W912P823B0006 Am0001.pdf
PDF 8 MB Posted
- Attached to
- Calcasieu River and Pass, Bar Channel Hopper Dredge Contract No. 1-2023, Cameron Parish, LA (OM23125)
- Solicitation number
- W912P823B0006
About this file
This document is an amendment to a solicitation for a hopper dredge contract. The amendment provides updates to specifications for dredging the Calcasieu River Bar Channel and potential addition of dredging the Corpus Christi Entrance Channel in Texas. Key details include replacement of paragraphs in the solicitation related to bidding schedules, contract duration estimates, environmental protection requirements, and dredge plant specifications. The amendment also adds details specifying dredging limits and permitted utilities for the Corpus Christi Entrance Channel. Bids for the contract are due on July 20, 2023 at 11:30 AM CST and may be submitted electronically or in-person. The solicitation is for dredging services to maintain depths in the Calcasieu River Bar Channel and potentially the Corpus Christi Entrance Channel through the use of multiple hopper dredges with capacities ranging from 3,600 to 14,788 cubic yards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P823B0006 Bid Abstract.pdf | ||
| W912P823B0006 Am0002.pdf | ||
| W912P823B0006 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitation is hereby amended as show n on the attached continuation pages.
BID OPENING IS SET FOR THURSDAY, 20 JULY 2023 AT 11:30AM LOCAL TIME. VIRTUAL BID OPENING INSTRUCTIONS ARE INCLUDED IN
THIS AMENDMENT.
1. CONTRACT ID CODE PAGE OF PAGES
1 26
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Jul-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P823B0006
X 9B. DATED (SEE ITEM 11)
20-Mar-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Jul-2023
CODE
CONTRACTING DIV- CHIEF
7400 LEAKE AVENUE, ROOM 172
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
1. DESCRIPTION AND MAGNITUDE OF WORK: The work consists of furnishing one fully crewed and equipped self-propelled trailing suction-type hopper dredge for the removal and satisfactory disposal of shoal material in the Calcasieu River Bar Channel (Cameron, LA) and Corpus Christi Entrance Channel (Nueces, TX). Work may be required in other areas of the New Orleans District, in areas of both the Galveston and Mobile Districts, and in other areas deemed necessary.
2. General Comment: Throughout the specifications, any reports, emails, or phone calls that list Jeff Corbino as a point of contact, the Contractor shall also include Lisa Finn when working in the Galveston District. Her contact information is the following:
Ms. Lisa Finn (Galveston District) Phone: 409-766-3949 Email: Lisa.M.Finn@usace.army.mil
3. Section 00010, paragraph 1.1 “Bidding Schedule”: Delete this section in its entirety and replace with the attached paragraph 1.1 entitled “Bidding Schedule”.
4. Section 00010, paragraph 1.5 “Conditions of Contract Award”, subparagraph c: Delete the Approximate Hopper Dredge Contract Duration table in its entirety and replace with the attached Approximate Hopper Dredge Contract Duration table.
5. Section 00800, paragraph 3.1 “Delivery of Plant”: In the second sentence, delete “mile -1.7 of the Calcasieu River (the seaward end of the rock jetties)” and replace with “Corpus Christi (the seaward end of the rock jetties)”.
6. Section 01 30 00, paragraph 1.14 “E-Verify Program”: Delete this paragraph in its entirety and replace with the attached paragraphs entitled 1.14 “General Security Requirements and Guidance”, 1.15 “Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something)” and 1.16 “Pre-Screen Candidates Using E-Verify Program”.
7. Section 01 57 20.00 10, paragraph 1.5 “Measurement and Payment”: Delete this paragraph in its entirety and replace with the attached paragraph 1.5 entitled “Measurement and Payment”.
8. Section 01 57 20.00 10, paragraph 3.7.1 Pump Operation, subparagraph d: In the last sentence, delete “subparagraph 35 20 23.23-2.1.4.f” and replace with “subparagraph 35 20 23.23-2.1.8.f”.
9. Section 01 57 20.00 10, paragraph 3.9 “Additional Sea Turtle Requirements: Delete this paragraph and replace with the following: “In addition to the reporting requirements listed in paragraph entitled "Sea Turtle Sightings", the Dredging Regions listed within paragraph entitled "Sea Turtle Dredging Regions" shall require sea turtle monitoring personnel and equipment as described in paragraphs entitled "Sea Turtle Monitoring Equipment", "NMFS-Approved Protected Species Observers", "Sea Turtle Reporting", and "Sea Turtle Deflector Requirements". If Option Item "Sea Turtle and Sturgeon Trawling and Relocation" is required by written notice by the Contracting Officer, the dredging regions listed within paragraph entitled "Sea Turtle Dredging Regions" shall require trawling and relocation as described in paragraph entitled "Sea Turtle and Sturgeon Trawling and Relocation".”
