Contract Award Package_W912P824C0040 (Fully Executed).pdf
PDF 27 MB Posted
- Solicitation number
- W912P824C0040
About this file
This document is a Contract Award Package for federal contract W912P824C0040. The contract was awarded to MIKE HOOKS, LLC on 2024-09-25 for $17,993,500 by the Department of the Army Corps of Engineers Engineering District New Orleans for the Atchafalaya River, Bayous Chene, Boeuf and Black, Bayou Chene and Avoca Island Cutoff, Maintenance Dredging project in Assumption, St. Mary and Terrebonne Parishes, Louisiana. The contract covers maintenance dredging of the Atchafalaya River and associated waterways under the project code ED 24-024.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER, 1. SOLICrTA 110N NO. 2. TYPE OF SOLICrTATION 3. DA TE ISSU8) PAGE OF PAGES
AND AWARD 0 SEALEDBID (IFB) 12-Aug-2024 (Construe/ion, Alteration, or Repair)
VV912P824B0053 □ NEGOTI/\TED
(RFP)
IMPORTANT-The "offer" section on the reverse must be fully completed by offerer.
4. CONTRACT NO. 5. REQUISrTION/PURCHASE REQUEST NO. 6. FROJECT NO.
ED 24-024
7. ISSUEDBY CODE IW912P8 8. ADDRESS OFFER TO (If Other Than Item 7) CODE I
USAGE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
SEE BIDDING INSTRUCTIONS IN SOLICITATION
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
TEL: FAX: TEL: FAX:
9. FOR INFORMATION A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
CALL: STEA-JANIE N MBELU 504-862-1047
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offerer" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Tille, identifying no., dale):
Atchafalaya River, Bayous Chene, Boeuf and Black, Bayou Chene and Avoca Island Cutoff, Maintenance D'edging, Assurrption, St. Mary and Terrebonne Parishes, Louisiana ED 24-024
The work consists of satisfactory removal and disposal of all shoal material within the lirrits of work including dike construction as described and as shown on the contract drawings.
The estimated value of this work is between $25,000,000 and $100,000,000.
11. The Contractor shall begin performance within _1_0_ calendar days and corrplete it within 371 calendar days after receiving
D award, 0 notice to proceed. This performance period is � mandatory, D negotiable. (See .)
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? 12B. CALENDAR DAYS (If "YES," indicate within how many calendar days after award in Item 12B.) I
0YES □ NO
13. ADDl'nONAL SOLICITATION REQUIREMENTS A. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 09:00 AM (hour) local time ··-1-2--Sep� (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offerer's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee 0 is, D is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than� calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48CFR) 53.236-1(e)
W912P8-24-C-0040
CLINS 0001 through 0004 in the amount of $16,180,000.00 are hereby awarded.
$16,180,000.00 W42HEM42648846
USACE, New Orleans Area Office 7400 Leake Avenue New Orleans, LA 70118
U.S. ARMY CORPS OF ENGINEERS
FINANCE CENTER
5722 INTEGRITY DRIVE
MILLINGTON TN 38054-5005
x
Section 00010 - Bidding Schedule
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job $1,750,000.00 $1,750,000.00 Mobilization and Demobilization
FFP
FOB: Destination
PURCHASE REQUEST NUMBER: W42HEM42648846
PSC CD: Y1PZ
NET AMT $1,750,000.00
ACRN AA
CIN: W42HEM426488460001
$1,750,000.00
0002 $0.00 Dredging - Bayou Black
FFP
NET AMT $0.00
0002AA 1,060,000 Cubic
Yard $3.00 $3,180,000.00
First 1,060,000
FFP
FOB: Destination
NET AMT $3,180,000.00
CIN: W42HEM426488460002AA
$3,180,000.00
0002AB 450,000 Cubic
Yard $3.00 $1,350,000.00
All Over 1,060,000
FFP
NET AMT $1,350,000.00
CIN: W42HEM426488460002AB
$1,350,000.00
0003 $0.00 Dredging – Bayou Chene
0003AA 2,135,000 Cubic
Yard $3.00 $6,405,000.00
First 2,135,000
FFP
NET AMT $6,405,000.00
CIN: W42HEM426488460003AA
$6,405,000.00
0003AB 915,000 Cubic
Yard $3.00 $2,745,000.00
All Over 2,135,000
FFP
NET AMT $2,745,000.00
CIN: W42HEM426488460003AB
$2,745,000.00
0004 1 Job $750,000.00 $750,000.00 Disposal Area Dike Construction/Repair
FFP
NET AMT $750,000.00
CIN: W42HEM426488460004
$750,000.00
0005 $0.00 OPTION Dredging – Bayou Boeuf - OW
0005AA 380,000 Cubic
Yard $3.30 $1,254,000.00
OPTION First 380,000
FFP
NET AMT $1,254,000.00
0005AB 160,000 Cubic
Yard $3.30 $528,000.00
OPTION All Over 380,000
FFP
NET AMT $528,000.00
0006 90 Days $350.00 $31,500.00 OPTION Bird Nesting Prevention and Avoidance
FFP
NET AMT $31,500.00
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 N/A N/A N/A N/A 0002AA Destination Government Destination Government 0002AB Destination Government Destination Government 0003 N/A N/A N/A N/A 0003AA Destination Government Destination Government 0003AB Destination Government Destination Government 0004 Destination Government Destination Government 0005 N/A N/A N/A N/A 0005AA Destination Government Destination Government
0005AB Destination Government Destination Government 0006 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 371 dys. ANP 1 CONSTR DIV-LAFAYETTE AREA OFC
JOHN PAGE
CORPS OF ENGINEERS 100 ASMA BLVD,
SUITE 300
LAFAYETTE LA 70508
(337) 291-3015
W912P8
0002 N/A N/A N/A N/A
0002AA 371 dys. ANP 1,060,000 CONSTR DIV-LAFAYETTE AREA OFC
JOHN PAGE
CORPS OF ENGINEERS 100 ASMA BLVD,
SUITE 300
LAFAYETTE LA 70508
(337) 291-3015
0002AB 371 dys. ANP 450,000 (SAME AS PREVIOUS LOCATION)
0003 N/A N/A N/A N/A
0003AA 371 dys. ANP 2,135,000 CONSTR DIV-LAFAYETTE AREA OFC
JOHN PAGE
CORPS OF ENGINEERS 100 ASMA BLVD,
SUITE 300
LAFAYETTE LA 70508
(337) 291-3015
0003AB 371 dys. ANP 915,000 (SAME AS PREVIOUS LOCATION)
0004 371 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0005 N/A N/A N/A N/A
0005AA 39 dys. ANP 380,000 CONSTR DIV-LAFAYETTE AREA OFC
JOHN PAGE
CORPS OF ENGINEERS 100 ASMA BLVD,
SUITE 300
LAFAYETTE LA 70508
(337) 291-3015
0005AB 39 dys. ANP 160,000 (SAME AS PREVIOUS LOCATION)
0006 371 dys. ANP 90 (SAME AS PREVIOUS LOCATION)
Section 00010 - Bidding Schedule
0001 1 Job $1,750,000.00 $1,750,000.00 Mobilization and Demobilization
FFP
FOB: Destination
PURCHASE REQUEST NUMBER: W42HEM42648846
NET AMT $1,750,000.00
CIN: W42HEM426488460001
$1,750,000.00
0002 $0.00 Dredging - Bayou Black
0002AA 1,060,000 Cubic
Yard $3.00 $3,180,000.00
First 1,060,000
FFP
NET AMT $3,180,000.00
0002AB 450,000 Cubic
Yard $3.00 $1,350,000.00
All Over 1,060,000
FFP
NET AMT $1,350,000.00
0003 $0.00 Dredging – Bayou Chene
0003AA 2,135,000 Cubic
Yard $3.00 $6,405,000.00
First 2,135,000
FFP
NET AMT $6,405,000.00
0003AB 915,000 Cubic
Yard $3.00 $2,745,000.00
All Over 2,135,000
FFP
NET AMT $2,745,000.00
0004 1 Job $750,000.00 $750,000.00 Disposal Area Dike Construction/Repair
FFP
NET AMT $750,000.00
0005 $0.00 OPTION Dredging – Bayou Boeuf - OW
0005AA 380,000 Cubic
Yard $3.30 $1,254,000.00
OPTION First 380,000
FFP
NET AMT $1,254,000.00
0005AB 160,000 Cubic
Yard $3.30 $528,000.00
OPTION All Over 380,000
FFP
NET AMT $528,000.00
0006 90 Days $350.00 $31,500.00 OPTION Bird Nesting Prevention and Avoidance
FFP
NET AMT $31,500.00
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 N/A N/A N/A N/A 0002AA Destination Government Destination Government 0002AB Destination Government Destination Government 0003 N/A N/A N/A N/A 0003AA Destination Government Destination Government 0003AB Destination Government Destination Government 0004 Destination Government Destination Government 0005 N/A N/A N/A N/A 0005AA Destination Government Destination Government 0005AB Destination Government Destination Government 0006 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 371 dys. ANP 1 CONSTR DIV-LAFAYETTE AREA OFC
JOHN PAGE
CORPS OF ENGINEERS 100 ASMA BLVD,
SUITE 300
LAFAYETTE LA 70508
(337) 291-3015
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The subject solicitation for Atchafalaya Maint Dredging Chene, Boeuf, and Black is herby amended as show n on the attached continuation pages. Any questions regarding this solicitation must be received via email by 12:00 p.m. CST on Tuesday, September 3, 2024.
