This document is an amendment to the solicitation for the Mississippi River Baton Rouge to Gulf of Mexico Southwest Pass Hopper Dredge Contract No. 2-2024 (OM24002), Solicitation No. W912P824B0012. The amendment makes changes to the solicitation, including revisions to the bidding schedules, contract duration, and production rates. It also provides instructions for bid submission, either electronically or physically, and announces the bid opening date and time. The solicitation is for a contract to furnish one fully crewed and equipped self-propelled trailing suction type hopper dredge to perform work in the Mississippi River Southwest Pass and other areas. The magnitude of the construction range is between $10,000,000 and $25,000,000. The Contract Specialists for this solicitation are Cori A. Caimi and Bambi Raja.

View the file

Other files

File Type Posted
24B0012 Bid Abstract (Signed).pdf PDF
W912P824B0012 Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered Solicitation for Mississippi River Baton Rouge to Gulf of Mexico Southw est Pass Hopper Dredge Contract (OM24002):

1. Make changes to the Solicitation as detailed in the follow ing pages.

2. Bid Submiission Cutoff set f or Tuesday, August 20, 2024 at 10:00am; Bid Opening set for 11:30am

3. Provide Instructions to Bidders

4. Provide Wage Rates Executive Order

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Aug-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P824B0012

X 9B. DATED (SEE ITEM 11)

05-Mar-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Aug-2024

CODE

CONTRACTING DIV- CHIEF

7400 LEAKE AVENUE, ROOM 172

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

15 August 2024

SUBJECT: Mississippi River Baton Rouge to Gulf of Mexico Southwest Pass Hopper Dredge Contract No. 2-2024 (OM24002). Solicitation No. W912P8-24-B-0012.

1. General Comment: There is a new EM 385-1-1 dated 15 March 2024. All work under these specifications shall be performed in accordance with the provisions of EM 385-1-1 �Safety and Occupational Health Requirements�, dated 15 March 2024. Note: References to a particular section of the EM 385-1-1 may be outdated.

2. Standard Form 1442, box 11: Delete �5 calendar days� and replace with �240 hours�.

3. Section 00010, paragraph 1.1 �Bidding Schedules�: Delete this paragraph (Lot One thru Lot Ten) and replace with the attached Bidding Schedules (Lot One thru Lot Eight).

4. Section 00010, paragraph 1.5 �Conditions of Contract Award�, subparagraph c: In the second sentence, delete �120 hours� and replace with �240 hours�. Also, delete the Approximate Hopper Dredge Contract Duration table in its entirety and replace with the attached �Approximate Hopper Dredge Contract Duration� table.

5. Section 00010, paragraph 1.5 �Conditions of Contract Award�, subparagraph d: Delete �120 hours� and replace with �240 hours�.

6. Section 00700, Clause 52.211-10 �Commencement, Prosecution, and Completion of Work�, subparagraph a: Delete �5 calendar days� and replace with �240 hours�.

7. Section 00800, paragraph 3.1 �Delivery of Plant�, subparagraph a: In the first sentence, delete �120 hours� and replace with �240 hours�.

8. Section 01 30 00: Add the following paragraph as paragraph 1.17 entitled �Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something)�.

1.17 SUSPICIOUS ACTIVITY REPORTING TRAINING (e.g. iWATCH, CorpsWatch, or See Something, Say Something)

All contract personnel shall receive initial and annual refresher training from the Requiring Activity (RA) representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative, or law enforcement entity.

9. Section 01 30 00 Attachment: Delete the Utility Summary Sheet and replace with the attached Utility Summary Sheet (Version: May 2024).

10. Section 01 35 26, paragraph 1.3.1.1.4 �Safety Personnel Training Requirements for Dredging�:

Delete this paragraph in its entirety and replace with the following paragraph 1.3.1.1.4 entitled �Safety Personnel Training Requirements�.

1.3.1.1.4 Safety Personnel Training Requirements

The SSHO shall meet the training and experience requirements of EM 385-1-1, Chapter 2-3.b.

Level 1 SSHOs are not permitted to supervise non-safety personnel at the site of work.

