This modification amends a solicitation for a hopper dredge contract. The work consists of furnishing one fully crewed and equipped self-propelled trailing suction hopper dredge on a rental basis to perform dredging in the Mississippi River Southwest Pass and other areas of the New Orleans, Galveston, and Mobile Districts. The estimated value of the contract is between $10-25 million. The amendment provides details on electronic bid submission procedures due to COVID-19 telework requirements, updates the wage determination, and makes various revisions to specifications including changing the start and completion window to no earlier than March 1st 2022 and no later than March 31st 2022. Interested parties are encouraged to register as vendors on SAM.gov and post subcontracting opportunities on the SBA Subnet. The contracting office contacts are provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OM-21-002

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The subject Solicitation for Mississippi River, Baton Rouge to Gulf of Mexico, Southw est Pass Hopper Dredge Contract No. 2-2021, Plaquemines Parish, Louisiana (OM-21-002) has been modified to provide specific details on how contractors are to submit Bids, Bonds and the Conference Call details for the Virtual Bid Opening w hich is now scheduled for Thursday, July 15, 2021 at 11:30 AM CST. The Contracting Officer and Contract Specialist w ill begin dow nloading bids at 10:30 AM CST, w hich is the bid receipt cutoff time. All bids received after 10:30 AM CST on Thursday, July 15, 2021 w ill be considered late. See the attached pages.

For any questions, please contact the Contracting Officer, (Veronica F. Garner-Flint 504-862-1515), or the Contract Specialist, (Karen Hargrave, 504-862-1561).

1. CONTRACT ID CODE PAGE OF PAGES

1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P821B0007

X 9B. DATED (SEE ITEM 11)

10-Dec-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

AM0001

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jun-2021

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - SF 30 CONTINUATION

The required response date/time 15-Jul-2021 10:30 AM has been added.

The Issued By organization below has been added:

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

The contractor period of performance begin 5 has been deleted.

The description of performance has changed from 00800-3.2 to 00010-1.5.

The following have been added by full text:

AM0001

1. Standard Form 1442, box 11: Delete “within 5 calendar days” and replace with “no earlier than 1 March 2022 and no later than 31 March 2022”.

2. Section 00010, paragraph 1.1 “Bidding Schedules”: Delete this paragraph in its entirety and replace with the attached paragraph 1.1 “Bidding Schedules”.

3. Section 00010, paragraph 1.5 “Conditions of Contract Award”, subparagraph c: In the second sentence, delete

“no later than 120 hours after issuance of Notice to Proceed by the Contractor” and replace with “no earlier than 1 March 2022 and no later than 31 March 2022”.

4. Section 00010, paragraph 1.5 “Conditions of Contract Award”, subparagraph c, table entitled “Approximate

Hopper Dredge Contract Duration”: Delete this table in its entirety and replace with the attached table entitled “Approximate Hopper Dredge Contract Duration”.

5. Section 00010, paragraph 1.5 “Conditions of Contract Award”, subparagraph d: Delete “within 120 hours after issuance of Notice to Proceed by the Contractor” and replace with “and to commence dredging no earlier than 1 March 2022 and no later than 31 March 2022”.

6. Section 00700, FAR Clause 52.211-10 "Commencement, Prosecution, and Completion of Work (Apr 1984)":

Delete this clause in its entirety and replace with the following:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract as described in Section 00010, paragraph entitled “Conditions of Contract Award”, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than as described in Section 00010, paragraph entitled “Conditions of Contract Award”.

7. Section 00800, paragraph 3.1 “Delivery of Plant”, subparagraph a: Delete “within 120 hours after issuance of the Notice to Proceed” and replace with “no earlier than 1 March 2022 and no later than 31 March 2022”.

