A22_Amendment 0002_W912P820B0001.pdf
PDF 5 MB Posted
- Solicitation number
- W912P820B0001
About this file
This federal solicitation seeks competitive bids for a firm fixed-price construction contract valued between $25-100 million. The U.S. Army Corps of Engineers Engineering District New Orleans will award the contract for work on the NEW ORLEANS TO VENICE, LOUISIANA, NOV-NF-W-06A.1, WOODPARK TO POINTE CELESTE PUMP STATION project in Plaquemines Parish, Louisiana. Scope of work includes clearing, grubbing, excavation, embankment, access ramp construction, geotextile placement, surfacing, culvert and pipe installation, turf establishment, asphalt paving, canal construction and other incidental tasks. The solicitation was issued on May 25th, 2020 as a total small business set-aside under NAICS 237990. Bids are due by June 25th, 2020 at 2:00pm CST. Plans and specifications are available through the SAM.gov website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01_Official Abstract_W912P820B0001.pdf | ||
| ED 14-027_Amend0002_Plans.pdf | ||
| A22_Amendment 0001_W912P820B0001.pdf | ||
| W912P820B0001.pdf | ||
| NOV-NF-W-06a.1_Plans_Part3.pdf | ||
| NOV-NF-W-06a.1_Plans_Part4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Reference Solicitation No. W912P820B0001, for NEW ORLEANS TO VENICE, LOUISIANA, NOV-NF-W-06A.1, WOODPARK TO POINTE
CELESTE PUMP STATION, PLAQUEMINES PARISH, LOUISIANA, is amended as follow s:
Please see continuation pages for changes
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P820B0001
X 9B. DATED (SEE ITEM 11)
26-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Jun-2020
CODE
VICKSBURG DISTRICT CONTRACTING OFFICE
4155 CLAY ST.
VICKSBURG MS 39183-3435
W912EE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P820B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
PROJNET WILL BE CLOSED TO QUESTIONS ON FRIDAY, 26 JUNE 2020 @ 04:00 P.M.
SPECIFICATIONS:
SECTION 00010
Page 00010-3 thru 7. Delete the Bidding Schedule in its entirety and substitute the attached revised Bidding Schedule, page 00010-3 thru 7.
SECTION 01100
Page 18, paragraph 17 (a)(1). New Permanent Road: Delete the 1st and 2nd sentence of this paragraph in their entirety and substitute the revised sentences as follows:
“Lake Hermitage Road beginning at approximately C/L Sta. 29+00. The new permanent road at Lake Hermitage shall be constructed in accordance with Section 32 12 16.00 12 ASPHALTIC PAVEMENT, and as shown on the contract drawings, once construction of the new levee is completed to approximate C/L Sta. 30+50.”
SECTION 31 23 00.00 12
Page 13, paragraph 3.6. Add the new paragraph “3.7 GRADE TOLERANCES” after paragraph 3.6 DEGRADING EXISTING LEVEES.
“3.7 GRADE TOLERANCES
Excavation of the drainage canal shall be cut to the grades and cross sections shown on the drawings. A tolerance not to exceed 0.25 of a foot below the prescribed grade and cross section shown will be permitted."
SECTION 31 24 00.00 12
Page 4, paragraph 1.3.1.1. Phase I Compacted Fill, Phase II Compacted Fill (Optional Work) and Uncompacted Fill. Delete the 3rd sentence “In areas where…” in its entirety and substitute the revised sentence(s) as follows:
“In areas where uncompacted fill is utilized to fill the drainage canal the basis of measurement for uncompacted fill will be cross sections taken prior to phase I work (as stated above) and the cross sections taken by the Government after final grading of the uncompacted fill is performed. The basis of measurement for compacted fill in areas where uncompacted fill is placed will be the Government cross sections taken after final grading of the uncompacted fill and the theoretical design section.”
Page 6, paragraph 1.4.2. Sand Fill. Delete the 2nd sentence in its entirety and substitute the revised sentence as follows:
“Price and payment shall constitute full compensation for furnishing all plant, labor, testing, materials, and equipment required, and performing all operations necessary for construction of the sand base, including foundation preparation, material processing, placing and compacting the material to design grade and other incidental work required to complete the required sand fill operation.”
Page 12, paragraph 1.5.1 (13). Uncompacted Fill. Delete the 1st sentence in its entirety and substitute the revised sentence as follows:
“The Contractor shall perform one soil classification, one organic content and one moisture test as specified in QUALITY CONTROL "General", subparagraph (10) in any lift that uncompacted fill is placed.”
Page 14, paragraph 1.8 4.1. Moisture Control Uncompacted Fill. Delete the 1st sentence in its entirety and substitute the revised sentence as follows:
“Uncompacted fill shall be placed at a moisture content of not greater than 20 percent of optimum moisture content and not to exceed 50 percent total moisture content as determined from ASTM D 698.”
SECTION 32 92 19.04 12
Page 8, paragraph 2.1.4. Mulch. Delete this paragraph “Mulch shall be 100%...” in its entirety and substitute the revised paragraph as follows:
"Mulch options include threshed straw from a cereal grain such as oats, wheat, barley, rye, or rice; bagasse; grass hay; or wood mulch fiber that shall be furnished and applied by the Contractor. All mulch products shall include a minimum 3% tackifier or be anchored by a method approved by the Contracting Officer. Materials that contain noxious grass or weed seeds that might be detrimental to the seed establishment or turf growth or to adjacent areas will not be acceptable. Mulch shall not contain any paper fiber product."
SECTION 33 40 01.00 12
Page 3, paragraph 1.3. Corrugated Metal Pipe. Delete the 2nd sentence in its entirety and substitute the revised sentence as follows:
“Payment will be made at the contract unit price per linear foot for "Corrugated Metal Arch Pipe (83"x57").”
DRAWINGS:
SHEET IDENTIFICATION No. G-05, G-07, C-01, C-11, C-17, C-24d, C-27, C-307, C-308 and CS-01. Delete these drawing in their entirety and substitute the attached revised drawings SHEET IDENTIFICATION No. G-05, G-07, C-01, C-11, C-17, C-24d, C-27, C-307, C-308 and CS-01.
00010-3 ED 14-027
SECTION 00010 – BIDDING SCHEDULE
New Orleans To Venice, Louisiana
NOV-NF-W-06A.1,
Woodpark To Pointe Celeste Pump Station, Plaquemines Parish, Louisiana
Item DESCRIPTION Estimated Quantity Unit Unit
Price Estimated Amount
BASE WORK
0001 Mobilization and Demobilization 1 JOB
0002 Canal Maintenance 1 JOB
0003 Traffic Control and Coordination 1 JOB
0004 Silt Fences
*0004AA First 60,000 LF 60,000 LF
*0004AB All Over 60,000 LF 15,000 LF
0005 Truck Wash-Down Racks 1 JOB
*0006 Separator Geotextile 95,000 SY
0007 Reinforcement Geotextile 42,700 SY
0008 Clearing and Grubbing 1 JOB
0009 Excavation, New Drainage Canal
*0009AA First 230,000 CY 230,000 CY
*0009AB All Over 230,000 CY 23,000 CY
0010 Embankment, Compacted Fill
*0010AA First 978,000 CY 978,000 CY
*0010AB All Over 978,000 CY 244,500 CY
0011 Sand Fill 430 CY
0012 Embankment, Uncompacted Fill
0012AA First 255,000 CY 255,000 CY
0012AB All Over 255,000 CY 127,500 CY
0013 Maintenance of Levee Protection 1 JOB
0014 Asphaltic Pavement 1 JOB
00010-4 ED 14-027
0015 Surfacing
*0015AA First 31,000 CY 31,000 CY
*0015AB All Over 31,000 CY 7,800 CY
0016 Seeding and Mulching 263 AC
0017+ Lime Soil Amendment 263 TON
0018+ Sulfur Soil Amendment 131 TON
0019 Fertilizer
0019AA First 52,600 LBS 52,600 LBS
0019AB All Over 52,600 LBS 26,300 LBS
0020 Turf Mowing
0020AA First 231 Acres 231 AC
0020AB All Over 231 Acres 693 AC
0021 8-inch HDPE Water Line 1,200 LF
0022 18-inch HDPE Pipe 138 LF
0023 18-inch Lateral Ditch PVC Culverts 1,320 LF
*0024 24-inch RCP Culverts 56 LF
*0025 36-inch RCP Culverts 368 LF
*0026 48-inch RCP Culverts 560 LF
*0027 54-inch RCP Culverts 2000 LF
*0028 Corrugated Metal Arch Pipe (83”x57”) 70 LF
*0029 Bedding 720 CY
TOTAL BASE WORK: $
OPTIONAL WORK (OW) – PHASE II
*0030 Silt Fences - OW 30,000 LF
*0031 Clearing - OW 1 JOB
*0032 Embankment, Compacted Fill -
OW
*0032AA First 170,000 CY 170,000 CY
00010-5 ED 14-027
*0032AB All Over 170,000 CY 51,000 CY
*0033 Seeding and Mulching - OW 55 AC
*0034+ Lime Soil Amendment - OW 55 TON
*0035+ Sulfur Soil Amendment - OW 28 TON
*0036 Fertilizer - OW
*0036AA First 11,000 LBS 11,000 LBS
*0036AB All Over 11,000 LBS 5,500 LBS
*0037 Turf Mowing - OW
*0037AA First 88 AC 88 AC
*0037AB All Over 88 AC 265 AC
TOTAL OPTIONAL WORK $
TOTAL BASE WORK + OPTIONAL WORK $
* Denoted change from previous Bidding Schedule.
