Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
W912P8
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The above numbered solicitation for Calcasieu River and Pass, Louisiana Dredged Material Management Plan (DMMP) CDF-7 Degrading and Dike Construction, Calcasieu Parish, Louisiana is hereby amended as follows:
1. Section 05 50 13, section 31 23 00.00 20, and section 31 24 00.00 12 are deleted in its entirely and replace with the attached.
2. Delete drawing Nos. C-13 and C-14 and replace with the attached drawings.
3. Provide questions and answers per the attached.
4. Provide updated bid bond form SF24.
Bid Opening Date remains unchanged as Thursday, 21 Nov 2019 at 2:00 P.M. (CST), conference room 125.
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT-W, ROOM 172
7400 LEAKE AVENUE
NEW ORLEANS, LA 70118-3651
SEE ITEM 6
W912P820B0018
11/14/2019
10/21/2019
SECTION 05 50 13
Page 3, paragraph 1.2. Delete this paragraph in its entirety and substitute the following therefore:
“1.2 MEASUREMENT AND PAYMENT
Measurement for spill boxes will be by each spill box successfully constructed and placed. Payment will be made at the applicable contract unit price per each for "CDF 7 - Additional Spill Box - OW", (if Option Work is exercised), or "CDF 2 - Spill Box Removal and Replacement - OW" (if Optional Work is exercised). Price and payment shall constitute full compensation for furnishing all plant, labor, materials, and equipment, for performing all operations necessary to remove existing spill boxes and culvert pipes; replacing with new spill boxes and steel culvert pipes; fabrication and assembly of steel decking and aluminum handrails; including excavation, shoring, backfilling, final grading, and all other incidental work as required to complete the installation of these functioning drainage structures; as specified herein and as shown on the drawings.”
SECTION 31 23 00.00 20
Page 3, paragraph 3.1.1. Delete this paragraph in its entirety and substitute the following therefore:
“3.1.1 Borrow-General
Borrow material for dike embankment fill shall be obtained from within the allowable borrow areas shown in the contract drawings. Excavation for borrow shall start from the borrow top edge of cut (B.E.C.) with a cut slope of 1 vertical to 3 horizontal to a depth no greater than the maximum borrow depth of elevation of 5.5’ NAVD88 for CDF-7, and -6.0’ NAVD88, for CDF-2.”
SECTION 31 24 00.00 12
1. Page 3, paragraph 1.1.4. Delete this paragraph in its entirety and substitute the following therefore:
“1.1.4 CDF-2 Work
If Optional Work is exercised, CDF-2 work will consist of construction of a new dike at CDF-2; as specified herein and in Section 31 23 00.00 20 Excavation And Fill, and the removal and replacement of the existing spill box; and other incidental work; as specified herein and as shown on the drawings.”
Amendment 0003
2. Page 11, paragraph 3.4.1. Delete this paragraph in its entirety and substitute the following therefore:
“3.4.1 Existing Spill Box Removal
The existing spill box at CDF-7 and/or CDF-2 (if Optional Work is exercised) shall be removed from within the existing dike embankment to assist in draining the disposal areas prior to clearing and grubbing operations. The existing CDF-7 spill box shall be set aside and relocated in accordance with paragraph "Spill Box Relocation". Any damages to the spillbox during removal shall be repaired by the Contractor at no additional cost to the Government.”
3. Page13,paragraph 3.8. Delete this paragraph in its entirety and substitute the following therefore:
“3.8 CDF-2 Spill Box Removal and Replacement (Optional Work).
If applicable, the existing spill box at CDF-2 shall be removed from within the existing embankment and replaced with a new one within the new dike alignment. The new location and invert elevations of the new CDF-2 spill box will be determined by the COR (See Section 05 50 13 Miscellaneous Metal Fabrications, for replacement details for the CDF-2 spill box).”
DRAWINGS
SHEET IDENTIFICATION Nos. C-13 and C-14. Delete these drawings in their entirety and substitute the attached revised drawings SHEET IDENTIFICATION Nos. C-13 and C-14 therefore.
Calcasieu River and Pass, LA, Dredged Material Management Plan (DMMP), CDF-7 Degrading and Dike Construction, Calcasieu Parish, LA
Question 1.
Scalable drawings and provided electronic files of the full scale drawings and scalable half size or 11x17 printable files for the drawing sheets.
