Mississippi River, Baton Rouge to the Gulf of Mexico, Indefinite Delivery – Indefinite Quantity Contract, 2021 Southw est Pass Stone Foreshore Dike and Stone Jetty Repairs, Miles 0.0 to -20.2 BHP, Plaquemines Parish, Louisiana (ED 21-023)
This procurement is UNRESTRICTED.
DESCRIPTION OF WORK: The w ork consists of placing various types of stone paving and stone repairs along the banks of Southw est Pass (Miles 0.0 to -20.2 BHP).
Magnitude of Construction: Betw een $10,000,000.00 and $25,000,000.00.
X
DOROTHY J PITRE 000-00-0000
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
21-Sep-2021
(RFP)
(IFB)
CALL:
2021 SWP Jetty Repair
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________01 Sep 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
W912P821D0018
7. ISSUED BY CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
11:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
ED 21-023
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912P821B00610003 38
See Item 7
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE
1MCZ8
FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
SEE SCHEDULE
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
$16,297,476.00
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE 96414527. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
US ARMY CORPS OF ENGR FINANCE CENTER
5722 INTEGRITY DRIVE
MILLINGTON TN 38054-5005
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR
BIS SERVICES, L.L.C.
GENE SIMON
1485 29TH ST
KENNER LA 70062-5356
15. TELEPHONE NO. (Include area code) 504 828-5569
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print) CHRISTOPHER M NUCCIO / CONTRACT SPECIALIST
TEL: (504) 862-2704 EMAIL: C
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY 21-Sep-2021
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912P821D0018
Section SF 30 - BLOCK 14 CONTINUATION PAGE
AMENDMENT 0001
SOLICITATION, OFFER AND AWARD (SF-1442)
SF1442, page 1, section 13 (a): Change sealed bid opening date from 9/06/2021 to 9/07/2021.
PROJECT TABLE OF CONTENTS
Insert the revised table on contents following the ‘Bid Bond Template.’
SECTION 01000
Delete Section 01000 in its entirety and and insert the revised Section 01000.
SECTION 01100
Insert Section 01100 after Section 01000.
AMENDMENT 0002
BIDDER QUESTIONS AND GOVERNMENT RESPONSES
Q1. Drawing C-02 – Typical Floatation Channel for Jetty and Jetty Tiebacks. The distances of 70’ (East Jetty) and 50’ (West Jetty) with no vessels allowed within this area make it impossible to build these sections. The equipment industry uses to do this work do not have the capabilities to make these reaches up 120 feet to backside toe with a 4 ton boulder. Major safety concerns here. Will the design engineers allow the standard 30 feet distance that is normal for this work?
A1. The purpose of maintaining a 70-ft distance from the top of excavation channel to the centerline of the West Jetty is to not disturb the siltation close to the jetty, which exists as its foundation. This standoff distance is the same as on previous year’s contracts for SWP Jetty Construction as well as the jetties built in Calcasieu Pass. Contractors bidding on this work are expected to utilize cranes large enough to safely lift and place jetty stone in a manner that is consistent with the contract specifications.
Q2. Drawing C-02 – Note 7 States that limits of repair will be established by Task Order. Also Amendment 001 Section 35 31 19.01 12 paragraph 3.3.1 states that the stone jetty repairs shall be specified in the before-construction surveys or as directed in the field by the CO. These areas my require much more dredging than the engineers realize. For example, the East Jetty Tiebacks are more on land and surrounded by large sandbars that will not only require a floatation channel but an access channel to get to the floatation channel. Access channels could be +/- 600 to 700 feet of hard packed sand that may not even stay open during the duration of the work. Will the New Orleans District provide the Stone Jetty Repair reaches prior to bid so we can prepare a more competitive bid for these specific reaches?
A2. All work associated with this base contract will be issued under an initial task order at the time of the award. The reaches of work identified by the government that need repair to include on the task order are included in this response in two documents labeled ‘2021 Proposed.pdf’ (map) and ‘Task Order 1.doc’.
Approximately 20k tons of stone will be needed for Stone Jetty Repair, 10k for the East Jetty Tiebacks and 10k for the East Jetty, itself. Most of the work done under this contract will be the East and West bank foreshore dike repairs.