12. Section 01 35 26, paragraph 1.4 �Accident Prevention Program�: Delete subparagraphs a thru c in their entirety and replace with the following subparagraphs a thru c.

a. The Contractor shall submit ENG Form 6206 (Activity Hazard Analysis (AHA)), ENG Form 6292 (Site-Specific Safety & Occupational Health Plan Worksheet), ENG Form 6293 (Accident Prevention Plan (APP) Worksheet), and ENG Form 6283 (Collateral Duty Safety Officer) (CDSO) Designation Letter). These ENG forms can be obtained from:

https://www.publications.usace.army.mil/USACE-Publications/Engineer-Forms/.

b. The Contractor shall submit a copy of company policy statement regarding accident prevention.

c. When marine plant and equipment are in use under a contract, the method of fuel oil transfer shall be included on MVN Form 385-10R, Fuel Oil Transfer. The Fuel Oil Transfer form can be obtained from:

https://www.mvn.usace.army.mil/About/Offices/Safety/Safety-Forms/.

13. Section 01 35 26, paragraph 1.11.1 �Mishap Reporting and Investigation�: Delete this paragraph in its entirety and replace with the following paragraph 1.11.1 entitled �Accident Investigation and Reporting�:

1.11.1 Accident Investigation and Reporting

The reporting and associated investigation of accidents and near misses is considered a leading indicator. The Contractor shall utilize the ENG Form 3394 (Mishap Notification and Investigation) to report accidents and near misses. ENG Form 3394 can be obtained from:

https://www.publications.usace.army.mil/USACE-Publications/Engineer-Forms/.

14. Section 01 35 26 Attachments: Delete the Accident Prevention Plan Checklist and the Activity Hazard Analysis in their entirety.

15. Section 35 20 23.23, paragraph 2.1.1 �Dredge Plant�, subparagraph b: Delete the Theoretical Hopper Dredge Production Rates (cy/day) table in its entirety and replace with the attached �Theoretical Hopper Dredge Production Rates (cy/day)� table.

16. Section 35 30 23.23, paragraph 3.10.1 �Mississippi River and Southwest Pass�: For the (2) 24� Enbridge Gas Pipelines, delete Jerome Snyder as a point of contact and replace with the following point of contact:

Joey Bubrig 985-209-9432 joey.bubrig@enbridge.com

17. Section 35 30 23.23, paragraph 3.10.1 �Mississippi River and Southwest Pass�: For the 4�, 6�, & 8� Texas Petroleum Investment Company pipeline bundle, delete Chris Sanfilippo and Jeff Meaux as point of contacts and replace with the following point of contact:

Cypress Melville 337-232-1702 cmelville@txpetinv.com

Section 00010, Paragraph 1.1 �Bidding Schedules�:

1.1 BIDDING SCHEDULES

SECTION 00010 � BIDDING SCHEDULE

MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO, SOUTHWEST PASS

HOPPER DREDGE CONTRACT NO. 2-2024

PLAQUEMINES PARISH, LOUISIANA

SOLICITATION NO. W912P824B0012

LOT ONE, 34 inch Inside Diameter (ID) Pump Suction, 14,788 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant

Bid Item Description Estimated

Quantity Unit Unit Price

Total Price

0001 Mobilization & Demobilization 1 Job

0002 Dredging 572 Hour

Option 0003 Option Dredging 572 Hour XXXXXXXX

Option

NMFS-Approved Protected Species Observers 30 Day

Option

Sea Turtle and Sturgeon Trawling and Relocation

30 Day

Option

Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation

1 Job

Total: LOT ONE BID

*SEE BID FORM NOTES

LOT TWO, 38 inch Inside Diameter (ID) Pump Suction, 12,430 cubic yard

Item Description

Estimated Quantity Unit

Unit Price

Total Price

Mobilization & Demobilization 1 Job

0002 Dredging 597 Hour

Option 0003 Option Dredging 597 Hour XXXXXXXX

Option

NMFS-Approved Protected Species Observers 30 Day

Option

Sea Turtle and Sturgeon Trawling and Relocation 30 Day

Option

Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation

1 Job

Total: LOT TWO BID

LOT THREE, 33.5 inch Inside Diameter (ID) Pump Suction, 9,400 cubic yard

Estimated Quantity Unit

Unit Price

Total Price

Mobilization & Demobilization 1 Job

0002 Dredging 787 Hour

Option 0003 Option Dredging 787 Hour XXXXXXXX

Option

NMFS-Approved Protected Species Observers 30 Day

Option

Sea Turtle and Sturgeon Trawling and Relocation 30 Day

Option

Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation

1 Job

Total: LOT THREE BID

LOT FOUR, 39.37 inch Inside Diameter (ID) Pump Suction, 8,300 cubic yard Nominal Hopper Capacity, One Dragarm and all attendant plant

Estimated Quantity Unit

Unit Price

Total Price

Mobilization & Demobilization 1 Job

0002 Dredging 1032 Hour

Option 0003 Option Dredging 1032 Hour XXXXXXXX

Option

NMFS-Approved Protected Species Observers 30 Day

Option

Sea Turtle and Sturgeon Trawling and Relocation 30 Day

Option

Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation

1 Job

Total: LOT FOUR BID

LOT FIVE, 31.5 inch Inside Diameter (ID) Pump Suction, 6,540 cubic yard

Estimated Quantity Unit

Unit Price

Total Price

Mobilization & Demobilization 1 Job

0002 Dredging 1077 Hour

Option 0003 Option Dredging 1077 Hour XXXXXXXX

Option

NMFS-Approved Protected Species Observers 30 Day

Option

Sea Turtle and Sturgeon Trawling and Relocation 30 Day

Option

Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation

1 Job

Total: LOT FIVE BID

LOT SIX, 30 inch Inside Diameter (ID) Pump Suction, 4,815 cubic yard

Estimated Quantity Unit

Unit Price

Total Price

Mobilization & Demobilization 1 Job

0002 Dredging 1106 Hour

Option 0003 Option Dredging 1106 Hour XXXXXXXX

Option

NMFS-Approved Protected Species Observers 30 Day

Option

Sea Turtle and Sturgeon Trawling and Relocation 30 Day

Option

Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation

1 Job

Total: LOT SIX BID

LOT SEVEN, 27 inch Inside Diameter (ID) Pump Suction, 3,600 cubic yard

Estimated Quantity Unit

Unit Price

Total Price

Mobilization & Demobilization 1 Job

0002 Dredging 1340 Hour

Option 0003 Option Dredging 1340 Hour XXXXXXXX

Option

NMFS-Approved Protected Species Observers 30 Day

Option

Sea Turtle and Sturgeon Trawling and Relocation 30 Day

Option

Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation

1 Job

Total: LOT SEVEN BID

LOT EIGHT, 26 inch Inside Diameter (ID) Pump Suction, 4,000 cubic yard

Estimated Quantity Unit

Unit Price

Total Price

Mobilization & Demobilization 1 Job

0002 Dredging 1475 Hour

Option 0003 Option Dredging 1475 Hour XXXXXXXX

Option

NMFS-Approved Protected Species Observers 30 Day

Option

Sea Turtle and Sturgeon Trawling and Relocation 30 Day

Option

Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation

1 Job

Total: LOT EIGHT BID

Section 00010, paragraph 1.5 �Conditions of Contract Award�, subparagraph c -- �Approximate Hopper Dredge Contract Duration� table:

APPROXIMATE HOPPER DREDGE

CONTRACT DURATION

Bid Lot

Pump Inside Diameter (inches)

Hopper Size (cubic yards)

Number of

Dragarms

Approximate Number of

Contract Days for Item 0002

Approximate Number of

Contract Days for Option Item 0003

1 34 14,788 2 46 46

2 38 12,430 2 48 48

3 33.5 9,400 2 56 56

4 39.37 8,300 1 68 68

5 31.5 6,540 2 70 70

6 30 4,815 2 71 71

7 27 3,600 2 82 82

8 26 4,000 2 88 88

Da te su bm itt ed

C/ L St at io n/ M ile

C/ L

Y Co or di na te

RD

B To e X, Y Co or di na te

LD

B To e X, Y Co or di na te M in im um El ev at io n

Si ze of U til ity

Ty pe of U til ity

Is ut ili ty lin e pr op er ly m ar ke d (y es /n o) If no re as on w hy

O w ne rN am e O w ne rP oi nt of Co nt ac ts

(e m ai la dd re ss ,p ho ne nu m be r, an d ph ys ic al ad dr es s)