The existing solicitation can only be printed on 8.5 x 11. None of the drawings are to scale and will not reasonably print as 11x17 or allow accurate bidding. Dependent on when all bidders are in receipt of these accurate drawings, we request a bid date extension.
Response 1.
New drawings were submitted to the contractor via amendment 0001 and posted onto FedBizOpps to clarify this matter.
Question 2.
Would you consider using RTK GNSS methods to verify all project bench marks per Section 21? It is over 70 miles of levelling that would be required between the points and two of the project bench marks are on the east side of the river and one is on the west side. It is not very cost efficient or practical to do differential levelling.
Response 2.
Amendment 0002 replied to this question: 21. PROJECT BENCHMARKS Benchmark and Project Temporary Benchmarks (TBM). To ensure local/internal consistency, the contractor shall verify all project benchmarks using differential leveling in accordance with Section D of the "USACE New Orleans District Guide for Minimum Survey Standards".
Question 3.
Contract Time: In reviewing the drawings and site conditions there is not enough time to dewater the project under the base contract. The ditches will required to be clean and deepen. The material is very wet and will required time to dewater in order to begin excavation and processing the material for placement. Additional 160 days is recommended.
Response 3.
Ditching & Draining work for CDF-7 was completed April 2019 giving the disposal area approximately 6 months to drain/dewater from the last dredging event. Some remnant amount of water is to be expected but will not impact excavation. Therefore, no additional time will be granted.
Also, no changes to the Plans and specifications are required at this time.
Question 4.
Can the USACE provide CADD files for this project?
Response 4.
The scope of work as well as all the necessary information and details required to successfully prepare a bid for this solicitation has been provided with the Plans and Specifications. The successful contractor will be issued CADD drawings and surveys as needed to complete the construction post contract award.
Solicitation Number W912P8-20-B-0018 Amendment 0003
Question 5.
Based on the Drawing C‐12, C‐13 and the section for this work, calculations indicate that there is not enough material to construct the wok for option 2. Has the government confirmed that the amount of borrow for this area? If there is not enough where is the material the additional material to be provide?
Response 5.
The following revisions have been made to the Plans and Specifications to address concerns about the availability of borrow material for dike construction on CDF-2.
Specifications A. Section 31 23 00.00 20 – Excavation and Fill, Paragraph 3.1.1 Borrow-General revised to read as follows:
“Excavation for borrow shall start from the borrow top edge of cut (B.E.C.) with a cut slope of 1 vertical to 3 horizontal to a depth no greater than the maximum borrow depth of elevation of 5.5’ NAVD88 for CDF-7, and -6.0’ NAVD88, for
CDF-2”
Drawings A. Note 5 on Sheet C-13 has been revised to read as follows: “Borrow may be excavated from the T.E.C. on a 1V:3H cut slope down to a max bottom edge of cut (B.E.C.) of El. -6.0’.
B. Sheet C-14 has been revised to show a max borrow depth elevation of -6.0’.
Question 6.
6a. What is the Pay Item for the Clearing and Grubbing associated with Disposal Facility CDF-2?
Response 6a.
Clearing and grubbing for CDF-2 is considered incidental to dike construction.
Question
6b. Note 3 on Drawing C-04 states that “Fill is not required where borrow is.” Does the same exclusion apply to degrade material? (Note: Degrade where borrow is would be allowable borrow).
Response 6b.
Per Section 31 23 00.00 20 Excavation and fill, Paragraph3.3.1 CDF-7 Degrade, CDF-7 site degrading within the limits of the borrow area of CDF-7 is not required, if excavated below elevation 12.5' NAVD88 for embankment fill.
6c. Does degrading of material need to be performed where Dike Construction is happening? (Note: This area is being filled with dike construction material. See Drawing C-06, Theoretical Dike Section #2).
Response 6c.
Degrading within the dike and berm footprint is not required.
Question
6d. What is the ground water elevation in CDF-7 and CDF-2? The ground water surface is not shown in the boring logs. What is the elevation of the river surface?
Response 6d.
Site specific phreatic information is not available. Real time stage hydrograph data may be obtained from the New Orleans district website specified under Section 00700, Paragraph “Physical Data”, subparagraph (g).
6e. The Embankment spec states that compaction equipment shall be a minimum of 16 tons. Standard sheep foot compactors (vibrating compaction roller) weigh approx. 12 tons and are commonly used in levee compaction. Is this 12 ton compactor sufficient for Embankment compaction?
