About this file

This solicitation describes a requirements contract for maintenance dredging services. The U.S. Army Corps of Engineers seeks to award a firm fixed-price contract for the removal and disposal of dredged materials from the Tiger Pass Channel in Plaquemines Parish, Louisiana. A hydraulic cutter-head dredge will excavate material, which will then be placed into wetland development areas via single point discharge. The solicitation is anticipated to be issued on August 23, 2019 as an invitation for bid. Interested vendors are encouraged to register as such on FedBizOps and SAM to receive announcements and be eligible to submit a bid. The work consists of dredging approximately 1.9 million cubic yards of material to a depth of -12 feet MLLW over a distance of 7.4 miles of channel.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912P819B0064

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The subject solicitation for the Mississippi River Outlets, Vicinity of Venice (MROV) – Tiger Pass Bar Channel, Maintenance Dredging, #20-1, Plaquemines Parish, LA. (ED 20-020 & ED 20-021) is amended as follow s:

a. Set bid opening date: Tuesday, August 25, 2020, at 11:00 a.m. CST

b. Provide Bid Opening Instruction Revisions

c. Update Plans, Specif ications, and attachments.

All other tems and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 40

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jul-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P819B0064

X 9B. DATED (SEE ITEM 11)

22-Oct-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jul-2020

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

SECTION 00010

Pages 00010-3, 4, and 5. Delete these pages in their entirety and substitute the attached revised pages 00010-3, 4, and 5 therefore.

STANDARD FORM 1442

Block 11. Change “210 calendar days” to “240 calendar days”.

SECTION 00700

Page 28 of 229, clause 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, sub-clause (c). Change “210 calendar days” to “240 calendar days”.

SECTION 01100

Page 10, paragraph 7. Delete this paragraph in its entirety and substitute the following therefore.

“7 ACCOMMODATIONS AND MEALS FOR INSPECTORS

(a) The Contractor shall furnish regularly to inspectors on board the dredge or other craft upon which they are employed a suitable separate room approximately 150 square feet in size for a Corps of Engineers field office.

The room shall be fully equipped and maintained to the satisfaction of the Contracting Officer; it shall be properly heated, ventilated, air conditioned, and lighted, shall have sufficient electrical outlets with power surge protection to power a laptop computer and printer, shall have a desk which can be locked, and a drafting table measuring at least four (4) feet by six (6) feet, a comfortable chair for each inspector, washing conveniences and daily janitorial services. This will not be a separate cost and will be included in the price of dredging. Should the Contractor have a photocopy machine on the jobsite, the Contractor may allow the use of his own in lieu of providing a separate machine for use by the Government inspector. The entire cost to the Contractor for furnishing, equipping, and maintaining the foregoing accommodations, shall be distributed amongst the existing bid items. If the Contractor fails to meet these requirements, the facilities referred to above will be secured by the Contracting Officer, and the cost thereof will be deducted from payments to the Contractor.

(b) If the Contractor maintains on this work an establishment for the subsistence of his/her own employees, he/she shall, when required, furnish to inspectors employed on the work, and to all Government agents who may visit the work on official business, meals of quality satisfactory to the Contracting Officer. All meals shall be available for purchase, by the Government's inspectors and agents, at the cost not to exceed $1.50 per person for each meal.”

SECTION 01 33 00

Page 5, paragraph 1.10. Delete this paragraph in its entirety and substitute the following therefore.

“1.10 TRANSMITTAL FORM (ENG FORM 4025)

The transmittal form (ENG Form 4025) attached to this section shall be used for submitting both Government-approved and information-only submittals in accordance with the instructions on the reverse side of the form. This form shall be properly completed by filling out all the heading blank spaces and identifying each item submitted. Special care shall be exercised to ensure proper listing of the contract specification paragraph and/or sheet number of the contract drawings pertinent to the data submitted for each item. In order to expedite review of submittals, an electronic copy of all submittals shall be sent to the Contracting Officer's Representative along with the hard copies. Each submittal shall be submitted in electronic (.pdf) form. Electronic files shall be .pdf, .dgn, .doc, .do or other format acceptable to the Contracting Officer's Representative.”

SUBMITTAL REGISTER

Delete the Submittal Register in its entirety and substitute the attached revised Submittal Register therefore.

SECTION 01 45 04.00 10

Page 2, paragraph 1.3. Delete this paragraph in its entirety and substitute the following

1.2 ELECTRONIC TEST REPORT DATA

As part of the Contractor's Quality Control Program, his/her selected QC laboratory shall provide to the Government electronic transmission of test report data in the prescribed formats in addition to the original test report data. Tests results shall be emailed to mvn-cd-q-testresults@usace.army.mil and also to the Government's Inspector and Project Engineer (email addresses will be given at the Preconstruction Conference). In addition, all test results shall be uploaded into RMS. The New Orleans District Construction Control Manual (NODCC Manual) specifies the minimum number of tests to be made and includes forms which shall be used to report test data. The Technical Specification sections may include testing and/or frequency requirements other than those listed in the NODCC Manual. The more comprehensive requirements shall govern in case of conflict. A copy of the NODCC Manual is attached at the end of this section.”