+Items not subject to the requirements of FAR 52.211-18 VARIATION IN ESTIMATED QUANTITY.
NOTE 1: The unit “JOB” as used in this Pricing Schedule is synonymous with the term “Lump Sum”.
NOTE 2: Award will be made as a whole to one bidder. Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED TOTAL
OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE DECLARED NON-
RESPONSIVE AND THEREFORE INELIGIBLE FOR AWARD.
NOTE 3: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2).
NOTE 4: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
00010-6 ED 14-027
NOTE 5: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
NOTE 6: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line items identified in the schedule as OPTIONAL WORK Items, in the quantity and price stated in the schedule. The Contracting Officer may exercise the OPTIONAL WORK Items by written notice to the Contractor. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). The Government will exercise OPTIONAL WORK no later than 450 calendar days after Notice to Proceed of this contract. Failure to bid on all items will result in a non-responsive bid.
NOTE 7: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). If an option is to be exercised at the time of contract award FAR 17.208 shall be used in place of FAR 52.217-5.
NOTE 8: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF OPTIONAL
WORK. In the event that the OPTIONAL WORK area is exercised under the terms of the contract, the time required for completion of the contract shall be 568 calendar days in addition to the original contract duration of 1170 calendar days established for the BASE WORK items specified in the Contract Clause entitled “COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52-211-10 – APR 1984)”.
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
00010-7 ED 14-027
EVALUATION OF SUBLINE ITEMS (Dec 2019 - AFARS 5152.211-9000).
Item Nos. 0004, 0009, 0010, 0012, 0015, 0019, 0020, 0032, 0036, and 0037 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its subline items.
(End of Clause)
VARIATIONS IN ESTIMATED QUANTITIES - SUBLINE ITEMS (Dec 2019 –
AFARS 5152.211-9001).
This variation in estimated quantities clause is applicable only to item Nos. 0004, 0009, 0010, 0012, 0015, 0019, 0020, 0032, 0036, and 0037.
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent subline item or elimination of all work under such a second or subsequent subline item will not be the basis for an adjustment in contract unit price.
(b) Where the actual quantity of work performed for item Nos. 0004, 0009, 0010, 0012, 0015, 0019, 0020, 0032, 0036, and 0037 is less than 85% of the quantity of the first subline item listed under such item, the Contractor will be paid at the contract unit price for that subline item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause at Federal Acquisition Regulation
(FAR) 52.211-18, VARIATION IN ESTIMATED QUANTITY.
(c) If the actual quantity of work performed under item Nos. 0004, 0009, 0010, 0012, 0015, 0019, 0020, 0032, 0036, and 0037 exceeds 115% or is less than 85% of the total estimated quantity of the subline item under that item and/or if the quantity of the work performed under the second subline item or any subsequent subline item under item Nos. NONE exceeds 115% or is less than 85% of the estimated quantity of any such subline item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR
52.211-18, VARIATION IN ESTIMATED QUANTITY.
(End of Clause)
18A
43a
G-05
:1
E D -1
-0
G -0
.d g n
A N
D M
IS
C
E L L
A N
E O
U S D
A T
A
T A
B U
L A
T
IO
N O
F F
A C
IL
IT
IE
S
L E
V E
E D
E S
IG
N
R
E M
O V
E D I T
E M
S F
R O
M T
A B F
O R D
W G
C -1
J
U N
W .J .L
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
H -0
-4
P L
A Q
U E
M
IN
E S P
A R
IS
H L
A
W P -2
-B -0
A N N
G U
Y E
N
A .N
D .H
U E
T E
W O
O D
P A
R K T
O P
O
IN
T E C
E L E
S T
E P
U M
P S
T A
T
IO
N
N O
V -N
F -W a .1
N E
W O
R L E
A N
S T
O V
E N
IC
E L
O U
IS
IA
N A
L A
U R
E N H
H A
T T
E N P .E
S
E P
S E
P T
E M
B E
R
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(2)**
Y - COORDINATEX - COORDINATEITEM
Y - COORDINATEX - COORDINATEITEM
3,728,254.42 411,357.27
410,825.68
410,729.01
410,555.01
410,495.23
410,433.13
408,494.38
408,391.20
408,083.56
407,515.12
3,729,218.64
3,729,389.28
3,729,647.08
3,729,724.62
3,729,800.32
3,732,180.55
3,732,316.46
3,732,073.10
3,732,480.25
3,732,704.72 407,052.95
3,733,576.49 405,810.91
3,734,262.05 404,914.60
3,734,398.79 404,710.88
3,734,179.13 403,971.24
3,734,791.57 402,905.75
3,735,191.69 402,541.38
3,735,500.06 402,286.82
3,734,752.64 401,123.97
3,736,239.95 399,602.56
3,736,358.16 399,433.62
3,737,156.49 399,406.11
3,737,420.12 399,395.73
3,737,451.70 399,389.23
3,737,611.84 399,338.13
3,738,698.21 398,861.84
3,740,360.28 398,357.80
3,740,909.91 398,229.04
3,742,351.72 397,936.96
3,743,493.86 397,730.72
3,743,929.96 397,665.85
ITEM OWNER DISPOSITIONDESCRIPTION
AERIAL LINES W/ POLES
FH
TRANSMISSION TOWER
AERIAL LINES W/ POLES
FIRE HYDRANT
WATER LINE
CULVERT
CULVERT
CULVERT
CULVERT
AERIAL LINES W/ POLES
CULVERT
CULVERT
CULVERT
CULVERT
CULVERT
AERIAL LINES W/ POLES
CULVERT
CULVERT
C-3
C-4
C-5
C-6
C-7
C-8
C-9
C-10
C-11
C-12
C-13
W-1
F-1
E-1
E-2
E-3
E-4
E-5
C-14
C-15
CULVERT
CULVERT
ENTERGY
ENTERGY
ENTERGY
ENTERGY
ENTERGY
E-6 GUIDE WIRESENTERGY
SHEET NUMBER
DOTD
DOTD
DOTD
DOTD
DOTD
DOTD
C-01
C-01
C-02
C-02
C-02
DOTD
DOTD
DOTD
PRIVATE
DUCKLAND, LLC
PRIVATE
PRIVATE
PRIVATE
SERVERN TRENT
SEVERN TRENT
C-01 TO C-02
C-01 TO C-02
C-01
C-16 PRIVATE CULVERT
0+00 TO 55+50
0+00 TO 56+00
29+48
1+73
6+89
11+88
13+12
18+93
29+17
54+50
54+50
47+80
54+50
47+96
49+36
54+07
64+00
90+69 TO 96+50
119+14
119+84
168+35
122+63 TO 206+04
W-3 29+59
E-8 30+00
SEVERN TRENT WATER LINE
NEW LEVEE C/L STATION
E-7 ENTERGY AERIAL LINES W/ POLES 0+00 TO 58+00C-01 TO C-02
2+26
8' ELK FENCE
CW-1
CW-2
F-2 48+50 TO 49+50
E-9 48+50 TO 49+50ELECTRICAL BOX
FENCE
CONCRETE HEADWALL
CONCRETE HEADWALL
ENTERGY
ENTERGY
PRIVATE
PRIVATE 47+79
119+84
ENTERGY C-21
ENTERGY C-21
C-21GT-01 PLAQUEMINES PARISH
POINTE CELESTE RD.
POINTE CELESTE RD.
POINTE CELESTE RD.
BB-1 C-01 28+86BILL BOARDPRIVATE OWNER
C-01
C-01
C-01
C-01
C-01
C-02
C-03
C-02
C-02
C-02
C-02
C-02
C-02
C-02
C-01
C-01
C-03
C-03
C-03
C-04
PLAQUEMINES PARISHGT-02 158+00
TABULATIONS OF FACILITIES WITHIN REQUIRED P.F.P.L.F.D.D.E. AND P.F.P.L.F.E.
TABULATIONS
PROTECTED SIDE RIGHT-OF-WAY
P.F.P.L.F.E.
REQUIRED P.F.P.L.F.D.D.E. AND
TABULATIONS
FLOOD SIDE RIGHT-OF-WAY
P.F.P.L.F.E.
REQUIRED P.F.P.L.F.D.D.E. AND
3,735,258.50 401910.99
ACCESS CORRIDOR 1
ACCESS CORRIDOR 2
ACCESS CORRIDOR 1
ACCESS CORRIDOR 1
ACCESS CORRIDOR 1
ACCESS CORRIDOR 1
ACCESS CORRIDOR 1
ACCESS CORRIDOR 1
FENCE
GATE
GATE
FENCE
METAL BRIDGE
CULVERT
C-18
C-18
C-18
C-18
WOODLAND
WOODLAND
ENTERGY
ENTERGY
ENTERGY
WOODLAND
WOODLAND
WOODLAND
WOODLAND
FENCE
FENCE ACCESS CORRIDOR 2
ITEM OWNER DISPOSITIONDESCRIPTION
TRANSMISSION TOWER
WOODLAND
ENTERGY
SHEET NUMBER
C-19
C-19
NEW LEVEE C/L STATION
C-19
TABULATIONS OF FACILITIES WITHIN REQUIRED P.F.P.L.F.D.D.E. AND P.F.P.L.F.E.
