W912P823B0026_Amendment_0001.pdf

PDF 2 MB Posted

Attached to
Mississippi River, New Orleans Harbor Cutterhead Dredge Rental No. 1-2023
Solicitation number
W912P823B0026
Issued by

About this file

This solicitation package is for a cutterhead dredge rental on the Mississippi River in New Orleans, Louisiana. The U.S. Army Corps of Engineers seeks bids for dredging services using a cutterhead dredge with various discharge pipe sizes, both with and without submerged pumps. Bidders must submit unit prices for line items including mobilization, dredging hours, option dredging hours, and towing services. The solicitation includes estimated dredging quantities, production rates, and contract duration schedules for each pipe size configuration. Bidders must demonstrate their dredge can meet required production rates. The bid opening will be conducted via audio teleconference on April 20, 2023 and award will be to the lowest priced responsive bid. The wage determination specifies labor classifications and rates.

View the file

Other files

File Type Posted
W9129823B0026_Abstract (Signed).pdf PDF
W912P823B0026 Solicitation Package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered solicitation for Mississippi River, New Orleans Harbor, Cutterhead Dredge No.1-2023. Orleans and Jefferson Parishes, Louisiana is hereby amended as follow s:

1. Set the bid opening date for 20 April 2023 at 11:00 AM CST via audio teleconference. "See Instructions to Bidders."

2. Make changes to the solicitation as detailed in the follow ing pages.

3. Update Instructions to bidders.

4. Include Wage Determination.

Please note: the Contracting Officer and Contract Specialist w ill begin dow nloading bids at 10:00 AM CST, w hich is the bid receipt cutoff time. All bids received after 10:00 AM CST on Thursday, April 20, 2023 w ill be considered late. For any questions, please contact the Contracting Officer - Veronica Garner Flint, (504) 862-1515 or the Contract Specialist - Melissa A. Vaughn, (504) 862-2762.

1. CONTRACT ID CODE PAGE OF PAGES

1 18

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Apr-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P823B0026

X 9B. DATED (SEE ITEM 11)

17-Mar-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Apr-2023

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CONTINUATION PAGE

1. Standard Form 1442, box 11: Delete “5 calendar days” and replace with “15 calendar days”.

2. Section 00010 “Bid Schedule”: Delete this section in its entirety and replace with the attached Section 00010 “Bid Schedule”.

3. Section 00700, FAR Clause 52.211-10 “Commencement, Prosecution, and Completion of Work (Apr 1984)”: In the first sentence, delete “5 calendar days” and replace with “15 calendar days”.

4. Section 00800, paragraph 3.1 “Delivery of Plant”, subparagraph a: In the first sentence, delete “120 hours” and replace with “15 calendar days”.

5. Section 35 20 23.23 Attachment “MVN Form 4267”:

Delete the MVN Form 4267 dated Feb 2021 and replace with the attached MVN Form 4267 dated April 2023.

W912P823B0026

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND

CONTRACTING REQUIREMENTS SECTION

00010

BID SCHEDULE

PART 1 GENERAL

1.1 BIDDING SCHEDULES

1.2 BID FORM NOTES

1.3 BIDDING

1.4 EVALUATION OF BIDS

1.5 CONDITIONS OF CONTRACT AWARD

1.6 BIDDER QUALIFICATIONS

1.7 PRE-AWARD INSPECTION OF PLANT

1.8 OPTION ITEMS

PART 2

PRODUCTS

(Not Used)

