A22W912P918B0008Amd1..pdf

PDF 526 KB Posted

Attached to
Clarence Cannon National Wildlife Refuge Pump Station
Solicitation number
w912p918b0008
Issued by

About this file

Amendment1

View the file

Other files

File Type Posted
A24CNWRQuestions1.pdf PDF
A02Amendment1Specs.pdf PDF
A02Amendment1plansPart2.pdf PDF
A24PumpStationPreBidSiteVisitSignIn.pdf PDF
A02Amendment1plans_Part1.pdf PDF
A22W912P918B0008.pdf PDF
A02_CCNWR_PS_Adv_Plans.pdf PDF
A02_CCNWR_PS_Adv_specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Clarence Cannon National Wildlife Refuse, Pump Station is hereby being amended to incorporate the following:

1. Bid opening is extended to March 5, 2018 at 10:00 am local time.

2. Revised Bid Schedule

3. Revised Specifications

4. Plans

5. Questions and Answers

**SEE ATTACHMENTS

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P918B0008

X 9B. DATED (SEE ITEM 11)

22-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Feb-2018

CODE

CONTRACTING DIVISION

US ARMY ENGR DIST ST LOUIS

1222 SPRUCE STREET, RM 4.207

ST LOUIS MO 63103-2833

W912P9 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P918B0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been added by full text:

AMENDMENT 01

CLARENCE CANNON NATIONAL WILDLIFE REFUGE, PUMP STATION are amended as follows:

GENERAL INFORMATION

BIDDING SCHEDULE - Delete this section and replace it with the revised like-numbered section which includes changes to bid item 0009 quantities.

SECTION 00 08 00 - Delete this section and replace it with the revised like-numbered section which includes the deletion of subparagraph (p) in Order and Coordination of Work.

SPECIFICATIONS

SECTION 03 42 13.00 10 - Delete this section and replace it with the revised like-numbered section.

SECTION 26 05 00.00 40 - Delete this section and replace it with the revised like-numbered section which includes changes to paragraphs 1.1, 1.2, 2.1.6 and 3.3.

SECTION 31 23 19.02 - Delete this section and replace it with the revised like-numbered section which includes changes to paragraphs 1.5 and 2.1.

SECTION 32 15 00.00 09 - Delete this section and replace it with the revised like-numbered section which includes changes to paragraph 2.1.2

PLANS

HYDROGRAPHS – Include Sheets R-701 and R-702 in this solicitation.