The bid opening date and time remains unchanged.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P824B0053
X 9B. DATED (SEE ITEM 11)
12-Aug-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Aug-2024
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P824B0053
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - SF 30 CONTINUATION
The following have been added by full text:
UPDATED SPECIFICATIONS & PLANS
SPECIFICATIONS:
SECTION 02 21 10.00 12
Page 8, paragraph 3.1.6.1 Disposal Areas Black Bayou 1, 2, and 3. Insert the new paragraph “3.1.6.2 Disposal Area 1A and 1B” after paragraph 3.1.6.1 and renumber subsequent paragraphs accordingly.
“3.1.6.2 Disposal Area 1A and 1B
Post-disposal surveys are required upon completion of pumping into disposal area "1A”. The surveys shall consist of five (5) equally spaced southwest/northeast cross sections within the disposal areas, extending from the edge of marsh and across disposal and extending 500' pass disposal boundary or as required to capture the entire footprint of disposal. The post-disposal surveys shall be taken as soon as practicable after discharge operations have ceased. Cross section shots for this disposal area survey shall be taken at 50-foot intervals. Soundings shall be chosen to the nearest 0.1-foot. Data shall also be furnished to the Government in a structured ASCII format on magnetic media. All survey data shall be in NAD 83 datum with elevations referenced to zero (0) M.L.G. All notes resulting from this survey shall be presented to the Contracting Officer's Representative.”
SECTION 35 20 23.00 12
Page 12, paragraph 3.2.3 Existing Pipelines, Structures Or Utilities. Delete the “Pipelines, Structures, Or Utilities Tables” at the end of this paragraph in their entirety and substitute the attached “Pipeline and Utility Table”.
Page 15, paragraph 3.3.1.1 Bayou Black Disposal Areas 1, 2 and 3. Delete this paragraph in its entirety and substitute the revised paragraph 3.3.1.1 as follows:
“3.3.1.1 Bayou Black Disposal Areas 1, 2 and 3
Bayou Black C/L Sta. 4+00 (approximately) to C/L Sta. 250+00 (approximately) shall be placed in Dredge Disposal Areas Bayou Black 1, 2, and 3. Material excavated from Bayou Chene above state's closure structure shall be placed in Bayou Black disposal sites 2 and 3. Sites are upland disposal areas without an elevation restriction. Disposal of material will start along the Bayou Black bank side of disposal area and directed in a northwesterly direction. The Contractor shall verify and maintain the integrity of the existing containment dikes during placement of dredged material within this disposal areas. Earthen material necessary to construct/ rehabilitate/ maintain containment dikes shall be obtained from the perimeter borrow canals. Where more practical, borrow material may be obtained from within the disposal area a minimum of 25-ft from the toe of the existing dike, with any trees required to be cleared shall be windrowed within the disposal areas.”
Page 16, paragraph 3.3.1.5 Lake Gascha Disposal Area. Insert the new paragraph “3.3.1.6 Disposal Area 1A and 1B” after paragraph 3.3.1.5 and renumber the subsequent paragraph accordingly.
“3.3.1.7 Disposal Areas 1A and 1B
Dredge material excavated from Dredge material excavated from Bayou Boeuf C/L Sta. 8+00 (approximately) to C/L Sta. 187+00.39 (approximately) shall be placed in Dredge Disposal Area 1A. Material shall be place at a maximum of +8.0 M.L.G.
Material is allowed to overflow dikes into the effluent overflow disposal area 1B. The Contractor shall verify and maintain the integrity of the existing containment dikes prior and during placement of dredged material within this disposal area. Earthen material necessary to rehabilitate/maintain containment dikes shall be obtained from the back canal. The discharge line for dredging of Bayou Boeuf shall run along the north bank of the GIWW from the Bayou Boeuf dredging reach and down to Disposal areas 1A and 1B. Contractor will coordinate with slip owners, to allow access to slips.
Contractor will not be allowed to restrict access to slips adjacent to the discharge pipeline.”
DRAWINGS:
SHEET IDENTIFICATION. Delete drawings G-03, C-01, C-01B and C-01C in their entirety and substitute the attached revised drawings SHEET ID Nos. G-03, C-01, C-01B and C-01C.
STATION
UTILITY
OWNER, CONTACT INFO
Bayou Boeuf
3+79.41 Telephone Cable South Central Bell New Owner: AT&T
4+36.04 4” Water Pipeline J. Ray McDermott and Co Phone: (504)587-5000 Number doesn’t work
8+35.91 12” Pipeline LA. Intrastate Gas Corp New Owner: Enlink Processing Services
Cordell Theriot:
ctheriot@enlink.com Phone: (337)322-6682
8+52.08 8” Pipeline LA. Intrastate Gas Corp New Owner: Harvest Midstream
Troy Brown:
trbrown@harvestmidstream.com Phone: (713)209-2400
8+95.10 22” Oil Pipeline Texas Pipeline Co.
New Owner: Shell
Adam Crawford:
Adam.crawford@shell.com Phone: (832)337-3745
34+57.22 Sub-Cable Southern LA. Electric Coop Phone: (985)876-6880
59+59.82 5” Sewer Pipeline J. Ray McDermott and Co Phone: (504)587-5000 Number doesn’t work
88+00.09 4” Water Pipeline St. Mary Parish Water Works Dist 3 Phone: (985)631-2907
101+99.19 20” Gas Pipeline Columbia Gulf Transmission Corp Jon Adamson Phone: (304)357-2081
Bayou Black
184+21.71 20” Gas Pipeline Williams Gas Pipeline Co NPMS Says “Different Owner/Operator” New Owner: Texas Gas Transmission, Inc
Brent Dhuet:
publicawareness@bwpipelines.com Phone: (985)804-2524 mailto:ctheriot@enlink.com mailto:trbrown@harvestmidstream.com mailto:Adam.crawford@shell.com mailto:publicawareness@bwpipelines.com
246+81.83 8” Pipeline Tennessee Gas Pipeline NPMS Says ‘Abandoned’ New Owner: PHMSA Community Liaison Services
Bill Lowry:
bill.lowry@dot.gov Phone: (713)272-2845
James ‘Jay’ Prothro:
james.prothro@dot.gov Phone: (713)272-2832
Bayou Chene
335+33.03 8” Dual Pipeline Enterprise Pipeline Co
979+27.78 4” Gas Pipeline Carl Oil and Gas
991+97.52 4” Flowline Entex
Disposal Area 1A
Within Disposal Area 12” Gas Pipeline Meridian Resource & Exploration Co
Within Disposal Area 4” SWD Pipeline Meridian Resource & Exploration Co
Within Disposal Area 8” Gas Pipeline Meridian Resource & Exploration Co mailto:bill.lowry@dot.gov mailto:james.prothro@dot.gov mailto:james.prothro@dot.gov
-0.7' MLLW = 0.0' NAVD88 = +2.9' MLG (1983 ADJUSTED)
LOCATION: X = 3,307,624.42, Y = 377,838.19
GAGE: DOWN LOWER ATCHAFALAYA RIVER APPROX.