PART 3

EXECUTION

(Not Used) -- End of Section Table of Contents --

W912P823B0026

Mississippi River, New Orleans Harbor Cutterhead Dredge OM23030AMEND

SECTION 00010

BID SCHEDULE

PART 1 GENERAL

1.1 BIDDING SCHEDULES

SECTION 00010 - BIDDING SCHEDULE

MISSISSIPPI RIVER, NEW ORLEANS HARBOR

CUTTERHEAD DREDGE NO. 1-2023

ORLEANS AND JEFFERSON PARISHES, LOUISIANA

SOLICITATION NO. W912P823B0026

LOT ONE, 24 IN. INSIDE DIAMETER (ID) PUMP DISCHARGE WITHOUT SUBMERGED PUMP

Bid Item DESCRIPTION Estimated Quantity

Unit Unit Price

Total Price

0001 MOBILIZATION AND

DEMOBILIZATION

1 JOB

0002 NOH DREDGING 1,095 HOUR

Option

NOH OPTION DREDGING 1,095 HOUR XXXXXXXX

0004 DREDGE TOWING SERVICE 20 MILE

TOTAL: LOT ONE BID

*SEE BID FORM NOTES FOLLOWING LAST BID LOT

MISSISSIPPI RIVER, NEW ORLEANS HARBOR

CUTTERHEAD DREDGE NO. 1-2023

ORLEANS AND JEFFERSON PARISHES, LOUISIANA

SOLICITATION NO. W912P823B0026

LOT TWO, 24 IN. INSIDE DIAMETER (ID) PUMP DISCHARGE WITH SUBMERGED PUMP

Bid Item DESCRIPTION Estimated Quantity

Unit Unit Price

Total Price

0001 MOBILIZATION AND

DEMOBILIZATION

1 JOB

0002 NOH DREDGING 825 HOUR

Option

NOH OPTION DREDGING 825 HOUR XXXXXXXX

0004 DREDGE TOWING SERVICE 20 MILE

TOTAL: LOT TWO BID

*SEE BID FORM NOTES FOLLOWING LAST BID LOT

W912P823B0026

LOT THREE, 27 IN. INSIDE DIAMETER (ID) PUMP DISCHARGE WITHOUT SUBMERGED PUMP

Unit Unit Price

Total Price

0001 MOBILIZATION AND

DEMOBILIZATION

1 JOB

0002 NOH DREDGING 864 HOUR

Option

NOH OPTION DREDGING 864 HOUR XXXXXXXX

TOTAL: LOT THREE BID

LOT FOUR, 30 IN. OR GREATER INSIDE DIAMETER (ID) PUMP DISCHARGE WITHOUT

SUBMERGED PUMP

Unit Unit Price

Total Price

0001 MOBILIZATION AND

DEMOBILIZATION

1 JOB

0002 NOH DREDGING 701 HOUR

Option

NOH OPTION DREDGING 701 HOUR XXXXXXXX

TOTAL: LOT FOUR BID

SECTION 00010 Page 6

LOT FIVE, 30 IN. OR GREATER INSIDE DIAMETER (ID) PUMP DISCHARGE WITH

SUBMERGED PUMP

Unit Unit Price

Total Price

0001 MOBILIZATION AND

DEMOBILIZATION

1 JOB

0002 NOH DREDGING 528 HOUR

Option

NOH OPTION DREDGING 528 HOUR XXXXXXXX

TOTAL: LOT FIVE BID

SECTION 00010 Page 7

1.2 BID FORM NOTES

a. The dredge and attendant plant must be able to operate in river stages above 12 feet at the New Orleans (Carrollton) gage, if necessary. Therefore, by bidding on this solicitation, the Contractor is certifying that its dredge meets this requirement.

b. Bidders shall bid on all items including optional items (see "Evaluation of Options" FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.

c. Bidders shall use the Item No. 0002 unit price to compute the Option Item No. 0003 total price.

d. Any bid may be rejected if the Contracting Officer or his/her authorized representative determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only the total price of the bid, but the prices for individual line items as well. Any bid may be rejected if the prices for any line items or subline items are materially unbalanced (see "Rejection of Individual Bids" FAR 14.404-2).

e. THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442 after Notice of Award. The NTP will be issued after verification of acceptable performance and payment bonds. Within 48 hours after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Administrative Contracting Officer or his/her authorized representative. Physical work cannot start until the Resident Management System is set-up, the Accident Prevention Program and other required submittals have been submitted and approved, and all preliminary meetings called for under the contract have been conducted.

f. RAPID VENDOR PAYMENT: See the following web based instructions for the submission of invoices:

www.mvn.usace.army.mil/Business-With-Us/Contracting/Rapid-Vendor-Payment.aspx

g. The unit "job" is a one-time payment for work performed. "Job" is synonymous with the previously used term "lump sum".

1.3 BIDDING

a. The bidder shall select only one bid lot, determined by the class of dredge intended to be used. Bids which are submitted on an inappropriate bid lot will be declared non-responsive.

b. Bidders shall furnish unit prices for all items listed on the schedule of bid items that require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items but does furnish an extended total or an estimated amount for such items, the Government will deem the unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED

ESTIMATED AMOUNT FOR ANY REQUIRED ITEM, THE BID WILL BE DECLARED

NON-RESPONSIVE.

