A21_W912P821R0028_Am_00001.pdf
PDF 2 MB Posted
- Attached to
- Operations Division Rock Supply
- Solicitation number
- W912P821R0028
About this file
This document is an amendment to a solicitation for Operations Division Rock Supply. The amendment revises the scope of work to require the supply of approximately 2 loaded barges of Grade B stone to Schooner Bayou Control Structure, 3 loaded barges to Freshwater Bayou Lock, and approximately 10 loaded barges to Catfish Point Control Structure. Barges must not exceed 9 feet draft and contain around 1,400 tons of stone. The amendment provides barge delivery and demurrage rates, contact information for the Department of the Army Corps of Engineers New Orleans District, and inspection requirements. The response date remains May 27, 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21_W912P821R0028_AM_0003.pdf | ||
| A21_W912P821R0028_Am__0002.pdf | ||
| A21_W912P821R0028.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912P821R0028
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above named solicitation for Operations Division Rock Supply, is hereby amended as follow s:
1. Delete the Scope of Work in its entirety and replace it w ith the attached.
2. Add Grade B Curve, barge locations and draft..
NOTE: Date for receipt of proposals remains as Thursday, 27 May 2021 at 10am CST
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Apr-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P821R0028
X 9B. DATED (SEE ITEM 11)
27-Apr-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Apr-2021
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
REVISED SCOPE OF WORK
1. SCOPE OF WORK:
ITEM 001: The contractor will supply approximately 2 each loaded barges of B-size stone (or equivalent as approved by the government) to Schooner Bayou Control Structure located at Schooner Bayou, 3.1 miles west of Freshwater Bayou Mile 15.9. Each barge shall not exceed 9 ft. draft and contain approximately 1,400 tons of Grade B stone (or equivalent as approved by the government). Additional barges may be required to meet the draft limitation of 9 ft. depending on barge size. All delivered barges will start with a 5 day unloading period. All barges will be delivered at a coordinated period with the Government. The corps expects to receive 2 barges at the same time. When unloading is near completion on the barges, the government will coordinate the pickup and return of the barge set.
ITEM 002: This item covers a demurrage 24 hour rental rate for each barge beyond the initial 5 days of barge delivery. This line will be activated only if the government holds any barge for longer than 5 days or 120 hours after its initial delivery.
ITEM 003: This item covers the delivery of loaded barges AND the pickup/return of unloaded barges associated with the rock supply to the Schooner Bayou Control Structure located at Schooner Bayou,
3.1 miles west of Freshwater Bayou Mile 15.9. The barge unloading time is expected to take up to 12 total days total starting at the initial delivery time of barges.
ITEM 004: The contractor will supply approximately 3 each loaded barges of B-size stone (or equivalent as approved by the government) to Freshwater Bayou Lock located at approximate Freshwater Bayou Channel Mile 1.5. Each barge shall not exceed 9 ft. draft and shall contain approximately 1,400 tons of Grade B stone (or equivalent as approved by the government).
Additional barges may be required to meet the draft limitation of 9 ft. depending on barge size. All delivered barges will start with a 5 day unloading period. All barges will be delivered at a coordinated period with the Government. The corps expects to receive all 3 barges at the same time. When unloading is near completion on the set of barges, the government will coordinate the pickup and return of the barge set. located at Schooner Bayou, 3.1 miles west of Freshwater Bayou Mile 15.9. Each barge shall contain approximately 1,400 tons of Grade B stone (or equivalent as approved by the government). All delivered barges will start with a 5 day unloading period. All barges will be delivered at a coordinated period with the Government.
ITEM 005: This item covers a demurrage 24 hour rental rate for each barge beyond the initial 5 days of barge delivery. This line will be activated only if the government holds any barge for longer than 5 days or 120 hours after its initial delivery.
ITEM 006: This item covers the delivery of loaded barges AND the pickup/return of unloaded barges associated with the rock supply to Freshwater Bayou Lock located at approximate Freshwater Bayou
ft. depending on barge size.
Channel Mile 1.5. The barge unloading time is expected to take up to 12 total days total starting at the initial delivery time of barges.
ITEM 007: The contractor will supply approximately 10 each loaded barges of B-size stone (or equivalent as approved by the government) to Catfish Point Control Structure located at Mile 24 of the Mermentau River, slightly west of Mermentau River/Grand Lake intersection.
All delivered barges will start with a 5 day unloading period. All barges will be delivered at a coordinated period with the Government. The corps expects to receive 4 barges at the same time. When unloading is near completion on the barges, the government will coordinate the pickup and return of the following barge set.
ITEM 008: This item covers a demurrage 24 hour rental rate for each barge beyond the initial 5 days of barge delivery. This line will be activated only if the government holds any barge for longer than 5 days or 120 hours after its initial delivery.
ITEM 009: This item covers the delivery of loaded barges AND the pickup/return of unloaded barges associated with the rock supply to the Catfish Point Control Structure located at Mile 24 of the Mermentau River, slightly west of Mermentau River/Grand Lake intersection. The barge unloading time is expected to take up to 12 total days total starting at the initial delivery time of barges.
The Government will accept and return the barges from/to the contractor at the delivery location listed within the contract line item description. Field coordination will be with Robert Gauthreaux @ 504- 453-7411
2. Points of Contact:
Robert Gauthreaux @ 504-453-7411 Jesse Adams @ 504-862-1061.
3. Delivery:
All items will be delivered via pushboat and barge to Schooner Bayou Control Structure, Freshwater Bayou Lock, and Catfish Point Control Structure.
4. Inspection:
A Government Technical Representative will perform an inspection of the materials upon retrieval to ensure that all ordered materials are in good condition. The invoice will not be paid if the materials are not in good condition.
Each barge shall not exceed 6 ft draft and shall contain approximately 840 tons of Grade B stone (or equivalent as approved by the government). Additional barges may be required to meet the draft limitation of 6
5. Invoice:
A copy of the invoice will be submitted to Mr. Jesse Adams, jesse.a.adams@usace.army.mil and mail the original to:
US Army Corps of Engineers Finance Center 5722 Integrity Drive Millington, TN 38054-5005
W912P821R00028
SUMMARY OF CHANGES
(End of Summary of Changes)
| Grade B Curve.pdf |
| TestDataSheet.pdf |
| 35 31 19.01Gradation 2011.pdf |
| Gradation1 |
| 1Barge Locations and Draft.pdf |
| SBCapture |
| FBapture |
| CPCapture |
Blank Page
File details come from the government source that posted it. Updated .