14 MILES TO GAGE, OFF RIGHT BANK AT LOWER
END OF SWEE BAY LAKE
GAGE INFORMATION:
BAYOU BOEUF AT AMELIA - 52800
LOCATION: X = 3,355,427.48, Y = 432,338.60
GAGE: LOCATED ON RIGHT SIDE OF DOCK OWNED BY
PIPE DISTIBUTION, INC
0.0' NAVD88 = +1.7 MLG (1983 ADJUSTED)
AVOCA ISLAND CUTOFF SOUTH OF MORGAN CITY - 03820
GAGES SET TO 0.0' NAVD88
/1
/2
A N
S I
D
S C
O T
T C
L E
M E
N T
S .A
.C
NEW ORLEANS DISTRICT
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E P
L O
T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N E
W O
R L
E A
N S
D
IS
T R
IC
T
N E
W O
R L
E A
N S
L
O U
IS
IA
N A
H -1
-4
S C
O T
T C
L E
M E
N T
B A
Y O
U S
C H
E N
E
B O
E U
F A
N D
B L
A C
K
J .A
.B
W
P
B
W
P
C X
X X
X
A T
C H
A F
A L
A Y
A R
IV
E
R
A S
S U
M P
T
IO
N
S T
M
A R
Y A
D
T
R R
E B
O N
N E
P A
R
IS
H E
S L
A
B A
Y O
U C
H E
N E
A N
D A
V O
C A
I S
L A
N D
C U
T O
F F
M A
R C
H
E D
-2 -0
M A
IN
T
E N
A N
C E
D R
E D
G
IN
G
G-03
V E
R T
IC
A
L C
O N
T R
O L
B A
Y O
U C
H E
N E
G E
N E
R A
L N
O T
E S
A N
D
G -0
A m e n d e d
.d g n
OR ANY ARCHEOLOGFICAL SITE AS SHOWN.
WITH PERSONEL OR EQUIPMENT IN THE "NO WORK AREAS"
2) THE CONTRACTOR WILL NOT BE PERMITTED TO ENCROACH
OFFICER'S REPRESENTATIVE.
THE EXISTING CABLE BARRIER WITH THE CONTRACTING
1) CONTRACTOR SHALL COORDINATE ENTRANCE BEYOND
NOTES FOR C-03:
GENERAL NOTES:
ANCHORS IN THE VICINITY OF CURVE 13.
BANK AS SHOWN. CONTRACTOR SHALL USE CAUTION WHEN PLACING/MOVING
4) GABIONS EXTEND TO THE BOTTOM EDGE OF CUT ALONG RIGHT DESCENDING
RESULTING FROM INGRESS/ EGRESS TO THE DISPOSAL AREA 6.
3) CONTRACTOR SHALL REPLACE/REPAIR ANY DAMAGE TO EXISTING DIKE
ANY RUTTING PRIOR TO DEMOBILIZATION.
VEGETATION. CONTRACTOR SHALL GRADE GROUND SURFACE TO REMOVE
CONTRACTOR SHALL MINIMIZE CLEARING AND DISTURBANCE OF EXISTING
DISPOSAL AREA #6 WILL BE ALLOWED AS SHOWN ON THE CONTRACT DRAWINGS.
2) TWO 200- FT WIDE PIPELINE ACCESS CORRIDORS ACROSS THE EXISTING
ARCHEOLOGICAL SITE AS SHOWN.
PERSONEL OR EQUIPMENT IN THE " NO WORK AREAS" OR ANY
1) THE CONTRACTOR WILL NOT BE PERMITTED TO ENCROACH WITH
NOTES FOR C-02 AND C-07:
CONDITIONS THAT EXISTED BEFORE USE OF THE DISPOSAL AREA.
CANAL TO DETERMINE IF DREDGING IS NEEDED TO RESTORE IT TO
BEFORE AND AFTER CROSS SECTIONS SHALL BE TAKEN OF THE BACK
STEPS NECESSARY TO PREVENT MATERIAL FROM ENTERING CANAL.
DISPOSAL AREAS IS PROHIBITED. CONTRACTOR IS TO TAKE WHATEVER
3) DREDGE MATERIAL OVERFLOW TO THE BACK CANAL EAST OF THE
DISPOSAL AREA.
2) MATERIAL FOR DIKE CONSTRUCTION SHALL BE TAKEN FROM WITHIN
2-FOOT ABOVE EXISTING GROUND ELEVATION.
ELEVATION OF +5.0 NAVD88. MATERIAL WITHIN 3B SHALL BE PLACED TO
BOUNDED BY SHORELINE AND EARTHEN DIKE WILL HAVE A MAMIMUN
OF 2-FOOT ABOVE EXISTING GROUND ELEVATION. OPEN WATER PORTION
1) MATERIAL PLACED WITHIN DISPOSAL AREA 3A SHALL BE A MAXIMUM FILL
NOTES FOR C-05:
EQUIPMENT IN THE "NO WORK AREAS" OR ANY ARCHEOLOGICAL SITE AS SHOWN.
3) THE CONTRACTOR WILL NOT BE PERMITTED TO ENCROACH WITH PERSONEL OR
THE DISPOSAL AREA.
AREA. ANY TREES REQUIRED TO BE CLEARED SHALL BE WINDROWED WITHIN
BLACK DISPOSAL AREA SHALL BE BORROWED FROM WITHIN THE DISPOSAL
2) MATERIAL NECESSARY FOR DIKE MAINTENANCE IN BAYOU
SHALL BE PLACED IN AVOCA #6.
AN ELEVATIONS RESTRICTIONS. MATERIAL BELOW STATE'S CLOSURE STRUCTURE
BLACK DISPOSAL AREA 1. SITE IS UPLAND DISPOSAL AREA WITHOUT
1) MATERIAL ABOVE THE STATE'S CLOSURE STRUCTURE SHALL BE PLACED IN BAYOU
SHEET C-0-1
BAYOU CHENE NOTES:
ACCESS TO BAYOU BLACK DISPOSAL AREA 3, SHALL BE VIA CANAL SHOWN ON DRAWINGS.
4) ACCESS TO BAYOU BLACK DISPOSAL AREAS 1 AND 2, SHALL BE VIA BANKLINE.
SHALL BE WINDROWED WITHIN THE DISPOSAL AREAS.
BACK CANAL. ANY TREES REQUIRED TO BE CLEARED
FOR DISPOSAL AREAS 1,2 AND 3, SHALL BE BORROWED FROM
3) MATERIAL NECESSARY FOR DIKE CONSTRUCTION/MAINTENANCE
BANK SIDE OF DISPOSAL AREA AND FLOW IN A NORTHWESTERLY DIRECTION.
2) DISPOSAL OF MATERIAL WILL START ALONG THE BAYOU BLACK
UPLAND DISPOSAL AREA WITHOUT AN ELEVATION RESTRICTION.
WITHIN BAYOU BLACK 1, 2 AND 3 DISPOSAL AREAS. SITES ARE
1) MATERIAL FROM C/L STA. 4+00 TO 250+00 SHALL BE PLACED
BAYOU BLACK NOTES:
MUST BE APPROVED BEFORE HAND BY THE CONTRACTING OFFICER'S REPRESETATIVE.
FOOT INTO DISPOSAL AREA (OR PAST EXISTING FILL MATERIAL). THE LOCATION
7) DISCHARGE LINE SHALL BE PLACED IN THE DISPOSAL APPROXIMATELY 100-200-
IN THE CONTRACTOR'S ACCESS PLAN.
