This document provides responses to contractor questions on solicitation W912P820B0048 from the U.S. Army Corps of Engineers for maintenance dredging of the Calcasieu River and Pass in Louisiana. The solicitation is for firm fixed price contracts for dredging between mile 5.0 and mile 17.0 of the waterway, with optional work for dredging Devil's Elbow and Cameron Loop. Services required include dredging, disposal of dredged materials in designated confined disposal facilities with retention dikes already in place, surveys, optional ditching and draining of disposal areas. The estimated value of work is between $25-100 million. The response document clarifies that dike construction is only required for disposal areas used by the contractor. It also explains that two line items for dike construction in one disposal area are related to base work and optional work. The point of contact for the solicitation is provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ED 20-038
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitaton for Calcasieu River and Pass, La Maintenance Dredging FY20 Mile 5.0 to Mile 17.0, Calcasieu and Cameron Parishes, LA is hereby amended as follow s:
1. Provides Government responses to bidder questions on attached Continuation pages.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P820B0048
X 9B. DATED (SEE ITEM 11)
10-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Aug-2020
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P820B0048
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - SF 30 CONTINUATION
The following have been added by full text:
AMENDMENT 0002
Amendment 0002
Contractor questions (Q) and Corps of Engineers response (R) for solicitation W912P820B0048 are provided below;
Q1: According to Specification Section 3.3, Paragraph 3.3.1.3, “Most CDF(s) available for use may already have spill box weirs on site from previous dredge contracts. Can the Government clarify which CDF’s have spill box weirs in place already?
R1: All CDF’s available in the contract for disposal have spill boxes in place ready for use.
Q2: The bidding schedule has 2 instances of dike construction in CDF M, one in the base and one in option 3. Can the Government clarify if this is intended?
R2: Assumption is that the Contractor meant Option 2. The contractor may or may not decide to use CDF-M for the base work. Should CLIN 0013 be exercised, the Contractor is directed to put material dredged from Cameron Loop into Disposal Area M. CLIN 0014 “Dike Construction CDF-M Cameron Loop – OW2” is meant to compensate for dike work necessary should CDF-M not be part of the base disposal plan or any additional dike work required in CDF-M in order to accommodate the dredged material resulting from Dredging of Cameron Loop as determined by the Contractor. If the Contractor does not submit CDF-M for the base disposal plan, the CLIN 0014 should cover the full effort to build the disposal area per specifications.
Should CLIN 0013 be exercised without CDF-M in the base disposal plan, both CLIN 0010 and CLIN 0014 will not be made, just CLIN 0014.
Q3: According to Specification Section 1.3, Paragraph, 1.3.3, “The Government will only pay for disposal areas that the Contractor uses and submits in the Disposal Plan.”
Can the Government confirm that this means that dike construction is not required for disposal areas not used?
R3: Dike construction is not required for disposal areas not used by the contractor. The contractor is also reminded that dikes shall be constructed, per specification requirements (Section 35 20 23.00 12, Paragraph3.31.2 “CDF Retention Dikes”), on every disposal area where dredged material will be pumped. If the contractor builds the dikes and elects not to pump into the CDF he is still entitled to receive full payment. If the contractor elects not to use a CDF, as originally contemplated, that is to say, no dikes are built per specifications requirements, then the CLIN corresponding to that CDF won’t be recognized as payable. Same situation applies to CDFs where the
W912P820B0048 preconstruction profiles may show that no additional dike construction is required to meet the minimum requirements.
(End of Summary of Changes)