WOODLAND
WOODLAND
WOODLAND
PERRIN, W.
WOODLAND
ENTERGY
ENTERGY
ENTERGY
GATE
CULVERT
GATE
CULVERT
CULVERT
ACCESS CORRIDOR 3
ACCESS CORRIDOR 3
ACCESS CORRIDOR 3
ACCESS CORRIDOR 3
ACCESS CORRIDOR 2
ACCESS CORRIDOR 2
ACCESS CORRIDOR 2
ACCESS CORRIDOR 2
ACCESS CORRIDOR 2
ACCESS CORRIDOR 2
C-20
C-20
C-19
C-19
3,747,914.31 396,704.15
3,748,148.07 396,620.82
3,748,472.04 396,487.10
3,748,641.49 396,412.24
3,744,804.10 397,499.93
3,746,971.08 397,067.06
3,747,096.62 397,029.89
3,749,088.30 396,186.09
RESERVED
RESERVED
RESERVED
RESERVED
RESERVED
RESERVED
TABULATIONS
PROTECTED SIDE RIGHT-OF-WAY
P.F.P.L.F.E.
REQUIRED P.F.P.L.F.D.D.E. AND
F-3
F-4
E-10
E-11
E-12
E-13
E-14
C-17
STR-1
F-5
F-6
GT-03
GT-04
C-18
C-19
E-15
E-16
C-20
GT-05
E-17
E-18
AERIAL LINES
AERIAL LINES
AERIAL LINES
AERIAL LINES
AERIAL LINES
AERIAL LINES W
AERIAL LINES
AERIAL LINES
C-03 TO C-05
C-04
C-18
C-18
C-18
C-19
C-19
C-19
C-20
C-20
3,728,304.08
3,728,494.13
3,729,099.70
3,729,486.19
3,729,950.11
3,731,132.82
3,731,820.77
3,731,837.94
3,732,095.34
3,732,086.12
3,733,413.96
3,733,576.78
3,733,743.49
3,733,755.58
410,986.61
410,887.42
410,558.47
410,301.46
409,938.33
408,976.88
408,074.02
408,033.69
407,604.15
407,515.38
404,890.63
404,595.19
404,471.38
404,512.52
3,733,800.60 404,577.08
3,733,932.03 404,631.72
404,394.05
3,733,870.30 404,677.03
3,733,813.25
3,733,821.26 404,369.39
3,733,777.89 404,132.16
3,733,863.77 404,080.94
3,733,820.42 404,012.94
3,734,359.45 402,980.86
3,734,468.84 402,780.40
3,734,701.12 402,453.07
3,734,829.65 402,307.08
3,735,077.74 402,078.66
3,735,068.73 402,044.82
3,734,873.73 401,715.75
3,734,658.84 401,353.11
3,734,505.52 401,094.37
3,736,099.30 399,454.42
3,736,146.91 399,333.53
3,736,105.88 399,323.46
3,736,129.49 399,284.64
3,736,162.93 399,292.85
3,736,172.68 399,268.11
3,737,459.29 399,176.17
3,738,657.39 398,655.00
3,740,497.95 398,104.24
3,742,510.04 397,693.61
3,744,280.65 397,392.09
3,746,975.62 396,862.38
3,748,529.23 396,250.19
3,749,057.51 395,975.84
RESERVED RESERVED
RESERVEDRESERVED
3,728,113.53 411,098.17
3,728,141.81 411,082.46
GATE
ENTERGY AERIAL LINES W/ POLES
C-25DOTD CULVERT 158+69C-21
(B)
(B)*
(2)(B)*
(1)
TO BE REMOVED & REPLACED
TO BE REMOVED
TO BE RELOCATED
TO BE DE-ENERGIZED
BY CONTRACTOR
TIMBER MAT BRIDGE
CONSTRUCTION
CONCURRENT WITH
PRIOR TO CONSTRUCTION
DO NOT DISTURB
BY OTHERS
BY OWNER
(1)
(2)
(3)
(A)
(B)
DO NOT DISTURB, NO ACCESS
DISPOSITION LEGEND
D-1
D-2
D-5
D-6
D-7
D-8
D-4
D-3
D-9
D-10
D-11
D-12
D-13
D-14
D-15
D-16
D-17
D-19
D-20
D-21
D-23
D-24
D-25
D-26
D-22
D-18
:1
E D -1
-0
G -0
.d g n
G-07
N E
W C
A N
A L C /L P
O
IN
T S
R O
W T
A B
U L
A T
IO
N S A
N D
T A
B U
L A
T
IO
N O
F F
A C
IL
IT
IE
S
C A
N A
L D
E S
IG
N
A
D D
E D I T
E M
G T -1
T O P .D .D .E T
A B
U L
A T
IO
N
J
U N
W .J .L
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
H -0
-4
P L
A Q
U E
M
IN
E S P
A R
IS
H L
A
W P -2
-B -0
A N N
G U
Y E
N
A .N
D .H
U E
T E
W O
O D
P A
R K T
O P
O
IN
T E C
E L E
S T
E P
U M
P S
T A
T
IO
N
N O
V -N
F -W a .1
N E
W O
R L E
A N
S T
O V
E N
IC
E L
O U
IS
IA
N A
L A
U R
E N H
H A
T T
E N P .E
S
E P
S E
P T
E M
B E
R
TO BE REMOVED & REPLACED
TO BE REMOVED
TO BE RELOCATED
TO BE DE-ENERGIZED
BY CONTRACTOR
TIMBER MAT BRIDGE
CONSTRUCTION
CONCURRENT WITH
PRIOR TO CONSTRUCTION
DO NOT DISTURB
BY OTHERS
BY OWNER
(1)
(2)
(3)
(A)
(B)
DO NOT DISTURB, NO ACCESS
DISPOSITION LEGEND
(1)(B)
(1)(B)**
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
(1)(B)
CHORD: 80.55'
TANGENT: 41.21'
LENGTH: 81.16'
DEGREE OF CURVATURE (ARC): 30° 09' 20.42"
DELTA: 24° 28' 28.44" LEFT
RADIUS: 190'
CHORD: 101.74'
TANGENT: 52.05'
LENGTH: 102.52'
DEGREE OF CURVATURE (ARC): 24° 52' 24"
DELTA: 24° 28' 28" LEFT
RADIUS: 240'
C-1 CURVE DATA - CANAL
C-2 CURVE DATA - ROAD
ITEM OWNER DISPOSITIONDESCRIPTION SHEET NUMBER
TABULATIONS OF FACILITIES WITHIN REQUIRED P.D.D.E.
Y - COORDINATEX - COORDINATEITEM
402294.43
400,936.71
3,741,540.05
399,966.82
3,746,253.04 399,203.86
395,897.31
3,750,235.19 395,907.01
3,750,177.30
3,746,310.07 399,180.76
397,235.00
3,746,144.57 399,060.80
399,736.38
3,741,763.16
399,813.11
3,741,476.72 399,809.76
3,741,490.64 399,844.29
3,737,260.24 400,800.28
3,737,194.47
3,735,435.92 402,187.04
RIGHT-OF-WAY TABULATIONS
REQUIRED P.D.D.E.