10. Section 01 57 20.00 10, paragraph 3.9.2 “NMFS-Approved Protected Species Observer Requirements”, subparagraph c(6): Delete the second to last sentence in its entirety and replace with the following: “Injured sea turtles shall be transported to a rehabilitation facility such as: Marineland at Marineland, Florida; Sea World at Orlando, Florida; the Aquarium of the Americas at New Orleans, SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
mailto:Lisa.M.Finn@usace.army.mil
Louisiana; or contact Texas Marine Mammal Stranding Network at 800-9-MAMMAL for a location in Texas.”
11. Section 01 57 20.00 10, paragraph 3.12 “Sea Turtle and Sturgeon Trawling and Relocation”: Delete “only if the contract clause entitled "Changes" (FAR 52.243-4) is invoked for the sea turtle and sturgeon trawling and relocation requirements” and replace with “only if Option Item “Sea Turtle and Sturgeon Trawling and Relocation” is required by written notice by the Contracting Officer”.
12. Section 01 57 20.00 10, paragraph 3.14 “Primary and Secondary Dredging Regions: Sea Turtle Requirements Table”, Note 3: Delete “and subject to the contract clause entitled "Changes" (FAR 52.243- 4)”.
13. Section 35 01 50.73, paragraph 2.1.1 “Survey Boat”, subparagraph d: Delete “If the Contract clause entitled "Changes" (FAR 52.243-4) is invoked” and replace with “If Option Item “Sea Turtle and Sturgeon Trawling and Relocation” is required by written notice by the Contracting Officer”.
14. Section 35 01 50.73, paragraph 2.1.2 “Fathometer”: In the eighth sentence, delete “and 50-foot” and replace “50, 60 and 70-foot”.
15. Section 35 01 50.73, paragraph 2.1.2.1 “Calibration”: In the second sentence, delete “and 40” and replace “40, 50, 60 and 70”.
16. Section 35 20 23.23, paragraph 1.4.5 “Distribution of Reports: Add the following to subparagraph a:
When working in the Corpus Christi Entrance Channel, the Contractor shall also send one copy of the reports to the following Galveston District point of contact:
US Army Corps of Engineers, Galveston District Southern Area Office ATTN: Mr. Andrew Smith, P.E.
1920 North Chaparral St.
Corpus Christi, TX 78401 Andrew.N.Smith@usace.army.mil
17. Section 35 20 23.23, paragraph 2.1.3 “Depthsounders”: In the sixth sentence, delete “40” and replace with “70”.
18. Section 35 20 23.23, paragraph 2.1.8 “Dredge Plant”, subparagraph b: Delete the Theoretical Hopper Dredge Production Rates (cy/day) table and replace with the attached Theoretical Hopper Dredge Production Rates (cy/day) table.
19. Section 35 20 23.23, paragraph 2.1.8 “Dredge Plant”, subparagraph c: In the first sentence, delete “55 feet” and replace with “61 feet”.
20. Section 35 20 23.23, paragraph 2.1.8 “Dredge Plant”, subparagraph f: In the first sentence, delete “Calcasieu River Bar Channel” and replace with “Calcasieu River Bar Channel and Corpus Christi Entrance Channel”.
21. Section 35 20 23.23, paragraph 3.3 “Primary Dredging Region”: Add the following as paragraph 3.3.2 entitled “Corpus Christi Entrance Channel, Texas”:
3.3.2 Corpus Christi Entrance Channel, Texas
The authorized dimensions of the Corpus Christi Ship Channel are -56 feet Mean Lower Low Water (MLLW) by 700 feet wide for stations -33+000 to -6+000 and -54 feet MLLW with varying width for stations -6+000 to 7+000. See the attached Corpus Christi Ship Channel Plates at the end of this section.
Disposal Area for Corpus:
Latitude Longitude NAD 83 State Plane Grid X Y
27° 46' 18.1076" North 97° 01' 12.9542" West 1462758.115 17172150.598 27° 47' 43.1034" North 97° 00' 12.9541" West 1468045.660 17180797.276 27° 47' 16.1045" North 96° 59' 25.9531" West 1472299.108 17178121.107 27° 45' 50.1090" North 97° 00' 25.9533" West 1467013.271 17169372.946
22. Section 35 20 23.23, paragraph 3.6 “Working in the Vicinity of Structures and Utility Crossings”, subparagraph b: Delete “Louisiana One Call” and replace with “Louisiana/Texas One Call”.
23. Section 35 20 23.23, paragraph 3.10 “List of Utilities”: Add the following as paragraph 3.10.2 entitled “Corpus Christi Entrance Channel”.
3.10.2 Corpus Christi Entrance Channel
Approximate Station
Permit No.
Description Owner Point of Contact
7+082.845 7757 One 20-inch pipeline
Water District
Tim Templeton Ttempleton@Ncwcid4.org
361-205-5388 1812 State Highway 361 Suite F
Port Aransas, TX 78373
7+116.754 8135 One 8-inch Conduit
Central Power and
Light
Teresa Trotman Ttrotman@Aep.com
214-777-1091 1201 Elm Street, Suite 4100
Dallas, Tx 75270
24. Section 35 20 23.23 Attachment: Add the attached plates 1 thru 6 titled “Corpus Christi Ship Channel, Texas, Corpus Christi Entrance Channel Hopper Dredging”.
25. Section 35 20 23.26, paragraph 3.2.1 “Computer Requirements”: In the first sentence of the second paragraph, delete “Windows 7” and replace with “Windows 10 or newer".
mailto:Ttempleton@Ncwcid4.org mailto:Ttrotman@Aep.com
BID SUBMISSION INSTRUCTIONS
NOTE: BIDDERS MAY SUBMIT BIDS BY ONLY ONE METHOD: A) ELECTRONIC COMMERCE (EMAIL) OR BY
2) PHYSICAL SUBMISSION. BIDDERS SHALL LIMIT THE BID SUBMITTAL TO ONE OPTION OR THE OTHER, NOT BOTH.
Electronic Submission of Bids (Email):
The New Orleans District utilizes electronic commerce (Email) for receipt of electronic bids under this IFB solicitation. To submit an electronic commerce (Email) bid please follow these steps:
1. Send an email containing your name, email address and bid/proposal to the following emails associated with the IFB (MUST include all emails):
• lauren.a.gandolfi@USACE.ARMY.MIL
• charles.r.zammit@USACE.ARMY.MIL
2. ALL BIDS SUBMITTED BY EMAIL MUST CONTAIN THE SOLICITATION NUMBER IN THE SUBJECT
LINE.
3. Once the agency receives your bid at the above email addresses, you will then receive a confirmation email stating your bid was received. If a bidder does not receive a reply acknowledging receipt electronically from the New Orleans District, it is incumbent upon the bidder to seek confirmation from the issuing Contracting office by phone.
Note: The size limit for incoming emails is 35MB. Any bid over this size may not be accepted by the server and will constitute the bid not being received timely. Please note that embedded links, URLs, and other html language included may interfere with the USACE server security, which may cause emails to be removed prior to being received by the contracting office. Bidders are advised to refrain from including external links, embedded links, URLs, and other html language not germane to the bid. Please note it is a bidder’s responsibility, when transmitting its bid electronically, to ensure the receipt of its bid to the proper designee at the proper time. See FAR 14.304(b)(1)(i) regarding untimely electronic bids. Please note, MVN’s computer system firewall may cause a delay in receipt of emails, so be sure to allow ample time for possible delay. If your email would exceed 35MB you can use one of the following methods as a work-around:
• Use .zip files as attachments. Combine multiple files into a .zip file to compress file size prior to adding as an email attachment.
• Send multiple emails. Label each email with same subject line and indicate number of emails.
For example: Smith Construction W912P823BXXXX (1 of 2) Smith Construction W912P823BXXXX (2 of 2).
mailto:lauren.a.gandolfi@USACE.ARMY.MIL mailto:charles.r.zammit@USACE.ARMY.MIL
Physical Submission of Bids:
Bidders may submit their bids by hand carrying or express mail to the New Orleans District Contracting Office in Room 172. Bidders are advised to allow adequate time to ensure timely submission of its bid.
Traffic onto the New Orleans District campus may be delayed by trains blocking the entrance or security either at the gate and/or inside of the building. Express delivery may be utilized but it is incumbent upon the bidder to ensure bid delivery time and date is before the receipt of bid cutoff time. See FAR 14.304(b)(1)(ii) and (c).
In accordance with current Security procedures at the District, any bidder hand carrying bids must notify the contract specialist and contracting officer no later than the day before the bid opening via email that they intend to submit their bid in person. Security will be notified of the expected time of the visit. For this bid opening, please notify:
• lauren.a.gandolfi@USACE.ARMY.MIL
• charles.r.zammit@USACE.ARMY.MIL
Bid Opening:
The Bid Opening is currently scheduled for Thursday, July 20, 2023, at 11:30 AM CST. The Contracting Officer and Contract Specialist will begin downloading bids at 10:30 AM CST, which is the bid submission receipt cutoff time. All bids received after 10:30 AM CST on Thursday, 20 July, 2023, will be considered late.
Audio Teleconference Bid Opening Information:
The audio teleconference number for the bid opening at 11:30 AM CST is:
1-844-800-2712
Attendee Code: 43382870 https://usace1.webex.com/meet/jeffrey.j.waguespack
Following the conclusion of the bid opening, in accordance with FAR 14.403(b), abstracts of offers for unclassified acquisitions shall be available for public inspection via SAM.GOV.
mailto:lauren.a.gandolfi@USACE.ARMY.MIL mailto:charles.r.zammit@USACE.ARMY.MIL https://usace1.webex.com/meet/jeffrey.j.waguespack
Section 00010, Paragraph 1.1 �Bidding Schedules�:
1.1 BIDDING SCHEDULES
SECTION 00010 � BIDDING SCHEDULE
CALCASIEU RIVER AND PASS, BAR CHANNEL
HOPPER DREDGE CONTRACT NO. 1-2023
CAMERON PARISH, LOUISIANA
SOLICITATION NO. W912P823B0006
LOT ONE (Ellis Island), 34 inch Inside Diameter (ID) Pump Suction, 14,788 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant
Bid Item Description Estimated
Quantity Unit Unit Price
Total Price
Mobilization & Demobilization 1 Job
0002 Dredging 527 Hour
Option 0003 Option Dredging 527 Hour XXXXXXXX
Option
Sea Turtle and Sturgeon Trawling and Relocation 53 Day
Option
Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation
1 Job
Total: LOT ONE BID
*SEE BID FORM NOTES
SECTION 00010 � BIDDING SCHEDULE
CALCASIEU RIVER AND PASS, BAR CHANNEL
HOPPER DREDGE CONTRACT NO. 1-2023
CAMERON PARISH, LOUISIANA
SOLICITATION NO. W912P823B0006
LOT TWO (Glenn Edwards), 38 inch Inside Diameter (ID) Pump Suction, 12,430 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant
Bid Item Description Estimated
Quantity Unit Unit Price
Total Price
0001 Mobilization & Demobilization 1 Job
0002 Dredging 544 Hour
Option 0003 Option Dredging 544 Hour XXXXXXXX
Option
Sea Turtle and Sturgeon Trawling and Relocation
55 Day
Option
Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation
1 Job
Total: LOT TWO BID
HOPPER DREDGE CONTRACT NO. 1-2023
CAMERON PARISH, LOUISIANA
SOLICITATION NO. W912P823B0006
LOT THREE (Stuyvesant), 33.5 inch Inside Diameter (ID) Pump Suction, 9,400 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant
Bid Item Description Estimated
Quantity Unit Unit Price
Total Price
0001 Mobilization & Demobilization 1 Job
0002 Dredging 716 Hour
Option 0003 Option Dredging 716 Hour XXXXXXXX
Option
Sea Turtle and Sturgeon Trawling and Relocation
73 Day
Option
Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation
1 Job
Total: LOT THREE BID
HOPPER DREDGE CONTRACT NO. 1-2023
CAMERON PARISH, LOUISIANA
SOLICITATION NO. W912P823B0006
LOT FOUR (Magdalen), 39.37 inch Inside Diameter (ID) Pump Suction, 8,300 cubic yard Nominal Hopper Capacity, One Dragarm and all attendant plant
Bid Item Description Estimated
Quantity Unit Unit Price
Total Price
Mobilization & Demobilization 1 Job
0002 Dredging 953 Hour
Option 0003 Option Dredging 953 Hour XXXXXXXX
Option
Sea Turtle and Sturgeon Trawling and Relocation 96 Day
Option
Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation
1 Job
Total: LOT FOUR BID
HOPPER DREDGE CONTRACT NO. 1-2023
CAMERON PARISH, LOUISIANA
SOLICITATION NO. W912P823B0006
LOT FIVE (Liberty Island), 31.5 in. Inside Diameter (ID) Pump Suction, 6,540 cubic yard Nominal Hopper Capacity, 2 Dragarms and all attendant plant
Bid Item Description Estimated
Quantity Unit Unit Price
Total Price
0001 Mobilization & Demobilization 1 Job
0002 Dredging 968 Hour
Option 0003 Option Dredging 968 Hour XXXXXXXX
Option
Sea Turtle and Sturgeon Trawling and Relocation
98 Day
Option
Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation
1 Job
Total: LOT FIVE BID
LOT SIX (Bayport), 30 in. Inside Diameter (ID) Pump Suction, 4,815 cubic yard Nominal Hopper Capacity, 2 Dragarms and all attendant plant
Bid Item Description Estimated
Quantity Unit Unit Price
Total Price
Mobilization & Demobilization 1 Job
0002 Dredging 959 Hour
Option 0003 Option Dredging 959 Hour XXXXXXXX
Option
Sea Turtle and Sturgeon Trawling and Relocation 97 Day
Option
Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation
1 Job
Total: LOT SIX BID
HOPPER DREDGE CONTRACT NO. 1-2023
CAMERON PARISH, LOUISIANA
SOLICITATION NO. W912P823B0006
LOT SEVEN (BE Lindholm), 28 in. Inside Diameter (ID) Pump Suction, 4,000 cubic yard Nominal Hopper Capacity, 2 Dragarms and all attendant plant
Bid Item Description Estimated
Quantity Unit Unit Price
Total Price
Mobilization & Demobilization 1 Job
0002 Dredging 1015 Hour
Option 0003 Option Dredging 1015 Hour XXXXXXXX
Option
Sea Turtle and Sturgeon Trawling and Relocation 102 Day
Option
Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation
1 Job
Total: LOT SEVEN BID
LOT EIGHT (Padre Island, Dodge Island), 27 in. Inside Diameter (ID) Pump Suction, 3,600 cubic yard Nominal Hopper Capacity, 2 Dragarms and all attendant plant
Quantity Unit Unit Price
Total Price
0001 Mobilization & Demobilization 1 Job
0002 Dredging 1109 Hour
Option 0003 Option Dredging 1109 Hour XXXXXXXX
Option
Sea Turtle and Sturgeon Trawling and Relocation
112 Day
Option
Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation
1 Job
Total: LOT EIGHT BID
HOPPER DREDGE CONTRACT NO. 1-2023
CAMERON PARISH, LOUISIANA
SOLICITATION NO. W912P823B0006
LOT NINE (Newport), 26 in. Inside Diameter (ID) Pump Suction, 4,000 cubic yard Nominal Hopper Capacity, 2 Dragarms and all attendant plant
Bid Item Description Estimated
Quantity Unit Unit Price
Total Price
Mobilization & Demobilization 1 Job
0002 Dredging 1306 Hour
Option 0003 Option Dredging 1306 Hour XXXXXXXX
Option
Sea Turtle and Sturgeon Trawling and Relocation 132 Day
Option
Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation
1 Job
Total: LOT NINE BID
LOT TEN (RN Weeks), 27 in. Inside Diameter (ID) Pump Suction, 3,700 cy Nominal Hopper Capacity, 2 Dragarms and all attendant plant
Quantity Unit Unit Price
Total Price
Mobilization & Demobilization 1 Job
0002 Dredging 1359 Hour
Option 0003 Option Dredging 1359 Hour XXXXXXXX
Option
Sea Turtle and Sturgeon Trawling and Relocation 138 Day
Option
Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation
1 Job
Total: LOT TEN BID
Section 00010, paragraph 1.5 �Conditions of Contract Award�, subparagraph c -- Approximate Hopper Dredge Contract Duration table:
APPROXIMATE HOPPER DREDGE
CONTRACT DURATION
Lot
Pump Inside Diameter (inches)
Hopper Size (Cubic Yards)
Number of
Dragarms
Approximate Number of
Contract Days for Item 0002
Approximate Number of
Contract Days for Option Item 0003
1 34.0 14788 2 44 44
2 38.0 12430 2 45 45
3 33.5 9400 2 53 53
4 39.37 8300 1 64 64
5 31.5 6540 2 65 65
6 30.0 4815 2 64 64
7 28.0 4000 2 67 67
8 27.0 3600 2 71 71
9 26.0 4000 2 80 80
10 27.0 3700 2 83 83
Section 01 30 00, paragraphs 1.14 �General Security Requirements and Guidance�, 1.15 �Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something)� and 1.16 �Pre-Screen Candidates Using E-Verify Program�:
1.14 GENERAL SECURITY REQUIREMENTS AND GUIDANCE
The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as "RAMs"), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
1.15 SUSPICIOUS ACTIVITY REPORTING TRAINING (E.G. IWATCH, CORPSWATCH, OR SEE
SOMETHING, SAY SOMETHING)
All contract personnel shall receive initial and annual refresher training from a Government representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior and guidance on reporting suspicious activity to the project manager, security representative, or law enforcement entity
1.16 PRE-SCREEN CANDIDATES USING E-VERIFYPROGRAM
Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements.
Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
Section 01 57 20.00 10, paragraph 1.5 �Measurement and Payment�:
1.5. MEASUREMENT AND PAYMENT
1.5.1 Dredging Item and Option Dredging Item
For both Primary Dredging Regions, environmental protection requirements, sea turtle monitoring/protection equipment, and NMFS-Approved Protected Species Observers (including accommodations and meals for NMFS-approved protected species observers, transportation of injured sea turtles and transportation of NMFS-approved protected species observers) will not be measured. All costs for environmental protection requirements, sea turtle monitoring/protection equipment, and NMFS- Approved Protected Species Observers shall be included in the contract unit price per hour in the "Dredging" and "Option Dredging" items on the bidding schedule.
1.5.2 Option Item: Sea Turtle and Sturgeon Trawling and Relocation
All costs for sea turtle and sturgeon trawling and relocation (including all costs for furnishing labor, equipment, fuel, oil, materials, supplies, etc) shall be included in the contract unit price per day in the "Sea Turtle and Sturgeon Trawling and Relocation" option item on the bidding schedule. Price and payment shall constitute full compensation for "Sea Turtle and Sturgeon Trawling and Relocation". Sea Turtle and Sturgeon trawling and relocation will be measured by the day. A day is defined as a 24-hour period beginning at 0000 hours and ending at 2400 hours of continuous trawling and relocation. Sea turtle and sturgeon trawling and relocation shall be performed as described in the paragraph entitled "Sea Turtle and Sturgeon Trawling and Relocation". No payment will be made for sea turtle and sturgeon trawling and relocation when the trawler's net tears, when trawling equipment breakdown is such that the trawler cannot operate as required, or when the trawler cannot operate due to weather. Payment will resume when trawling operations recommence. Within 72 hours after receiving written direction from the Contracting Officer to begin trawling, the Contractor shall commence trawling for sea turtles to relocate them from the channel area. If an additional hopper dredge or dredges is approved for simultaneous work on the contract as specified in Section 35 20 23.23, paragraph entitled "Addition of Plant", then the Contracting Officer will make the determination if an additional trawler is needed for each hopper dredge being used.
1.5.3 Option Item: Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation
"Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation" will not be measured. All costs for mobilization and demobilization for sea turtle and sturgeon trawling and relocation (including all costs for furnishing labor, equipment, fuel, oil, materials, supplies, etc) shall be included in the contract job price in the "Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation" option item on the bidding schedule. Price and payment shall constitute full compensation for "Mobilization and Demobilization of Sea Turtle and Sturgeon Trawling and Relocation".
Section 35 20 23.23, paragraph 2.1.8 �Dredge Plant�, subparagraph b � Theoretical Hopper Dredge Production Rates (cy/day) table:
THEORETICAL HOPPER DREDGE PRODUCTION RATES (cy/day)
Bid Lot
Pump Inside Diameter (inches)
Hopper Size (cubic yards)
Number of
Dragarms
Dredge & Haul
Production All
Projects
Agitation Production
SW Pass (cy/day)
Calcasieu (cy/day)
1 34.0 14,788 2 89,638 219,124 246,514
2 38.0 12,430 2 85,383 217,037 244,166
3 33.5 9,400 2 64,729 164,890 185,502
4 39.37 8,300 1 49,677 121,028 136,157
5 31.5 6,540 2 46,978 125,107 140,746
6 30.0 4,815 2 45,029 135,530 152,471
7 28.0 4,000 2 41,663 131,994 148,493
8 27.0 3,600 2 36,435 130,153 146,422
9 26.0 4,000 2 34,095 95,227 107,129
10 27.0 3,700 2 32,476 92,724 104,314