About this file

The solicitation requests proposals for a Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract, No. 1-2022. The scope of work involves furnishing a fully crewed and self-propelled trailing suction hopper dredge to perform work in the Mississippi River Southwest Pass and potentially other areas of the New Orleans, Galveston, and Mobile Districts. Offerors must propose dredging services with dredges ranging in pump size from 34 to 39 inches and hopper capacities of 6,300 to 14,788 cubic yards. The estimated value of the contract is between $10-25 million. The original solicitation was to be issued on December 10, 2021, with amendments to establish the revised bid opening date of July 14, 2022. The NAICS code is 237990. Interested parties can find additional details on www.sam.gov under solicitation number W912P822B0004.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OM22001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered Solicitation for Mississippi River Baton Rouge to Gulf of Mexico Southw est Pass Hopper Dredge Contract No. 1-2022 (OM22001) has been amended to:

1. Make Changes to the Solicitation as detailed in the follow ing pages

2. Set Bid Opening Date for Thursday, July 14, 2022 at 11:00am

1. CONTRACT ID CODE PAGE OF PAGES

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Jun-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P822B0004

X 9B. DATED (SEE ITEM 11)

10-Dec-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jun-2022

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P822B0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - INSTRUCTIONS TO BIDDERS

The following have been added by full text:

AMENDMENT 0001

1. Page 2, “Description and Magnitude of Work”: Delete the second sentence and replace with the following: “Work will be performed in Mississippi River Southwest Pass and possibly in other areas of the New Orleans District and in areas of both the Galveston and Mobile District.”

2. Standard Form 1442, box 11: Delete “within 5 calendar days” and replace with “no earlier than 1 February 2023 and no later than 28 February 2023”.

3. Section 00010, paragraph 1.1 “Bidding Schedules”: Delete this section (Lot One thru Lot Eleven) and replace with the attached Bidding Schedules (Lot One thru Lot Five).

4. Section 00010, paragraph 1.5 “Conditions of Contract Award”, subparagraph c: In the second sentence, delete “no later than 120 hours after issuance of Notice to Proceed” and replace with “no earlier than 1 February 2023 and no later than 28 February 2023”. Also, delete the Approximate Hopper Dredge Contract Duration table in its entirety and replace with the attached “Approximate Hopper Dredge Contract Duration Table”.

5. Section 00010, paragraph 1.5 “Conditions of Contract Award”, subparagraph d: In the last sentence, delete “within 120 hours after issuance of Notice to Proceed” and replace with “no earlier than 1 February 2023 and no later than 28 February 2023”.

6. Section 00700, Clause 52.211-10 Commencement, Prosecution, and Completion of Work, subparagraph a: Delete “within 5 calendar days after the date the Contractor receives the notice to proceed” and replace with “no earlier than 1 February 2023 and no later than 28 February 2023”.

7. Section 00800, paragraph 3.1 “Delivery of Plant”, subparagraph a: Delete “within 120 hours after issuance of the Notice to Proceed” and replace with “no earlier than 1 February 2023 and no later than 28 February 2023”.

8. Section 00800, paragraph 3.4 “Construction and Architect-Engineer (A-E) Contracts: Delete the current paragraph in its entirety and replace with the following:

3.4 CONSTRUCTION AND ARCHITECT-ENGINEER (A-E) CONTRACTS (UAI

5131.105)

(d)(2)(i)(B) In accordance with FAR 31.105(d)(2)(i)(b), for the predetermined schedule of construction equipment use rates, use Engineer Pamphlet (EP) 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule.

(End of special contract requirement)

Note 1: Costs for repairs or overhauling are not allowed.

