W912P824B0027 Amendment 0001.pdf
PDF 9 MB Posted
- Solicitation number
- W912P824B0027
About this file
This document is an amendment to Solicitation W912P824B0027 for the Port of New Orleans (PONO) Approach Channel Deepening project in Orleans Parish, Louisiana. The amendment revises Section 00010 - Bidding Schedule, Section 35 20 23.00 12, and the drawings. It increases the pricing detail quantity for CLIN 0002 Dredging from 175,000 CY to 325,000 CY. The bid opening date remains unchanged. The work consists of dredging the Mississippi River approach channel at the Port of New Orleans to a required grade of -52 feet Low Water Reference Plane (LWRP) and disposing of the dredged material below the -55 foot LWRP contour. The magnitude of construction for this project is between $1,000,000 and $5,000,000. Offerors must be registered in SAM to receive a contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P824B0027 Abstract SIGNED.pdf | ||
| W912P824B0027 Amendment 0002.pdf | ||
| W912P824B0027 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Port of New Orleans (PONO), Approach Channel Deepening
The purpose of this amendment is to:
Revise section 00010 Revise section 35 20 23.00 12 Revise Draw ings.
See continuation page for details.
The Bid Opening Date remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P824B0027
X 9B. DATED (SEE ITEM 11)
27-Jun-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Jul-2024
CODE
CONTRACTING DIV- CHIEF
7400 LEAKE AVENUE, ROOM 172
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P824B0027
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - BIDDING SCHEDULE
CLIN 0002
The pricing detail quantity has increased by 150,000.00 from 175,000.00 to 325,000.00.
SECTION 01330 - SUBMITTAL PROCEDURES
The following Delivery Schedule item for CLIN 0002 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
130 dys. ANP 175,000 CONSTRUCTION DIV - CHIEF
STUART WAITS
7400 LEAKE AVENUE
NEW ORLEANS LA 70118-3651
(504) 862-1452 FOB: Destination
W912P8
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
130 dys. ANP 325,000 CONSTRUCTION DIV - CHIEF
STUART WAITS
7400 LEAKE AVENUE
NEW ORLEANS LA 70118-3651
(504) 862-1452 FOB: Destination
W912P8
SECTION SF 30 - SF 30 CONTINUATION
The following have been added by full text:
CONTINUATION PAGE
SPECIFICATIONS:
SECTION 00010
Page 00010-3. Delete the Bidding Schedule in its entirety and substitute the attached revised Bidding Schedule, page 00010-3.
SECTION 35 20 23.00 12
Page 9, paragraph 3.1.5 Character Of Materials. Delete the 2nd paragraph “Virgin material will be…” in its entirety and substitute the revised paragraph as follows:
“Virgin material will be encountered below the channel dimensions listed above. The scope of work pertains to deepening the approach channel below the currently maintained depth of -35 feet LWRP to -52 feet LWRP. Dredged Material Grain Size Curves from the feasibility study are attached at the end of this section.”
DRAWINGS:
SHEET IDENTIFICATION. Delete drawings C-01 thru C-07 in their entirety and substitute the attached revised drawings SHEET ID Nos. C-01 thru C-07.
SECTION 00010 – BIDDING SCHEDULE
Port of New Orleans (PONO) Approach Channel Deepening
Orleans Parish, Louisiana
Item DESCRIPTION Estimated Quantity
Unit Unit Price Estimated Amount
0001 Mobilization and Demobilization 1 JOB
*0002 Dredging 325,000 CY
TOTAL: $
* Denote changes from previous Bidding Schedule.
Award will be made as a whole to one bidder.
NOTE 1: The unit “JOB” as used in this Bidding Schedule is synonymous with the term “Lump Sum” used elsewhere within these plans and specifications.
NOTE 2: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE
DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR AWARD.
NOTE 3: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or subline items are materially unbalanced (See FAR 14.404-2).
NOTE 4: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442 after Notice of Award. The NTP will be issued immediately after verification of acceptable performance and payment bonds.
Within 24 hours after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
00010-3 ED 23-009
(End of Summary of Changes)
NEW ORLEANS DISTRICT
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E P
L O
T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N E
W O
R L
E A
N S
D
IS
T R
IC
T
N E
W O
R L
E A
N S
L
O U
IS
IA
N A
A N
S I
D
T Y
L E
R J
M
IL
L
E R 1
J U
L
M .J
.T
J .A
.B
J A
S O
N A
B
IN
E
T
M A
R C
H
W
P
B
W P
C
E D
-0
H -1
-4
O R
L E
A N
S P
A R
IS
H
L
A
A P
P R
O A
C H
C H
A N
N E
L D
E E
P E
N
IN
G
P O
R T
O F
N E
W O
R L
E A
N S
P
O N
O
RM 101
RM 99
X 3661654.256 Y 516579.333 0+00
8+62.97
41+22.67
78+49.49
108+01
108+01
113+09.72
117+20.19
121+81.99
126+89.60
131+97.96
149+86.20
100' OFFSET
OPERATIONS BASELINE
TCHOUPITOULAS ST.