W912P823B0026

SECTION 00010 Page 8

1.4 EVALUATION OF BIDS

a. To provide fair competition between dredges of dissimilar sizes and production rates, the hourly dredging quantities have been determined based on the estimated quantity of shoal material to be removed and the nominal production rate of the dredge in each bid lot. The production rates shown in the chart in the paragraph entitled "Minimum Production Rate Requirements" located in the Dredging Region Section(s) were used to make this determination.

b. The nominal dredge production rates listed in this solicitation were conservatively estimated based on an average "Standard" cross-sectional quantity of material for this solicitation's dredging regions, which have variable and dynamic shoaling conditions. It is the bidder's responsibility to make its own assessment of the actual dredging conditions in order to prepare a bid for this work.

c. Award will be made to that responsible bidder presenting the lowest priced responsive bid in response to this solicitation, regardless of the Bid Lot used.

d. The hourly quantities shown on the bid lots (Bid Items "NOH Dredging" and "NOH Option Dredging") are 100% pay time hours. The actual calendar duration of the contract may vary as a result of fractional pay time. Refer to Section 35 20 23.23, paragraph entitled "Dredging and Option Dredging Items", for additional information.

1.5 CONDITIONS OF CONTRACT AWARD

a. Award will be made as a whole to one bidder. The dredge and attendant plant offered in the bidding schedule shall be complete with full operating personnel and in operating status for the contract period. EM 385-1-1, Section 19, "Floating Plant and Marine Activities" shall be complied with at all times. NOTE: All work under these specifications shall be performed in accordance with the provisions of EM 385-1-1 "Army Corps of Engineers Safety and Health Requirements Manual", latest edition.

b. The Government may award the contract at the total bid price, comprised of the base items and option item(s); however, the Government is not obligated to exercise any option item(s).

c. The number of hours stated in the bidding schedule is an estimated quantity. The dredge and attendant plant will be retained for an approximate number of days shown in the table below starting no later than 15 calendar days after issuance of the Notice to Proceed.

W912P823B0026

SECTION 00010 Page 9

APPROXIMATE DREDGE

CONTRACT DURATION

Bid Lot Discharge Line ID

(INCHES)

Submerged Pump

Approximate Number of

Contract Days for Item 0002

Approximate Number of

Contract Days for Option Item 0003

1 24 NO 67 67

2 24 YES 54 54

3 27 NO 56 56

4 30 or greater NO 48 48

5 30 or greater YES 40 40

The time required for completion of the contract shall be established as the number of calendar days listed in the column entitled "Approximate Number of Contract Days for Item 0002" for the applicable bid lot. In the event Option Item 0003 is fully exercised under the terms of the contract, the time required for completion of the contract shall be extended by the number of calendar days listed in the column entitled "Approximate Number of Contract Days for Option Item 0003" for the applicable bid lot. In the event Option Item 0003 is partially exercised, the contract completion date shall be extended using the following formula:

[(partial option hours exercised)/(option hours listed in bid schedule for applicable bid lot)] x (calendar days listed in column "Approximate Number of Contract Days for Option Item 0003" for applicable bid lot)

d. The bidder shall be capable of providing for assignment of the dredge and all attendant plant, complete and in full operating condition in all respects, and to commence dredging no later than 15 calendar days after issuance of the Notice to Proceed.

1.6 BIDDER QUALIFICATIONS

a. Before the Government will award a contract based on this solicitation, the apparent low bidder shall establish that it is responsible and entitled to award of the contract, by certifying that its dredge meets the appropriate production rate for the dredging region, as listed in the chart in the paragraph entitled "Minimum Production Rate Requirements" located in the Dredging Region Section(s). The dredge must have performed at, or above, the listed production rate for at least 85 percent of the total contract duration, on any contracts that are used to prove plant capability, within three years prior to the bid opening date of this solicitation. Failure to establish the dredge's capability to meet the required production rate will result in a finding of non-responsibility.

b. A bidder may be rejected as non-responsible if it cannot show the necessary capital, experience, or equipment needed to perform the work

W912P823B0026 described under this solicitation (see "Responsible Prospective Contractors" FAR Subpart 9.1). The bidder must also show that the dredge and attendant plant are not already obligated for the performance of other work which would delay commencement, performance, and completion of the solicited work, and must show that delivery of the dredge and attendant plant to the site of work can be made within the time allowed in the specifications.

c. Bidders must register in the System for Award Management (SAM) database in accordance with FAR 52.204-7-OCT 2018.