Q3. The specs state that the Jetty areas to be repaired will not be given until after award. We need to know the approximate areas that you will require us to work. Some of the tie backs on the East Jetty are land locked and cannot be accessed from water. Some have a sandbar that goes out over 500 feet from the jetty and will require an access channel to get to the flotation channel. Please consider giving us an estimated station or coordinate instead of saying the entire area may need work.
A3. See response to question 2.
Q4. The drawings show that the flotation channel on the East side cannot be closer than 70 feet from the toe of the Jetty, that will make the reach to repair the Jetty a maximum of about 120 feet to reach the backside of the Jetty. That will be an impossible reach, no machine that will fit in the flotation channel can place a 4-ton rock that far from the barge. Your USACE safety manual will not allow that. Please consider allowing a 30’ limit from the toe of the Jetty.
A4. See response to question 1. The flotation channel width may be adjusted, if needed.
Q5. The bid schedule has an estimated 60,000 CY of excavation for the project. From our site inspections the East Jetty and tie back areas that will require flotation to access is approximately station 0+00 to 52+00 and has about 90,000 CY. The West Jetty area that will need floatation to access is from station 0+00 to 94+00 and has about 167,000 CY. These quantities do not include the access channels that will need to be excavated to get to the floatation channels. Some of these areas are extremely hard to excavate and some are easier. To allow us to prepare a fair and competitive bid it’s imperative that we have a better idea of the exact work areas for the Jetties.
A5. See response to question 2.
Q6. I just read in the amendment 001 specifications 35 31 19.01 part 3: Stone foreshore dike repair areas and Stone Jetty repair areas shall be specified in the before construction drawings, Jobsite specifications and/or by the contracting officer. Will those placement areas be provided before bid date?
A7. See response to question 2.
Q8. The drawings show that the flotation channel on the East side cannot be closer than 70 feet from the centerline of the Jetty, that will make the reach to repair the Jetty a maximum of about 120 feet to reach the backside of the Jetty. That will be an impossible reach, no machine that will fit in the flotation channel can place a 4-ton rock that far from the barge. Your USACE safety manual will not allow that. Please consider allowing a 30’ limit from the toe of the Jetty.
A8. Repeat of question 4.
2021 PROPOSED
Insert this page in response to the Bidder questions above.
TASK ORDER #1
Insert this page in response to the Bidder questions above.
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job $1,387,426.00 $1,387,426.00 Mobilization and Demobilization
FFP
FOB: Destination
PSC CD: Y1PZ
NET AMT $1,387,426.00
0002 200,000 Ton Miles $65.17 $13,034,000.00 Stone Foreshore Dike Repairs
FFP
NET AMT $13,034,000.00
0003 20,000 Ton Miles $91.44 $1,828,800.00 Stone Jetty Repairs
FFP
NET AMT $1,828,800.00
0004 45,000 Cubic
Yard $1.05 $47,250.00
Flotation Channel Excavation
FFP
NET AMT $47,250.00
0005 1 Job $1,051.00 $1,051.00 OPTION Subsequent Mobilization and Demob
FFP
Subsequent Mobilization and Demobiliztion - OW
NET AMT $1,051.00
0006 50,000 Ton Miles $65.17 $3,258,500.00 OPTION Stone Foreshore Dike Repairs-OW
FFP
NET AMT $3,258,500.00
0007 10,000 Ton Miles $91.44 $914,400.00 OPTION Stone Jetty Repairs-OW
FFP
NET AMT $914,400.00
0008 15,000 Cubic
Yard $1.05 $15,750.00
OPTION Flotation Channel Excavation-OW
FFP
NET AMT $15,750.00
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government 0004 N/A N/A N/A Government 0005 N/A N/A N/A Government 0006 N/A N/A N/A Government 0007 N/A N/A N/A Government 0008 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 27-SEP-2021 TO
26-SEP-2022
N/A CONSTR DIV-LAFAYETTE AREA OFC
THEODORE B. EILTS
CORPS OF ENGINEERS 646 CAJUNDOME
BLVD SUITE 3
LAFAYETTE LA 70506
337-291-3011
W912P8
0002 POP 27-SEP-2021 TO
26-SEP-2022
