture: ----- ___ -----.] Each EDWOSB concern participating in the joint venture shall submit a separate signed copy of the EDWOSB representation.
(6) (Complete only if the offeror represented itself as a small business concern in paragraph (b)(1) of this provision.)
The offeror represents as part of its offer that it ( ___ ) is, ( ___ ) is not a veteran-owned small business concern.
(7) (Complete only if the offeror represented itself as a veteran-owned small business concern in paragraph (b)(6) of this provision.) The offeror represents as part of its offer that it ( ___ ) is, ( ___ ) is not a service-disabled veteran-owned small business concern.
(8) [Complete only if the offeror represented itself as a small business concern in paragraph (b)(1) of this provision.] The offeror represents, as part of its offer, that--
(i) It ( ___ ) is, ( ___ ) is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material change in ownership and control, principal office, or HUBZone employee percentage has occurred since it was certified by the Small Business Administration in accordance with 13 CFR part 126; and
(ii) It ( ___ ) is, ( ___ ) is not a joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (b)(8)(i) of this provision is accurate for the HUBZone small business concern or concerns that are participating in the joint venture. (The offeror shall enter the name or names of the HUBZone small business concern or concerns that are participating in the joint venture: ___ .) Each HUBZone small business concern participating in the joint venture shall submit a separate signed copy of the HUBZone representation.
(9) (Complete if offeror represented itself as disadvantaged in paragraph (c)(2) of this provision.) The offeror shall check the category in which its ownership falls:
___ Black American.
___ Hispanic American.
___ Native American (American Indians, Eskimos, Aleuts, or Native Hawaiians).
___ Asian-Pacific American (persons with origins from Burma, Thailand, Malaysia, Indonesia, Singapore, Brunei, Japan, China, Taiwan, Laos, Cambodia (Kampuchea), Vietnam, Korea, The Philippines, Republic of Palau, Republic of the Marshall Islands, Federated States of Micronesia, the Commonwealth of the Northern Mariana Islands, Guam, Samoa, Macao, Hong Kong, Fiji, Tonga, Kiribati, Tuvalu, or Nauru).
___ Subcontinent Asian (Asian-Indian) American (persons with origins from India, Pakistan, Bangladesh, Sri Lanka, Bhutan, the Maldives Islands, or Nepal).
___ Individual/concern, other than one of the preceding.
(c) Definitions. As used in this provision--
Service-disabled veteran-owned small business concern--
(1) Means a small business concern--
(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and
(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.
(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C.