AREA #1A. LOCATIONS OF CORRIDOR AND RETURN WEIR(S) SHALL BE SHOWN
6) CONTRACTOR WILL BE ALLOWED A 100-FOOT ACCESS CORRIDOR INTO DISPOSAL
FILL TO TOP OF DIKES, AT ALL TIMES.
BORROWED FROM BACK CANAL. MAINTAIN 2-FOOT OF FREEBOARD FROM DREDGE
5) MATERIAL NECESSARY FOR DIKE MAINTENANCE IN DISPOSAL AREA #1A SHALL BE
SITE AS SHOWN.
IN THE "NO WORK AREA" WITHIN DISPOSAL AREAS #1A AND 1G OR ANY ARCHAELOGICAL
4) THE CONTRACTOR SHALL NOT ENCROACH WITH PERSONNEL OR EQUIPMENT
MERIDIAN RESOURCES TO VERIFY LOCATIONS.
ACTUAL LOCATIONS MAY VARY. THE CONTRACTOR SHALL CONTACT
3) PIPELINE LOCATIONS SHOWN IN THE DISPOSAL AREA ARE APPROXIMATE,
WITH SLIP OWNERS, TO ALLOW ACCESS TO SLIPS
DOWN TO DISPOSAL AREA #1A. CONTRACTOR WILL COORDINATE
2) THE DISCHARGE LINE SHALL RUN ALONG NORTH BANK OF BAYOU BOEUF
TO OVERFLOW INTO OVERFLOW AREA 1B.
WITHIN DISPOSAL AREA #1A AT ELEVATION +8.0 AND ALLOWED
1) MATERIAL FROM C/L STA. 0+00 TO 187+00.39 SHALL BE PLACED
BAYOU BOEUF NOTES:
ON DRAWING.
2) BORROW AND ACCESS FOR EARTHEN DIKE SHALL BE VIA CHANNEL SHOWN
DIRECTION TOWARDS THE OVERFLOW AREA.
ELEVATION. MATERIAL SHALL BE DIRECTLY DISCHARGED IN SOUTHERLY
1) MATERIAL TO BE PLACED 2-FOOT ABOVE EXISTING GROUND
NOTES FOR C-04:
ARE ADHERED TO AND IN PLACE.
PROVIDED THAT THE ENGINEERING CONTROLS DESCIBED IN NOTES 1 THROUGH 6
DREDGE EFFLUENT ACROSS (OUTSIDE OF) THE DISPOSAL AREA BOUNDARIES IS ALLOWABLE
TO PROTECT SENSITIVE AREA (AS DESCRIBED IN NOTES 5 AND 6). THE OVERFLOW OF
(AS DESCRIBED IN NOTE 1 THROUGH 4) AND THE CONSTRUCTION OF EARTHEN DIKES
THROUGH THE CONTROLLED AND DIRECTED DISCHARGE OF DREDGED MATERIAL
NOTE 5). THE PARTIAL CONTAINMENT DREDGED SLURRY SHALL BE ACCOMPLISHED
6) DISPOSAL AREA BOUNDARIES ARE DEFINED BY DASHED LINES (AS DESCRIBED IN
ADJACENT WATERS INSIDE THE DISPOSAL AREA AND ADJACENT TO THE DIKE.
DIKE ALIGNMENT. BORROW FOR THE LOWER CAMP ACCESS DIKE SHALL BE FROM
WATERS OF LAKE GASCHA OUTSIDE OF THE DISPOSAL AREA AND PARALLEL TO THE
ON DRAWING C-04A. BORROW FOR THE NORTH DIKE SHALL BE FROM THE ADJACENT
AREA, EARTHEN DIKES SHALL BE CONSTRUCTED AT THE TWO LOCATIONS SHOWN
5) IF THE CONTRACTOR USES ANY PORTION OF THE LAKE GASCHA DISPOSAL
POINT.
MATERIAL BEGINS TO STACK ALONG THE SHORELINE TOWARDS THE DISCHARGE
4) THE DISCHARGE LINE SHOULD BE PERIODCALLY MOVED AS THE DREDGED
ELEVATION AT THE TIME OF DISPOSAL.
AND MAY BE FIELD ADJUSTED DEPENDING ON OBSERVED SURFACE WATER
3) MAXIMUM SLURRY ELEVATION SHALL BE APPROXIMATELY +5.0 FEET NAVD88,
SHORELINE TO MAXIMIZE STACKING OF MATERIAL.
2) DREDGED MATERIAL DISCHARGE SHOULD BE DIRECTED TOWARDS THE
FEET FROM THE LAKE'S SHORELINE WITHIN THE DISPOSAL AREA.
DISCHARGE POINTS SHOULD BE ESTABLISHED APPROXIMATELY 500 TO 1000
1) IF THE CONTRACTOR ELECTS TO USE THE LAKE GASCHA DISPOSAL AREA,
NOTES FOR C-04A:
EXISTED DUE TO DISPOSAL MATERIALS ENTERING BAYOU PENCHANT.
TO DETERMINE IF DREDGING IS NEEDED TO RESTORE TO CONDITIONS THAT
5) BEFORE AND AFTER CROSS SECTIONS SHALL BE TAKEN OF BAYOU PENCHANT.
OPPOSITE BAYOU PENCHANT.
MANNER TO ENSURE THAT EFFLUENT EXITS THE ROCK DIKES AT CORNERS
4) DISCHARGE EFFLUENT MUST BE DIRECTED TOWARDS SHORELINES AND IN A
THAN ELEVATION 3.0' M.L.G.
+6.0 FEET NAVD88. CONTRACTOR SHALL PIPE-UP IF MATERIAL STACKS HIGHER
3) MATERIAL IS TO BE DISPOSED TO A MINIMUM ELEVATION OF
2) DISCHARGE POINT SHALL INCLUDE A BAFFLE PLATE.
INTO BAYOU CHENE AND PENCHANT.
THE EXISTING ROCK DIKES TO LIMIT THE OVERFLOW OF DREDGED EFFLUENT
1) DIKE CONSTRUCTION AND REFURBISHMENT MAY BE REQUIRED INSIDE OF
NOTES FOR C-06:
IDENTIFY DISCHARGE POINTS.
CONSTRUCTED AT THE WESTERN MOST SIDE AS SHOWN. CONTRACTOR SHALL
8) DISPOSAL AREA 6 WILL BE AN UNCONFINED, WITH EXCEPTION OF DIKE TO BE
REPLACED PRIOR TO DEMOBILIZATON.
7) PORTIONS OF THE CABLE BARRIER REMOVED FOR ACCESS SHALL BE REPAIR/
6) CONTRACTOR SHALL BE AWARE OF SHALLOW WATER DEPTHS IN AVOCA LAKE.
BALD EAGLE NESTING SEASON FROM 1 OCTOBER THROUGH 15 MAY.
CONSTRUCTION, PIPELINE MOVEMENT, RUNNING AIRBOATS, ETC) DURING
LONG AS THERE IS NO DISRUPTIVE CONSTRUCTION WORK (INCLUDING DIKE
5) EFFLUENT DISCHARGE FROM DISPOSAL AREA #6 IS PERMITTED, AS
R
E V
IS
E
D B
A Y
O U
B O
U E
F N
O T
E S
J
U L
S .A
.C
R
E V
IS
E
D B
A Y
O U
B L
A C
K N
O T
E
J
U L
S .A
.C
CURVE
CHANNEL CURVE DATA
LENGTH OF CURVEDELTATANGENTINFLECTIONRADIUS
9 1,720.10'3°10'59"932.07'54°45'06"1,800.00'
AREA #1A
DISPOSAL
P .C C /L S
T A
PLATFORM
EXISTING
4" SWD PIPELINE
12" GAS AND
EXPLORATION CO.
MERIDIAN RESOURCE &
4" SWD PIPELINE
& EXPLORATION CO.