Deleted Revised C-107 C-107.1

SR101 SR101.1

SR102 SR102.1

SR103 SR103.1

SR104 SR104.1

SR105 SR105.1

SR201 SR201.1

SR202 SR202.1

SR301 SR301.1

SR302 SR302.1

SR303 SR303.1

SR304 SR304.1

BIDDING SCHEDULE

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount

0001 Mobilization and Demobilization 1 JOB $____ $________

0002 Clearing and Grubbing

a. First 5 acres 5 AC $______ $_______

b. All over 5 acres 4 AC $______ $_______

0003 Stripping

a. First 5 acres 5 AC $______ $_______

b. All over 5 acres 4 AC $______ $_______

0004 Excavation 1 JOB $____ $________

0005 Compacted Embankment 1 JOB $____ $________

0006 Crushed Stone Surfacing

a. First 500 tons 500 TN $_____ $_______

b. All over 500 tons 100 TN $_____ $_______

0007 Crushed Stone Base

a. First 450 tons 450 TN $____ $________

b. All over 450 tons 75 TN $____ $________

0008 Geosynthetics 1 JOB $____ $________

0009 Stone Protection – Riprap (650 LB Top Size)

a. First 6,800 tons 6,800 TN $____ $________

b. All over 6,800 tons 750 TN $____ $________

0010 Stone Protection – Crushed Stone Bedding

a. First 1,800 tons 1,800 TN $____ $________

b. All over 1,800 tons 200 TN $____ $________

0011 Filter

a. First 350 tons 350 TN $____ $________

b. All over 350 tons 50 TN $____ $________

0012 Metal Sheet Piling 1 JOB $____ $________

0013 Precast Concrete Box Culverts And Appurtenances 1 JOB $____ $________

0014 Chain Link Fence and Appurtenances 1 JOB $____ $________

0015 Borrow Area Seeding

a. First 1 acre 1 AC $_____ $_______

b. All over 1 acre 1 AC $_____ $_______

0016 Establishment of Turf 1 JOB $____ $_______

0017 Reinforced Concrete 1 JOB $____ $________

0018 Miscellaneous Metals 1 JOB $____ $________

BIDDING SCHEDULE

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount

0019 Plastic Items 1 JOB $____ $________

0020 Slide Gates and Gate Hoists 1 JOB $____ $________

0021 Pumps and Appurtenances 1 JOB $____ $________

0022 Electrical Work 1 JOB $____ $________

0023 Care of Water 1 JOB $____ $________

0024 Flowable Fill (CLSM) 1 JOB $____ $________

0025 Bonds and Insurance 1 JOB $____ $________

TOTAL $________

ABBREVIATIONS

JOB Job TN Ton AC Acre

(See BIDDING SCHEDULE NOTES)

BIDDING SCHEDULE NOTES

1. All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit is shown as job "JOB".

2. When bids are solicited on a unit price basis, bidders shall insert in the spaces provided therefore in the SCHEDULE both the "unit price" and the "estimated amount" resulting from applying the said unit price to the estimated quantity shown. In event the bidder quotes only a total price ("estimated amount") in its bid and fails to quote the unit price, the Government will determine such unit price by dividing the total price quoted by the quantity of the item set out in the SCHEDULE. The bidder agrees that the unit price so determined shall be used for the purpose of bid evaluation, award and all payments to the Contractor including final payment.

3. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid and the extension will be corrected accordingly.

4. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.

5. Bidders are required to bid on all items listed on the Bidding Schedule in addition to inserting a total quoted bid in the appropriate space provided. Failure to do so will be considered good cause to disqualify the bid.

6. Bidders are encouraged to pay particular attention to the requirements on lab “validation” in Section 01 14 40 of the contract specifications.

7. EVALUATION OF SUBDIVIDED ITEMS (MAR 1995) UAI 52.211-5001

Item Nos. 0002, 0003, 0006, 0007, 0009, 0010, 0011, and 0015 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.

8. VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS. UAI 52.211-5001.

This variations in estimated quantities clause is applicable only to Item Nos. 0002, 0003, 0006, 0007, 0009, 0010, 0011, and 0015.

(a) Variation from the estimated quantity in the actual work performed under any second or subsequent subitem or elimination of all work under such a second or subsequent subitem will not be the basis for an adjustment in contract unit price.

(b) Where the actual quantity of work performed for Item Nos. 0002, 0003, 0006, 0007, 0009, 0010, 0011, and 0015 is less than 85 percent of the quantity of the first subitem listed under such item, the Contractor will be paid at the contract unit price for that subitem for the actual quantity of work performed, and, in addition, an equitable adjustment shall be made in accordance with the Contract Clause FAR 52.212-11, Variation in Estimated Quantities.

(c) If the actual quantity of work performed under Item Nos. 0002, 0003, 0006, 0007, 0009, 0010, 0011, and 0015 exceeds 115 percent or is less than 85 percent of the total estimated quantity of the subitems under that item, and/or if the quantity of work performed under the second subitem or any subsequent subitem under Item Nos. 0002, 0003, 0006, 0007, 0009, 0010, 0011, and 0015 exceeds 115 percent or is less than 85 percent of the estimated quantity of any such subitem, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the Contract Clause FAR 52.211-18, Variation in Estimated Quantities.

The following have been deleted:

BID NOTES

BID SCHEDULE

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been added by full text:

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3 Million, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

The following have been modified:

52.214-15 PERIOD FOR ACCEPTANCE OF BIDS (APR 1984)

In compliance with the solicitation, the bidder agrees, if this bid is accepted within one hundred and eighty (180) calendar days rom the date specified in the solicitation for receipt of bids, to furnish any or all items upon which prices are bid at the price set opposite each item, delivered at the designated point(s), within the time specified in the Schedule.