N ot es

(e .g w as lin e dr ed ge d ov er ,d isp os ed on ,s ki pp ed (d isc us sr ea so n w hy an y is su es w ith ow ne r, et c)

U til ity

Su m m ar y Sh ee t

D re dg in g Re gi on

N ot e:

Th e Co nt ra ct or sh al lf ill ou to ne sh ee tf or ea ch dr ed gi ng re gi on

Section 35 20 23.23, paragraph 2.1.1 �Dredge Plant�, subparagraph b � �Theoretical Hopper Dredge Production Rates (cy/day)� table:

THEORETICAL HOPPER DREDGE PRODUCTION RATES (cy/day)

Bid Lot Pump Inside Diameter (inches)

Hopper Size

(cubic yards)

Number of

Dragarms

Dredge & Haul

Production All

Projects

Agitation Production

SW Pass (cy/day)

Calcasieu (cy/day)

1 34.0 14,788 2 89,638 219,124 246,514

2 38.0 12,430 2 85,383 217,037 244,166

3 33.5 9,400 2 64,729 164,890 185,502

4 39.37 8,300 1 49,677 121,028 136,157

5 31.5 6,540 2 46,978 125,107 140,746

6 30 4,815 2 45,029 135,530 152,471

7 27 3,600 2 36,435 130,153 146,422

8 26 4,000 2 34,095 95,227 107,129

SOLICITATION NUMBER:

W912P824B0012

NOTE: BIDDERS MAY SUBMIT BIDS BY ONLY ONE METHOD: A) ELECTRONIC COMMERCE

(EMAIL) OR BY 2) PHYSICAL SUBMISSION. BIDDERS SHALL LIMIT THE BID SUBMITTAL TO

ONE OPTION OR THE OTHER, NOT BOTH.

Electronic Submission of Bids/Proposals (Email):

The New Orleans District utilizes electronic commerce (Email) for receipt of electronic bids under this IFB solicitation. To submit an electronic commerce (Email) bid please follow these steps:

1. Send an email containing your name, email address and bid/proposal to the following emails associated with the IFB (MUST include all emails):

Veronica.garner-flint@usace.army.mil Cori.A.Caimi@USACE.ARMY.MIL

2. ALL BIDS SUBMITTED BY EMAIL MUST CONTAIN THE SOLICITATION NUMBER IN

THE SUBJECT LINE.

3. Once the agency receives your bid/proposal at the above email addresses, you will then receive a confirmation email stating your bid/proposal was received. If a bidder does not receive a reply acknowledging receipt electronically from the New Orleans District, it is incumbent upon the bidder to seek confirmation from the issuing Contracting office by phone.

Note: The size limit for incoming emails is 35MB. Any bid/proposal over this size may not be accepted by the server and will constitute the bid not being received timely. Please note that embedded links, URLs, and other html language included may interfere with the USACE server security, which may cause emails to be removed prior to being received by the contracting office. Bidders are advised to refrain from including external links, embedded links, URLs, and other html language not germane to the proposal/bid. Please note it is a bidder’s responsibility, when transmitting its bid electronically, to ensure the receipt of its bid to the proper designee at the proper time. See FAR 14.304(b)(1)(i) regarding untimely electronic bids. Please note, MVN’s computer system firewall may cause a delay in receipt of emails, so be sure to allow ample time for possible delay. If your email would exceed 35MB you can use one of the following methods as a work-around:

Use .zip files as attachments. Combine multiple files into a .zip file to compress file size prior to adding as an email attachment.

Send multiple emails. Label each email with same subject line and indicate number of emails.

For example: Smith Construction W912P823BXXXX (1 of 2) Smith Construction W912P823BXXXX (2 of 2).

Physical Submission of Bids:

Bidders may submit their bids by hand carrying or express mail to the New Orleans District Contracting Office in Room 172. Bidders are advised to allow adequate time to ensure timely submission of its bid.