MERIDIAN RESOURCE
10 1,432.44' 58°20'14" 799.53' 4°00'00" 1,458.48'
11 1,512.30' 39°34'51" 544.18' 3°45'57.51" 1,044.72'
M A
T C
H L
IN
E S
H E
E T C -0
AZIMUTHS ARE GRID TURNED CLOCKWISE FROM ZERO NORTH
DASHED TICKS. PREPARED FROM AERIAL PHOTOS FLOWN 2023
LAMBERT CONFORMAL CONIC PROJECTION IS SHOWN BY
INSIDE THE PLAN AREA. POLYCONIC PROJECTION 1983
NORTH AMERICAN DATUM IS SHOWN BY SOLID TICKS AND
NOTES:
0 600'
SCALE:1"=600'
1200'
BOEUF
LILY BOOM CUTOFF
' 0
,3
,0
'3
,0
,0
'3
,0
'3
,0
,0
417,000
29°38'30"
414,000
29°38' 0"
411,000
29°37'30"
408,000
,3
,0
,0
'3
,0
'3
,0
,0
'3
,0
29°37'30"
408,000
29°38' 0"
411,000
29°38'30"
414,000
417,000
N
C-01
C -0
A m e n d e d
.D G
N
C /L S
T A .0
A N
D D
R E
D G
IN
G B
A Y
O U B
L A
C K
A P P
R O
X L
IM
IT
O
F W
O R
K
A N
D C
H E
N E
B A
Y O
U B
O E
U F
B
L A
C K
P L
A N
S H
E
SEE SHEET G-03
FOR GENERAL NOTES,
Y
.0
X .4
C /L . S
T A . 1
.3
B A Y
O U B
O E
U F
O F W
O R
K A
N D D
R E
D G
IN
G
A P P R
O X . L
O W
E R L
IM
IT
B A Y O
U
C /L S
T A .0
A N
D D
R E
D G
IN
G B
A Y
O U C
H E
P
R O
X L
IM
IT
O
F W
O R
K
S H
E E T C -0
B
M A T C
H L
IN
E
B
AY
O U C
H E N E
(NO WORK AREA)
ARCHAEOLOGICAL SITE
FROM WATERS EDGE (TYP)
MAINTAIN A MIN DISTANCE OF 100'
EXISING DIKE
EXISING DIKE
AREA
EFFLUENT OVERFLOW
MAX EL. +8.0 M.L.G.
DISCHARGE AREA
DREDGE MATERIAL
Y
.5
X
.8
P .C . C /L S
T A
.3
CURVE #9
Y
.7
X
.6
P .T
C /L S
T A
.5
CURVE #1
Y
.6
X
.2
X .7
Y .5
P .T . C /L S
T A
Y 406739.209
X 3353225.280
P .T . C /L S
TA
363+
45.24
Y=407102.544
X=3354182.600
P.C . C
/L STA 353+00.60
CURVE #
Y .2
X
.2
P .C . C /L S
T A
.9
Y
.3
X
.8
P .C
C /L S
T A
.0
Y=4
2.
X=3
.9
P.
T.
C /L S
TA
+4 7.
Y=
.6
X=
9.
P.
C . C /L S
TA
+0 7.
Y
.0
X
.4
C /L S
T A . 2
.7
P .T . C /L S
T A
.3
Y
.4
X
.8
P .C . C /L S
T A
.1
Y
.4
X
.8
P .T
C /L S
T A
.2
Y= 416688.03 X= 3353334.17
P.C. C/L STA 63+65.1658
Y
.5
X
.4
P .T C /L S
T A
.4
Y
.8
X
.2
P .C C /L S
T A
.4
Y
.2
X
.7
P .T C /L S
T A
.9
CURVE #7
CURVE #8
C U
R V
E
CURVE #23
C U
R V
E
HEATER PLATFORM
METER PLATFORM
APPROX. C/L STA. 59+59.82
EL. UNKOWN
5" SEWER PIPE LINE
J. RAY MCDERMOTT & CO.
APPROX. C/L STA. 88+00.09 C/L
EL. -28.0' M.L.G.
4" WATER PIPELINE
WATER WORKS DIST .3
ST. MARY PARISH
ELEV -28.8 M.L.G.
APPROX. C/L STA 101+99.19
20" GAS PIPELINE
COLUMBIA GULF TRANSMISSION CO.
8" GAS PIPELINE
EXPLORATION CO
MERIDIAN RESOURCE &
4" SWD PIPELINE
8" GAS PIPELINE &
EXPLORATION CO
MERIDIAN RESOURCE &
EL.-38.8' M.L.G.
APPROX C/L STA 335+33.03
8" DUAL PIPELINE
ENTERPRISE PIPELINE CO
APPROX. C/L STA. 246+81.83
EL. UNKNOWN
8" PIPELINE
TENNESSEE GAS PIPELINE
B A
Y O
U S
C H
E N
E
B O
E U
F A
N D
B L
A C
K
M A
IN
T
E N
A N
C E
D R
E D
G
IN
G B
A Y
O U
C H
E N
E A
N D
A V
O C
A I
S L
A N
D C
U T
O F
F
A
D D
E D
D
IS
P O
S A
L A
R E
A
A A
N D
B
J
U L
S .A
.C
DISPOSAL AREA
BAYOU BLACK
DISPOSAL AREA 2
BAYOU BLACK
AREA #1B
DISPOSAL
/1
/2
A N
S I
D
S C
O T
T C
L E
M E
N T
S .A
.C
NEW ORLEANS DISTRICT
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E P
L O
T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N E
W O
R L
E A
N S
D
IS
T R
IC
T
N E
W O
R L
E A
N S
L
O U
IS
IA
N A
H -1
-4
S C
O T
T C
L E
M E
N T
J .A
.B
W
P
B
W
P
C X
X X
X
A T
C H
A F
A L
A Y
A R
IV
E
R
A S
S U
M P
T
IO
N
S T
M
A R
Y A
R R
E B
O N
N E
P A
R
IS
H E
S
L A
M A
R C
H
E D
-2 -0
0 600' 1200'
SCALE
AZIMUTHS ARE GRID TURNED CLOCKWISE FROM ZERO NORTH
DASHED TICKS. PREPARED FROM AERIAL PHOTOS FLOWN 2023.
LAMBERT CONFORMAL CONIC PROJECTION IS SHOWN BY
INSIDE THE PLAN AREA. POLYCONIC PROJECTION 1983
NORTH AMERICAN DATUM IS SHOWN BY SOLID TICKS AND
NOTES:
CURVE
CHANNEL CURVE DATA
3°30'01.21"
LENGTH OF CURVE
1,357.90'
DELTATANGENT
720.77'
INFLECTIONRADIUS
1,636.87'
5 2,674.622°13'27.78"1,472.01'2,575.80'
AREA #1A
DISPOSAL
PLATFORM
EXISTING
4" SWD PIPELINE
12" GAS AND
EXPLORATION CO.
MERIDIAN RESOURCE &
4" SWD PIPELINE
& EXPLORATION CO.