S T
A T
E S
T R
E E
T
SHEET LEGEND
DREDGE BASELINE POB/POE/POI
N
BASELINE PI.
C-01
MISSISSIPPI RIVER
P .I S T A .9
OPERATION'S BASELINE, 100FT OFFSET FROM FACE OF WHARF
NAPOLEON "A"
NAPOLEON "C"
WHARFMILAN ST.
NASHVILLE "A"
AVE. W
HARF
HENRY CLAY
NOTES
STA. EASTING NORTHING
0 400' 800'
SCALE:1"=400'
APPROX. LIMITS OF DREDGING
X 3662381.101 Y 516114.130
X 3665571.115 Y 515427.099
X 3669294.205 Y 515388.646
X 3672203.202 Y 515884.880
X 3672166.029 Y 516099.199
X 3672659.247 Y 516225.828
X 3673055.002 Y 516334.747
X 3673497.520
X 3673979.732
X 3674461.933
X 3676156.841
Y 516466.793
Y 516625.341
Y 516786.332
Y 517356.489 O V
E R
A L
L P
L A
N
:1
DEEPENED APPROACH CHANNEL AUTHORIZED LIMITS
NASHVILLE "B" NASHVILLE "C"
NAPOLEON "A"
BASELINE
OPERATIONS
2-ABANDONED
ENTERGY
AT&T
BASELINE
400' FROM OPERATIONS
B.E.C. LIMIT
55' CONTOUR LINE
LIMITS TABLE IS BASED OFF OPERATIONS 100 FT OFFSET BASELINE.
7. STATIONING FOUND IN THE DEEPENED APPROACH CHANNEL
6. CROSS SECTIONS ARE BASED OFF DREDGE BASELINE
THE -55 FOOT (LWRP) CONTOUR IN THE MISSISSIPPI RIVER
5. EXCAVATED MATERIAL SHALL BE PLACED BEYOND
4. VERTICAL DATUM: LOW WATER REFERENCE PLANE (LWRP)
3. DEPTH CONTROL (LWRP)
2. OVER DEPTH: ADDITIONAL 2' DEPTH
1. ADVANCE DREDGING: ADDITIONAL 2' DEPTH
DREDGING BASELINE
S
TA
. 3
.9
S
TA
. 54+
27.54
RIVER MILE (RM)
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
DREDGING BASELINE
S T
A
.4
P2
P1
P4
P3 AUTHORIZED LIMITS
DEEPENED APPROACH CHANNEL
DEEPENED APPROACH CHANNEL LIMITS
APPROACH
UPSTREAM
APPROACH
DOWNSTREAM
41+22.67
78+49.49
45°ANGLE STA. ACTUAL POINT COORDINATE
P1:
P2:
P3:
P4:
X 3665566.962
X 3669293.585
Y 515367.138
Y 515328.649
33+81.49
X 3670265.037 Y 514336.922 145+13.64
X 3664590.147 Y 514410.294
REVETMENT FOOTPRINT
CHANNEL CENTERLINE
250 FT FROM CHANNEL CENTERLINE
CHANNEL SAILING LIMIT
CHANNEL SAILING LINE
250 FT FROM CHANNEL CENTERLINE
CHANNEL SAILING LIMIT
B
E R
T H
IN
G
L
IM
IT
(DISPOSAL DISCHARGE LIMIT)
-55' CONTOUR
TO BE DREDGED BY THE PORT
NO ANCHORING
REVETMENT FOOTPRINT NO A
NCHORIN
G
REVETMENT F
OOTPRIN
T
P1.5
P3.5
DREDGING LIMITS
APPROACH
UPSTREAM
APPROACH
DOWNSTREAM
38+37.11
81+05.30
45°ANGLE STA. ACTUAL POINT COORDINATE
P1:
P1.5:
P3.5:
P4:
3665223.469 X
3669630.055 X
515030.667 Y
514985.156 Y
33+81.49
X 3670265.037 Y 514336.922 145+13.64
X 3664590.147 Y 514410.294
DREDGE AREA
,6
,5
.9
,6
.9
.0
S
T A
P O
B
,6
,5
.4
,6
.3
.5
S
T A
P O
E
S T A
S T
A
S T
A
S T
A
S T
A
P .I S
T A .7
P .I S
T A .1
S T
A
S T
A
DEEPENED APPROACH CHANNEL (50' DEPTH)
RM 100
File details come from the government source that posted it. Updated .