3,735,504.95
399,966.82
3,737,285.53
3,741,578.29
3,750,825.64 397,352.26
3,750,244.94
395,903.01
3,746,263.36
3,750,641.82
399,010.01
3,746,131.35 399,029.58
3,742,461.61
399,786.43
3,741,600.29
3,741,588.73 399,784.45
400,833.13
NEW CANAL C/L STATION
235+00
232+65
234+64
DUCKLANDS
PORT
WOODLAND
DUCKLANDS
WOODLAND
DUCKLANDS
WOODLAND
DUCKLANDS
DUCKLANDS
WOODLAND
DUCKLANDS
DUCKLANDS
DUCKLANDS
DUCKLANDS
DUCKLANDS
DUCKLANDS
WOODLAND
WOODLAND
WOODLAND
WOODLAND
WOODLAND
WOODLAND
WOODLAND
WOODLAND
ELK FENCE
FENCE
GATE
GATE
GATE
CULVERT
FENCE
FENCE
FENCE
CULVERT
CULVERT
CULVERT
GATE
GATE
FENCE
FENCE
FENCE
FENCE
GATE
GATE
MISC. MATERIAL
GATE
CULVERT
CULVERT
72+60 TO 137+94
111+98
138+34
138+61
186+05
138+77
139+40
179+70
179+70 TO 186+15
186+79
186+10
235+00
186+15
186+00 TO 234+91
221+64
227+69
234+00
231+68
235+19
233+53
232+08
GT-106
GT-107
GT-108
Y - COORDINATEX - COORDINATEITEM
404,699.97
403,962.95
3,734,327.22
3,734,108.34
3,734,739.89 402,864.22
402,492.953,735,147.59
3,734,208.79 404,876.41
3,733,523.65 405,772.18
3,732,417.81 407,395.23
STATION
0+00.00
3,732,649.94 407,016.97
3,737,226.44 400,907.02
3,737,299.38 400,872.85
3,738,808.70 400,528.14
3,739,530.80 400,363.18
3,740,505.47 400,140.94
3,740,994.93 400,028.30
3,741,740.27 399,866.21
3,741,771.01 399,862.12
3,742,458.74 399,827.17
3,742,483.15 399,824.34
3,745,919.63 399,198.43
3,746,184.80 399,142.58
3,746,218.59 399,132.27
3,750,752.52 397,297.79
3,750,096.24 395,668.71
NEW CANAL C/L POINTS
3,732,005.07 408,219.83
3,732,034.55 408,077.24
3,732,389.03 407,582.35
1+45.60
7+54.35
9+43.67
13+87.48
29+08.29
40+36.04
42+48.54
50+17.38
62+84.69
68+36.10
94+50.82
95+31.98
110+80.17
118+20.87
128+20.56
133+22.81
140+85.58
141+16.58
148+05.21
148+29.77
183+22.80
185+93.78
186+29.11
235+20.11
252+76.41
Y - COORDINATEX - COORDINATEITEM
TABULATIONS
20-FEET MAINTENANCE ROAD
3,731,978.71 408,139.90
3,731,995.22 408,060.02
3,732,614.82 406,993.90
3,733,489.77 405,747.35
3,734,174.64 404,851.92
404,692.983,734,281.33
403,957.643,734,062.95
402,837.593,734,706.75
402,398.653,735,188.76
C-302 and C-303
C-303
C-303
C-303
C-304
C-303
C-303
C-304
C-304
C-304
C-304
C-305
C-304
C-305
C-304 AND C-305
C-305
C-305
RD-1
RD-2
RD-3
RD-4
RD-5
RD-6
RD-7
RD-8
RD-9
RD-10
RD-11
RD-12
RD-13
RD-14
RD-15
RD-16
RD-17
RD-18
RD-19
RD-20
RD-21
RD-22
RD-23
RD-24
RD-25
3,732,313.39 407,615.82
3,732,350.46 407,374.86
F-100
F-101
GT-100
GT-102
GT-103
C-100
C-101
F-102
F-103
F-104
C-102
C-103
GT-104
GT-105
F-105
F-106
F-107
F-108
C-104
C-105
C-305
C-305
C-305
C-305
C-305
C-305
C-305
400,867.273,737,196.11
400,824.113,737,288.24
400,479.403,738,797.57
400,314.433,739,519.67
400,092.203,740,494.31
399,979.513,740,984.01
399,832.333,741,575.74
399,801.343,741,764.91
399,750.373,742,476.29
399,125.813,745,905.38
399,070.173,746,169.55
399,037.653,746,271.76
397,201.243,750,791.61
RD-17a 3,741,206.30 399,931.17
3,741,488.47 399,868.27
M-1
WOODLAND GATE 138+77C-303GT-101
46 47
RADIUS = 2,804.8'
C-5
C-6
3 42
FH
FH
C-3
E-1
C-4
E-7
W-1
FH
FH
C-7
BB-1
C-8
E-8
E-2
FLOODWALL AND DRAINAGE DITCH EASEMENT
REQUIRED PERPETUAL FLOOD PROTECTION LEVEE
REQUIRED ACCESS ACQUIRED IN NOV-NF-W-06b.1
W-3
SEE SHEET C-16
ACCESS CORRIDOR
WOODPARK TEMPORARY
BOR. NF06-113CU BOR. NF06-114CU
BOR. NF06-115CU
W-1
SEE SHEETS C-23 AND C-24 FOR DETAILS
LAKE HERMITAGE ROAD
43a
FLOODWALL AND DRAINAGE DITCH EASEMENT
REQUIRED PERPETUAL FLOOD PROTECTION LEVEE
EASEMENT
LEVEE FLOODWALL AND DRAINAGE DITCH
REQUIRED PERPETUAL FLOOD PROTECTION
ACCESS RAMP
TEMPORARY WORK AREA EASEMENT
FLO
O
DW
ALL AND DRAINAG
E DITCH EASEM
ENT
REQ
UIRED PERPETUAL FLO
O
D PRO
TECTIO
N LEVEE
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
H -0
-4
P L
A Q
U E
M
IN
E S P
A R
IS
H L
A
W P -2
-B -0
A N N
G U
Y E
N
A .N
D .H
U E
T E
W O
O D
P A
R K T
O P
O
IN
T E C
E L E
S T
E P
U M
P S
T A
T
IO
N
N O
V -N
F -W a .1
N E
W O
R L E
A N
S T
O V
E N
IC
E L
O U
IS
IA
N A
L A
U R
E N H
H A
T T
E N P .E
S
E P
S E
P T
E M
B E
R
0+00 5+00 10+00 15+00 20+00 25+00 30+00 35+00 40+00
-5
-10
-15
-5
-10
-15
44+00
-20 -20
M A
T C
H L
IN
E C /L S
T A
STATIONING ALONG LEVEE CENTERLINE
E L E
V A
T
IO
N N
A V
D .5
E L E
V A
T
IO
N N
A V
D .5
CONSTRUCTION GRADE PHASE II EL. 12.0 (OPTIONAL)
CONSTRUCTION GRADE PHASE I EL. 12.5
COMPACTED FILL
PHASE II TYPICAL SECTION 1 (SHEET C-11)
C /L S
T A
C /L S
T A
EXISTING GROUND AT NEW LEVEE C/L
100' SMOOTH TRANSITION
L
IM
IT
O
F L
E V
E E W
O R
K
B /L S
T A C /L S
T A -2
0 (NOV-NF-W-06b.1)
TIE-IN EXISTING LEVEE
CONSTRUCTION GRADE PHASE I EL. 13.5
C /L S
T A -1
IF IT SETTLED
TO BE BROUGHT UP TO ELEVATION 12.5
CONSTRUCTED IN THE 06B.1 CONTRACT AND
EL. 12.5 (OPTIONAL)
CONSTRUCTION GRADE PHASE IIC
/L S
T A
C /L S
T A
SEE SHEET C-24
LAKE HERMITAGE ROAD - RAMP,
LEVEE DESIGN - PERMANENT
EL. 13.5 1V ON 10H
1V ON 10H
PHASE I TYPICAL SECTION 1A (SHEET C-07)
(SHEET C-11)
PHASE II TYPICAL SECTION 2A
(SHEET C-08)
SECTION 2A
PHASE I TYPICAL
PHASE I TYPICAL SECTION 1B (SHEET C-07)
100' SMOOTH TRANSITION 100' SMOOTH TRANSITION
PHASE II TYP. SECT. 1 (SHEET C-11)
PHASE II
NO WORK AREA
C /L S
T A
C /L S
T A
CB
CB
CB
CB
BASELINE
LA HWY 23
BASELINE
LA HWY 23
.7
.7
.7
.7
1 16+
02 2
9 3
PLAQUEMINES PARISH, LA.
FLOOD SIDE
L.A. HWY 23
H E
R M
IT
A G
E R
D
L A
K
EXISTING DITCH
EXISTING DITCH
NEW LEVEE C/L
0+00
2+19
B /L S
T A C /L S
T A -2
L
IM
IT
O
F L
E V
E E W
O R
K
LAND SIDE
WW
WW
WW
WW
WWWW
C-01
:1
E D -1
-0
C -0
.d g n
N
SCALE: 1'' = 200'
0200' 200' 400' 600' 800'
9° '15
° 5
' 5
° 3
7'
° 5
' 1
,7 ,0
° 3
7'
° 3
6'
° 5
' 5
° 5
' 1
"40
9, ° 5
' 2
,7 ,0
° 3
7'
° 5
' 2
° 5
' 3
"29
° 3 7'
,7 ,0
° 5
' 3
"41
0, ° 5
' 4
,7 ,0
° 5
' 4
° 3
7'
1, ° 3
7'
° 5
' 4
,7 ,0
° 3
7'
° 5
' 2
° 3
7'
,7 ,0
° 5
' 2
° 5
' 4
° 5
' 3
,7 ,0
° 5
' 3
° 3
7'
° 5
' 1
,7 ,0
° 5
' 1
1, ° 3
7'
° 5
' 0
° 5
' 0
,7 ,0 0 29
° 3 7'
° 5
' 5
° 5
' 5
0, ,7 ,0
° 5
' 4
° 3
7'
° 5
' 4
9, ° 3
7'
,7 ,0
B /L S
T A C /L S
T A
M A
T C
H L
IN
E
C /L S
T A T
O C /L S
T A
P L
A N A
N D P
R O
F
IL
E
L E
V E
E D
E S
IG
N
ADJACENT CONTRACTOR.
THE CONTRACTOR SHALL COORDINATE WORK ACTIVITIES WITH THE
4. MULTIPLE CONTRACTORS TO BE WORKING AT THE SAME LOCATION.
AND CLEARED DEBRIS IS TO BE REMOVE FROM SITE.
3. THE CONTRACTOR SHALL MAINTAIN THE CONSTRUCTION AREA NEAR HWY. 23
BUILT TO ELEVATION 6.0.
2. THE EXISTING LEVEE SHALL NOT BE DEGRADED UNTIL THE NEW LEVEE IS
UTILITY POLES IN ACCORDANCE WITH TYPICAL SECTION.