MERIDIAN RESOURCE
/1
/2
A N
S I
D
S C
O T
T C
L E
M E
N T
S .A
.C
NEW ORLEANS DISTRICT
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E P
L O
T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N E
W O
R L
E A
N S
D
IS
T R
IC
T
N E
W O
R L
E A
N S
L
O U
IS
IA
N A
H -1
-4
S C
O T
T C
L E
M E
N T
B A
Y O
U S
C H
E N
E
B O
E U
F A
N D
B L
A C
K
J .A
.B
W
P
B
W
P
C X
X X
X
A T
C H
A F
A L
A Y
A R
IV
E
R
A S
S U
M P
T
IO
N
S T
M
A R
Y A
R R
E B
O N
N E
P A
R
IS
H E
S L
A
B A
Y O
U C
H E
N E
A N
D A
V O
C A
I S
L A
N D
C U
T O
F F
M A
R C
H
E D
-2 -0
M A
IN
T
E N
A N
C E
D R
E D
G
IN
G
C-01B
P L
A N
S H
E E
T
B A
Y O
U B
L A
C K
A N
D B
A Y
O U
C H
E N
E
'3
,0
,0
'3
,0
,0
,0
,0
,0
,0
,0
,0
,0
,0
' 3
' 0
'3
'0
' 3
' 0
'3
'0
417,000 417,000
414,000 414,000
29°38' 0" 29°38' 0"
411,000 411,000
29°37'30" 29°37'30"
408,000 408,000
47^31'52.29"
4 5,736.87' 691.64' 0°59'55.42" 1,376.64'
6 1,297.19' 3,236.13' 4°25'00.84" 3,086.18'
7 3820.55' 618.58' 1°29'58.83" 1,226.52'
8 3,483.39' 53°42'19.90" 1,746.95' 1°39'58.87" 3,232.67'
C /L S
T A .0
A N
D D
R E
D G
IN
G B
A Y
O U C
H E
P
R O
X L
IM
IT
O
F W
O R
K
18°23'37.53"
136°18'48.60"
59°29'37.86"
13°44'55.86"
47°31'52.29"
S H E E T C -0 A
M A T C
H L
IN
S H
E E T C -0
B
M A T C
H L
IN
E
B
AY
O U
B
LA
C
K
Y=
.6
X=
9.
P.
C . C /L S
TA
+0 7.
Y
.5
X
.4
P .T C /L S
T A
.4
Y
.8
X
.2
P .C C /L S
T A
.4
Y
.2
X
.7
P .T C /L S
T A
.9
Y
.2
X
.1
P .C C /L S
T A
.5
Y= 409004.47
X= 3369684.67
P.T. C/L STA 171+75.38
Y= 410591.77
X= 3369375.89
P.C. C/L STA 155+58.32
Y= 413010.81
X= 3370195.77
P.T. C/L STA 128+83.70
Y = 415811.04
X = 3373359.72
P .C . C /L S
TA 86+58.55
Y = 416589.80
X = 3374486.55
P .T. C
/L S
TA 72+81.91
Y = 417075.43
X = 3375411.33
P .C . C /L S
TA 62+37.38
C U
R V E
C U R
V E
C U
R V
E
C U R
V E
CURVE #7
CURVE #8
C U
R V
E
DISPOSAL AREA 1
BAYOU BLACK
FROM WATERS EDGE (TYP)
MAINTAIN A MIN DISTANCE OF 100'
EXISTING DIKE
METER PLATFORM
4" SWD PIPELINE
8" GAS PIPELINE &
EXPLORATION CO
MERIDIAN RESOURCE &
APPROX. C/L STA. 184+21.71
EL. -28.0 M.L.G
20" PIPELINE
WILLIAMS GAS PIPELINE CO.
APPROX. C/L STA. 246+81.83
EL. UNKNOWN
8" PIPELINE
TENNESSEE GAS PIPELINE
C
-0 B
A m e n d e d .d g n
A
D D
E D
D
IS
P O
S A
L A
R E
A
A a n d
B J
U L
S .A
.C
HEATER PLATFORM
AREA #1B
DISPOSAL
DISPOSAL AREA
BAYOU BLACK
DISPOSAL AREA 2
BAYOU BLACK
(SEE NOTES, SHEET G-03)
DISPOSAL AREA #3
FOR BAYOU BLACK
PIPELINE ACCESS
AREA #1A
DISPOSAL
4" SWD PIPELINE
12" GAS AND
EXPLORATION CO.
MERIDIAN RESOURCE &
4" SWD PIPELINE
& EXPLORATION CO.
MERIDIAN RESOURCE
/1
/2
A N
S I
D
S C
O T
T C
L E
M E
N T
S .A
.C
NEW ORLEANS DISTRICT
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E P
L O
T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N E
W O
R L
E A
N S
D
IS
T R
IC
T
N E
W O
R L
E A
N S
L
O U
IS
IA
N A
H -1
-4
S C
O T
T C
L E
M E
N T
B A
Y O
U S
C H
E N
E
B O
E U
F A
N D
B L
A C
K
J .A
.B
W
P
B
W
P
C X
X X
X
A T
C H
A F
A L
A Y
A R
IV
E
R
A S
S U
M P
T
IO
N
S T
M
A R
Y A
R R
E B
O N
N E
P A
R
IS
H E
S L
A
B A
Y O
U C
H E
N E
A N
D A
V O
C A
I S
L A
N D
C U
T O
F F
M A
R C
H
E D
-2 -0
M A
IN
T
E N
A N
C E
D R
E D
G
IN
G
N
Y= 422473.44
X= 3355048.76
C/L STA. 4+00
WORK AND DREDGING
APPROX. UPPER LIMIT OF
SHEET C
-01MATCH LI
NE
BOEUF
,0
'3
,0
,0
'3
,0
'3
,0
417,000
414,000
29°38' 0"
411,000
,3
,0
'3
,0
'3
,0
,0
'3
,0
29°38' 0"
411,000
29°38'30"
414,000
417,000
B A Y O
U
,0
' 3
420,000
423,000
420,000
423,000
29°39'00"
29°39'30"
29°39'00"
29°39'30"
C
-0 C
A m e n d e d .d g n
P L
A N
S H
E E
T
B A
Y O
U B
O E
U F
C-01C
CURVE
7,638.40' 0°45'00.37"
CHANNEL CURVE DATA
5°00'00.62"
1°11'58.52"
LENGTH OF CURVE
2,855.28'
1,7978'
3,587.46'
DELTATANGENT
1,4444.50'
1,447.92'
1,883.10'
103°17'03.09"
INFLECTION
59°29'37.86"
43°02'04.85"
RADIUS
1,145.88'
4,776.29'
24 89°48'44.53" 2,283.67' 2°30'02.63" 3,591.44''2,291.16'
Y
.3
X
.8
P .C
C /L S
T A
.0
Y=4
2.
X=3
.9
P.
T.
C /L S
TA
+4 7.
Y=
.6
X=
9.
P.
C . C /L S
TA
+0 7.
Y
.4
X
.8
P .T
C /L S
T A
.2
Y= 416688.03 X= 3353334.17
P.C. C/L STA 63+65.1658
Y= 419139.61 X= 3354399.97
P.T. C/L STA 36+91.93
Y= 421907.74 X= 3355028.28
P.C. C/L STA 8+36.65
Y= 422743.85 X= 3355058.58
P.C. C/L STA 0+00.00
C U
R V
E
C U
R V
E
CURVE #23
FROM WATERS EDGE (TYP)
MAINTAIN A MIN DISTANCE OF 100'
EXISTING DIKE
EXISING DIKE
EXISING DIKE
AREA
EFFLUENT OVERFLOW
MAX EL. +8.0 M.L.G.
DISCHARGE AREA
DREDGE MATERIAL
METER PLATFORM
APPROX. C/L STA. 59+59.82
EL. UNKOWN
5" SEWER PIPE LINE
J. RAY MCDERMOTT & CO.
APPROX. C/L STA. 88+00.09 C/L
EL. -28.0' M.L.G.
4" WATER PIPELINE
WATER WORKS DIST .3
ST. MARY PARISH
ELEV -28.8 M.L.G.
APPROX. C/L STA 101+99.19
20" GAS PIPELINE
COLUMBIA GULF TRANSMISSION CO.
8" GAS PIPELINE
EXPLORATION CO
MERIDIAN RESOURCE &
4" SWD PIPELINE
8" GAS PIPELINE &
EXPLORATION CO
MERIDIAN RESOURCE &
TTTTTTTTT APPROX. C/L STA. 3+79.41
TELEPHONE CABLES
SOUTH CENTRAL BELL
APPROX. C/L STA 4+36.04
EL. -20.3 M.L.G
4" WATER PIPELINE
J. RAY MCDERMOTT & CO
APPROX C/L STA. 8+35.91
EL. -30.0 M.L.G
12" PIPELINE
LA. INTRASTATE GAS CORP
APPROX. C/L STA. 34+57.22
EL. -28.79 M.L.G
ASSN, SUB-CABLE
SOUTHERN LA. ELECTRIC COOP
APPROX. C/L STA. 8+52.08
EL. -28.0 M.L.G
8" PIPELINE
GAS CORP
LA. INTRASTATE
C/L STA. 8+95.10
EL. -28.0 M.L.G
22" OIL PIPELINE
TEXAS PIPELINE CO.