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 27-SEP-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 27-SEP-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 27-SEP-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 27-SEP-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0007 POP 27-SEP-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0008 POP 27-SEP-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
BID SCHEDULE
SECTION 00010 – PRICING SCHEDULE
Mississippi River, Baton Rouge to the Gulf of Mexico, Indefinite Delivery – Indefinite Quantity Contract, 2021 Southwest Pass Stone Foreshore Dike and Stone Jetty Repairs, Miles 0.0 to -20.2 BHP, Plaquemines Parish, Louisiana
DESCRIPTION
Estimated Quantity
Unit
Unit Price Estimated Amount
BASE WORK
0001 Mobilization and Demobilization 1 JOB
$1,387,426.00 $1,387,426.00
0002 Stone Foreshore Dike Repairs 117,000 TON
$65.17 $13,034,000.00
0003 Stone Jetty Repairs 75,000 TON
$91.44 $1,828,800.00
0004 Flotation Channel Excavation 45,000 CY
$1.05 $47,250.00
TOTAL BASE WORK: $16,297,476.00
OPTIONAL WORK (OW)
Subsequent Mobilization and Demobilization-OW
1 JOB
$1,051.00 $1,051.00
0005 Stone Foreshore Dike Repairs-OW 38,000 TON
$65.17 $3,258,500.00
0006 Stone Jetty Repairs-OW 25,000 TON
$91.44 $914,400.00
0008 Flotation Channel Excavation-OW 15,000 CY
$1.05 $15,750.00
TOTAL OPTIONAL WORK: $4,189,701.00
TOTAL BASE WORK + OPTIONAL WORK: $20,487,177.00
NOTE 1: The award will be made as a whole to one bidder.
NOTE 2: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH
THE UNIT PRICE AND THE EXTENDED TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS
BID SHALL BE DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR AWARD.
NOTE 3: Any bid may be rejected if the Contracting Officer, in writing, determines that it is unreasonable as to price. Unreasonableness of price includes not only total price of the bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub-line items are materially unbalanced.
NOTE 4: NOTICE OF AWARD/NOTICE TO PROCEED: The successful bidder is advised that performance and payment bonds will be submitted in accordance with the time frame in block 12B of SF 1442 after the Notice of Award. Performance and payment bonds will be required per individual task order. The Notice To Proceed will be issued immediately after verification of acceptable performance and payment bonds. A separate Notice To Proceed will be issued for each Task Order. Within 7 days after issuance of the Notice To Proceed, the Contractor will initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start on a first Task Order until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required have been submitted and approved and all preliminary meetings called for under the contract, have been conducted. Similarly, physical work cannot start on subsequent Task Orders until Task Order specific supplements to the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all Task Order specific preliminary meetings called for under the contract, have been conducted.
NOTE 5: OPTIONAL WORK ITEMS. The Government may require the delivery of Item Nos. 0005, 0006, 0007, and 0008, identified in the schedule as Optional Work items, in the quantities and prices stated in the schedule. If an Optional Work item quantity is exceeded, the overrun quantity will be paid for at the Optional Work item unit price stated in the schedule. The Contracting Officer may exercise the Optional Work by written notice to the Contractor within the one-year period of the contract. The Government will exercise the Optional Work in accordance with the Clause in Section 00700 CONTRACT CLAUSES entitled “OPTION FOR INCREASED QUANTITY-SEPERATELY PRICED LINE ITEM” (FAR 52.217- 7, MAR 1989). Failure to bid on all items will result in a non-responsive bid.
NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). The Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement.
Evaluation of options will not obligate the Government to exercise the option(s).
NOTE 7: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF OPTIONAL WORK. In the event that the OPTIONAL WORK item Nos. 0005, 0006, 0007, and 0008 are exercised under the terms of the contract, the time required for completion of the contract will not be adjusted but shall be performed concurrent with the original contract duration of 365 calendar days.
NOTE 8: Initial mobilization and demobilization costs will be paid for by the Government. Any subsequent mobilization and demobilization costs will be paid for by the Government provided that (a) the Contractor has completed all the work assigned in all the Task Orders issued and the Contractor has demobilized, or (b) the Government has suspended the Contractor and the Contractor has demobilized.
Descriptions of the anticipated work is specified in Section 01100, paragraph entitled “LOCATIONS AND
ANTICIPATED WORK”.
NOTE 9: Attention is directed to the Section 00700 CONTRACT CLAUSES entitled "ORDER LIMITATIONS" (FAR 52.216-19, Oct 1995) for Task Order limitations.
NOTE 10: Task Orders will be issued by electronic communications (e-mail or facsimile) by the Contracting Officer.
NOTE 11: All quantities are estimated and are to be used for bid evaluation purposes only. Estimated quantities of individual contract line items may vary significantly either up or down depending on the work required during the one-year contract period as long as the earnings limitations of the contract are not exceeded.
NOTE 12: Any travel and lodging costs of Contractor personnel shall be considered in the Contractor’s pricing and shall be distributed among the individual contract line items.
NOTE 13: This Pricing Schedule is for evaluation purposes only to determine the lowest bidder.
NOTE 14: The unit “Job” as used in this Pricing Schedule is synonymous with the term “Lump Sum” used elsewhere within these plans and specifications.
NOTE 15: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
Section 00100 - Bidding Schedule/Instructions to Bidders
CLAUSES INCORPORATED BY REFERENCE
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
JUN 2020
52.211-18 Variation in Estimated Quantity APR 1984 52.219-8 Utilization of Small Business Concerns OCT 2018 52.219-9 Small Business Subcontracting Plan JUN 2020
CLAUSES INCORPORATED BY FULL TEXT
52.214-5000 Apparent clerical mistakes.
ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluations of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the government will proceed on the assumption that the bidder intends his bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
(End of statement)
52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (JUN 2020)
(a) Definitions. As used in this clause--
Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition Regulation 28.102-1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection. (i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the U.S. Department of the Treasury, Financial Management Service, Surety Bond Branch, 3700 East West Highway, Room 6F01, Hyattsville, MD 20782. Or via the internet at http://www.fms.treas.gov/c570/.
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
(End of clause)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR, DF ARS,AFARS,UAI
Section 00600 - Representations & Certifications
52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
JUN 2020
Section 00700 - Contract Clauses
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUN 2020
52.203-13 Contractor Code of Business Ethics and Conduct JUN 2020 52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
JUN 2020
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
JUN 2020
52.204-14 Service Contract Reporting Requirements OCT 2016 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.
JUL 2018
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2020
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
OCT 2018
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards - Overtime
Compensation
MAY 2018
52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016
52.222-27 Affirmative Action Compliance Requirements for Construction
APR 2015
52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons OCT 2020 52.222-54 Employment Eligibility Verification OCT 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-6 Drug-Free Workplace MAY 2001 52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.227-1 Authorization and Consent JUN 2020 52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
JUN 2020
52.228-1 Bid Guarantee SEP 1996 52.228-2 Additional Bond Security OCT 1997 52.228-11 Individual Surety--Pledge of Assets FEB 2021 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-26 Preconstruction Conference FEB 1995 52.242-5 Payments to Small Business Subcontractors JAN 2017 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.244-2 Subcontracts JUN 2020 52.244-6 Subcontracts for Commercial Items JUL 2021 52.246-12 Inspection of Construction AUG 1996 52.247-34 F.O.B. Destination NOV 1991
52.249-2 Alt I Termination for Convenience of the Government (Fixed- Price) (Apr 2012) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General AUG 2019 252.203-7003 Agency Office of the Inspector General AUG 2019 252.203-7004 Display of Hotline Posters AUG 2019 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7006 Billing Instructions OCT 2005 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.219-7003 Small Business Subcontracting Plan (DOD Contracts) DEC 2019 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010 252.223-7004 Drug Free Work Force SEP 1988 252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017 252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017 252.225-7048 Export-Controlled Items JUN 2013 252.226-7001 Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business Concerns
APR 2019
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.242-7004 Material Management And Accounting System MAY 2011 252.242-7006 Accounting System Administration FEB 2012 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JAN 2021
CLAUSES INCORPORATED BY FULL TEXT
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management (SAM) records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Registered in the System for Award Management (SAM) means that--
(1) The Contractor has entered all mandatory information, including the unique entity identifier and the EFT indicator (if applicable), the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14), into SAM;
(2) The Contractor has completed the Core, Assertions, Representations and Certifications, and Points of Contact sections of the registration in SAM;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record ``Active''.
System for Award Management (SAM) means the primary Government repository for prospective Federal awardee and Federal awardee information and the centralized Government system for certain contracting, grants, and other assistance-related processes. It includes—
(1) Data collected from prospective Federal awardees required for the conduct of business with the Government;
(2) Prospective contractor-submitted annual representations and certifications in accordance with FAR subpart 4.12;
and
(3) Identification of those parties excluded from receiving Federal contracts, certain subcontracts, and certain types of Federal financial and non-financial assistance and benefits.
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b) If the solicitation for this contract contained the provision 52.204-7 with its Alternate I, and the Contractor was unable to register prior to award, the Contractor shall be registered in SAM within 30 days after award or before three days prior to submission of the first invoice, whichever occurs first.
(c) The Contractor shall maintain registration in SAM during contract performance and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement. The Contractor is responsible for the currency, accuracy and completeness of the data within SAM, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in SAM after the initial registration, the Contractor is required to review and update on an annual basis, from the date of initial registration or subsequent updates, its information in SAM to ensure it is current, accurate and complete. Updating information in SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(d)(1)(i) If a Contractor has legally changed its business name or ``doing business as'' name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to--
(A) Change the name in SAM;
(B) Comply with the requirements of subpart 42.12 of the FAR; and
(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor shall provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (d)(1)(i) of this clause, or fails to perform the agreement at paragraph (d)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the ``Suspension of Payment'' paragraph of the electronic funds transfer (EFT) clause of this contract.
(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR subpart 32.8, Assignment of Claims). Assignees shall be separately registered in SAM. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the ``Suspension of Payment'' paragraph of the EFT clause of this contract.
(3) The Contractor shall ensure that the unique entity identifier is maintained with the entity designated at www.sam.gov for establishment of the unique entity identifier throughout the life of the contract. The Contractor shall communicate any change to the unique entity identifier to the Contracting Officer within 30 days after the change, so an appropriate modification can be issued to update the data on the contract. A change in the unique entity identifier does not necessarily require a novation be accomplished.
(e) Contractors may obtain additional information on registration and annual confirmation requirements at https://www.sam.gov.
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within (Contracting Officer insert number) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 calendar days after the date of issuance of the notice to proceed. The time stated for completion shall include final cleanup of the premises.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,920.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.216-18 ORDERING. (AUG 2020)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 09/27/2021 through 09/26/2022.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) A delivery order or task order is considered "issued" when--
(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;
(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or
(3) If sent electronically, the Government either--
(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or
(ii) Distributes the delivery order or task order via email to the Contractor's email address.
(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.
52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $1,000,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor -
(1) Any order for a single item in excess of $24,000,000.00;
(2) Any order for a combination of items in excess of $24,000,000.00; or
(3) A series of orders from the same ordering office within 3 calendar days that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 3 calendar days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-22 INDEFINITE QUANTITY. (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in theTask Order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that Task Order to the same extent as if the Task Order were completed during the contract's effective period.
(e) The Contractor shall provide written telecommunication notice (e-mail or facsimile) to the Contracting Officer's Representative of the need to place any quantity for an item of a Task Order above the estimated quantity included for that item in the Task Order. The notice shall be provided at least five (5) calendar days prior to the anticipated need for the additional quantity. The Contractor will be responsible for any impact on the completion of the work resulting from an untimely notice. Upon approval by the Contracting Officer for any additional quantity of an item, the time specified in the Task Order shall be modified accordingly.
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 30 DAYS. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (JAN 2021)
Caribbean Basin country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4)such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Designated country means any of the following countries:
(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);
(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);
(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or
(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St.
Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).
Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.
Domestic construction material means--
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if--
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material…