Response 6e.
A 12 ton compactor may be used but the Contractor shall submit the manufacturer’s specifications for the smaller compaction equipment or government approval. Compaction requirements specified in the solicitation are based on a 16 ton compactor. Number of passes for compaction shall be adjusted accordingly.
6f. Under the Optional Work (CDF-2) Bid Item 0009, it states Spill Box Removal and Replacement. The spec states Removal and Relocation (Sec 31 24 00.00 12, page 3, 1.1.4 CDF-2 Work). Please clarify? Also, please clarify the work relative to all the spill boxes. In the Base Work, Bid Item 0005, it states Spill Box Relocation for CDF-7.
Please clarify that scope of work? In the Optional Work, Bid Item 0008, it states CDF-7 Additional Spill Box. Is this Bid Item 0008, where the (5) runs of steel pipe are to be installed (Drawing C-11). In the specs the scope of work for the spill boxes is not clear and inconsistent.
Response 6f.
Description for Bid Item 0009: “CDF 2 – Spill Box Removal and Replacement - OW” is accurate. The intention is to remove existing spill box and replace it with a new one which will be installed close to the location of the existing one.
Paragraph 1.1.4 CDF-2 Work has been revised to read as follows:
“If Optional Work is exercised, CDF-2 work will consist of construction of a new dike at CDF-2; as specified herein and in Section 31 23 00.00 20 Excavation and Fill, and the removal and replacement of the spill box; and other incidental work; as specified herein and as shown on the drawings.”
Work on CDF-7 consist of relocation of the existing spill box, which includes relocation of the existing culverts, and installation of a second spill box which will include 5 new culverts. Sheet C-11 provides the culvert layout for the 5 new culverts to be installed with the new spill box.
Please refer to Section 05 50 13 Miscellaneous Metal Fabrications, paragraph 1.2 Measurement and Payment for a complete description on work to be covered under CLINS 0005 and 0008. Culverts for the new spill box on CDF-7 shall be included under CLIN 0008.
6g. Is there a method or requirement for how the contractor needs to excavate the borrow areas? (Example: If the contractor begins excavation in the middle of the borrow area, the haul distances would be minimized and the hauling operation more efficient).
Response 6g.
Sequencing of degrading operations is the contractor’s means and method. Excavation plan will be discussed post-award.
Question 7.
7a. Please define any density requirements to be met on the levee dikes?
Response 7a.
No specific density is required. Embankment construction requirements for placement, spreading and compaction has been provided as well as required compaction equipment.
7b. Will any erosion control fencing be required around the perimeter of the dikes?
Response 7b.
Same footprint is subject to turbidity increases when dredging is perform and does not create turbidity levels above baseline conditions. No erosion control fencing is required.
7c. Will the degrade material be allowed to be spread back over the outside footprint of the dike area once the dike is in place?
Response 7b.
No material will be allowed outside the footprint of the dike area.
7d. Will contractor be required to hydro seed and/or plant grass on levee once it is complete?
Response 7d.
Planting is not a requirement in this solicitation.
Question
7e. What is the anticipated Notice of Award Date.
Response
Award is anticipated to occur within 30 days after Notice to Proceed.
Is there a location to be provided by the owner that will allow the contractor water access for equipment and material on/off loading or is it the responsibility of the contractor to secure a staging location for its own use?
Response
The contractor is responsible of identifying and securing an onload/offload facility in order to gain water access.
Section 01100 – General Provisions, Paragraph 12 “Access Plan” provide more details on requirements for the access plan.