A
D D
E D
D
IS
P O
S A
L A
R E
A
A A
N D
B
J U
L
S
.A .C
1 AREA #1B
DISPOSAL
AZIMUTHS ARE GRID TURNED CLOCKWISE FROM ZERO NORTH
DASHED TICKS. PREPARED FROM AERIAL PHOTOS FLOWN 2023
LAMBERT CONFORMAL CONIC PROJECTION IS SHOWN BY
INSIDE THE PLAN AREA. POLYCONIC PROJECTION 1983
NORTH AMERICAN DATUM IS SHOWN BY SOLID TICKS AND
NOTES:
0 600'
SCALE:1"=600'
1200'
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The subject solicitation for Atchafalaya Maint Dredging Chene, Boeuf, and Black is hereby amended to answer questions from industry as show n on the attached continuation pages.
The bid opening date and time remains unchanged.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P824B0053
X 9B. DATED (SEE ITEM 11)
12-Aug-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Sep-2024
CODE
USACE, CONTRACTING DIVISION
ATTN: HPO CT - ROOM 184
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - SF 30 CONTINUATION
The following have been added by full text:
QUESTIONS AND ANSWERS
Questions and Answers updated 9/6/2024
QUESTION 1: Note 7 on the bid schedule states that Bid Item 0005 is excluded from the Variation in Estimated Quantity clause. However, the clause states that it applies to item Nos. 0002, 0003, and 0005. Please confirm that Bid Item 0005 is included under the clause.
RESPONSE 1: Inclusion of CLIN 0005 in note 7 is in error. Note should only apply to CLIN 0006. Note is revised with this response to read, “The quantity shown in Item 0006 is for evaluation purposes only. Payment for this line item will be based on the actual quantity used and it shall be excluded from the clause FAR 52.211-18, “VARIATION IN ESTIMATED QUANTITY.”
QUESTION 2: What is the date of last dredging for Bayou Black Sta. 4+00 to 96+00? Please also provide dredging dimensions.
RESPONSE 2: Based on Contract 88-C-0155., The limits of dredging were non-continuous. Work included Station 9+00 C/L to Station 158+00 C/L and from Station 205+00 C/L to Station 251+89.62 C/L Bayou Black - GIWW.
Channel width was 400 feet with dredging to elevation (-)22.0ft MLG with overdepth at (-)24.0ft MLG.
QUESTION 3: What is the date of last dredging for Bayou Boeuf Sta. 4+00 to 96+00? Please also provide dredging dimensions.
RESPONSE 3: Based on Contract 88-C-0155., The limits of dredging was Station 2+00 C/L to Station 96+00 C/L on Bayou Boeuf; The contract involved dredging a 400 foot wide channel to an elevation of (-)22. 0ft MLG and an allowable overdepth to (-)24.0 ft MLG in all the reaches of work except in the upper portion of Bayou Boeuf from Station 2+00 to Station 65+45. In this reach the channel width was 300ft wide and widening to 400ft wide in curves up to Station 95+22. The elevation remained at (-) 22.0ft MLG with overdepth at (-)24.0ft MLG.
QUESTION 4: Section 35 20 23 Paragraph 3.3.1.2 and Note 3 for Plan Sheet C-06 state that material shall be placed in Penchant East and West to a minimum elevation of +6.0 ft NAVD88. Does the Government intend for material to be placed to a minimum elevation of +6.0 ft or a maximum elevation of +6.0 ft?
RESPONSE 4: Material shall be placed in Penchant East and West to a MAXIMUM of +6.0 ft NAVD88.
“Minimum” was in error.
QUESTION 5: What are the survey end areas for all channels to be dredged?
RESPONSE 5: See attached tabulations of end areas.
(End of Summary of Changes)
End Area Avg EA
0+00 2683.748
500.00 2212.14
5+00 1740.523
500.00 1341.37
10+00 942.219
500.00 824.00
15+00 705.771
500.00 663.78
20+00 621.797 -
500.00 615.38
25+00 608.964
500.00 579.00
30+00 549.039
500.00 819.06
35+00 1089.082
500.00 1009.69
40+00 930.29
500.00 846.69
45+00 763.09
500.00 814.95
50+00 866.81
500.00 880.99
55+00 895.163
500.00 897.26
60+00 899.354
500.00 896.98
65+00 894.597
500.00 881.00
70+00 867.412
500.00 880.09
75+00 892.77
500.00 876.44
80+00 860.114
500.00 832.18
85+00 804.247
500.00 767.04
90+00 729.823
500.00 766.39
95+00 802.959
500.00 858.90
100+00 914.844
500.00 978.31
105+00 1041.778
500.00 1097.12
Bayou Black Feb 2024
Station Distance 1V on 2H
1 9/6/2024 1:00 PM
Bayou Black Feb 2024
Station Distance 1V on 2H
110+00 1152.46
500.00 1190.59
115+00 1228.713
500.00 1322.68
120+00 1416.642
500.00 1440.04
125+00 1463.435
500.00 1487.14
130+00 1510.844
500.00 1509.14
135+00 1507.429
500.00 1582.79
140+00 1658.148
500.00 1750.15
145+00 1842.161
500.00 2061.39
150+00 2280.621
500.00 2502.27
155+00 2723.912
500.00 2979.97
160+00 3236.029
500.00 3518.05
165+00 3800.065
500.00 4096.30
170+00 4392.536
500.00 4512.10
175+00 4631.662
500.00 4655.77
180+00 4679.887
500.00 3263.18
185+00 1846.463
500.00 1931.30
190+00 2016.138
500.00 2153.56
195+00 2290.979
500.00 2077.86
200+00 1864.733
500.00 1607.23
205+00 1349.724
500.00 1294.56
210+00 1239.388
500.00 1394.59
215+00 1549.782
500.00 1576.10
2 9/6/2024 1:00 PM
Bayou Black Feb 2024
Station Distance 1V on 2H
220+00 1602.41
500.00 1672.54
225+00 1742.677
500.00 1776.41
230+00 1810.137
500.00 1847.67
235+00 1885.199
500.00 1931.01
240+00 1976.813
500.00 2035.09
245+00 2093.362
500.00 2075.35
250+00 2057.335
Total Rounded
3 9/6/2024 1:00 PM
Bayou Boeuf FEBUARY 2024
0+00 0
500.00 340.50
5+00 680.992
500.00 917.13
10+00 1153.271
500.00 1156.86
15+00 1160.452
500.00 981.66
20+00 802.87 -
500.00 858.53
25+00 914.195
500.00 978.18
30+00 1042.158
500.00 1328.10
35+00 1614.036
500.00 1782.09
40+00 1950.137
500.00 1792.10
45+00 1634.056
500.00 1680.45
50+00 1726.836
500.00 1930.65
55+00 2134.458
500.00 1820.24
60+00 1506.013
500.00 1348.00
65+00 1189.983
500.00 1455.22
70+00 1720.461
500.00 1353.93
75+00 987.402
500.00 891.82
80+00 796.239
500.00 864.05
85+00 931.862
500.00 992.63
90+00 1053.405
500.00 965.56
95+00 877.724
500.00 546.91
100+00 216.089
500.00 288.08
105+00 360.071
500.00 481.19
Station Distance
1 9/6/2024 1:04 PM
Bayou Boeuf FEBUARY 2024
Station Distance
1V on 2H
110+00 602.312
500.00 478.07
115+00 353.823
500.00 237.91
120+00 122
500.00 170.26