8. Section 01 30 00, paragraph 1.12 “As-Built Drawings”: In the last paragraph, delete “Upon approval of the “As-Built” drawings, the drawings will become final and the Contractor shall submit three hard copy sets of 11 inch by 17 inch as-built drawings with two standard size CD-RW disk copies and email an electronic CADD file to the Construction Division, respective Area Office”, and replace with the following sentences: “The Contractor shall submit the draft as-builts for review by email in PDF format to the respective area office personnel. Upon approval/acceptance of the draft as-builts, the Contractor shall submit the final as-builts in both CADD and PDF format into RMS as a closeout submittal.”

9. Section 35 20 23.23, paragraph 1.5 “Dredge and Attendant Plant Data Sheet”: Add the following at the end of the paragraph: “If the Contractor requests a substitution of plant or addition of plant during the contract, the plant data sheet of the substituted plant or the additional plant must be submitted at the time of the request.”

10. Section 35 20 23.23, paragraph 2.1.4 “Dredge Plant”, subparagraph b, table entitled “Theoretical Hopper

Dredge Production Rates (cy/day)”: Delete this table in its entirety and replace with the attached table entitled “Theoretical Hopper Dredge Production Rates (cy/day)”.

11. Section 35 20 23.23, paragraph 3.6 “Working in the Vicinity of Structures and Utility Crossings”: Add the following as subparagraph d at the end of this paragraph:

d. Prior to dredging over a utility crossing within the dredging channel, the Contractor shall obtain a cross-section survey of the channel showing an accurate location and elevation of the utility provided by the utility owner.

12. Section 35 30 23.23, paragraph 3.10.1 “Mississippi River & Southwest Pass”: Add the following utility crossings to the table:

(2) 10” Gas Pipelines (Inactive)

11.7 AHP Unknown

Gulf South 520 Alliance St

Kenner, LA 70062 Attn: Gerald Roser

Gerald Roser

Gerald.Roser@bwpipelines.com

Harold Sylve (Field POC) 504-415-1864

Harold.Sylve@bwpipelines.com

(2) 12” Pipelines (Abandoned)

11.6 AHP Unknown

Noble Energy

Submerged cable 11.3 AHP Unknown

Entergy

Alex Padilla 504-912-4426 apadill@entergy.com

W912P821B0007

Section 00010, Paragraph 1.1 “Bidding Schedules”:

1.1 BIDDING SCHEDULES

SECTION 00010 – BIDDING SCHEDULE

MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO, SOUTHWEST PASS

HOPPER DREDGE CONTRACT NO. 2-2021

PLAQUEMINES PARISH, LOUISIANA

SOLICITATION NO. W912P821B0007

LOT ONE (Ellis Island), 34 inch Inside Diameter (ID) Pump Suction, 14,788 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant

Bid Item

Description Estimated Quantity

Unit Unit Price

Total Price

Mobilization & Demobilization

1 Job

0002 Dredging 2070 Hour

Option

Option Dredging 1380 Hour XXXXXXXX

Total: LOT ONE BID

*SEE BID FORM NOTES

LOT TWO (Glenn Edwards), 38 inch Inside Diameter (ID) Pump Suction, 12,430 cubic yard Nominal Hopper Capacity, Two Dragarms and all

Description Estimated Quantity

Unit Unit Price

Total Price

Mobilization & Demobilization

1 Job

0002 Dredging 2160 Hour

Option

Option Dredging 1440 Hour XXXXXXXX

Total: LOT TWO BID

LOT THREE (Stuyvesant), 33.5 inch Inside Diameter (ID) Pump Suction, 9,400 cubic yard Nominal Hopper Capacity, Two Dragarms and all

Description Estimated Quantity

Unit Unit Price

Total Price

Mobilization & Demobilization

1 Job

0002 Dredging 2849 Hour

Option

Option Dredging 1899 Hour XXXXXXXX

Total: LOT THREE BID

LOT FOUR (Terrapin Island), 33.5 inch Inside Diameter (ID) Pump Suction, 6,300 cubic yard Nominal Hopper Capacity, Two Dragarms and all