1.7 PRE-AWARD INSPECTION OF PLANT

a. The apparent low bidder shall make the dredge and attendant plant available for inspection, to determine compliance with these specifications, as soon as practicable after bids are opened, and prior to contract award. If deficiencies are found during the inspection, the bidder will be notified in writing, which may be transmitted by email or facsimile. Upon receipt of such notice, the bidder shall correct all deficiencies at least two calendar days in advance of the projected contract award date.

b. Two calendar days before the projected award date, or upon notification by the bidder that the deficiencies have been corrected, a Government representative will re-inspect the dredge and attendant plant. If at that time the dredge and attendant plant do not meet the requirements of these specifications, the bidder will be rejected as non-responsible.

c. The Government may choose to waive the pre-award inspection if the projected contract award date is less than five calendar days after the bid opening date. Waiver of the pre-award inspection does not relieve the bidder from the requirement to provide a dredge and attendant plant in full compliance with the specifications.

1.8 OPTION ITEMS

a. The Government may require the delivery of, in whole or part, any Option Items. The Government may exercise an Option Item by written notice to the Contractor. If the Government activates the Option Item, the activation will occur while the Contractor's equipment is in the work vicinity as described in the applicable Dredging Region Section(s). If Option Dredging Item work is exercised, it shall be performed as a continuance of Dredging Item work, which shall be activated first.

b. No additional mobilization/demobilization will be paid to the Contractor for Option Item work performed within the work region. The Contractor shall commence performance of optional work no more than three calendar days after the time the Contractor receives the Government's Notice to Proceed with the optional work.

PART 2 PRODUCTS (Not Used) PART 3 EXECUTION (Not Used)

-- End of Section –

0001 Page 12 of 18

FROM:

NAME AND TYPE [ ]

TYPE (walking, carriage, wires): [ ]

DREDGE PUMP, HP CUTTER, HP DIPPER OR BUCKET

OTHER TOTAL SHIFTS PER DAY

AUTHORIZED

DIMENSIONS

> WIDTH OF SWING

> WIDTH OF SWING

C/L STATIONS > WIDTH OF SWING

GMS/liter GMS/liter

TYPE

TYPE

MM TYPE

AMOUNT

AVERAGE WIDTH OF CUT (SWING) FEET

TOTAL ADVANCE THIS PERIOD FEET

TOTAL ADVANCE PREVIOUS TO THIS PERIOD FEET BOOSTER (in line) :