| �������� | � | �� | � ��������������������� !!!"!!#$�%&'(�)�(����)�����*+,-+.!../01231/45��6 | 789��8: | �8�;�<�� |
| � | ���8;;� | ��� =>/?�@A�@0B421C4=1@2��DED��� | �F=4=?�@A�123@0/@04=1@2FG0?=>H1?FI��J8: | �8�;�<�� | |
| � | ���8;;� | ��� |
/?03?2=��@A�K1L�/013? /?245�FGM�@A�K@2L4M@G2=�2@=�=@�?N3??LM1551@2HFI =O@GF42LHFI OG2L0?LHFI 3?2=F K1L�1L?2=1A134=1@2K1L�L4=? 12P1=4=1@2�2GMK?0
| QR����QSTF1B24=G0?HFI24M?HFI�U����=1=5?HFI�����VWX | ;� YZYZ [Z[Z \Z\ZHF]̂_I HF]̂_I HF]̂_I 3̀ ab̀âc]��������F]̂_����d��eST�feR%ghi�%fjF1B24=G0?HFI24M?HFI�����VWX | ;� YZYZ [Z[ZHF]̂_I HF]̂_I��RQ�RSg%�feR%ghi�%fjfeR%gh�S 24M?�U�4LL0?FF F=4=?�@A�123@0/@04=1@2514K151=>�51M1=�HkIF1B24=G0?HFI24M?HFI�U����=1=5?HFI�����VWX | ;� YZYZ [Z[Z 3̀ ab̀âc]��������F]̂_4G=O@01C?L�A@0�5@345�0?/0@LG3=1@2��l� | � |
| ���� | ; |
��JmV���8<9 fgS��SR��n�R��.#�iR%do�*+.!-pj�/a]qrast]u�tv�BF4�w�A40�Hxy�3A0I�z\Z[[yĤI
A@0��{���
��|���XX9
| ������ | �� | |
| � | ��@K51B4=1@2}���~]��c�]�/as�rsb̂_�̂�u�F�a]cvHs]qI�̂a]��sa�_v�t̀��u�c̀�c�]�G�sc]u�Fĉc]q�̀��4�]asr̂�H�]a]s�̂�c]a�r̂__]u�c�]�B̀ �]a��]�cI�s��c�]�̂t̀�]�b]�̂_�q��Z��Àa�b̂v�]�c�̀��c�]�b]�̂_�q�����]�ts�u��̀aq]_�]q��̀�a��]saq��]�]r�c̀aq��̂u�s�sqcâc̀aq��̂�u�q�rr]qq̀aq���̀s�c_v�̂�u�q]�]â__vZ��Ò �]�]a����]a]�c�]�F�a]cs]q�̂a]�r̀ab̀âcs̀�q�̂rcs���̂q�r̀wq�a]cs]q���]��c�]�F�a]cs]q��ts�u���̀aq]_�]q�s��q�r��q�����̀s�c_v�̂�u�q]�]â__v��̂q��]__�̂q��q]�]â__v��̀�_v��̀a�c�]�b�ab̀q]�̀��̂__̀�s���̂��̀s�c�̂rcs̀��̀a�̂rcs̀�q�̂�̂s�qc�̂�v�̀a�̂__�̀���qZ��Àa�̂__�̀c�]a�b�ab̀q]q��]̂r��F�a]cv�ts�uq�scq]_����̀s�c_v�̂�u�q]�]â__v��sc��c�]�/as�rsb̂_���̀a�c�]�b̂v�]�c�̀��c�]�q���q�̀���̀bb̀qsc]�c�]��̂�]�̀��c�]�F�a]cvZ��1���̀�_s�sc�̀��_ŝts_scv�sq�s�usr̂c]u��c�]�_s�sc�̀��_ŝts_scv�sq�c�]���__���̂̀ ��c�̀��c�]�b]�̂_�q��Z�����3@2L1=1@2F}���=�]�/as�rsb̂_��̂q�q�t�scc]u�c�]�tsu�su]�cs�s]u�̂t̀�]Z�����=O?0?A@0?}��=�]�̂t̀�]�̀t_s�̂cs̀��sq��̀su�s��c�]�/as�rsb̂_�w�ĤI��b̀��̂rr]bĉ�r]�tv�c�]�B̀ �]a��]�c�̀��c�]�tsu�su]�cs�s]u�̂t̀�]���sc�s��c�]�b]as̀u�qb]rs�s]u�c�]a]s���̀a�̂rr]bĉ�r]�Hqs�cv�H��I�ûvq�s���̀��b]as̀u�sq�qb]rs�s]uI��]�]r�c]q�c�]���ac�]a�r̀�cârc�̂_�ùr��]�cq�̂�u��s�]q�c�]�t̀�uHqI�a]��sa]u�tv�c�]�c]a�q�̀��c�]�tsu�̂q�̂rr]bc]u��sc�s��c�]�cs�]�qb]rs�s]u�Hc]��HY�I�ûvq�s���̀�b]as̀u�sq�qb]rs�s]uI�̂�c]a�a]r]sbc�̀��c�]��̀a�q�tv�c�]�bas�rsb̂_��̀a�HtI�s��c�]�]�]�c�̀���̂s_�a]�c̀�]�]r�c]�q�r����ac�]a�r̀�cârc�̂_�ùr��]�cq�̂�u��s�]�q�r��t̀�uq��b̂vq�c�]�B̀ �]a��]�c��̀a�̂�v�r̀qc��̀�bàr�as���c�]��̀ a����sr��]�r]]uq�c�]�̂�̀ ��c�̀��c�]�tsuZ����?̂r��F�a]cv�]�]r�cs���c�sq�s�qca��]�c�̂�a]]q�c�̂c�scq�̀t_s�̂cs̀��sq��̀c�s�b̂sa]u�tv�̂�v�]�c]�qs̀�HqI�̀��c�]�cs�]��̀a�̂rr]bĉ�r]�̀��c�]�tsu�c�̂c�c�]�/as�rsb̂_��̂ v��â�c�c̀�c�]�B̀ �]a��]�cZ��2̀ csr]�c̀�c�]�q�a]cvHs]qI�̀��]�c]�qs̀�HqI�sq��̂ s�]uZ��Ò �]�]a���̂ s�]a�̀��c�]��̀csr]�̂bb_s]q�̀�_v�c̀�]�c]�qs̀�q�̂��a]�̂cs����̀c��̀ a]�c�̂��qs�cv�H��I�r̂_]�ûa�ûvq�s��̂uuscs̀��c̀�c�]�b]as̀u�às�s�̂__v�̂__̀�]u��̀a�̂rr]bĉ�r]�̀��c�]�tsuZ����~1=2?FF}��=�]�/as�rsb̂_�̂�u�F�a]cvHs]qI�]�]r�c]u�c�sq�tsu�t̀�u�̂�u�̂��s�]u�c�]sa�q]̂_q�̀��c�]�̂t̀�]�ûc]Z�� |
L4=?�K@2L�?N?3G=?L�����
| �< | �98 |
| �� |
�8��< ;��X � �7�;8 �/̂b]a�̀ a��0]u�rcs̀��4rc�Fĉc]�]�c�w�=�sq�s��̀a�̂ cs̀��r̀__]rcs̀���]]cq�c�]�a]��sa]�]�cq�̀��xx�GF3���\z����̂q�̂�]�u]u�tv�q]rcs̀��[�̀��c�]�/̂b]a�̀ a��0]u�rcs̀��4rc�̀���Y��zZ��>̀��ù��̀c��]]u�c̀�̂�q�]a�c�]q]���]qcs̀�q���_]qq��]�usqb_̂v�̂��̂_su�@��sr]�̀��M̂ �̂�]�]�c�̂�u�K�u�]c�H@MKI�r̀�cà_����t]aZ��=�]�@MK�r̀�cà_����t]a��̀a�c�sq�r̀__]rcs̀��sq������w��xzZ��~]�]qcs�̂ c]�c�̂c�sc��s__�ĉ�]�Y��̀�a�c̀�a]̂u�c�]�s�qca�rcs̀�q���̂c�]a�c�]��̂rcq��̂�u�̂�q�]a�c�]���]qcs̀�qZ��F]�u�̀�_v�r̀��]�cq�a]_̂cs���c̀�̀�a�cs�]�]qcs�̂ c]��s�r_�us����q���]qcs̀�q��̀a�a]u�rs���c�sq�t�au]���̀a�̂�v�̀c�]a�̂qb]rcq�̀��c�sq�r̀__]rcs̀��̀��s��̀a�̂ cs̀��c̀}��B]�]â_�F]a�sr]q�4u�s�sqcâcs̀���0]��_̂c̀av�F]ra]ĉaŝc�Ls�sqs̀��HMYPY3KI��Yy���A�Fca]]c��2~��~ q̂�s��c̀���L3��[�x�zZ�� �@12=�P?2=G0?@=O?0���X �
�W�/40=2?0FO1/12L1P1LG453@0/@04=1@2
| � | � | ||||||||||||||||||||
| �� | ���� | �� | ��� | ||||||||||||||||||
| ������ | ��� | ��� | � | ||||||||||||||||||
| �� | � | ��� | �������� | �� | ��������� | �� | ��!������ | ���� | � | ||||||||||||
| �� | ���� | ��"" | ������� | � | |||||||||||||||||
| � | ������� | �##��!�" | �� | � | |||||||||||||||||
| � | ������������ | �� | $�����" | %��!�&��� | '� | (����� | � | ||||||||||||||
| � | ��"" | "���" | ���� | ��� | �������� | ������� | �� | � | |||||||||||||
| � | )���&�#�" | �� | � | ||||||||||||||||||
| � | �#�&� | ���������� | *)���&�#�"* | �� | � | ||||||||||||||||
| � | ��&� | �� | � | ||||||||||||||||||
| � | ����� | � | ��� | ||||||||||||||||||
| ������ | #����� | � | |||||||||||||||||||
| �"" | ���� | � | |||||||||||||||||||
| � | ����� | �� | #����� | ������� | �� | � | ��#���������!� | &�#�&��� | +����, | �� | ��������-��-��&�. | ���� | ������ | ||||||||
| �!����&� | �� | ��� | |||||||||||||||||||
| ����� | �� | � | |||||||||||||||||||
| �� | ��#���������!� | �� | ��� | � | ������ | �� | � | ||||||||||||||
| � | ����, | #������� | |||||||||||||||||||
| �#, | �� | /���� | !������, | �� | �� | ����&�� | �� | � | |||||||||||||
| � | &��#������� | ��!�"!��� | 0� | � | |||||||||||||||||
| � | ���� | ��� | �1#���� | #���" | ��� | �� | � | #��&������ | �� | � | |||||||||||
| � | ��� | #��&�� | (� | � | |||||||||||||||||
| ��� | &����, | � | |||||||||||||||||||
| � | ���� | ��� | ����� | � | ��1���� | ��""�� | "��������� | +����, | '23 | �� | � | ||||||||||
| � | ��� | #��&� | ��� | � | |||||||||||||||||
| � | ������ | ��� | �� | �1&��� | ��""���.� | 4� | +�. | 5��#�������� | �1�&����� | � | |||||||||||
| � | ���� | �� | �������� | ���� | �##��� | �� | � | ||||||||||||||
| � | 6�#������� | �� | � | ||||||||||||||||||
| � | ��������7� | "��� | �� | �##��!�� | �������� | ��� | ���� | �&� | ��� | ||||||||||||
| �� | � | ||||||||||||||||||||
| � | "���������� | "����� | � | ||||||||||||||||||
| ������ | � | ||||||||||||||||||||
| � | !�"�� | #�� | ���� | � | |||||||||||||||||
| � | 8( 9(8(�: | 8(;(� | �"�&< | �� | � | ||||||||||||||||
| � | #���" | ��� | +����, | � | |||||||||||||||||
| � | ��&� | !�"��. | �� | � | |||||||||||||||||
| � | ����, | ��"��� | � | &�-������ | ����������� | �� | #��#����� | +�. | = | ||||||||||||
| �� | ��"��#"� | &��#����� | �������� | ��� | ��!�"!��, | � | |||||||||||||||
| ��� | ����� | ��� | ��������� | � | |||||||||||||||||
| �"" | �##��� | �� | � | ||||||||||||||||||
| � | �#�&�� | +%����� | , | %����� | 9, | ��&�. | |||||||||||||||
| ����� | *5>?)>? �@ | %A?@�:+(@%.�* | (� | � | |||||||||||||||||
| � | �#�&� | ���������� | *%A?@�:+(@%.* | �� | � | ||||||||||||||||
| � | ��&� | �� | � | ||||||||||||||||||
| � | ����, | ������ | ��"� | � | |||||||||||||||||
| � | "����� | ���������� | &�����#������ | �� | ��& | ||||||||||||||||
| �� | � | ||||||||||||||||||||
| � | ��������� | ;����!��, | � | ||||||||||||||||||
| �� | &�-������ | ������������ | �1���, | � | |||||||||||||||||
| � | #������ | ��� | �""�&��� | � | |||||||||||||||||
| ��� | ���#�&��!� | "���������� | �� | "����"��� | ����� | � | |||||||||||||||
| � | ����, | #��!���� | � | ||||||||||||||||||
| �� | � | ||||||||||||||||||||
| � | ��� | ����" | �� | � | |||||||||||||||||
| ��� | "����"��� | ����"� | |||||||||||||||||||
| 223 | �� | � | |||||||||||||||||||
| � | ���� | #���" | ���� | +&. | = | ||||||||||||||||
| �� | ����!����" | �������� | ��� | ��!�"!��, | � | &��#"���� | �����!�� | �� | (���!����" | %����� | +%������� | B��� | 'C. | ��� | ��& | ||||||
| ����!����" | ������, | � | |||||||||||||||||||
| �"" | �&&��#��� | � | |||||||||||||||||||
| � | ����� | � | |||||||||||||||||||
| � | $�!������� | ��� | ������� | � | |||||||||||||||||
| � | ������ | �� | ������ | ||||||||||||||||||
| ���������" | �������������� | ����������� | &��&������ | ��� | �����&��" | &�#���"���� | D� | 5��#�������� | �1�&����� | � | |||||||||||
| � | ���� | � | |||||||||||||||||||
| �"" | ����1 | � | |||||||||||||||||||
| ��� | &��#����� | ���"�� | (���!����"� | � | |||||||||||||||||
| �"" | �1�&��� | � | |||||||||||||||||||
| � | ���� | �##����� | � | ||||||||||||||||||
| � | ���� | *5��#����� | %��"*E | ��� | � | ||||||||||||||||
| �"" | ����1 | �� | �� | ||||||||||||||||||
| ���!� | ���" | �� | �1�&���� | �� | ;����, | F�� | G��#� | ||||||||||||||
| ���, | �� | ��� | �� | ||||||||||||||||||
| �� | /������&���� | ��������� | �� | ||||||||||||||||||
| ���!� | ���"�� | H� | ��#� | � | |||||||||||||||||
| � | ���� | ��� | ���"� | �� | ��& | ||||||||||||||||
| #����� | ������� | � | |||||||||||||||||||
| �� | ���� | �� | � | ||||||||||||||||||
| � | �#�&� | #��!����� | I� | (� | ��� | �##"�&����� | �� | ���������� | &�����&��, | � | |||||||||||
| � | ����� | *���* | ��� | *������* | � | ||||||||||||||||
| �"" | ��&"��� | *#��#���"* | ��� | *��������* |
���J�K L F ;@ M 66?@%% %� �@ >B (F5>?)>? �(>F8( 9(8(�: 8(;(� +N.%($F �A?@+%.F ;@+%. M �(�8@+%. OPQRSTU � '�'� 5��#����� %��"5��#����� %��"8( 9(8(�: 8(;(� +N.%� �@ >B (F5>?)>? �(>F'�'� �F ;@+%. M �(�8@+%. OPQRSTU%($F �A?@+%.F ;@ M 66?@%%���J�K � 5��#����� %��"8( 9(8(�: 8(;(� +N.'�'�%� �@ >B (F5>?)>? �(>F �F ;@+%. M �(�8@+%. OPQRSTU%($F �A?@+%.F ;@ M 66?@%%���J�K V 5��#����� %��"8( 9(8(�: 8(;(� +N.'�'�%� �@ >B (F5>?)>? �(>F �F ;@+%. M �(�8@+%. OPQRSTU%($F �A?@+%.F ;@ M 66?@%%���J�K J 5��#����� %��"8( 9(8(�: 8(;(� +N.'�'�%� �@ >B (F5>?)>? �(>F �F ;@+%. M �(�8@+%. OPQRSTU%($F �A?@+%.F ;@ M 66?@%%���J�K W 5��#����� %��"8( 9(8(�: 8(;(� +N.'�'�%� �@ >B (F5>?)>? �(>F
�F ;@+%. M �(�8@+%. OPQRSTU%($F �A?@+%.F ;@ M 66?@%%���J�K X
| ��Y�VY�V | W��Z | [\ | +?@]� | Ĉ'2 |
| H. | LY�_ |
| AM_003_W912P820B0018_ED 19-044.pdf |
| Amendment 003 |
| “1.2 MEASUREMENT AND PAYMENT |
| “3.1.1 Borrow-General |
| “1.1.4 CDF-2 Work |
| “3.4.1 Existing Spill Box Removal |
| “3.8 CDF-2 Spill Box Removal and Replacement (Optional Work). |
| Revised Sheets C-13 & C-14 |
| C-13_CDF 2 Dike Plan |
| C-14_CDF 2 Theoretical Sections |