1. THE CONTRACTOR SHALL PERFORM GRADING AROUND EXISTING SIGNS AND
NOTES:
A
D D
E D
N O W
O R
K A
R E
A
IN
P
H A
S E P
R O
F
IL
E
J
U N
W .J .L
FILL
COMPACTED EL 12.0
DURING PHASE I
SILT FENCE INSTALLED
DURING PHASE I
SILT FENCE INSTALLED
DURING PHASE I
SILT FENCE INSTALLED
FLOODWALL AND DRAINAGE DITCH EASEMENT
REQUIRED PERPETUAL FLOOD PROTECTION LEVEE
FLOODWALL AND DRAINAGE DITCH EASEMENT
REQUIRED PERPETUAL FLOOD PROTECTION LEVEE
FLOODWALL AND DRAINAGE DITCH EASEMENT
REQUIRED PERPETUAL FLOOD PROTECTION LEVEE
DRAINAGE DITCH EASEMENT
LEVEE FLOODWALL AND
REQUIRED PERPETUAL FLOOD PROTECTION
SEE PHASE I (DO NOT DISTURB)
EXISTING REINFORCEMENT GEOTEXTILE,
EL 12.5
FILL
COMPACTED
SILT FENCE
:1
C-11
E D -1
-0
C -1
T S .d g n
T Y
P
IC
A L L
E V
E E D
E S
IG
N S
E C
T
IO
N S
P H
A S
E I I
L E
V E
E D
E S
IG
N
R
E V
IS
E D P
H A
S E T
Y P
IC
A L S
E C
T
IO
N
L
IM
IT
S O
F W
O R
K
J
U N
W .J .L
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
H -0
-4
P L
A Q
U E
M
IN
E S P
A R
IS
H L
A
W P -2
-B -0
A N N
G U
Y E
N
A .N
D .H
U E
T E
W O
O D
P A
R K T
O P
O
IN
T E C
E L E
S T
E P
U M
P S
T A
T
IO
N
N O
V -N
F -W a .1
N E
W O
R L E
A N
S T
O V
E N
IC
E L
O U
IS
IA
N A
L A
U R
E N H
H A
T T
E N P .E
S
E P
S E
P T
E M
B E
R
TO HWY 23
AS PART OF THE WORK IN PHASE II.
2. RESHAPING OF THE LEVEE MAY BE NECESSARY, NO MATERIAL IS TO BE DEGRADED/REMOVED
FACILITATE BOTH PHASE I AND PHASE II CONSTRUCTION.
1. SILT FENCE SHALL BE PAID UNDER PHASE 1 BUT THE LOCATION SHALL BE INSTALLED TO
NOTES:
C/L
NEW LEVEE
80'
TO HWY 23
10'
225' - 250'
205' - 215'
C/L
DITCH
EXISTING
SLOPE TO DRAIN
FLOOD SIDE
1V
ON 3
H
1V ON 4H
C/L
NEW LEVEE
C/L
EXISTING DITCH
10'
FLOOD SIDE
1V ON 4H1V
ON 3
H
80'
15'
CLEARING, FERTILIZING, AND SEEDING (PHASE II)
CLEARING, FERTILIZING, AND SEEDING LIMIT (PHASE II)
PHASE II - TYPICAL SECTION 1 (OPTIONAL WORK)
C/L STA. 38+74 TO C/L STA. 47+96
NOT TO SCALE
PHASE II - TYPICAL SECTION 2A (OPTIONAL WORK)
LAND SIDE
LAND SIDE
(100' TRANSITION FROM C/L STA. 37+74 TO C/L STA. 38+74)
C/L STA. 31+30 (+/-)TO C/L STA. 37+74
C/L STA. -1+71 (+/-) TO C/L STA. 28+00 (+/-)
NOT TO SCALE
C-10
F-2
E-4
E-3
FH
B2
D4
C3
E-6
RADIUS = 2924.79
G-1
G-2
G-3
G-4
E-9
C-10
C-9
E-7
BOR. NF06-118PU
BOR. NF06-117CU
FENCE
EXISTING
SEE NOTES 1 AND 2
SBA ACCESS CORRIDOR,
TEMPORARY
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
H -0
-4
P L
A Q
U E
M
IN
E S P
A R
IS
H L
A
W P -2
-B -0
A N N
G U
Y E
N
A .N
D .H
U E
T E
W O
O D
P A
R K T
O P
O
IN
T E C
E L E
S T
E P
U M
P S
T A
T
IO
N
N O
V -N
F -W a .1
N E
W O
R L E
A N
S T
O V
E N
IC
E L
O U
IS
IA
N A
L A
U R
E N H
H A
T T
E N P .E
S
E P
S E
P T
E M
B E
R
.1
+9 1.1
PLAQUEMINES PARISH, LA.
L.
A.
H
W Y
L.
A.
H
W Y
EASEMENT
NO WORK AREA
BASELIN
E
LAND SIDE
LAND SIDE
N
:1050' 50' 100'
SCALE: 1'' = 50'
150' 200'
89° 54' 45"
89° 54' 45"
3,732,400
3,732,200
,4
,8
3,732,000 4 ,6
,0
,2
,4
3,732,000
,6
,8
0 3,732,600
3,732,400
,8
3,732,200 ,6
,4
0 3,732,800
,2
,0
0 3,733,000
,8
,6
3,733,000
,4
3,732,800
3,732,600
E D -1
-0
C -1
.d g n
C-17
SCALE: 1" = 50'
4. TABULATIONS OF FACILITIES, SEE SHEET G-05.
3. FOR X-Y COORDINATES, SEE SHEET G-04.
DESIGNED, INSTALLED, MAINTAINED AND REMOVED BY CONTRACTOR.
2. IF ACCESS CORRIDOR IS USED, A CANAL CROSSING SHALL BE
SHOWN ON SHEET C-26.
1. IF ACCESS CORRIDOR IS USED, AN ASPHALT APRON IS REQUIRED AS
NOTES:
P L
A N V
IE
W
S B
A A
C C
E S
S C
O R
R
ID
O R
L E
V E
E D
E S
IG
N
SBA ACCESS CORRIDOR - PLAN VIEW
R
E M
O V
E D N
O T
E
W .J .L
J
U N
FILLS HOLLOW PORTION OF BLOCKS.
CONCRETE MAKE SURE CONCRETE
HORIZONTAL. WRAP-UP BLOCKS IN
SET WITH HOLLOW CORE
BRICK FOR TEMPORARY SUPPORT.
HOLLOW CONCRETE BLOCK AND/OR
VALVE BOX
SLIP TYPE ADJUSTABLE
BRICK
TAPPING VALVE
DR 11
8" HDPE PIPE
BLOCK
CONCRETE THRUST
TAPPING SLEEVE
STAINLESS STEEL
(TYP)
BACKFILL
COMPACTED
SEE NOTE 4
WATERLINE TO REMAIN
EXISTING 16" AC
TAPPING VALVE
DR 11
8" HDPE PIPE
TAPPING SLEEVE
STAINLESS STEEL
FORM AS NEEDED
3000 PSI CONCRETE
A MIN. DEPTH OF 16'-0"
BOTTOM OF EXCAVATION FOR
DRIVE SHEET PILING BELOW
3-PZC18 SHEET PILING.
WATERLINE
(TEMPORARY) 8" HDPE
WATERLINE
(TEMPORARY) 8" HDPE
WATERLINE
EXISTING 8" HDPE
8" D.I. TEE
MJxMJ
BFV 3-A
(DESIGNED BY CONTRACTOR)
ADJUSTABLE PIPE SUPPORT
PIPING AS SPECIFIED
8" D.I CLASS 52 (TYP.)
8" O.C. RUN EACH WAY
PAD WITH NO. 4 BARS
24" x 6" CONCRETE
BACKFLOW PREVENTER
REDUCED PRESSURE ZONE
(TYPICAL)
U.L. AND F.M. APPROVED
O.S.AND Y. GATE VALVE
ABOVE GROUND (TYP.)
FLANGED PIPE
GALV. BASE PLATE
12" x 12" x ¼"
(TYP.) GRADE
EXISTING 8" DI CLASS 52
(TYPICAL)
THRUST BLOCK
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
H -0
-4
P L
A Q
U E
M
IN
E S P
A R
IS
H L
A
W P -2
-B -0
A N N
G U
Y E
N
A .N
D .H
U E
T E
W O
O D
P A
R K T
O P
O
IN
T E C
E L E
S T
E P
U M
P S
T A
T
IO
N
N O
V -N
F -W a .1
N E
W O
R L E
A N
S T
O V
E N
IC
E L
O U
IS
IA
N A
L A
U R
E N H
H A
T T
E N P .E
S
E P
S E
P T
E M
B E
R
WATER LINE
EXIST.
6" 8"
E D -1
-0
C -2 d .d g n
:1
C-24d
2'-0" SQUARE CONC
24" MIN
(TYP)
M
IN4
C-24c NOT TO SCALE
TIE-IN DETAIL
C-24c NOT TO SCALE
TIE-IN DETAIL
C-24c NOT TO SCALE
B.F.P. DETAIL
A
- NOT TO SCALE
SECTION
C-24b
C-24b 3
C-24b
A
W .L
R E
L O
C A
T
IO
N D
E T
A
IL
S
L E
V E
E D
E S
IG
INCLUDING RODS, COUPLINGS, STRAPS, AND OTHER BURIED STEEL.
COATING BEFORE POURING CONCRETE. TYPICAL FOR ALL STEEL
5. COAT TAPPING SLEEVE AND BOLTS WITH AN APPROVED BITUMASTIC
GLANDS MAY BE "WRAPPED-UP" IN CONCRETE.
TO KEEP CONCRETE FROM BONDING. TYPICAL WHENEVER BOLTS OR
4. COVER GLANDS AND BOLTS WITH HEAVY POLYETHELENE SHEETING
3. MAKE TAP, LINE EXTENSION AND BACKFILL.
2. IF NO LEAKS, POUR INDICATED CONCRETE BLOCK AND SUPPORT PAD.
VALVE AND APPLY STANDARD HYDROSTATIC TEST.
