About this file

This document is an Amendment of Solicitation/Modification of Contract for a fiscal year 2024 Indefinite Delivery, Indefinite Quantity (IDIQ) contract for cutterhead dredge projects in the Atchafalaya Basin and Gulf Intracoastal Waterway (GIWW). The amendment extends the virtual bid opening to Friday, June 13, 2025, at 11:00am local time, with a bid submission deadline of 10:00am the same day.

The amendment modifies two key sections: the Bidder Qualifications and Delivery of Plant. For bidder qualifications, contractors must now prove their dredge has performed at or above the required production rate for a minimum of 30 consecutive days on a single contract within the past three years. The delivery site is initially set as Berwick Bay Harbor, but the starting assignment may require mobilization to various locations in the dredging regions. The contract allows for potential equitable adjustments if the delivery site changes due to circumstances beyond the contractor's control.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OM24065

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The subject solicitation for FY 2024 Indefinite Delivery, Indefinite Quantity (IDIQ) Atchafalaya Basin, Gulf Intracoastal Waterw ay (GIWW), and Miscellaneous Projects Cutterhead Dredge(OM24065) is hereby amended as follow s:

1) Please see attached continuation pages.

2) The virtual bid opening has been extended until Friday, June 13, 2025, 11:00am (local time). The bid submission deadline is Friday, June 13, 2025, 10:00am (local time).

3) It is anticipated that this w ill be the last amendment for this requirement. No further questions w ill be addressed at this time.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Jun-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P824B0037

X 9B. DATED (SEE ITEM 11)

07-Jun-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Jun-2025

CODE

CONTRACTING DIV- CHIEF

7400 LEAKE AVENUE, ROOM 172

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P824B0037

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - SF 30 CONTINUATION

The following have been added by full text:

AMENDMENT 0002

1) Section 00010, paragraph 1.5 “Bidder Qualifications”: Delete subparagraph a and replace with the following:

a. Before the Government will award a contract based on this solicitation, the apparent low bidder shall establish that it is responsible and entitled to award of the contract. The Contractor must establish responsibility by providing sufficient documentation for review and approval that its dredge meets the appropriate production rate for the dredging region, as listed in the table in paragraph entitled "Minimum Production Rate Requirements" located in the Dredging Region Section(s). The Contractor must prove the proposed dredge has performed at, or above, the listed production rate(s) for a minimum of 30 days on a single contract within three years prior to the bid opening date of this solicitation. Failure to establish the dredge's capability to meet the required production rate will result in a finding of non-responsibility.

2) Section 00800, paragraph 3.1 “Delivery of Plant”: Delete subparagraph a and replace with the following:

a. For bidding purposes, the delivery site will be Berwick Bay Harbor for the initial task order ordering work; however, the starting assignment for the dredge may require initial mobilization to any of the locations in the Dredging Region Section(s). Should the delivery site change due to fault of the Contractor, no equitable adjustment will be made for any additional costs. Should the delivery site change due to no fault of the Contractor, an equitable adjustment will be made for any additional costs under the contract clause entitled "Changes" (FAR 52.243-4). Upon arrival of the dredge and all of the attendant plant at the delivery site, the plant may be inspected by Government personnel to determine whether any deficiencies have developed since the time the plant was brought into compliance pursuant to the pre-award inspection.

The Contractor will be notified of acceptance or rejection of the plant. The dredge may be given an assignment immediately upon acceptance, and will be expected to commence dredging at that time. The Notice to Proceed may be issued immediately upon receipt of acceptable Performance and Payment Bonds.

(End of Summary of Changes)