125+00 218.514
500.00 208.06
130+00 197.613
500.00 166.55
135+00 135.491
500.00 139.59
140+00 143.684
500.00 178.21
145+00 212.729
500.00 211.44
150+00 210.145
500.00 157.64
155+00 105.127
500.00 164.91
160+00 224.689
500.00 387.96
165+00 551.238
500.00 596.59
170+00 641.949
500.00 588.15
175+00 534.353
500.00 392.71
180+00 251.068
500.00 158.64
185+00 66.212
201.98 56.10
187+01.983 45.985
Total
2 9/6/2024 1:04 PM
Bayou Chene Feb 2024
250+00 2057.335
500.00 1691.63
255+00 1325.928
500.00 1052.76
260+00 779.582
500.00 901.68
265+00 1023.784
500.00 1043.20
270+00 1062.621 -
500.00 1048.97
275+00 1035.326
500.00 697.70
280+00 360.077
500.00 222.45
285+00 84.83
500.00 90.06
290+00 95.295
500.00 73.13
295+00 50.968
500.00 49.54
300+00 48.111
500.00 33.77
305+00 19.432
500.00 53.52
310+00 87.607
500.00 556.71
315+00 1025.821
500.00 677.59
320+00 329.36
500.00 763.73
325+00 1198.107
500.00 1343.14
330+00 1488.165
500.00 1580.83
335+00 1673.494
500.00 1554.77
340+00 1436.042
500.00 1407.89
345+00 1379.739
500.00 1498.32
350+00 1616.904
500.00 1209.09
355+00 801.276
500.00 735.61
Station Distance
1 9/6/2024 1:06 PM
Station Distance
1V on 2H
360+00 669.953
500.00 559.17
365+00 448.381
500.00 562.32
370+00 676.258
500.00 903.11
375+00 1129.964
500.00 1380.28
380+00 1630.599
500.00 1646.90
385+00 1663.203
500.00 1351.58
390+00 1039.959
500.00 883.08
395+00 726.206
500.00 784.40
400+00 842.59
500.00 1075.62
405+00 1308.647
500.00 1609.69
410+00 1910.728
500.00 1880.91
415+00 1851.087
500.00 1708.62
420+00 1566.161
500.00 1327.54
425+00 1088.921
500.00 1019.98
430+00 951.046
500.00 972.18
435+00 993.315
500.00 1096.35
440+00 1199.376
500.00 1582.51
445+00 1965.644
500.00 1663.64
450+00 1361.632
500.00 1166.61
455+00 971.587
500.00 860.86
460+00 750.127
500.00 669.37
465+00 588.615
500.00 554.33
2 9/6/2024 1:06 PM
Station Distance
1V on 2H
470+00 520.041
500.00 392.83
475+00 265.626
500.00 257.90
480+00 250.176
500.00 237.55
485+00 224.931
500.00 210.73
490+00 196.525
500.00 350.75
495+00 504.969
500.00 588.88
500+00 672.79
500.00 744.59
505+00 816.385
500.00 931.85
510+00 1047.311
500.00 952.22
515+00 857.131
500.00 837.86
520+00 818.596
500.00 810.27
525+00 801.948
500.00 752.83
530+00 703.708
500.00 625.25
535+00 546.783
500.00 443.66
540+00 340.539
500.00 296.45
545+00 252.358
499.97 385.28
550+00 518.20
499.97 943.42
555+00 1368.63
499.97 1538.92
560+00 1709.20
499.97 1821.57
565+00 1933.94
499.97 1893.07
570+00 1852.21
499.97 2028.65
575+00 2205.10
499.97 2358.29
3 9/6/2024 1:06 PM
Station Distance
1V on 2H
580+00 2511.49
499.97 2568.99
585+00 2626.48
499.97 2598.68
590+00 2570.89
499.97 2377.63
595+00 2184.38
499.97 2016.81
600+00 1849.25
499.97 1593.82
605+00 1338.40
499.97 1091.87
610+00 845.34
499.97 784.93
615+00 724.52
499.97 752.45
620+00 780.39
499.97 734.73
625+00 689.07
499.97 746.11
630+00 803.15
499.97 902.30
635+00 1001.45
499.97 1073.58
640+00 1145.71
499.97 1035.62
645+00 925.52
499.97 759.19
650+00 592.86
499.97 518.73
655+00 444.61
499.97 338.49
660+00 232.36
499.97 131.79
665+00 31.22
499.97 20.08
670+00 8.93
499.97 4.88
675+00 0.83
499.97 1.71
680+00 2.60
499.97 13.73
685+00 24.86
499.97 22.80
4 9/6/2024 1:06 PM
Station Distance
1V on 2H
690+00 20.74
499.97 21.67
695+00 22.61
499.97 44.56
700+00 66.52
499.97 71.61
705+00 76.71
499.97 101.83
710+00 126.94
499.97 138.45
715+00 149.95
499.97 164.60
720+00 179.26
499.97 247.74
725+00 316.22
499.97 453.92
730+00 591.61
499.97 766.14
735+00 940.67
499.97 811.40
740+00 682.12
499.97 694.81
745+00 707.51
499.97 691.24
750+00 674.97
499.97 650.07
755+00 625.18
499.97 570.14
760+00 515.09
499.97 451.83
765+00 388.57
499.97 310.34
770+00 232.10
499.97 344.93
775+00 457.75
499.97 626.37
780+00 795.00
499.97 787.99
785+00 780.98
499.97 761.66
790+00 742.33
499.97 780.49
795+00 818.65
499.97 1154.23
5 9/6/2024 1:06 PM
Station Distance
1V on 2H
800+00 1489.82
499.97 1732.73
805+00 1975.65
499.97 2166.26
810+00 2356.86
499.97 2643.66
815+00 2930.45
499.97 3087.14
820+00 3243.83
499.97 3353.62
825+00 3463.41
499.97 3146.31
830+00 2829.20
499.97 2434.25
835+00 2039.30
499.97 1694.68
840+00 1350.07
499.97 1265.19
845+00 1180.32
499.97 1132.22
850+00 1084.13
499.97 984.14
855+00 884.16
499.97 1002.95
860+00 1121.74
499.97 1018.19
865+00 914.64
499.97 1009.86
870+00 1105.08
499.97 1126.12
875+00 1147.17
499.97 1176.85
880+00 1206.53
499.97 1111.95
885+00 1017.36
499.97 984.74
890+00 952.12
499.97 901.72
895+00 851.31
499.97 777.33
900+00 703.34
499.97 490.96
905+00 278.59
499.97 426.14
6 9/6/2024 1:06 PM
Station Distance
1V on 2H
910+00 573.70
499.97 638.46
915+00 703.22
499.97 878.49
920+00 1053.76
499.97 1140.20
925+00 1226.63
499.97 1342.94
930+00 1459.25
499.97 1622.08
935+00 1784.92
499.97 1718.09
940+00 1651.27
499.97 1593.60
945+00 1535.93
499.97 1598.11
950+00 1660.29
499.97 1752.41
955+00 1844.54
499.97 1898.52
960+00 1952.51
499.97 1939.52
965+00 1926.52
499.97 1919.96
970+00 1913.39
499.97 1932.79
975+00 1952.18
499.97 2016.16
980+00 2080.13
499.97 2084.81
985+00 2089.48
499.97 1759.10
990+00 1428.71
499.97 1662.94
995+00 1897.17
499.97 1601.81
1000+00 1306.45
499.97 1184.08
1005+00 1061.72
499.97 1035.39
1010+00 1009.05
499.97 865.05
1015+00 721.05
499.97 439.98
7 9/6/2024 1:06 PM
Station Distance
1V on 2H
1020+00 158.91
499.97 690.47
1025+00 1222.03
499.97 1335.58
1030+00 1449.13
499.97 1200.52
1035+00 951.91
499.97 829.58
1040+00 707.24
435.82 367.08
1044+38.82 26.92
Total
8 9/6/2024 1:06 PM
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The subject solicitation for Atchafalaya Maint Dredging Chene, Boeuf, and Black is herby amended to extend the offer due date and bid opening date.
Offer due date: Friday, September 13, 2024 at 9:00 am CT.
Bid opening: Friday, September 13, 2024 at 11:00 am CT.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P824B0053
X 9B. DATED (SEE ITEM 11)
12-Aug-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .