West Jefferson Levee District, Harvey Lock Forebay Floodwall, Jefferson Parish, Louisiana
Solicitation number
W912P824B0035
Issued by

About this file

This document is a solicitation for the West Jefferson Levee District, Harvey Lock Forebay Floodwall project in Jefferson Parish, Louisiana, with Solicitation Number W912P824B0035. The procurement is set aside for 100% Historically Underutilized Business Zone (HUBZone) Small Businesses. The work consists of raising the current elevation of the levee with a pile-founded concrete T-wall, as well as related site work such as clearing, grading, paving, fencing, and landscaping. The estimated construction value is between $1,000,000 and $5,000,000. Bids are due by 10:00 AM local time on August 23, 2024, and the bid opening is scheduled for 1:00 PM the same day. The contract will be a single Firm Fixed Price (FFP) contract awarded by the Department of the Army Corps of Engineers, Engineering District New Orleans.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1'-0" 1'-0"STABILITY SLAB

EXCAVATION

EXCAVATION

FLOODWALL

EDGE OF ROAD

MATCH EXISTING ROAD ELEVATION

REMOVE ASPHALT TO HIGHWAY CENTERLINE.

REINFORCEMENT

2" WEARING COURSE

SEE REINFORCEMENT DETAIL, BELOW.

8" UNIFORM CONCRETE PAVEMENT.

11'-0"

10'-6"

3"

3"

PAVEMENT

EDGE OF C/L

WIRES @ 6" CTRS.

3-NO. 00 GAUGE

WIRES @ 6" CTRS.

3-NO. 00 GAUGE

WIRES @ 6" CTRS.

NO. 5 GAUGE

WIRES @ 1-0" CTRS.

NO. 5 GAUGE

FLOOD SIDE LAND SIDE

EL. VARIES

NEW ASPHALT EXISTING ASPHALT

SLOPE (2%)

NEW ASPHALT TYPICAL SECTION FOR SHOULDER

SCALE: 3/4" = 1'-0"

LEGEND:

6. COMPACTED SUBGRADE

5. 6" STONE

4. PRIME COAT

3. 2-1/2" BINDER COURSE

2. TACK COAT

1. 2" WEARING COURSE

3 4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

N E

W A

S P

H A

L T

T Y

P

IC

A L

S E

C T

IO

N

S

C-505

H

C -5

.d g n

T-WALL EXCAVATION AND NEW ASPHALT TYPICAL SECTION

SCALE: 3/4" = 1'

NOTES:

SQ. FT. OF PAVEMENT=44 POUNDS

PAVEMENT. WEIGHT OF FABRIC REQUIRED TO REINFORCE 100

3. FABRIC IS TO BE PLACED 2" BELOW FINISHED SURFACE OF

REPLACED TO MATCH EXISTING.

2. ALL MARKINGS REMOVED DUE TO EXCAVATION WILL BE

AS BACKFILL OR AS SPECIFIED IN SECTION 31 24 00.00 12.

1. MATERIAL EXCAVATED FROM THE TOE TRENCH SHALL BE USED

J3

D1

REINFORCEMENT DETAIL- PARTIAL PLAN

A12

SCALE: 3/4" = 1'-0"

TRANSVERSE, EXPANSION OR CONSTRUCTION JOINT

18" PIPE PILE (TYP.)

C/L REQ'D. PZ-22 SHEETPILE

WALL LINE

C/L REQ'D. PZ-22 SHEETPILE

WALL LINE18" PIPE PILE (TYP.)

2'-6"

2'-6"

'-0

'-9

38'-9 1/8 "

2'-6"

1'-6"

6 EQUAL SPACES @ 5'-7 1/2" = 33'-9 1/8"

7'-2 7/8

38'-7 1/4 "

2'-6

6 SPACES @ 5'-7" = 33'-6"

161.87

/4

'-1

/4

163.45

PROJECTS

FOR TIE INTO FUTURE

EXPOSED SHEETPILE

#7 @ 9" E.F.

SEE NOTES

H

S -4

.d g n

T -W

A L

L P

L A

N S

S-401

M O

N O

L

IT

H M

-1

M -2

NOTES:

MONOLITH M-2:

PILES #13-16 ARE BATTERED 1H:3V

PILE #2 IS VERTICAL

PILE #1 IS BATTERED1H:4V

OTHERWISE SPECIFIED.

2. ALL PILES BATTERED AT 1H:3V UNLESS

ON ALL PILES.

1. TENSION CONNECTORS TO BE INSTALLED

LEGEND:

BATTERED PILE

VERTICAL PILE

SHEET PILE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

S-402

S-402

S-401

S-401SCALE: 1/2" = 1'-0"

FLOOD SIDE

LAND SIDE

5 6

8 9 11 12 13

MONOLITH M1 - PLAN

1 2 4

" = 1'-0"8

SCALE:

FLOOD SIDE

LAND SIDE

5 6

13 14

MONOLITH M2 - PLAN

A3

G13

10'-10 3/8 "

H17

(TYP. FOR STEM)

3" CLR.

EL. 25.5

EL. 21.0

EL. 18.0

SCALE: 1/2" = 1'-0"

SECTION

H2

A1

H17

3'-9"1'-0"4'-9"

S

T A

B S

L A

B

E M

B E

D

T Y

P

3'-9"1'-0"4'-9"

S

T A

B S

L A

B

E M

B E

D

T Y

P

30'-0"

2'-6"5 SPACES @ 5' = 25'-0"2'-6"

C/L REQ'D. PZ-22 SHEETPILE

WALL LINE18" PIPE PILE (TYP.)

/8

3'-9"1'-0"4'-9"

S

T A

B S

L A

B

E M

B E

D

T Y

P

3'-9"1'-0"4'-9"

S

T A

B S

L A

B

E M

B E

D

T Y

P

2'-6" 2'-6"

2'-3"2'-3"

2'-6" 2'-6"

2'-3"

2'-6"

2'-3"

2'-6" 2'-6"

2'-3"

/8

10.7447°

(TYP.)

18" PIPE PILE

H

S -4

.d g n

T -W

A L

L P

L A

N S

S

E C

T

IO

N S

S-402

M O

N O

L

IT

H S

M -1

M

-2

M -3

M

3. TENSION CONNECTORS TO BE INSTALLED ON ALL PILES.

2. SEE SHEET S-405 FOR REINFORCEMENT DETAILS.

STEM WALL SHALL SLOP 1/4"/FT. UPWARDS TOWARDS PROTECTED SIDE.

1. ALL TOP OF STEM ELEVATIONS SHALL BE FROM THE FLOOD SIDE OF WALL. TOP OF

NOTES:

LEGEND:

BATTERED PILE

VERTICAL PILE

SHEET PILE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

S-401

S-401

S-402

S-402S-402 S-403

EL. 19.5

EL. 16.5

SECTION - M4

SCALE: 1/2" = 1'-0"

LAND SIDE

EL. VARIES

FLOOD SIDE

TIP EL. -70.0 (TYP.)

EL. VARIESEXISTING GROUND

EL. 17.25

EL. 20.5

EL. 17.5

SECTION - M2

SCALE: 1/2" = 1'-0"

" = 1'-0"8

SCALE:

FLOOD SIDE

LAND SIDE

7 8 9 12

EL. 25.5

MONOLITH M3 - PLAN

TIP EL. -70.0 (TYP.)

1 2 3

EL. VARIESEXISTING GROUND

EL. 19.5

EL. 16.5

SECTION - M3

SCALE: 1/2" = 1'-0"

TIP EL. -21.0

TIP EL. -70.0 (TYP.)

EL. VARIESEXISTING GROUND

EL. 17.25

EL. 21.0

EL. 18.0

SECTION - M1G13

SCALE: 1/2" = 1'-0"

TIP EL. -21.0

(TYP.)

PILE

SHEET

PZ-22

EL. 25.5

TIP EL. -70.0 (TYP.)

EL. VARIESEXISTING GROUND

EL. 18.75

A3

PILE

SHEET

PZ-22

2'-3"

TIP EL. -21.0

PILE

SHEET

PZ-22

2'-3"

A9

TIP EL. -21.0

PILE

SHEET

PZ-22

EL. 18.25

2'-3"

EL. 25.5

2'-6"

TYP

LAND SIDE FLOOD SIDELAND SIDE FLOOD SIDE

LAND SIDE FLOOD SIDE

G1

A9A9 A15

38'-0"

2'-6"6 SPACES @ 5'-6" = 33'-0"2'-6"

C/L REQ'D. PZ-22 SHEETPILE

WALL LINE18" PIPE PILE (TYP.)

/8

/8

32'-0"

2'-6"4 SPACES @ 6.75' = 27'-0"2'-6"

C/L REQ'D. PZ-22 SHEETPILE

WALL LINE18" PIPE PILE (TYP.)

/8

/8

3'-9"1'-0"4'-9"

S

T A

B S

L A

B

E M

B E

D

T Y

P

2'-6"

2'-3"

H

S -4

.d g n

T -W

A L

L P

L A

N S

S

E C

T

IO

N S

S-403

M O

N O

L

IT

H M

-4

M -5

3. TENSION CONNECTORS TO BE INSTALLED ON ALL PILES.

2. SEE SHEET S-405 FOR REINFORCEMENT DETAILS.

STEM WALL SHALL SLOP 1/4"/FT. UPWARDS TOWARDS PROTECTED SIDE.

1. ALL TOP OF STEM ELEVATIONS SHALL BE FROM THE FLOOD SIDE OF WALL. TOP OF

NOTES:

LEGEND:

BATTERED PILE

VERTICAL PILE

SHEET PILE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

S-405S-403

S-403

S-403

" = 1'-0"8

SCALE:

FLOOD SIDE

LAND SIDE

5 6

8 9 10 13 14

MONOLITH M4 - PLAN

1 2 3

A15

SCALE: 1/2" = 1'-0"

FLOOD SIDE

LAND SIDE

4 5

6 7 8 9 10

MONOLITH M-5 - PLAN

1 2 3

B14 B14

EL. 19.5

EL. 16.5

SECTION - M5

SCALE: 1/2" = 1'-0"

LAND SIDE EL. 24.0

FLOOD SIDE

TIP EL. -70.0 (TYP.)

EL. VARIESEXISTING GROUND

EL. 17.25

TIP EL. -21.0

PILE

SHEET

PZ-22

2'-3"

2'-6"

S-402

H1

B1 B14

40'-0"

2'-6"5 SPACES @ 7' = 35'-0"2'-6"

C/L REQ'D. PZ-22 SHEETPILE

WALL LINE18" PIPE PILE (TYP.)

/8

/8

40'-0"

2'-6"5 SPACES @ 7' = 35'-0"2'-6"

C/L REQ'D. PZ-22 SHEETPILE

WALL LINE18" PIPE PILE (TYP.)

/8

/8

PROJECTS

FOR TIE INTO FUTURE

EXPOSED SHEETPILE

H

S -4

.d g n

T -W

A L

L P

L A

S

S-404

M O

N O

L

IT

H M

-6

M -7

5. ALL PILES BATTERED AT 1H:3V UNLESS OTHERWISE SPECIFIED.

3. TENSION CONNECTORS TO BE INSTALLED ON ALL PILES.

2. SEE SHEET S-405 FOR REINFORCEMENT DETAILS.

STEM WALL SHALL SLOP 1/4"/FT. UPWARDS TOWARDS PROTECTED SIDE.

1. ALL TOP OF STEM ELEVATIONS SHALL BE FROM THE FLOOD SIDE OF WALL. TOP OF

NOTES:

LEGEND:

BATTERED PILE

VERTICAL PILE

SHEET PILE

MONOLITH 7:

PILE #12 IS VERTICAL

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

S405 S405

S405 S405

SCALE: 1/2" = 1'-0"

FLOOD SIDE

LAND SIDE

4 5 6

7 8 9 10 11 12

MONOLITH M-6 - PLAN

1 2 3

B1 B14

SCALE: 1/2" = 1'-0"

FLOOD SIDE

LAND SIDE

4 5 6

7 8 9 10 11 12

MONOLITH M7 - PLAN

1 2 3

B8 B14

H1

B1

4'-0"1'-0"4'-6"

S

T A

B S

L A

B

E M

B E

D

T Y

P

2'-6" 2'-6"

2'-3"

#7 @ 9" E.F.