TOTAL ADVANCE TO DATE FEET

TOTAL LENGTH OF DISCHARGE PIPE: *SEE REVERSE SIDE HANDLING PIPE LINES HPL

AVERAGE LIFT FEET HANDLING ANCHOR LINES HAL

AVERAGE PUMP SPEED RPM CLEARING PUMP AND PIPE LINE CPPL

AVERAGE GROSS CY'S DREDGED PER PUMP HOUR CY/HR CLEARING CUTTER OR SUCTION HEAD CCSH

AVERAGE NET CY'S DREDGED PER PUMP HOUR CY/HR WAITING FOR SCOWS WFS

LF/HR TO AND FROM WHARF OR ANCHORAGE TFWA

CHANGING LOCATION OF PLANT ON JOB CLPJ

CUBIC YARDS REMOVED LOSS DUE TO OPPOSING NATURAL ELEMENTS LDNE

LOSS DUE TO PASSING VESSELS WVP

(1) CREDITED (pay place) SHORE LINE AND SHORE WORK SLSW

(2) GROSS (computed amount) WAITING FOR BOOSTER WFB

MINOR OPER. REPAIRS (explain in remarks) MOR

(1) CREDITED (pay place) WAITING FOR ATTENDANT PLANT WAP

(2) GROSS (computed amount) PREPARATION AND MAKING UP TOW PMUT

TRANSFERRING PLANT BETWEEN WORKS TPBW

(1) CREDITED (pay place) LAY TIME OFF SHIFT AND SATURDAYS LTOSS

(2) GROSS (computed amount) SUNDAYS AND HOLIDAYS SH

FIRE DRILL FD

MISCELLANEOUS (explain in remarks) MISC

TOTAL NON-EFFECTIVE WORKING TIME

DREDGE

TENDER #1

TENDER #2

SKIFF

CREW PCT OF TOTAL TIME IN PERIOD

SURVEY

BARGES

CRANE BARGE MAJOR REPAIRS AND ALTERATIONS

IDLER BARGE CESSATION

CUTTER-TYPE COLLISIONS

SPUD LENGTH MISCELLANEOUS (explain in remarks)

NUMBER OF TOTAL LOST TIME

INSPECTIONS PERCENTAGE OF TOTAL TIME

( ) NO

TOTAL TIME IN PERIOD

( ) YES

Version: April 2023 (Signature and Remarks required on reverse side)

DATE OR PERIOD

DREDGE TYPE:

cu. yds. cap.

BUCKET

CUTTERHEAD

DIPPER

DUSTPAN

RANGES - RT, CL, LT

HIRED LABOR

TOTAL NUMBER OF DAYS ON

WHICH WORK WAS DONE:

(not chargeable to cost of work)

GRAIN SIZE

MINIMUM

GAGE LOCATION

MAXIMUM

PROJECT

AND

ASSIGNMENT

DEPTHWIDTH

DUSTPAN SUCTION PIPE JET, HP

RANGES - RT, CL, LT

RANGES - RT, CL, LT

THRU: TO:

inch inside diameter discharge

REPORT NO.

SHOREDREDGE

WORK SCHEDULE

COMPLETION

CHARACTER

OF

MATERIAL

(leave blank if grab samples aren't taken)

(chargeable to cost of work)

CONTRACT OR

ORDER

NUMBER

WEATHER

CONDITION miles

AVERAGE

DEPTH

RIVER

STAGE

MM

NUMBER

BEFORE DREDGING

VISUAL MATERIAL

CLASSIFICATION

CHANNEL

CONDITION

ABSOLUTE DENSITY VOIDS RATIOIN PLACE DENSITY

ITEM

NO. OF TIMES

MVN FORM 4267

AVERAGE LINEAR FOOT PER HOUR

CONTRACT USE

ONLY

TOTAL EFFECTIVE AND NON-EFFECTIVE

ITEM

BY DIV & OCE PERSONNEL

ATTENDANT PLANT

HOURS

(If "YES", explain under remarks on back)

BY DISTRICT PERSONNEL

HAS ANYTHING DEVELOPED WHICH MIGHT LEAD TO A

CHANGE ORDER OR CLAIM?

TIME

NAME OR NUMBER

AMOUNT PREVIOUSLY REPORTED:

TOTAL AMOUNT DREDGED TO DATE:

PCT. OF NON-EFFECTIVE TIME

LOST TIME

REPORTS CONTROL SYMBOL

ENGCW-0-13

DAYS PER WEEK

PROPULSION

REPORT OF OPERATIONS -- PIPELINE, DIPPER OR BUCKET DREDGES

DAILY[ ] [ ] [ ]NEW WORK

MAINTE-

NANCE [ ] [ ] ANNUAL

CHARACTER OF

REPORT

DREDGE

IDLER BARGE USED (Yes/No):

PUMP

DISCHARGE

SIZE

DREDGE ADVANCE MECHANISM

PUMPING OR DREDGING

PCT. OF EFFECTIVE TIME

AFTER DREDGING

VISIBILITY

UNIT QUANTITY

(chargeable to cost of work)

AMOUNT DREDGED THIS PERIOD:

DISTRIBUTION OF TIMEWORK PERFORMED

EFFECTIVE WORKING TIME

NON-EFFECTIVE WORKING TIME

(chargeable to cost of work)

WIND (maximum velocity & direction)

BEFORE DREDGING

CONTRACTOR

AFTER DREDGING

AMOUNT

MINIMUM SOUNDING

OVERDEPTH

NUMBER OF

CREWMEMBERS

TIMETIME

(clear, cloudy, rain, snow, and fog)

LOCATION

(INCLUDE STATIONS

NUMBERS)

