This amendment modifies a solicitation for maintenance dredging services along the Calcasieu River and Pass in Louisiana. The purpose is to answer industry questions, update the project duration from 210 to 240 calendar days, and provide clarification on survey data and containment facility availability. Required services include dredging from Mile 17.0 to Mile 36.0 to maintain depths for navigation. The solicitation was issued by the US Army Corps of Engineers New Orleans District for their client, the Department of the Army. The response deadline and award date are not specified. Real time kinematic survey equipment may be used if calibrated to the proper datum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised Bid Abstract W912P823B0060.pdf | ||
| Bid Abstract W912P823B0060.pdf | ||
| Amendment 0001 - W912P823B0060.pdf | ||
| Solicitation No. W912P823B0060.pdf | ||
| Plans_ED-23-015.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
- Answ er questions from industry
- Update project duration
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Sep-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P823B0060
X 9B. DATED (SEE ITEM 11)
09-Aug-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Sep-2023
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P823B0060
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - SF 30 CONTINUATION
The following have been added by full text:
CHANGES TO 1442, 00010, 00700
STANDARD FORM 1442
Standard Form 1442, block 11. Change “210 calendar days” to “240 calendar days”.
SECTION 00010
Page 00010-6, NOTE 8. On the 5th line, change “210 calendar days” to “240 calendar days”.
SECTION 00700
Page 36/259, clause 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, subclause (c). Change “210 calendar days” to “240 calendar days”.
QUESTIONS & ANSWERS 9/12/23
Questions & Answers Dated 09/12/2023
Solicitation Number: W912P821B0048 Description: Calcasieu River and Pass, LA Maintenance Dredging FY23, Mile 17.0 to Mile 36.0 Question 1: Will USACE provide post-dredge survey data from the most recent CDF dike raising events?
Answer 1: The USACE does not provide post-dredge survey data. However, per spec section 01100 paragraph 20, all bidders are highly encouraged to visit the project site location prior to submission of any bids.
Question 2: Please provide the names of the CDF’s used in for material placement in the most recent dredging event.
Answer 2: In 2022 and 2023, construction work was performed in CDF-1, 3, 8, 12B, 17, E, 13 and
22. Areas not available are CDF’s 2, and 7 as degrade and dike construction is on going, and CDF 1 was recently discharged into. The rest should be good to go.
Question 3: Will USACE accept real time kinematic (RTK) survey equipment in lieu of the Automatic Recording Tide Gauge? Still working on an answer to this question.
Answer 3: RTK can be used but Contractor must calibrate to the applicable datum conversion depending on where a survey is being conducted as detailed in Spec Section 01100 Paragraph
25. DATUM RELATIONSHIPS and Plan Sheet G-03.
(End of Summary of Changes)