#9 @ 12"

#5 @ 12"

4'-0"1'-0"4'-6"

S

T A

B S

L A

B

E M

B E

D

T Y

P

2'-6" 2'-6"

2'-3"

5'-0"

3"3

5'-0"#7 @ 9"

STEM

SLAB

H

S -4

.d g n

T -W

A L

L S

E C

T

IO

N S

M O

N O

L

IT

H S

M -6

M

-7

S-405

A N

D S

E C

T

IO

N

T Y

P

IC

A L

S T

E M

R E

IN

F

O R

C E

M E

N T

P R

O F

IL

E

NOTES

MISS PILES.

2. BOTTOM MAT OF REINFORCEMENT SHALL BE SPACED TO

NOT EXCEED 2" IN DIAMETER.

1. ALL HOLES CUT IN SHEETPILES FOR REINFORCEMENT SHALL

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

S404 S404

S405

S405

EL. 18.5

EL. 15.5

LAND SIDE

TIP EL. -21.0

EL. 24.0

FLOOD SIDE

TIP EL. -70.0 (TYP.)

EL. VARIESEXISTING GROUND

SECTION - M6

SCALE:1/2" = 1'-0"

EL. 16.25

PILE

SHEET

PZ-22

2'-3"

LAND SIDE

TIP EL. -21.0

FLOOD SIDE

TIP EL. -70.0 (TYP.)

TYPICAL T-WALL REINFORCEMENT

SCALE:1/2" = 1'-0"

PILE

SHEET

PZ-22

(TYP. FOR STEM)

(TYP. FOR SLAB)

4" CLR.

3" CLR.

EL. 18.0

EL. 15.0

LAND SIDE

TIP EL. -21.0

EL. 24.0

FLOOD SIDE

TIP EL. -70.0 (TYP.)

EL. VARIESEXISTING GROUND

SECTION - M7

SCALE:1/2" = 1'-0"

EL. 15.75

PILE

SHEET

PZ-22

2'-3"

#7 @ 6" #7 @ 6"

SCALE:1/2" = 1'-0"

TYPICAL T-WALL STEM REINFORCEMENT - ELEVATION

NOTE: TRANSVERSE REBAR NOT SHOWN FOR CLARITH

B1 B8

B14

J3

B14

3"

TAG ABOVE

SEE IDENTIFICATION

10 GAGE C.R.S.

IDENTIFICATION TAG

C MONOLITH JOINT

L

TOP OF T-WALL EL. 25.5 TOP OF T-WALL EL. 25.5

EL. VARIES

1 1/4 "1 1/4 "

2 1/2 "

/2

/8

/4

CAP SCREW C.R.S.

FOR ELEVATIONS

SEE SCHEDULE

END OF MONOLITH

"UP STREAM" (US)

TAG

IDENTIFICATION

END OF MONOLITH

"DOWN STREAM" (DS)

BOLT (TYP.)

REFERENCE

S-501

S E

T T

L E

M E

N T

R E

F E

R E

N C

E M

A R

K E

R D

E T

A

IL

S

NOTE:

DIVISION. ATTENTION OF: CEMVN-ED-S

(COR). THE COR WILL FURNISH THIS DATA TO ENGINEERING

THIS DATA TO THE CONTRACTING OFFICER REPRESENTATIVE

SETTLEMENT REFERENCE MARKERS AND SHALL SUBMIT

THE CONTRACTOR SHALL TAKE FINAL ELEVATIONS OF ALL

H S

-5 .d g n

MARKER SCHEDULE

SETTLEMENT REFERENCE

DSELEV.

MONO.

M1 23

M2

M3

M4

M5

M6

M7

MARKER POSITION

US ELEV.

23 22

21 20

B9

REFERENCE BOLT

SCALE: 6" = 1'-0"

LAND SIDE

SETTLEMENT REFERENCE MARKER - ELEVATION TYP.

SCALE: 1" = 1'-0"

DOWN-STREAM UP-STREAM

LAND SIDE

F1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

F9

IDENTIFICATION TAG

SCALE: N.T.S.

10 GAGE C.R.S.

M-3

DESIGNATION

MONOLITH

SLAB

BASE

TOP OF

LENGTH

MONOLITH

H : V

BATTER

PILE

ELEV.

TIP

SLAB

BASE

BOTT. OF

ELEV.

CUTOFF

LENGTH

PILE

GENERAL MONOLITH LOCATION PILE FOUNDATION DATA

MONOLITH

PER

REQUIRED

NUMBER

21.0

LENGHT (FT.)

TOTAL

32 10

1/2'' THICK PLATE 1/2'' THICK PLATE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

M1 38.75 18.751:3 -70.0 14

M2 V

17.520.5 18.25 -70.0

18.0

45.84

93.75

88.25

1:3

1312.5

93.25 14

1305.5

911:4 91

88.25

M3 1:3 1216.519.5

M4

17.25

M5

40M6

-70.0

19.5 16.5 1:3 17.25 -70.0 14

19.5 16.5 1:3 17.25 -70.0

18.5 15.5 1:4 16.25 -70.0 12

40M7 18.0 15.0 15.75 -70.0

111:3

V

995.5

85.75

90.5

1 85.75

TOTAL 90 8282.5 FT.

18" DIA. STEEL PIPE PILE

BETWEEN STEEL BARS

NOTE: ABOVE PLAN IS FOR SHOWING ANGLES

#8 A706 BARS (TYP.)

C /L

P

IL

E

C/L PILE

PLAN

18" DIA. STEEL PIPE PILE

3" X 3/8" BACKER RING

TYP.

TYP.

TYPICAL PIPE PILE SPLICE DETAIL

1/4

PILE CONNECTOR

7/16

PILE CONNECTOR

/2

#8 A706 BARS

TYP.

1/4

SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0"S-503

S-503

NOTES:

5. ALL PILES SHALL HAVE PILE CONNECTORS.

BOTH VT AND UT FOR 100% OF THE WELD LENGTH.

4. PIPE PILE SPLICE WELDS SHALL BE NON-DESTRUCTIVELY TESTED USING

FOR 3 DAYS PRIOR TO PLACING THE CONCRETE FOR THE T-WALL BASE SLABS.

DRIVEN PILE. THE CONCRETE FILL FOR THE PIPE PILE SHALL BE CURED

MAY ELECT TO SUSPEND A POUR STOP 5 FEET BELOW THE TOP OF THE

ANY VOIDS THAT REMAIN AFTER PILE DRIVING. THE CONTRACTOR

3. PIPE PILES SHALL BE FILLED WITH F'c = 2,500 PSI CONCRETE TO FILL

IN THE SPECIFICATIONS.

SHALL CONFORM WITH THE MATERIAL REQUIREMENTS AS STATED

2. ALL STEEL PIPE SHALL BE 18" DIA. WITH A 1/2" WALL THICKNESS AND

ALONG THE PILE SECTION LENGTH).

THE CUT OFF ELEVATION OF THE PILE (MEASURED VERTICALLY

T-WALL FOUNDATION BASE CONCRETE, DOWN TO 20 FEET BELOW

1. PILES SHALL BE COATED FROM 3 INCHES ABOVE THE BOTTOM OF

N.T.S.

U-BAR DETAIL-(SHEET PILE)

1'-2"

C L

R

STEEL SHEET PILING

NOTE: DRY BOTTOM NOT SHOWN

10"10"

HOLE

THROUGH HANDLING

PILING OR PASS

THROUGH SHEET

CUT 1" DIA HOLE

ROTATE AS REQ'D.

STEEL SHEET PILING,

FOR EACH PAIR OF

ONE NO. 5 HAIR PIN

ELEVATION

1/ 2'

(T Y P

1/2'' THICK PLATE

/2

SECTION

STEEL PIPE PILE

#8 A706 BARS

STEEL PIPE PILE

E2

B6 B12 B17

B17

PLAN

SCALE: 1" = 1'-0"

J12 J17

S-503

H

S -5

.d g n

A N

D D

E T

A

IL

S P

IP

E

P

IL

E S

C H

E D

U L

E

PROTECTED SIDE

FILLER

1/2'' PREFORMED JOINT

BARS

HORIZONTAL

6" BELOW TOP OF WALL

EL. VARIES

VERTICAL BARS

H

S -5

.d g n

T -W

A L

L J

O

IN

T D

E T

A

IL

S

S-504

S-504

S-504

ELEVATION -

SHEET PILE INTERLOCKS

BOTTOM OF T-WALL

DETAIL OF T-WALL MONOLITH JOINTS

SCALE: 1'' = 1'- 0''

C/L MONOLITH JOINT (DETAILS SYMMETRICAL ABOUT C/L)

T-WALL T-WALL

JOINT FILLER(TYP)

3 BULB WATERSTOP

6'' 6''

4'' CLR. (TYP)

1/2'' PREFORMED

C/L MONOLITH JOINT

#4 U-BARS, 12''

C L

R (T

Y P

SCALE: 1 1/2'' = 1' - 0''

SECTION

J14

VARIES*

VARIES*

4'' STABILIZATION SLAB

VARIES*

VARIES*

TOP OF SLAB

TYPICAL STEM PLAN VIEW REINFORCE

U

-B A

R S

J14

B1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

A

4" STABILIZATION SLAB

C/L SHEET PILING

(TYPICAL)

WATER STOP MATERIAL

WITH HYDROPHILIC

MINIMUM DEPTH OF 3"

PACK VOID TO A

SEE NOTE

JOINT SEALANT (TYP)

ELASTOMETIC

H

S -5

.d g n

W A

L L

J O

IN

T

A N

D W

A T

E R

S T

O P

D E

T A

IL

S

S-505

S-505

S-505

S-505

S-505

S-505

S-505

S-505

S-505

S-505

S-505

S-505

S-505

FLOOD SIDE

TYPICAL T-WALL JOINT

THREE-BULB WATERSTOP

D/2D/2

D

C.J.

3'' (TYP)

D/2 D/2

D

T -W

A L

L T

-W A

L L

EXPANSION JOINT

1/2'' PREFORMED

N.T.S.SCALE:

SCALE: 1'' = 1' - 0''

SEE DETAIL

THREE-BULB WATERSTOP,

9''

1/4'' R

1/4'' R

3/4'' Ø

1/2'' Ø1- 1'' Ø

/8

DRY CONDITION WET CONDITION

SEE DETAIL

/2

1/2" SEALANT

EXPANSION JOINT

/2" PREFORMED1

/2

1/2" SEALANT

EXPANSION JOINT

1/2" PREFORMED

BACKER ROD

WATERSTOP

HYDROPHILIC

ALIGNED WITH THE WALL JOINT

SHEETPILE INTERLOCK

/8" X 8" X 8"3

RUBBER SHEET

NEORENE

OVERSIZED WASHERS (TYP)

1/2" Ø C.R.S. BOLTS W/

SHEET PILING

WATER STOP

THREE BULB

STABILIZATION SLAB

WATER STOP

THREE BULB

3/8" PL

(TYP)

OVERSIZED WASHERS

3/8" Ø C.R.S. BOLTS W/

SHEET PILING

STABILIZATION SLAB

UNALIGNED WITH THE WALL JOINT

SHEETPILE INTERLOCK

1/4

TO PLATE

SHEET PILE

SHEET PILING

NEOPRENE RUBBER SHEET

3 BULB WATER STOP

/2

M

O N

O L

IT

H

J O

IN

T

(T Y

P

/2

- (TYP.)

1/2"1-

3 BULB WATER STOPSHEET PILING

3/8" PL

/2 M

O N

O L

IT

H

J O

IN

T

(TYP)

1/2" (MIN.)1-

T

Y P

/2

1" (MIN.)

/2

OVERSIZED WASHERS (TYP)

3/8" Ø C.R.S. BOLTS W/

MATERIAL (TYPICAL)

HYDROPHILIC WATER STOP

PACK VOID WITH

/2" X 2-1/2" X 2-1/2" (TYP)1

NEOPRENE RUBBER SHEET

MATERIAL SEE

CONNECTION WATER STOP

3 BULB

5"

1/4

CP-1

CP-1

SECTION

SCALE: 3'' = 1'- 0''

SECTION

SCALE: 3'' = 1'- 0''

SCALE: 3'' = 1'- 0''

DETAIL

A8

SCALE: 3'' = 1'- 0''

DETAIL

K9

SECTION

SCALE: 3'' = 1'- 0''

SECTION

SCALE: N.T.S.

LAND SIDE

3/8" Ø C.R.S. BOLTS W/

OVERSIZED WASHERS (TYP)

SCALE:3/4"=1'

0 1' 2' 3'

SCALE:1"=1'

0 1' 2'

SCALE: 3"=1'

0 3" 6" 9" 12"

A2

WATERSTOP

THREE-BULB

EXPANSION JOINT

1/2" PREFORMED

F15

K9

SEE DETAIL

G1

E8

D15

D15

A2

A8

E8

F15

D15

K9

B16

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

G U

A R

D R

A

IL

R E

F E

R E

N C

E D

R A

W

IN

G

RF-001

H

R F

-0

.d g n

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

G U

A R

D R

A

IL

R E

F E

R E

N C

E D

R A

W

IN

G

RF-002

H

R F

-0

.d

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

G U

A R

D R

A

IL

R E

F E

R E

N C

E D

R A

W

IN

G

RF-003

H

R F

-0

.d

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

G U

A R

D R

A

IL

R E

F E

R E

N C

E D

R A

W

IN

G

RF-004

H

R F

-0

.d

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

G U

A R

D R

A

IL

R E

F E

R E

N C

E D

R A

W

IN

G

RF-005

H

R F

-0

.d

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

G U

A R

D R

A

IL

R E

F E

R E

N C

E D

R A

W

IN

G

RF-006

H

R F

-0

.d

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

G U

A R

D R

A

IL

R E

F E

R E

N C

E D

R A

W

IN

G

RF-007

H

R F

-0

.d

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

G U

A R

D R

A

IL

R E

F E

R E

N C

E D

R A

W

IN

G

RF-008

H

R F

-0

.d

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

G U

A R

D R

A

IL

R E

F E

R E

N C

E D

R A

W

IN

G

RF-009

H

R F

-0

.d

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

G U

A R

D R

A

IL

R E

F E

R E

N C

E D

R A

W

IN

G

RF-010

H

R F

-0

.d

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

G U

A R

D R

A

IL

R E

F E

R E

N C

E D

R A

W

IN

G

RF-011

H R

F -0

.d

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

P L

A N

A N

D P

R O

F

IL

E R

E F

E R

E N

C E

D R

A W

IN

G

RF-012

H

R F

-0

.d

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

R E

A D

Y F

O R

A D

V E

R T

IS

E

M E

N T

W E

S T

J E

F F

E R

S O

N L

E V

E E

D

IS

T R

IC

T

H A

R V

E Y

L O

C K

F O

R E

B A

Y F

L O

O D

W A

L L

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

J U

N E

A N

S I

D

ID

A

B E

T A

N C

E S

-T O

R R

E S

D J M

/S D

B

G A

A

C R

A

IG

W A

U G

A M

A N

P

.E .H

-4 -4

J E

F F

E R

S O

N P

A R

IS

H

L

O U

IS

IA

N A

L E

V E

E S

E C

T

IO

N S

R E

F E

R E

N C

E D

R A

W

IN

G

RF-013

H

R F

-0

.d

File details come from the government source that posted it. Updated .