1. TEMPORARILY SUPPORT TAPPING SADDLE AND
NOTES:
R
E V
IS
E D N
O T
E
J
U N
W .J
VARIESVARIES
1V ON 1H
EXISTING GRAVEL ROAD
1V ON 1H
1V ON 4H
LINE
EXCAVATION
LEVEE DESIGN SECTION
TRENCH
6"D X 4"W
TRENCH
6"D X 4"W
PANEL MATS
(1' X 1' X 20') BOLTED IN 4'
NEW TIMBER MATTING
TOP OF TRUCK WASHDOWN RACK
(TYPICAL)
TO TRUCK WASHDOWN RACK
FOR INGRESS AND EGRESS
RAMP (SURFACING MATERIAL)
CONTRACTOR TO PROVIDE
AND DRAIN)
(TO RECEIVE MATTING
EXCAVATION 12' X 20'
BOLTED IN 4' PANEL MATS
NEW TIMBER MATTING (1' X 1' X 12')
BASE OF TRUCK WASH RACK
BOLTED IN 4' PANEL MATS
NEW TIMBER MATTING (1' X 1' X 12')
BASE OF TRUCK WASHDOWN RACK
BOLTED IN 4' PANEL MATS
NEW TIMBER MATTING (1' X 1' X 20')
TOP OF TRUCK WASHDOWN RACK
6" BELOW GROUND
36" SILT FENCE EMBEDDED
OR STEEL T- POSTS
7' LONG X 3-1/2" DIA.
ROUNDED WOOD POSTS
7" CRUSHED STONE (LOOSE MATERIAL)
7" CRUSHED STONE OR
SURFACING MATERIAL
(EMBED IN TRENCH)
SILT FENCE
FLOOD SIDE
(EMBED IN TRENCH)
SILT FENCE
LAND SIDE
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
H -0
-4
P L
A Q
U E
M
IN
E S P
A R
IS
H L
A
W P -2
-B -0
A N N
G U
Y E
N
A .N
D .H
U E
T E
W O
O D
P A
R K T
O P
O
IN
T E C
E L E
S T
E P
U M
P S
T A
T
IO
N
N O
V -N
F -W a .1
N E
W O
R L E
A N
S T
O V
E N
IC
E L
O U
IS
IA
N A
L A
U R
E N H
H A
T T
E N P .E
S
E P
S E
P T
E M
B E
R
O F E
X C
A V
A T
IO
N
T O
D E
P T
H
X
IS
T G
R O
U N
D
T O
A B
O V
E
20'
DRAIN
SLOPE TO
DRAIN
SLOPE TO
6"
M A
X
(M
IN
IM
U M
10' O.C.
VARIES12'' LIFTS
SLO
PE V
ARIE
S
POINTS OF EGRESS.
3. TRUCK WASHDOWN RACK AT ALL
CONTRACTING OFFICER.
2. DISPOSE OF MUD AS DIRECTED BY
1. SLOPE TIMBER MATTING TO DRAIN.
NOTES:
C/L
2' MAX.
1' MIN.
4'
T O D
R A
IN
S L
O P
E
(TYP.)
20'
NOT TO SCALE
TRUCK WASHDOWN RACK - PLAN VIEWNOT TO SCALE
SILT FENCE
NOT TO SCALE
FLOOD SIDE DETAIL
NOT TO SCALE
TRUCK WASHDOWN RACK - PROFILE
NOT TO SCALE NOT TO SCALE
ROAD-SURFACING DETAIL
CONCURRENTLY WITH A BENCH ON THE FLOODSIDE.
A BENCH ON THE LAND SIDE MAY BE CONSTRUCTED
THE SIDE OF THE LEVEE AT ANY ONE TIME.
2. NO MORE THAN ONE BENCH IS PERMITTED ON
FOR COMPACTED FILL.
1. BENCHING IS REQUIRED FOR AREAS DESIGNATED
NOTES:
NOT TO SCALE
LAND SIDE DETAIL
BENCHING DETAIL (PHASE I ONLY)
:1
E D -1
-0
C -2
.d g n
C-27
M
IS
C E
L L
A N
E O
U S D
E T
A
IL
S L E
V E
E D
E S
IG
N
R
E V
IS
E D D
E T
A
IL
T
IT
L E
J
U N
W .J
DISTANCE VARIES
(SEE PLAN)
DISTANCE VARIES
DISTANCE VARIES
(SEE PLAN)
DISTANCE VARIES
BOTTOM WIDTH = 40'
BOTTOM WIDTH = 40'
DITCH
EXISTING
DITCH
EXISTING
TO BE REMOVED
EXISTING CATTLE FENCE
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
H -0
-4
P L
A Q
U E
M
IN
E S P
A R
IS
H L
A
W P -2
-B -0
A N N
G U
Y E
N
A .N
D .H
U E
T E
W O
O D
P A
R K T
O P
O
IN
T E C
E L E
S T
E P
U M
P S
T A
T
IO
N
N O
V -N
F -W a .1
N E
W O
R L E
A N
S T
O V
E N
IC
E L
O U
IS
IA
N A
L A
U R
E N H
H A
T T
E N P .E
S
E P
S E
P T
E M
B E
R
EXISTING GROUNDEL. VARIES
HWY 23 SIDE NFL BACK LEVEE SIDE
EXISTING GROUND
BOTTOM EL. VARIES
NEW DRAINAGE CANAL
NEW CANAL C/L
1V:3.5H
NO STEEPER THAN 1V:3.5H
SLOPE VARIES
EXISTING GROUNDEL. VARIES
BOTTOM EL. VARIES
NEW DRAINAGE CANAL
NEW CANAL C/L
NO STEEPER THAN 1V:4H
SLOPE VARIES
1V:4H
POINT CELESTE ROAD
(SEE PLAN)
(SEE PLAN)
POINT CELESTE ROAD SIDE
C/L STA. 139+32 TO C/L STA. 235+20
NOT TO SCALE
TYPICAL CANAL SECTION 4
C/L STA. 235+20 TO C/L STA. 252+05
NOT TO SCALE
TYPICAL CANAL SECTION 5
SEE NOTE 2SEE NOTE 2
SEE NOTE 2SEE NOTE 2
SEE PLAN AND PROFILE SHEETS
SEE PLAN AND PROFILE SHEETS
LIMIT OF CLEARING AND GRUBBING
FOR SEEDING LIMIT SEE NOTES
C/L
20' MAINTENANCE ROAD
VARIES, SEE PLAN AND TABULATION
LIMIT OF CLEARING AND GRUBBING
FOR SEEDING LIMIT SEE NOTES
WEST SIDE
DURING CANAL EXCAVATION.
THE CONTRACTOR SHALL NOT BLOCK OR IMPEDE CANAL FLOW
4. IN AREAS WHERE THE EXISTING CANAL IS BEING ENLARGED,
SECTIONS 4 AND 5.
SLOPES. THERE IS A 90 DEGREE TURN BETWEEN TYPICAL CANAL
PROVIDE A SMOOTH TRANSITION BETWEEN CANAL BOTTOM AND SIDE
3. BETWEEN TYPICAL CANAL SECTIONS 4 AND 5, THE CONTRACTOR SHALL
2. REQUIRED PERPETUAL DRAINAGE DITCH EASEMENT.
SURFACING MATERIAL OR FLEXIBLE/RIGID PAVEMENT.
IS COMPLETED UNLESS IT IS WITHIN A CANAL OR COVERED BY
1. ALL DISTURBED AREAS SHALL BE SEEDED AFTER CONSTRUCTION
NOTES:
LIMITS OF EXCAVATION
LIMITS OF EXCAVATION
SHALL BE USED AS UNCOMPACTED FILL.
EXCAVATED SUITABLE EMBANKMENT
SHALL BE USED AS UNCOMPACTED FILL.
EXCAVATED SUITABLE EMBANKMENT
:1
C-307
E D -1
-0
C -3
.d g n
T Y
P
IC
A L C
A N
A L D
E S
IG
N S
E C
T
IO
N S
C A
N A
L D
E S
IG
N
R
E V
IS
E D N
O T
E O
N T
Y P
C A
N A
L S
E C
T
IO
N
J
U N
W .J
CANAL BOTTOM
CANAL BOTTOM
1.5'
REFER TO THE CULVERT SCHEDULE TABLE
REINFORCED CONCRETE CULVERTSSEPARATOR GEOTEXTILE
7" SURFACING
OVER PIPE)
(1' MIN. COVER
COMPACTED FILL 12" COMPACTED BEDDING MATERIAL
SEPARATOR GEOTEXTILE
INVERT EL.
GROUND
EXISTING
INVERT EL.
OVER PIPE)
(1' MIN. COVER
COMPACTED FILL
SEPARATOR GEOTEXTILE
7" SURFACING
GROUND
EXISTING
12" COMPACTED BEDDING MATERIAL
SEPARATOR GEOTEXTILE
REFER TO THE CULVERT SCHEDULE TABLE
REINFORCED CONCRETE CULVERTS
SEPARATOR GEOTEXTILE (1' MIN. COVER OVER PIPE)
COMPACTED FILL
7" SURFACING
REPOSE
REFER TO THE CULVERT SCHEDULE TABLE
REINFORCED CONCRETE CULVERTS
REPOSE
UPSTREAM INVERT EL.
DOWNSTREAM INVERT EL.
CANAL BOTTOM
BEDDING MATERIAL
12" COMPACTED
SEPARATOR GEOTEXTILE
ROAD C/L
CULVERT LENGTH
NEW CANAL C/L
* IN REFERENCE TO NEW CANAL C/L STATION, UNLESS NOTED OTHERWISE.
NEW CANAL C/L
-7.61
-7.50
-6.60
-9.05
-9.02
-10.01
-8.40
-10.94
-10.98
-11.01
-7.60
-7.30
-6.58
-9.04
-9.00
-9.99
-8.20
-10.93
-10.96
-10.99
C A
N A
L B
O T
T O
M
C A
N A
L B
O T
T O
M
1V ON 3~4H
T O
P O
F C
U T
V O
N
H
V O
N
H
T O
P O
F C
U T
1V ON 3~4H
T O
P O
F C
U T
1V ON 3~4H
C A
N A
L B
O T
T O
M
V O
N
H
V O
N
H T O
P O
F C
U T
1V ON 3~4H
C A
N A
L B
O T
T O
M
C A
N A
L B
O T
T O
M
V O
N
H
T O
P O
F C
U T
1V ON 3~4H 1V ON 3~4H
T O
P O
F C
U T
V O
N
H
T O
P O
F C
U T
1V ON 3~4H
V O
N
H
V O
N
H
T O
P O
F C
U T
C A
N A
L B
O T
T O
M
1V ON 3~4H
C
A N
A L B
O T
T O
M
NEW CANAL C/L NEW CANAL C/L
ROAD C/LROAD C/L
1V ON 3H 1V
ON 3
H
1V ON 3H1V
ON 3
H
C A
N A
L B
O T
T O
M
NAME DIAMETER (IN) LENGTH (FT) STATION*
DIADIA
CULVERT SCHEDULE TABLE
INVERT EL (FT)
DOWNSTREAM
INVERT EL (FT)
UPSTREAM
BARRELS
NUMBER OF
A
1 2
A
SECTION
NOT TO SCALE
SECTION
NOT TO SCALE
NOT TO SCALE
PLAN VIEW NOT TO SCALE
PLAN VIEW
DIA. 1.5'1.5'
1.5' 1.5'
ROAD 1, SHEET C-18
139+68
186+94
186+38
5 54
54 -11.27 -11.28
68+86.5
232+93.5
234+51.5
235+95.5
248+96.5
138+97
71+26
C-500
C-501
C-502
C-503
C-504
C-505
C-506
C-507
C-508
C-509
C-510
SEE TYP. SECTIONS
VARIES
SEE T
YP
. S
ECTIO
NS
VARIE
S
SEE TYP. SECTIONS
VARIES
SEE T
YP
. S
ECTIO
NS
VARIE
S
SEE NOTE 5
SEE NOTE 5
CUT FOR CULVERT CROSSINGS AT EXISTING ACCESS ROADS.
5. SEPARATOR FABRIC SHALL EXTEND 10-FEET BEYOND TOP OF
AN OUTSIDE SPACING OF 1.5' AS SHOWN IN SECTION 2.
BARRELS, USE 1.5' OF SPACING BETWEEN EACH BARREL AND
4. FOR CULVERT CROSSINGS REQUIRING MORE THAN TWO
PIPES AT JOINTS.
3. GEOTEXTILE FABRIC SHALL BE PLACED AROUND CULVERT
ANY DIKES WHEN SO DIRECTED BY THE CONTRACTING OFFICER.
THROUGH THE CULVERT, THE CONTRACTOR SHALL REMOVE
2. SHOULD IT BECOME NECESSARY AT ANY TIME TO DRAIN
BAGS AND/OR USE PUMPS TO DEWATER AS REQUIRED.
INSTALL DIKES MADE FROM THE EXCAVATED MATERIAL, SAND
BE PERFORMED IN THE DRY AND THE CONTRACTOR SHALL
1. CULVERT INSTALLATION AND BACKFILL OPERATION SHALL
NOTES:
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
H -0
-4
P L
A Q
U E
M
IN
E S P
A R
IS
H L
A
W P -2
-B -0
A N N
G U
Y E
N
A .N
D .H
U E
T E
W O
O D
P A
R K T
O P
O
IN
T E C
E L E
S T
E P
U M
P S
T A
T
IO
N
N O
V -N
F -W a .1
N E
W O
R L E
A N
S T
O V
E N
IC
E L
O U
IS
IA
N A
L A
U R
E N H
H A
T T
E N P .E
S
E P
S E
P T
E M
B E
R
:1
C-308
E D -1
-0
C -3
.d g n
A N
D C
U L
V E
R T D
E T
A
IL
S N
E W C
A N
A L E
X C
A V
A T
IO
N C
A N
A L D
E S
IG
N
J
U N
W .J .L
R E
V
IS
E D C
U L
V E
R T L
E N
G T
H S I
N T
A B
L E
A D
D E
D N
O T
E D
IM
E N
S
IO
N T
O S
E C
T
IO
N
EL. 12.5
EL. 12.5
EL. 12.5
EL. 12.5
EL. 12.5
L E
V E
E C
R O
S S S
E C
T
IO
N S
CS-01
P H
A S
E
E D -1
-0
C S -1 .d g n
:1
R
E V
IS
E D D
W G "N
O T
E S
J
U N
W .J .L
-20
E O
A
N G
N G
N G
N G
T B
S L P
T O
D
T O
D
S L P
T B
P S
T
S L P
S L P
S L P
S L P
S L P
P S
C B
L C
L F S
C
S L P
S L P
S L P
F S
T
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H M
S H
M S
H
M S
H
M S
H
-20
E O
A
N G
N G
N G
T B
S L P
T O
D
T O
D
P S
T
S L P
S L P
S L P
S L P
S L P
B L
P S
C C
L
F S
C
S L P
S L P
S L P
F S
T
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
-20
E O
A N
G
N G
N G
N G
N G
N G
N G
T B
S L P
T O
D
T O
D P
S T
S L P
S L P
S L P
S L P
B L
P S
C C
L F S
C
S L P
S L P
S L P
F S
T
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
-20
E O
A
N G
N G
N G
N G
N G
T B
S L P
T O
D
T O
D P
S T
S L P
S L P
S L P
S L P
P S
C B
L C
L
F S
C S
L P
S L P
S L P
F S
T
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
-20
E O
A N
G
N G
N G
N G
N G
T B
S L P
T O
D
T O
D P
S T
S L P
S L P
S L P
S L P
S L P
P S
C C
L B
L F S
C
S L P
S L P
S L P
F S
T
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
-20
E O
A
N G
N G
N G
N G
T B
S L P
T O
D
T O
D
S L P
T B
P S
T
S L P
S L P
S L P
S L P
S L P
P S
C B
L C
L F S
C
S L P
S L P
S L P
F S
T
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H M
S H
M S
H
M S
H
M S
H
-20
E O
A
N G
N G
N G
T B
S L P
T O
D
T O
D
P S
T
S L P
S L P
S L P
S L P
S L P
B L
P S
C C
L
F S
C
S L P
S L P
S L P
F S
T
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
E O
A N
G
N G
N G
N G
N G
N G
N G
T B
S L P
T O
D
T O
D P
S T
S L P
S L P
S L P
S L P
B L
P S
C C
L F S
C
S L P
S L P
S L P
F S
T
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
-20
E O
A
N G
N G
N G
N G
N G
T B
S L P
T O
D
T O
D P
S T
S L P
S L P
S L P
S L P
P S
C B
L C
L
F S
C S
L P
S L P
S L P
F S
T
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
M S
H
SP; SLOPEPAVING
BOT; BOTTOM
CL; CENTERLINE
EW; EDGE WOODS
FL; FENCE LINE
FS; FLOOD SIDE LEVEE
NG; NATURAL GROUND
PS; PROTECTED SIDE LEVEE
RMP; RAMP PWL: POWER LINE
WE; WATER EDGE
TOL; TOE OF LEVEE
TB; TOP OF BANK
SND; SOUNDINGS
SLP; SLOPE SHOT
MSH; MARSH
CROSS-SECTION ABBREVIATIONS
N A
V D .5
FLOOD SIDE
LAND SIDE
2.8
-105.1
2.4
-98.9
1.4
-82.6
.7
-65.4
.3
-50.6
.0
-48.3
-.8
-44.8
-2.0
-42.2
-1.4
-33.9