Note 2: A copy of the "EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE" (Region III) can be obtained from the following website:

https://www.publications.usace.army.mil/Portals/76/Users/182/86/2486/EP%201110-1- 8_RV1-12.pdf?ver=x6psY-gBPGg5dSOqQdjEMg%3d%3d

9. Section 01 30 00, paragraph 1.12 “As-built Drawings”, subparagraph b and c: Delete in their entirety and replace with the following:

b. A Dredging Summary sheet that shall include the following (at a minimum): regions dredged, dredge name, dates dredged per each dredging region, yardage per each dredging region, disposal type per each dredging region (include amount of loads and yardage for each disposal). If multiple dredges were used, the information shall include what each dredge dredged by date, yardage in each dredging region and disposal type per dredging region (include amount of loads and yardage for each disposal).

c. A Utility Summary sheet that shall list every utility (for both the dredging channel and disposal areas). For every utility, the following verified information shall be provided:

C/L station, C/L XY-coordinate, right descending bank toe XY-coordinate, left descending bank toe XY-coordinate, minimum elevation, all horizontal information required to determine actual alignments of all utilities, utility size, utility type and POC information. In the notes column, state whether the utilities were dredged over or disposed on. A sample Utility Summary sheet is included at the end of this section. The Contractor shall also submit a copy of all as-builts, surveys, etc. received from the owner.

10. Section 01 30 00: Add the attached sample Utility Summary sheet to the end of this section.

11. Section 01 45 00.15 10, paragraph 1.4 “System Requirements”: For the Connection to the Internet, delete “minimum of 4 Mbs per user” and replace with “minimum 10 Mbs per user”.

For the MS Windows, delete “Windows 7 x 64 bit (RMS requires 64 bit O/S) or newer (REQUIRED)” and replace with “Windows 10, Windows 8 64-bit (RMS requires 64-bit O/S) or newer (REQUIRED)”.

12. Section 35 20 23.23, paragraph 1.5 “Dredge and Attendant Plant Data Sheet”: Add the following sentence to the end of the paragraph: “The Contractor shall submit the request timely in order to provide the Government at least 14 calendar days to review the request and complete all necessary paperwork.”

13. Section 35 20 23.23, paragraph 2.1.4 “Dredge Plant”, subparagraph b: Delete the Theoretical

Hopper Dredge Production Rates (cy/day) table in its entirety and replace with the attached “Theoretical Hopper Dredge Production Rates (cy/day) Table”.

14. Section 35 30 23.23, paragraph 3.10.1 “Mississippi River & Southwest Pass”: Delete the current utility list of utilities and replace with the attached “List of Utilities - Mississippi River & Southwest Pass”.

Section 00010 -- “Bidding Schedules” (Lot One thru Lot Five):

1.1 BIDDING SCHEDULES

SECTION 00010 – BIDDING SCHEDULE

MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO, SOUTHWEST PASS

HOPPER DREDGE CONTRACT NO. 1-2022

PLAQUEMINES PARISH, LOUISIANA

SOLICITATION NO. W912P822B0004

LOT ONE (Ellis Island), 34 inch Inside Diameter (ID) Pump Suction, 14,788 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant

Bid Item Description

Estimated Quantity Unit

Unit Price

Total Price

Mobilization & Demobilization 1 Job

0002 Dredging 2070 Hour

Option

Option Dredging 2070 Hour XXXXXXXX

Total: LOT ONE BID

*SEE BID FORM NOTES

SECTION 00010 – BIDDING SCHEDULE

MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO, SOUTHWEST PASS

HOPPER DREDGE CONTRACT NO. 1-2022

PLAQUEMINES PARISH, LOUISIANA

SOLICITATION NO. W912P822B0004

LOT TWO (Glenn Edwards), 38 inch Inside Diameter (ID) Pump Suction, 12,430 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant

Bid Item Description

Estimated Quantity Unit

Unit Price

Total Price

Mobilization & Demobilization 1 Job

0002 Dredging 2160 Hour

Option

Option Dredging 2160 Hour XXXXXXXX

Total: LOT TWO BID

LOT THREE (Stuyvesant), 33.5 inch Inside Diameter (ID) Pump Suction, 9,400 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant

Estimated Quantity Unit

Unit Price

Total Price

Mobilization & Demobilization 1 Job

0002 Dredging 2849 Hour

Option

Option Dredging 2849 Hour XXXXXXXX

Total: LOT THREE BID

LOT FOUR (Terrapin Island), 33.5 inch Inside Diameter (ID) Pump Suction, 6,300 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant

Item

Description Estimated Quantity

Unit Unit Price

Total Price

0001 Mobilization & Demobilization

1 Job

0002 Dredging 3481 Hour

Option

Option Dredging 3481 Hour XXXXXXXX

Total: LOT FOUR BID

LOT FIVE (Magdalen), 39.37 inch Inside Diameter (ID) Pump Suction, 8,300 cubic yard Nominal Hopper Capacity, One Dragarm and all attendant plant

Estimated Quantity Unit

Unit Price

Total Price

Mobilization & Demobilization 1 Job

0002 Dredging 3736 Hour

Option

Option Dredging 3736 Hour XXXXXXXX

Total: LOT FIVE BID

Section 00010 -- “Approximate Hopper Dredge Contract Duration Table”:

APPROXIMATE HOPPER DREDGE

CONTRACT DURATION

Bid Lot

Pump Inside Diameter (inches)

Hopper Size (Cubic Yards)

Number of

Dragarms

Approximate Number of

Days for Item

Approximate Number of

Days for Option Item 0003

1 34 14788 2 115 115

2 38 12430 2 119 119

3 33.5 9400 2 151 151

4 33.5 6300 2 180 180

5 39.37 8300 1 191 191

Date submitted:

C/L Station/Mile # C/L

X, Y Coordinate RDB Toe

X, Y Coordinate LDB Toe

X, Y Coordinate Minimum Elevation

Size of Utility

Type of Utility

Owner Name Owner Point of Contacts

(email address, phone number, and physical address) Notes:

Utility Summary

Dredging Region:

Note: The Contractor shall fill out one sheet for each dredging region.

Section 01 30 00 -- “Utility Summary”:

Section 35 20 23.23 -- “Theoretical Hopper Dredge Production Rates (cy/day) Table”:

THEORETICAL HOPPER DREDGE PRODUCTION RATES (cy/day)

Bid Lot

Pump Inside Diameter (inches)

Hopper Size

(cubic yards)

Number of

Dragarms

Dredge & Haul

Production All

Projects

Agitation Production

SW Pass (cy/day)

Calcasieu (cy/day)

1 34.0 14,788 2 89,638 219,124 246,514

2 38.0 12,430 2 85,383 217,037 244,166

3 33.5 9,400 2 64,729 164,890 185,502

4 33.5 6,300 2 51,286 167,856 188,838

5 39.37 8,300 1 49,677 121,028 136,157

3.10 LIST OF UTILITIES

3.10.1 Mississippi River & Southwest Pass

Utility Dia.

(inches)

Approximate Station and/or Mile

Approximate Elevation (feet) MLLW

Owner and Telephone Number

(2) 10" Gas Pipelines (Inactive)

11.7 AHP Unknown Gulf South

520 Alliance St Kenner, LA 70062

Gerald Roser Gerald.Roser@bwpipelines.com

Harold Sylve 504-415-1864

Harold.Sylve@bwpipelines.com

(2) 12" Pipelines (Abandoned)

11.6 AHP Unknown Noble Energy

C/O Chevron Pipe Line Company Attn: Land Manager

1400 Smith St, Room 38114 Houston, TX 77002-7327

Steven Fontana 985-791-9150

SFontana@chevron.com

Thomas August 713-372-9657

Thomas.August@chevron.com

Nicholas Angelle 713-372-3026, 281-382-1672 nicholasangelle@chevron.com

Submerged cable

11.3 AHP Unknown Entergy

Thanh Tran 504-365-2925

Ttran1@entergy.com

Section 35 20 23.23 -- “List of Utilities - Mississippi River & Southwest Pass”:

Utility Dia.

(inches)

Approximate Station and/or Mile

Approximate Elevation (feet) MLLW

Owner and Telephone Number

10" Oil Pipeline (partially removed)

9.9 AHP Unknown Chevron Pipe Line Company

Attn: Land Manager

1400 Smith St, Room 38114 Houston, TX 77002-7327

Steven Fontana 985-791-9150

SFontana@chevron.com

Thomas August 713-372-9657

Thomas.August@chevron.com

Nicholas Angelle 713-372-3026, 281-382-1672 nicholasangelle@chevron.com

(2) 24" Gas Pipelines

7.2 AHP Unknown Enbridge

4088 Hwy 56

Houma, LA 70363

Jerome Snyder 985-876-6851, 985-209-9012 Jerome.Snyder@enbridge.com

10.75" Pipeline (Idle)

7.1 AHP Unknown Chevron Pipe Line Company

(see above)

10" Pipeline

(Abandoned)

7.0 AHP Unknown Chevron Pipe Line Company

(see above)

8" Pipeline 7.0 AHP Unknown Chevron Pipe Line Company (see above)

6-5/8" Gas Pipeline

162+32

1.9 BHP

Unknown Promethean Decommissioning Co.

16340 Park Ten Place Ste 130

Houston, TX 77084

Clint Boman 936-697-3651 clint.boman@promethean-decom.com

Steve Louis 281-410-5693 steve.louis@promethean-decom.com

Utility Dia.

(inches)

Approximate Station and/or Mile

Approximate Elevation (feet) MLLW

Owner and Telephone Number

20" Gas Pipeline

302+65

4.5 BHP

-83.5 ft. Kinetica Partners, LLC 224 Aviation Road Houma, LA 70363

Chris Cantrelle 985-223-6125, 985-665-0989

Chris.Cantrelle@kineticallc.com

4", 6", & 8" Oil and

Gas Pipeline Bundle

318+96

4.8 BHP

-90.5 ft. Texas Petroleum Investment Company

101 La Rue France, Suite 406 Lafayette, LA 70508

Chris Sanfilippo 337-232-1702, 337-577-8465 csanfilippo@txpetinv.com

Jeff Meaux 337-577-3992 jmeaux@txpetinv.com

(2) 16" Outflow Lines

(Abandoned)

8.0 BHP Unknown Whitney Oil & Gas, LLC

920 Memorial City Way, Suite 200

Houston, TX 77024

Maria Gomez 832-786-7164 mgomez@whitneyoilco.com

Kyle Bordelon 832-786-7169 kbordelon@whitneyoilco.com

Russell Steiner 832-786-7163

Rsteiner@whitneyoilco.com

8" Oil Pipeline

534+13

8.9 BHP

-93.5 ft. Harvest Pipeline

Mark Bordelon 337-422-1343 mbordelon@harvestmidstream.com

36" Gas Pipeline

680+20

11.7 BHP

-81.5 ft. Kinetica Partners, LLC (see above)

INSTRUCTION TO

BIDDERS

Due to the response for COVID-19, most federal employees have been mandated to telework, and currently only authorized personnel are allowed access to the District buildings throughout USACE. As a result, we have implemented the below procedures for all current and future bid openings, until such restrictions have been lifted and normal access has resumed at the MVN HQ Building.

Electronic Submission of Bids:

MVN will utilize mail for receipt of electronic bids under IFB Solicitations. In order to submit an electronic bid please follow these steps:

Send an email containing your name, email address and proposal to the following Contracting Officer and Contract Specialist associated with the IFB:

Contracting Officer – Ms. Veronica Garner-Flint email: Veronica.Garner- Flint@usace.army.mil

Contract Specialist – Ms. Cori Caimi, email: Cori.A.Caimi@usace.army.mil

Once the Contracting Officer or Contract Specialist receives your Proposal, you will then receive a confirmation email stating your Proposal was received.

The Bid Opening is currently scheduled for Thursday, July 14, 2022 at 11:30am CST. The Contracting Officer and Contract Specialist will begin downloading bids at 11:00 AM CST, which is the bid receipt cutoff time. All bids received after 11:00 AM CST on Thursday, July 14, 2022 will be considered late.

Audio Teleconference Bid Opening Information:

Bid Opening will be held on Tuesday, Thursday, July 14, 2022 at 11:30 AM CST. Please use the following call-in information to attend the meeting:

TBA

Following the conclusion of the bid opening, the Bid Abstract will be uploaded to SAM website under this solicitation, within 24 hours.

SECTION SF 30 - SF 30 CONTINUATION

The required response date/time 14-Jul-2022 11:00 AM has been added.

The number of offeror copies required has increased by 1 from 0 to 1.

(End of Summary of Changes)