Section 35 20 23.23 ATTACHMENT

FLOATING Marsh Trackhoes-30' Skidder Barges

PONTOONS Marsh Trackhoes-60'

Metal Metal Metal Marsh Buggies Breast

PVC PVC PVC Dozers Head

Flexifloat Other Other Front End Loaders Line

TOTAL LF Air Boats Other

ATV's

ELBOWS Stiff Y-Valves

Swivel Spreaders

SHORE DATE DATE TOTAL TOTAL TOTAL VISUAL MATERIAL

CONNECTION START FINISH GROSS CYS CREDITED CYS ACREAGE CLASSIFICATION

100% 70% 35% 0% 0% - MISC (Mob) TOTAL

BASE HRS

OPTION HRS

PREVIOUS HRS

TOTAL HRS

GAL.

GAL.

LBS.

GAL.

NAME: NAME: NAME:

TITLE: TITLE: TITLE:

Version: April 2023

INSIDE DIAMETER OF DISHARGE PIPE, IN

MVN FORM 4267

ANCHORS

DISPOSAL AREA SUMMARY

COORDINATE

TIME BREAKDOWN

TODAY QUANTITY PREVIOUS QUANTITY

OPERATING SUPPLIES

QUANTITY TO DATE

LUBRICANT (oil)

RECOMMENDED BY (Name, title, and signature) APPROVED BY (Name, title, and signature)

REMARKS:

SHORE AMOUNTSUBMERGEDAMOUNT AMOUNT

REMARKS

LUBRICANT (grease)

SUMMARY OF DREDGE DISCHARGE PIPELINE, DISPOSAL AREAS and TIME BREAKDOWN

SUBMITTEDED BY (Name, title, and signature)

ATTENDANT PLANT

DREDGE DISCHARGE PIPELINE DISPOSAL AREA EQUIPMENT ANCHORING SYSTEMS

NAME/LOCATION

FUEL (diesel)

WATER

TOTAL COMBINED

DISCHARGE, LF

Section 35 20 23.23 ATTACHMENT

SECTION 00100 - INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS

SOLICITATION NUMBER: W912P823B0026

NOTE: BIDDERS MAY SUBMIT BIDS BY ONLY ONE METHOD: A) ELECTRONIC COMMERCE (EMAIL) OR BY 2) PHYSICAL SUBMISSION. BIDDERS SHALL LIMIT THE BID SUBMITTAL TO ONE OPTION OR THE OTHER, NOT BOTH.

Electronic Submission of Bids/Proposals (Email):

The New Orleans District utilizes electronic commerce (Email) for receipt of electronic bids under this IFB solicitation.

To submit an electronic commerce (Email) bid please follow these steps:

1. Send an email containing your name, email address and bid/proposal to the following emails associated with the IFB (MUST include all emails):

Melissa.A.Vaughn@usace.army.mil veronica.garner-flint@usace.army.mil

2. ALL BIDS SUBMITTED BY EMAIL MUST CONTAIN THE SOLICITATION NUMBER IN THE SUBJECT LINE.

3. Once the agency receives your bid/proposal at the above email addresses, you will then receive a confirmation email stating your bid/proposal was received. If a bidder does not receive a reply acknowledging receipt electronically from the New Orleans District, it is incumbent upon the bidder to seek confirmation from the issuing Contracting office by phone.

Note: The size limit for incoming emails is 35MB. Any bid/proposal over this size may not be accepted by the server and will constitute the bid not being received timely. Please note that embedded links, URLs, and other html language included may interfere with the USACE server security, which may cause emails to be removed prior to being received by the contracting office. Bidders are advised to refrain from including external links, embedded links, URLs, and other html language not germane to the proposal/bid. Please note it is a bidder’s responsibility, when transmitting its bid electronically, to ensure the receipt of its bid to the proper designee at the proper time. See FAR 14.304(b)(1)(i) regarding untimely electronic bids. Please note, MVN’s computer system firewall may cause a delay in receipt of emails, so be sure to allow ample time for possible delay. If your email would exceed 35MB you can use one of the following methods as a work-around:

Use .zip files as attachments. Combine multiple files into a .zip file to compress file size prior to adding as an email attachment.

Send multiple emails. Label each email with same subject line and indicate number of emails. For example:

Smith Construction W912P823BXXXX (1 of 2) Smith Construction W912P823BXXXX (2 of 2).

Physical Submission of Bids:

Bidders may submit their bids by hand carrying or express mail to the New Orleans District Contracting Office in Room 172. Bidders are advised to allow adequate time to ensure timely submission of its bid. Traffic onto the New Orleans District campus may be delayed by trains blocking the entrance or security either at the gate and/or inside of the building. Express delivery may be utilized but it is incumbent upon the bidder to ensure bid delivery time and date is before the receipt of bid cutoff time. See FAR 14.304(b)(1)(ii) and (c).

Bid Opening:

The Bid Opening is currently scheduled for Thursday, April 20, 2023, at 11:00 am CST. The Contracting Officer and Contract Specialist will begin downloading bids at 10:00 AM CST, which is the bid submission receipt cutoff time. All bids received after 10:00 AM CST on Thursday, April 20, 2023, will be considered late.

Audio Teleconference Bid Opening Information:

W912P823B0026

Instructions as well as any subsequent audio teleconference Bid Opening Information will be provided on SAM.GOV prior to the final closing date of this solicitation. In the event of changes to the solicitation that require a change to the closing date/time, the bid opening Audio Teleconference information will be provided via amendment.

Join from the meeting link https://usace1.webex.com/usace1/j.php?MTID=m65465afbac6c84b75f5dd82133db1470 Join by meeting number Meeting number (access code): 2763 007 3138 Meeting password: Jg2dcNpp3*5

Tap to join from a mobile device (attendees only) +1-844-800-2712,,27630073138## US Toll Free +1-669-234-1177,,27630073138## US Toll

Join by phone +1-669-234-1177 US Toll +1-844-800-2712 US Toll Free

Following the conclusion of the bid opening, in accordance with FAR 14.403(b), abstracts of offers for unclassified acquisitions shall be available for public inspection via SAM.GOV.

W912P823B0026

Davis-Bacon Project Wage Determination

Project Wage Decision Number: 2023-LA-15418 308 2/08/2023 State: Louisiana

County: Statewide

Construction Type: Dredging Agency: U.S. Army Corps of Engineers Contract Number:

W912P823B0026 Project Name: Mississippi River, New Orleans Harbor Cutterhead Dredge Rental No. 1-

2023, OM23031

Description of Work (as clarified):

The work consists of satisfactory removal of material within the limits of the Hopper Dredge Disposal Area (HDDA) Borrow Site and disposal of material within the limits of the restoration areas to the required dimensions. Solicitation number W912P822B0026.

Date of Decision: 2/08/2023 Expires: 08/08/2023

Modification Number: N/A

Classification Hourly Rate Fringe Benefits

Derrick Operator $16.20 $0.00

Dozer Operator $16.20 $0.00

Dredge 16” “and Over

Deckhand $16.20 $0.00

Dredge Tender Operator $16.20 $0.00

Fireman $16.20 $0.00

First Assistant Engineer $16.20 $0.00

Leverman $16.20 $0.00

Oiler $16.20 $0.00

Second Assistant Engineer $16.20 $0.00

W912P823B0026

Shoreman $16.20 $0.00

Third Assistant Engineer $16.20 $0.00

Truck Driver $16.20 $0.00

Welder $16.20 $0.00

Dredge Under 16” “

Deckhand $16.20 $0.00

Dredge Tender Operator $16.20 $0.00

Leverman $16.20 $0.00

Oiler $16.20 $0.00

Welder $16.20 $0.00

Hydraulic Dredging

First Cook $16.20 $0.00

Handyman $16.20 $0.00

Janitor, Cabin Person $16.20 $0.00

Second Cook $16.20 $0.00

Marsh Buggy, Dragline, Oiler. $16.20 $0.00

Marsh Buggy, Dragline, Operator $16.20 $0.00

Self-Propelled Hopper Dredge, Drag

Tender $16.20 $3.45+a

a. FOOTNOTE: Fourteen paid vacation days and eight paid holidays: New Year’s Day, Good Friday, Memorial Day, Independence Day, Labor Day, Veterans’ Day, Thanksgiving Day and Christmas Day provided the employee has one year of service.

This wage determination is specifically for the project listed above. It cannot be used for any other purpose including contracts and or project.

W912P823B0026