Traffic onto the New Orleans District campus may be delayed by trains blocking the entrance or security either at the gate and/or inside of the building. Express delivery may be utilized but it is incumbent upon the bidder to ensure bid delivery time and date is before the receipt of bid cutoff time. See FAR 14.304(b)(1)(ii) and (c). Bidders are also advised to inform USACE Contract if you plan to physically submit the bid 48 hours before bids are due.

Bid Opening:

The Bid Opening is currently scheduled for Tuesday, August 20, 2024, at 11:30 am CST. The Contracting

Officer and Contract Specialist will begin downloading bids at 10:00 AM CST, which is the bid submission receipt cutoff time. All bids received after 10:00 AM CST on Tuesday, August 20, 2024, will be considered late.

Audio Teleconference Bid Opening Information:

Instructions as well as any subsequent audio teleconference Bid Opening Information will be provided on SAM.GOV prior to the final closing date of this solicitation. In the event of changes to the solicitation that require a change to the closing date/time, the bid opening Audio Teleconference information will be provided via amendment.

Join from the meeting link https://dod.teams.microsoft.us/l/meetup-join/19%3adod%3ameeting_0d61271f37744f5e8fff138bf2e48d03% 40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7-8f3163d27582%22%2c%22Oid%22% 3a%223f85fe51-67e4-4f51-9c09-3e183c94b719%22%7d

Meeting ID: 993 259 309 302 Passcode: 2gsdM5

Dial in by phone +1 601-262-2433

Phone conference ID: 233 305 455#

Davis-Bacon Project Wage Determination

Final Rule: Increasing the Minimum Wage for Federal Contractors (Executive Order 14026)

On November 24, 2021, the Department published the final rule, “Increasing the Minimum Wage for Federal Contractors,” This final rule introduced regulations to implement Executive Order 14026, “Increasing the Minimum Wage for Federal Contractors,” which was signed by President Joseph R. Biden Jr. on April 27, 2021. Executive Order 14026 states that the Federal Government’s procurement interests in economy and efficiency are promoted when the Federal Government contracts with sources that adequately compensate their workers. The Executive Order raises the minimum wage paid by those contractors to workers performing work on or in connection with covered federal contracts to $15.00 per hour, beginning January 30, 2022; and beginning January 1, 2023, and annually thereafter, an amount determined by the Secretary of Labor (Secretary). The Department’s final rule established standards and procedures for implementing and enforcing the minimum wage protections of Executive Order 14026, and became effective on January 30, 2022.

On September 28, 2023, the Department of Labor published a notice in the Federal Register announcing that, beginning January 1, 2024, the Executive Order 14026 minimum wage rate will increase to $17.20 per hour (Minimum Wage for Federal Contracts Covered by Executive Order 14026, Notice of Rate Change in Effect as of January 1, 2024). This Executive Order minimum wage generally applies to workers performing work on or in connection with federal contracts that are entered into, renewed, or extended (pursuant to an option or otherwise) on or after January 30, 2022, in the following four categories:

Procurement contracts for construction covered by the DBA;

Service contracts covered by the SCA;

Concessions contracts, including any concessions contract excluded from the SCA by the Department’s regulations at 29 CFR 4.133(b); and

Contracts in connection with federal property or lands and related to offering services for federal employees, their dependents, or the general public.[1]

Additionally, beginning on January 1, 2024, contractors may no longer credit employee tips toward the Executive Order 14026 minimum wage, and tipped employees covered by Executive Order 14026 will be entitled to a cash wage of at least $17.20 per hour. Contractors covered by Executive Order 14026 must ensure that workers receive no less than the minimum wage rates in effect during each calendar year in which a covered contract is performed.

Contracts in the four categories described above that were entered into, extended, or renewed prior to January 30, 2022, are generally subject to a lower minimum wage rate established by Executive Order 13658, “Establishing a Minimum Wage for Contractors.” Questions relating to Executive Orders 13658 and 14026 may be directed to the Wage and Hour’s Division of Government Contracts Enforcement at (202) 693-0064.