Description Estimated Quantity

Unit Unit Price

Total Price

Mobilization & Demobilization

1 Job

0002 Dredging 3481 Hour

Option

Option Dredging 2321 Hour XXXXXXXX

Total: LOT FOUR BID

LOT FIVE (Magdalen), 39.37 inch Inside Diameter (ID) Pump Suction, 8,300 cubic yard Nominal Hopper Capacity, One Dragarm and all attendant plant

Description Estimated Quantity

Unit Unit Price

Total Price

Mobilization & Demobilization

1 Job

0002 Dredging 3736 Hour

Option

Option Dredging 2491 Hour XXXXXXXX

Total: LOT FIVE BID

Section 00010, paragraph 1.5 “Conditions of Contract Award”, subparagraph c, table entitled “Approximate Hopper Dredge Contract Duration”:

APPROXIMATE HOPPER DREDGE

CONTRACT DURATION

Lot

Pump Inside

Diameter (inches)

Hopper Size (Cubic Yards)

Number of

Dragarms

Approximate Number of

Days for Item

Approximate Number of Days for

Option Item

1 34 14788 2 119 79

2 38 12430 2 123 82

3 33.5 9400 2 155 103

4 33.5 6300 2 184 122

5 39.37 8300 1 195 130

Section 35 20 23.23, paragraph 2.1.4 “Dredge Plant”, subparagraph b, table entitled “Theoretical Hopper Dredge Production Rates (cy/day)”:

THEORETICAL HOPPER DREDGE PRODUCTION RATES (cy/day)

Lot

Pump Inside

Diameter (inches)

Hopper Size

(cubic yards)

Number of

Dragarms

Dredge & Haul

Production All

Projects

Agitation Production

SW Pass (cy/day)

Calcasieu (cy/day)

1 34.0 14,788 2 89,638 219,124 246,514

2 38.0 12,430 2 85,383 217,037 244,166

3 33.5 9,400 2 64,729 164,890 185,502

4 33.5 6,300 2 51,286 167,856 188,838

5 39.37 8,300 1 49,677 121,028 136,157

INSTRUCTION TO BIDDERS

INSTRUCTION TO BIDDERS

Due to the response for COVID-19, most federal employees have been mandated to telework, and currently only authorized personnel are allowed access to the District buildings throughout USACE. As a result, we have implemented the below procedures for all current and future bid openings, until such restrictions have been lifted and normal access has resumed at the MVN HQ Building.

Electronic Submission of Bids:

MVN will utilize the DoD Safe website for receipt of electronic bids under IFB Solicitations. In order to submit an electronic bid please follow these steps:

1. Send an email containing your name and email address to the Contracting Officer and Contract Specialist associated with the IFB:

Contracting Officer – Ms. Veronica Garner Flint, email: veronica.garner-flint@usace.army.mil Contract Specialist – Ms. Karen Hargrave, email: karen.d.hargrave@usace.army.mil

2. The Contracting Officer or Contract Specialist will go to the DoD Safe site, input your name and email address, and then will request the file from you. You will then receive an automated email from the site with a unique link in the email.

3. Once the email with the link is received, please click on the link in the email, which will take you to the DoD Safe site.

4. This will be a unique webpage where you can upload your file. The default page will load with the box checked off next to, “Send me an email when each recipient picks up the files”.

Please leave this box checked in order to receive a notification when the file is received from the Contracting Officer or Contract Specialist. Please leave unchecked, “Encrypt every file”. The site itself contains a high level of security in which additional encryption is not required.

5. When you are ready to upload your bid file (please use pdf format for bid submission), you can either click the blue button which says, “Click to Add Files or Drag Them Here” to locate the file on your computer, or simply drag the file onto the screen.

6. In the Description box that appears after uploading your file, please type your Company Name.

7. Click the button that appears at the bottom of the page, “Drop-off Files”. A banner will pop-up asking for confirmation that your upload does not contain Classified Information. Click ok on the banner.

8. You will be taken to a confirmation page that should say, “Drop-Off Completed” at the top.

This is your confirmation that your file was successfully uploaded to the site.