-.9
-30.0
-.6
-26.2
-.4
-24.1
.3
-20.4
1.5
-16.6
2.5
-12.9
3.7
-9.1
4.7
-4.5
5.3
-1.2
5.5
.0
5.7
2.5
5.5
5.4
4.9
8.7
4.0
12.5
3.4
16.1
2.8
21.2
2.1
30.5
.8
35.6
.5
54.9
.5
74.4
.6
93.2
.7
113.4
.9
134.9
-.6
153.2
.6
174.0
-.5
193.2
-.9
214.7
.2
233.5
-1.0
253.5
-1.0
274.0
-1.3
294.5
-.3
313.1
.8
333.0
.6
353.7
-1.4
366.6
-1.4
384.0
-1.3
404.2
.4
422.9
.5
441.9
1.1
460.6
1.1
469.6
1.6
478.2
-.2
480.9
-1.6
500.5
-3.3
517.3
-3.3
534.1
3.3
-95.9
2.8
-91.8
2.0
-76.8
1.0
-61.7
.1
-45.3
-.6
-41.4
-1.9
-38.2
-1.6
-29.7
-.8
-26.5
-.2
-22.1
.8
-17.6
2.3
-12.7
3.5
-7.9
4.4
-3.8
5.3
-.2
5.3
.3
5.3
3.1
4.9
6.1
4.1
9.2
3.4
12.6
2.8
17.9
2.5
23.0
2.4
29.9
.9
38.9
.9
60.1
.7
77.3
.5
97.6
.2
113.7
1.7
126.6
1.9
144.9
.1
165.6
.6
185.9
.6
204.3
-.7
224.9
-.8
245.4
-1.1
264.9
.8
286.3
-1.2
305.4
.3
325.8
.3
346.1
.6
365.7
-.7
385.4
-.9
404.9
-.8
424.4
-.9
430.5
-1.5
444.8
-2.2
466.4
-3.6
483.7
-2.8
504.6
-.5
526.3
.1
531.2
3.5
-89.4
3.5
-87.1
2.8
-83.3
2.1
-74.9
1.5
-67.5
1.1
-60.7
.3
-52.0
.1
-45.6
-.1
-42.7
-.5
-38.9
-1.7
-36.5
-1.5
-29.8
-.4
-27.6
.4
-21.3
1.5
-15.1
2.8
-9.5
4.2
-3.8
5.0
-.2
5.2
.8
5.2
2.5
5.1
4.6
4.1
8.6
3.1
13.3
2.6
17.7
2.3
21.6
2.1
30.1
1.0
36.2
.6
44.4
.6
64.8
.7
84.4
.1
104.6
.4
124.3
.7
143.7
.6
164.0
.7
184.4
.6
204.6
.0
223.8
.5
244.7
1.3
265.0
.3
284.2
.6
304.3
-1.0
323.2
-2.3
344.5
-1.1
362.9
1.0
372.2
.9
386.1
-.5
402.7
.6
418.0
-.2
429.5
.5
443.3
-1.4
463.1
-1.6
485.0
-2.3
502.0
-2.9
507.5
-3.4
523.9
-3.0
542.3
2.7
-86.9
2.5
-83.6
2.4
-77.0
1.7
-69.3
1.2
-59.7
.7
-49.9
.3
-43.8
-.2
-40.9
-1.0
-38.5
-1.2
-31.0
-.5
-28.5
.9
-20.9
2.1
-15.0
3.4
-10.1
4.6
-5.7
5.4
-1.9
5.6
-.2
5.6
1.7
5.3
4.7
4.8
6.9
3.7
11.1
2.6
15.8
2.0
22.2
.9
32.9
.5
49.7
-.2
66.2
.2
84.5
.1
105.8
-.4
125.9
.4
141.7
-1.0
145.9
-.9
155.9
.5
165.5
.3
186.0
-.9
205.1
-.9
225.3
.3
245.9
-1.0
265.8
-1.0
286.0
-1.0
305.5
-.5
325.9
.3
345.8
.8
365.7
-.9
385.7
-.4
405.4
.6
426.3
.9
445.4
-1.0
466.3
-1.2
485.9
-1.2
496.6
-1.3
503.8
-1.3
518.8
-1.3
530.6
.7
550.3
2.9
-86.6
2.7
-84.5
2.1
-79.5
1.5
-72.4
.9
-64.7
.4
-55.9
.2
-52.3
-.2
-47.9
-2.1
-43.2
-1.8
-31.0
-.7
-28.9
.2
-24.1
1.4
-18.3
2.7
-14.3
4.1
-8.8
5.0
-5.9
5.6
-3.4
5.7
-1.0
5.7
.0
5.6
1.3
4.6
5.1
3.8
8.0
3.0
12.6
2.4
17.8
2.3
27.6
.6
38.5
.6
53.9
.8
73.3
-.1
92.5
.2
113.6
-1.6
133.5
-.5
152.9
-1.9
174.6
.4
181.1
1.8
194.2
2.4
202.9
.8
211.1
1.3
224.7
.8
244.1
-.3
264.0
-.4
283.8
-.6
303.1
.1
323.9
-.4
343.5
-1.6
364.7
-1.5
383.8
-1.1
403.5
-1.3
423.3
-1.0
443.9
1.0
463.6
1.0
483.4
1.0
503.1
.6
521.4
-1.3
536.2
2.8
-105.1
2.4
-98.9
1.4
-82.6
.7
-65.4
.3
-50.6
.0
-48.3
-.8
-44.8
-2.0
-42.2
-1.4
-33.9
-.9
-30.0
-.6
-26.2
-.4
-24.1
.3
-20.4
1.5
-16.6
2.5
-12.9
3.7
-9.1
4.7
-4.5
5.3
-1.2
5.5
.0
5.7
2.5
5.5
5.4
4.9
8.7
4.0
12.5
3.4
16.1
2.8
21.2
2.1
30.5
.8
35.6
.5
54.9
.5
74.4
.6
93.2
.7
113.4
.9
134.9
-.6
153.2
.6
174.0
-.5
193.2
-.9
214.7
.2
233.5
-1.0
253.5
-1.0
274.0
-1.3
294.5
-.3
313.1
.8
333.0
.6
353.7
-1.4
366.6
-1.4
384.0
-1.3
404.2
.4
422.9
.5
441.9
1.1
460.6
1.1
469.6
1.6
478.2
-.2
480.9
-1.6
500.5
-3.3
517.3
-3.3
534.1
3.3
-95.9
2.8
-91.8
2.0
-76.8
1.0
-61.7
.1
-45.3
-.6
-41.4
-1.9
-38.2
-1.6
-29.7
-.8
-26.5
-.2
-22.1
.8
-17.6
2.3
-12.7
3.5
-7.9
4.4
-3.8
5.3
-.2
5.3
.3
5.3
3.1
4.9
6.1
4.1
9.2
3.4
12.6
2.8
17.9
2.5
23.0
2.4
29.9
.9
38.9
.9
60.1
.7
77.3
.5
97.6
.2
113.7
1.7
126.6
1.9
144.9
.1
165.6
.6
185.9
.6
204.3
-.7
224.9
-.8
245.4
-1.1
264.9
.8
286.3
-1.2
305.4
.3
325.8
.3
346.1
.6
365.7
-.7
385.4
-.9
404.9
-.8
424.4
-.9
430.5
-1.5
444.8
-2.2
466.4
-3.6
483.7
-2.8
504.6
-.5
526.3
.1
531.2
3.5
-89.4
3.5
-87.1
2.8
-83.3
2.1
-74.9
1.5
-67.5
1.1
-60.7
.3
-52.0
.1
-45.6
-.1
-42.7
-.5
-38.9
-1.7
-36.5
-1.5
-29.8
-.4
-27.6
.4
-21.3
1.5
-15.1
2.8
-9.5
4.2
-3.8
5.0
-.2
5.2
.8
5.2
2.5
5.1
4.6
4.1
8.6
3.1
13.3
2.6
17.7
2.3
21.6
2.1
30.1
1.0
36.2
.6
44.4
.6
64.8
.7
84.4
.1
104.6
.4
124.3
.7
143.7
.6
164.0
.7
184.4
.6
204.6
.0
223.8
.5
244.7
1.3
265.0
.3
284.2
.6
304.3
-1.0
323.2
-2.3
344.5
-1.1
362.9
1.0
372.2
.9
386.1
-.5
402.7
.6
418.0
-.2
429.5
.5
443.3
-1.4
463.1
-1.6
485.0
-2.3
502.0
-2.9
507.5
-3.4
523.9
-3.0
542.3
2.7
-86.9
2.5
-83.6
2.4
-77.0
1.7
-69.3
1.2
-59.7
.7
-49.9
.3
-43.8
-.2
-40.9
-1.0
-38.5
-1.2
-31.0
-.5
-28.5
.9
-20.9
2.1
-15.0
3.4
-10.1
4.6
-5.7
5.4
-1.9
5.6
-.2
5.6
1.7
5.3
4.7
4.8
6.9
3.7
11.1
2.6
15.8
2.0
22.2
.9
32.9
.5
49.7
-.2
66.2
.2
84.5
.1
105.8
-.4
125.9
.4
141.7
-1.0
145.9
-.9
155.9
.5
165.5
.3
186.0
-.9
205.1
-.9
225.3
.3
245.9
-1.0
265.8
-1.0
286.0
-1.0
305.5
-.5
325.9
.3
345.8
.8
365.7
-.9
385.7
-.4
405.4
.6
426.3
.9
445.4
-1.0
466.3
-1.2
485.9
-1.2
496.6
-1.3
503.8
-1.3
518.8
-1.3
530.6
.7
550.3
B/L STA. 1094+00.00
B/L STA. 1096+00.00
B/L STA. 1098+00.00
B/L STA. 1100+00.00
B/L STA. 1102+00.00
1 INCH = 10 FEET VERTICAL.
DRAWINGS CS-301 THRU CS-310, SCALE: 1 INCH = 20 FEET VERTICAL AND
3. DRAWINGS CS-01 THRU CS-50, SCALE: 1 INCH = 20 FEET VERTICAL AND HORIZONTAL.
2. ALL CROSS SECTIONS SHOWN ARE PERPENDICULAR TO LEVEE BASELINE.
1. SEE SHEET G-05 FOR B/L = C/L MATCH TABULATIONS.
NOTES:
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .