20B0006 Amendment 0001.pdf
PDF 316 KB Posted
- Solicitation number
- W912P8-20-B-0006
About this file
This solicitation is for a Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge rental contract. The work consists of furnishing one fully crewed and equipped self-propelled trailing suction type hopper dredge on a rental basis to perform dredging work in the Mississippi River Southwest Pass and possibly other areas of the New Orleans, Galveston, and Mobile Districts. The estimated value of the work is between $5 million and $10 million. The solicitation was issued on November 14, 2019, with bids to be opened on a future date as established in an amendment. This is an unrestricted procurement under NAICS code 237990. Offerors are encouraged to register as interested vendors on Beta SAM, where the solicitation documents will be posted, and to post subcontracting opportunities on the SBA Subnet. Offerors must register with SAM to receive an award. The point of contact for the solicitation is the listed Contract Specialists.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P820B0006 Bid Abstract.pdf | ||
| 20B0006 AM0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OM-20-277
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The subject Solicitation Mississippi River, Baton Rouge to Gulf of Mexico, Southw est Pass Hopper Dredge Rental Contract No. 3-2020, Plaquemines Parish, Louisiana (OM-20-003). has been modified to:
1. Set the bid opening date to Tuesday, April 21, 2020 at 11:00am local time.
2. Make changes to the solicitation as detailed in the f ollow ing pages. All other terms and conditions remain unchanged.
"Due to the impacts of COVID-19, the USACE New Orleans District has placed most personnel on telew ork. As such, w e are implementing a process w hich w ill allow for the submission of bids electronically, as w ell as having virtual bid openings through Webex.
Once the process has been fully established w e w ill issue an Amendment w ith the specific details on how contractors w ill be able to submit bids and the Webex meeting details.
For any questions, please contact the Contracting Officer, (Ione Cataldo, 504-862-2882), or the Contract Specialist, (Cori Caimi, 504-862-1352)."
1. CONTRACT ID CODE PAGE OF PAGES
1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Mar-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P820B0006
X 9B. DATED (SEE ITEM 11)
13-Nov-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Mar-2020
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P820B0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00600 - REPS AND CERTS
The following have been deleted:
52.204-8
SECTION SF 30 - SF 30 CONTINUATION
The following have been added by full text:
AM0001
1. General comment: Delete any reference within the specifications to Edward Creef and replace with the following point of contact: Jeff Corbino, phone: (504) 862-1958, email: Jeffrey.M.Corbino@usace.army.mil.
2. Standard Form 1442, box 11: Delete “within 5 calendar days” and replace with “no earlier than 1 January 2021 and no later than 15 January 2021”.
3. Section 00010, paragraph 1.1 “Bidding Schedules”: Delete this paragraph in its entirety and replace with the attached paragraph 1.1 entitled “Bidding Schedules”.
4. Section 00010, paragraph 1.5 “Conditions of Contract Award”, subparagraph c: In the last sentence, delete “120 hours after receipt of Notice to Proceed by the Contractor” and replace with “15 January 2021”.
5. Section 00010, paragraph 1.5 “Conditions of Contract Award”, subparagraph c, table entitled “Approximate
Hopper Dredge Contract Duration (Base Plus Option)”: Delete this table in its entirety and replace with the attached table entitled “Approximate Hopper Dredge Contract Duration (Base Plus Option)”.
6. Section 00010, paragraph 1.5 “Conditions of Contract Award”, subparagraph d: Delete “within 120 hours after receipt of Notice to Proceed by the Contractor” and replace with “no earlier than 1 January 2021 and no later than 15 January 2021”.
7. Section 00700, FAR Clause 52.211-10 "Commencement, Prosecution, and Completion of Work (Apr 1984)":
Delete "within 5 (five) calendar days after the date the Contractor receives the notice to proceed" and replace with "no earlier than 1 January 2021 and no later than 15 January 2021". Also, delete "after the date of receipt by Contractor of notice to proceed" and replace with "after 15 January 2021".
8. Section 00800, paragraph 3.1 “Delivery of Plant”, subparagraph a: In the first sentence, delete “within 120 hours after receipt by the Contractor of the Notice to Proceed” and replace with “no earlier than 1 January 2021 and no later than 15 January 2021”.
9. Section 00800, paragraph 3.4 “Equipment Ownership and Operating Expense Schedule”: Delete this paragraph in its entirety and replace with attached paragraph 3.4 entitled “Construction and Architect-Engineer (A-E) Contracts (UAI 5131.105)”.
10. Section 01 30 00, paragraph 1.14 “Suspicious Activity Reporting Training”: Delete this paragraph in its entirety.
11. Section 01 30 00, Part 1 “General”: Insert the attached paragraph 1.14 “Fuel Price Adjustment” after existing paragraph 1.13 “Fuel Consumption Reporting Requirements”.
12. Section 35 20 23.23, Part 2 “Products”: In the first sentence, delete “due to the fact that the services of the equipment are leased by the Government,”.
13. Section 35 20 23.23, paragraph 2.1.4 “Dredge Plant”, subparagraph b, table entitled “Theoretical Hopper
Dredge Production Rates (cy/day)”: Delete this table in its entirety and replace with the attached table entitled “Theoretical Hopper Dredge Production Rates (cy/day)”.
14. Section 35 20 23.23, paragraph 2.2 “Gages”, subparagraph g: Delete the third sentence in the first paragraph.
15. Section 35 20 23.23, paragraph 3.3.1 “Mississippi River and Southwest Pass, Louisiana”: Delete the first two sentences of the paragraph and replace with: “The authorized dimensions of the channel are 50 feet Mean Lower Low Water (MLLW) datum by 750 feet bottom width from New Orleans to Mile 17.5 Below Head of Passes, then narrowing to 600 feet wide through the jetty channel and bar channel.”
16. Section 35 20 23.23, paragraph 3.8 “Work For Others”: Insert the following as subparagraph c, and rename existing subparagraph c as subparagraph d: “c. If the dredge returns to an assignment in another dredging region and the dredge in tow never enters the route that would have been taken had the dredge not been released, when dredged material starts flowing through the discharge pipeline; or”.
Section 00010, Paragraph 1.1 “Bidding Schedules”:
1.1 BIDDING SCHEDULES
SECTION 00010 – BIDDING SCHEDULE
MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO, SOUTHWEST PASS
HOPPER DREDGE RENTAL CONTRACT NO. 3-2020
PLAQUEMINES PARISH, LOUISIANA
SOLICITATION NO. W912P820B0006
LOT ONE (Ellis Island), 34 inch Inside Diameter (ID) Pump Suction, 14,788 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant
Bid Item
Description Estimated Quantity
Unit Unit Price
Total Price
Mobilization & Demobilization of hopper dredge and all attendant plant.
1 Job
Dredging - Rental of a trailing type hopper dredge.
2755 Hour
Option
Option Dredging - Same plant listed in Item No. 0002 of this bid lot.
689 Hour XXXXXXXX
Total: LOT ONE BID
*SEE BID FORM NOTES
LOT TWO (Glenn Edwards), 38 inch Inside Diameter (ID) Pump Suction, 12,430 cubic yard Nominal Hopper Capacity, Two Dragarms and all
Item Description
Estimated Quantity Unit
Unit Price
Total Price
Mobilization & Demobilization of hopper dredge and all attendant plant.
1 Job
Dredging - Rental of a trailing type hopper dredge.
2875 Hour
Option
Option Dredging - Same plant listed in Item No. 0002 of this bid lot.
719 Hour XXXXXXXX
Total: LOT TWO BID
LOT THREE (Stuyvesant), 33.5 inch Inside Diameter (ID) Pump Suction, 9,400 cubic yard Nominal Hopper Capacity, Two Dragarms and all
Estimated Quantity Unit
Unit Price
Total Price
Mobilization & Demobilization of hopper dredge and all attendant plant.
1 Job
Dredging - Rental of a trailing type hopper dredge.
3792 Hour
Option
Option Dredging - Same plant listed in Item No. 0002 of this bid lot.
948 Hour XXXXXXXX
Total: LOT THREE BID
LOT FOUR (Terrapin Island), 33.5 inch Inside Diameter (ID) Pump Suction, 6,300 cubic yard Nominal Hopper Capacity, Two Dragarms and all
Estimated Quantity Unit
Unit Price
Total Price
Mobilization & Demobilization of hopper dredge and all attendant plant.
1 Job
Dredging - Rental of a trailing type hopper dredge.
4633 Hour
Option
Option Dredging - Same plant listed in Item No. 0002 of this bid lot.
1158 Hour XXXXXXXX
Total: LOT FOUR BID
LOT FIVE (Magdalen), 39.37 inch Inside Diameter (ID) Pump Suction, 8,300 cubic yard Nominal Hopper Capacity, One Dragarm and all attendant plant
Estimated Quantity Unit
Unit Price
Total Price
Mobilization & Demobilization of hopper dredge and all attendant plant.
1 Job
Dredging - Rental of a trailing type hopper dredge.
4973 Hour
Option
Option Dredging - Same plant listed in Item No. 0002 of this bid lot.
1243 Hour XXXXXXXX
Total: LOT FIVE BID
Section 00010, paragraph 1.5.c, table entitled “Approximate Hopper Dredge Contract Duration (Base Plus Option)”:
APPROXIMATE HOPPER DREDGE
CONTRACT DURATION
(BASE PLUS OPTION)
Bid Lot Pump Inside Dia.
(inches) Hopper Size (Cubic Yards)
Number of Dragarms
Approximate Number of Rental
Days
1 34 14788 2 198
2 38 12430 2 205
3 33.5 9400 2 257
4 33.5 6300 2 305
5 39.37 8300 1 325
Section 00800, paragraph 3.4 “Equipment Ownership and Operating Expense Schedule”:
3.4 CONSTRUCTION AND ARCHITECT-ENGINEER (A-E) CONTRACTS (UAI 5131.105)
(d)(2)(i)(B) For the predetermined schedule of construction equipment use rates, use Engineer Pamphlet (EP) 1110- 1-8, Construction Equipment Ownership and Operating Expense Schedule.
(End of special contract requirement)
Note 1: Reference "Construction and Architect-Engineer Contracts" (FAR 31.105). Costs for repairs or overhauling are not allowed.
Note 2: A copy of the "EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE" (Region III) can be obtained from the following website:
https://www.publications.usace.army.mil/Portals/76/Users/182/86/2486/EP%201110-1- 8%20Vo3%20.pdf?ver=2019-12-02-104221-527
Section 01 30 00, Part 1 “General”, paragraph 1.14 “Fuel Price Adjustment”:
1.14 FUEL PRICE ADJUSTMENT
a. The fuel price adjustment shall be made monthly for the item identified below, upward or downward, to reflect the percentage change in the fuel price index of the Bureau of Labor Statistics (BLS) Producer Price Indexes for #2 diesel fuel, WPU 057303 (Not Seasonally Adjusted). For the purpose of this clause, the term "fuel cost per contract unit" means that part of the contract unit price of the dredging operation that is attributable solely to the cost of fuel.
The fuel cost per contract unit is established below:
Dredging Item........................18% of contract unit price
b. The Preliminary BLS Producer Price Index for No. 2 diesel fuel, WPU05703, available on the BLS website for the April 2020 price shall be recorded in contract documents and shall serve as the basis of any price adjustments throughout the contract, to include any option periods, if exercised. The monthly fuel price adjustment shall be calculated by multiplying the fuel cost per contract unit as determined above, by the percentage change in the Preliminary BLS Indices, by the quantity of work performed under the item.
Fuel Price Adjustment for Dredging Item = [(Dollar Amount of Dredging Item)*(0.18)*(Latest Preliminary BLS Index - Preliminary BLS Index for April 2020)] / [Preliminary BLS Index for April 2020]
A price adjustment, upward or downward, shall be made on each monthly payment. Option periods, if exercised, shall be calculated in the same manner, always comparing to the Preliminary BLS Index for April 2020. If any preliminary index is later revised by the BLS, this contract will not be adjusted based upon the revision.
Section 35 20 23.23, paragraph 2.1.4 “Dredge Plant”, subparagraph b, table entitled “Theoretical Hopper Dredge Production Rates (cy/day)”:
THEORETICAL HOPPER DREDGE PRODUCTION RATES (cy/day)
Lot Pump
Inside Diameter (inches)
Hopper Size
(cubic yards)
Number of Drag Arms
Dredge & Haul
Production All
Projects
Agitation Production
SW Pass (cy/day)
Calcasieu (cy/day)
1 34.0 14,788 2 89,638 219,124 246,514
2 38.0 12,430 2 85,383 217,037 244,166
3 33.5 9,400 2 64,729 164,890 185,502
4 33.5 6,300 2 51,286 167,856 188,838
5 39.37 8,300 1 49,677 121,028 136,157
"General Decision Number: LA20200007 01/03/2020
Superseded General Decision Number: LA20190007
State: Louisiana
Construction Type: Heavy Dredging
Counties: Louisiana Statewide.
DREDGING PROJECTS ALONG THE GULF COAST AREA INCLUDING THE
MISSISSIPPI RIVER AND ITS TRIBUTARIES TO THE OHIO RIVER
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020
* SULA1994-001 04/01/1994
Rates Fringes
Derrick Operator.................$ 7.25
Dozer Operator...................$ 7.25
Dredge 16"" and Over Deckhand....................$ 7.25 Dredge tender operator......$ 7.25 Fireman.....................$ 7.25 First assistant engineer....$ 7.25 Leverman....................$ 7.25 Oiler.......................$ 7.25 Second assistant engineer...$ 7.25 Shoreman....................$ 7.25 Third assistant engineer....$ 7.25 Truck driver................$ 7.25 Welder......................$ 7.25
Dredge Under 16"" Deckhand....................$ 7.25 Dredge tender operator......$ 7.25 Leverman....................$ 7.25 Oiler.......................$ 7.25 Welder......................$ 7.25
Hydraulic Dredging First cook..................$ 7.25 Handyman....................$ 7.25 Janitor, cabin person.......$ 7.25 Second cook.................$ 7.25
Marsh Buggy Dragline, Oiler......$ 7.25
Marsh Buggy Dragline, Operator...$ 7.25
Self-Propelled Hopper Dredge, Drag Tender......................$ 9.70 3.45+a
FOOTNOTE: Fourteen paid vacation days and eight paid holidays: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day & Christmas Day provided the employee has one year of service.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
| 2020-03-20T15:43:14-0500 | |
| CATALDO.IONE.MARIE.1230854862 |
File details come from the government source that posted it. Updated .