9. The Contracting Officer or Contract Specialist will receive an automated email stating that the file has been submitted. They will then send an email back to the company, confirming that they received the notice from the DoD Safe site.

The Bid Opening is currently scheduled for Thursday, July 15, 2021 at 11:30 AM CST. The Contracting Officer and Contract Specialist will begin downloading bids at 10:30 AM CST, which is the bid receipt cutoff time. All bids received after 10:30 AM CST on Thursday, July 15, 2021 will be considered late.

Audio Teleconference Bid Opening Information:

Bid Opening will be held on Thursday, 15 July 2021 at 11:30 AM CST. Please use the following call-in information to attend the meeting:

Toll-Free: 844-867-6169 Access Code: 4001298

Following the conclusion of the bid opening, the Bid Abstract will be uploaded to SAM.gov website under this solicitation, within 24 hours.

Bid Bonds (Offer Guarantee) should be submitted electronically with the Bid Package as per the scheduled Bid Opening on Amendment. As per Class Deviation 2020-O0016, Electronic signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered original signatures and dates. In addition, a Corporate Seal is not required, the SF 28 need not be sworn and notarized and a written authorization of the release signed by the surety is acceptable in lieu of the notarized authorization of release by the surety. Original Certified

Bonds need not be submitted at time of bid. USACE MVN Contracting Division reserves the right to request the Original Certified Bonds, if deemed necessary to verify their authenticity.

The following deviation clauses now apply, in lieu of the corresponding FAR clauses:

52.228-11, Pledges of Assets (DEVIATION 2020-O0016), which removes the requirement for the Standard Form 28 to be sworn and notarized.

52.228-15, Performance and Payment Bonds—Construction (DEVIATION 2020- O0016), which removes the requirements for seals on Standard Forms.

52.228-16, Performance and Payment Bonds—Other than Construction (DEVIATION 2020-O0016), which removes requirements for seals on Standard Forms.

For any Questions please contact:

Contracting Officer – Ms. Veronica Garner Flint, email: veronica.garner-flint@usace.army.mil ;

Phone: 504-862-1515 Contract Specialist – Ms. Karen Hargrave, email: karen.d.hargrave@usace.army.mil ;

Phone: 504-862-1561

UPDATE WAGE DETERMINATION

"General Decision Number: LA20210007 01/01/2021

Superseded General Decision Number: LA20200007

State: Louisiana

Construction Type: Heavy Dredging

Counties: Louisiana Statewide.

DREDGING PROJECTS ALONG THE GULF COAST AREA INCLUDING THE

MISSISSIPPI RIVER AND ITS TRIBUTARIES TO THE OHIO RIVER

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/01/2021

* SULA1994-001 04/01/1994

Rates Fringes

Derrick Operator.................$ 7.25

Dozer Operator...................$ 7.25

Dredge 16"" and Over Deckhand....................$ 7.25 Dredge tender operator......$ 7.25 Fireman.....................$ 7.25 First assistant engineer....$ 7.25 Leverman....................$ 7.25 Oiler.......................$ 7.25 Second assistant engineer...$ 7.25 Shoreman....................$ 7.25 Third assistant engineer....$ 7.25 Truck driver................$ 7.25 Welder......................$ 7.25

Dredge Under 16"" Deckhand....................$ 7.25 Dredge tender operator......$ 7.25 Leverman....................$ 7.25 Oiler.......................$ 7.25 Welder......................$ 7.25

Hydraulic Dredging First cook..................$ 7.25 Handyman....................$ 7.25 Janitor, cabin person.......$ 7.25 Second cook.................$ 7.25

Marsh Buggy Dragline, Oiler......$ 7.25

Marsh Buggy Dragline, Operator...$ 7.25

Self-Propelled Hopper Dredge, Drag Tender......................$ 9.70 3.45+a

FOOTNOTE: Fourteen paid vacation days and eight paid holidays: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day & Christmas Day provided the employee has one year of service.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)