SECTION 01 57 20.01 12

1. Throughout this section delete all information concerning the contact information of Edward Creef to the following new point of contact: “Mr. Jeffrey Corbino, of the U.S. Army Corps of Engineers at (504) 862-1958 or email at Jeffrey.M.Corbino@usace.army.mil.”

2. Page 8, paragraph 3.3.1. Delete this paragraph in its entirety and substitute the following

“3.3.1 Nesting Birds

Colonial nesting wading birds (including but not limited to, herons, egrets, and Ibis) and seabirds/waterbirds (including, but not limited to terns, gulls, black skimmers, and brown pelicans) may nest in the project area. The nesting birds and their nests must not be disturbed or destroyed. The nesting activity period extends from February 15 through September 15.

Dredging activity during this period may be subject to additional requirements as stated below.

3.3.1.1 Reporting

The presence of nesting wading birds and/or seabirds/waterbirds within the minimum distances from the work area as specified in paragraph "No Work Distances" must be immediately reported to Mr. Jeffrey Corbino, of the U.S. Army Corps of Engineers at (504) 862-1958 or email at Jeffrey.M.Corbino@usace.army.mil.

3.3.1.2 No Work Distances

No-work distance restrictions are as follows:

" Terns, gulls, and Black Skimmers - 650 feet;

" Colonial nesting wading birds - 1000 feet; and, " Brown Pelicans - 2000 feet.

Coordination by the New Orleans District personnel with the U.S. Fish and Wildlife Service may result in a reduction of these no-work distance restrictions depending on the species of birds found nesting at the work site.

3.3.1.3 Bird Nesting Prevention and Avoidance Measures

The Contractor shall prepare and submit to the Contracting Officer's Representative, for approval, a plan, detailing the efforts that will be undertaken to prevent birds from nesting within the minimum distances, as specified in paragraph "No Work Distances", from any work activity. The plan shall be submitted in accordance with paragraph entitled "Implementation".

Additionally, one copy of this plan shall be submitted to:

U.S. Army Corps of Engineers, New Orleans District Attn: CEMVN-OD-T, Mr. Jeffrey Corbino 7400 Leake Avenue New Orleans, LA 70118

Nest prevention measures shall be intended to deter birds from nesting on the disposal area(s) and access corridor(s) without physically harming birds during the nesting activity period, as specified in paragraph "Nesting Birds". Nest prevention measures may be used in combination and or adjusted to be most effective. The use of any harassment measures shall be in accordance with EM 385-1-1 (Safety and Health Requirements), latest edition. At minimum, nest prevention measures shall include the following:

Flagging/Streamers - Flagging and or streamers at least 2 feet in length and which consist of reflective plastic/mylar type material shall be attached to the top of stakes at least 3 feet in height. The stakes shall be driven into the ground at approximately 20-foot intervals.

Flagging and or streamers shall be placed such that the flags/streamers move in a light wind.

Vehicular/Pedestrian Traffic - At a minimum, one terrain vehicle (ATV) and/or one person shall travel throughout the entire disposal area at least once per hour from dawn to dusk.

Specific nest prevention measures used during the work shall be monitored for effectiveness and may require adjustment and/or modification. All equipment/supplies used for nest prevention shall be removed from the work site upon the completion of the work and as directed by the Contracting Officer.

3.3.1.4 Discovery of Bird Nests at the Work Site

If bird nests are discovered at the work site, immediate notification shall be made, as specified in paragraph "Reporting". The contractor shall immediately mark the bird nests with flagging on stakes 3-feet above the ground surface and no closer than 3 feet from the nest. The contractor shall immediately implement safe work distances from the nest(s), as specified in the "No Work Distances" paragraph, and place flagging to create exclusion zone(s) around the nest(s), and advise all equipment operators of the bird nest(s) and exclusion zone(s).”

SECTION 35 20 23.00 12

1. Page 7, paragraph 1.6.3. Delete this paragraph in its entirety and substitute the following

“1.6.3 Cellular Telephone and Internet

The Contractor shall provide at least one (1) cellular telephone aboard the dredge. Cellular phone service shall be available to Government personnel for conducting official Government business 24 hours per day, seven (7) days per week. In the event that more than one (1) dredge is assigned to contract, there must be one (1) cellular phone per dredge. The Contractor shall also provide high speed Internet service and associated equipment must be capable of providing adequate connection to allow the inspectors to import/export files through ROMS (shall provide a minimum download speed of 10 Mbps and a minimum upload speed of 1.5 Mbps for the sole use of the Inspector). The Contractor must field verify that the service provider chosen has adequate continuous coverage at the construction site. The contractor shall be responsible for the installation, maintenance of and the monthly service fees necessary to provide continuous cellular telephone and high speed Internet service for the duration of the contract. Final approval of the plant will not be made until the equipment is installed and in good working order.”

2. Page 8, paragraph 1.7.4. Delete this paragraph in its entirety and substitute the following

“1.7.4 Inspectors (Government Agents) Transportation.

The Contractor shall furnish, throughout the contract period, for the exclusive use of the Government: a motorboat, a minimum of a 50 horsepower motor with enclosed cabin and equipped with safety equipment as required by EM 385-1-1. The Contractor shall also furnish fuel, oil, and maintenance of the motorboat throughout the contract period. The Contractor shall assume full responsibility for the storage and security of the motorboat when not in use by the Government employees. There shall be no separate payment for these items and the cost shall be distributed throughout the existing bid items. Equipment which fails to perform because of insufficient power or other mechanical deficiencies or due to inexperienced operators shall be replaced, or the operator replaced, as the case may be, within 12 hours after the Contractor is directed to do so by the Contracting Officer's Representative. No smoking shall be allowed inside the cabin and operator's space while occupied by Government personnel. No Smoking signs shall be posted. The required transportation equipment is specified below;

Skiff. Aluminum 18-foot aluminum skiff, full operated, with a minimum 25 horsepower outboard motor

Airboat. The Contractor shall also provide the services of a fully operated airboat, capable of accommodating a minimum of four (4) passengers for the use of the Government to access the disposal sites.”

3. Delete ENG FORM 4267 in its entirety and substitute the attached updated MVN FORM 4267, dated 24 May 2018 therefore.

NEW SECTION 35 20 23.33

Add the attached new Section 35 20 23.33.

DRAWINGS

SHEET IDENTIFICATION Nos. G-01, G-02, and C-01 thru C-07. Delete these drawings in their entirety and substitute the attached revised drawings SHEET IDENTIFICATION Nos. G- 01, G-02, and C-01 thru C-07 therefore.

SECTION 00010 – BIDDING SCHEDULE

Mississippi River Outlets Vicinity of Venice, Louisiana

Tiger Pass Bar Channel Dredging #20-2

Plaquemines Parish, Louisiana

Item DESCRIPTION Estimated Quantity

Unit Unit Price Estimated Amount

BASE WORK

0001 Mobilization and Demobilization 1 JOB

0002 Dredging

0002AA First 1,500,000 1,500,000 CY

0002AB All Over 1,500,000 400,000 CY

TOTAL BASE WORK: $

OPTIONAL WORK - OW

Bird Nesting Prevention and Avoidance Measures

60 DAY

TOTAL OPTIONAL WORK: $

TOTAL BASE WORK + OPTIONAL WORK: $

Award will be made as a whole to one bidder.

NOTE 1: The unit “JOB” as used in this Bidding Schedule is synonymous with the term “Lump Sum” used elsewhere within these plans and specifications.

NOTE 2: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED TOTAL OR

ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE DECLARED NON-RESPONSIVE

AND THEREFORE INELIGIBLE FOR AWARD.

NOTE 3: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or subline items are materially unbalanced (See FAR 14.404-2, Rejection of Individual Bids).

NOTE 4: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442 after Notice of Award. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.

NOTE 5: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the government to exercise the option(s).

NOTE 6: OPTION FOR INCREASED QUANTITY -- SEPARATELY PRICED LINE ITEM (FAR

52.217-7). The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within three days prior to the estimated completion date of the basic line item or any previously exercised option. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

NOTE 7 OPTIONAL WORK ITEM: If the Government activates the Optional Work Item, the activation will occur while the Contractor’s plant is within the limits of work. No additional mobilization/demobilization will be paid to the Contractor for the Optional Work. Bidders shall bid on all items including Optional Items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.

Note 8: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF OPTIONAL WORK. In the event that the OPTIONAL WORK is exercised under the terms of the contract, the time required for completion of the contract shall be the original contract duration of 240 calendar days established for the BASE WORK items specified in Section 00700, CONTRACT CLAUSES, paragraph entitled “COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK”. The

EVALUATION OF SUBLINE ITEMS (Dec 2019 - AFARS 5152.211-9000).

Item Nos. 0002 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its subline items.

(End of Clause)

VARIATIONS IN ESTIMATED QUANTITIES - SUBLINE ITEMS (Dec 2019) - AFARS 5152.211-9001).

This variation in estimated quantities clause is applicable only to item Nos. 0002.

(a) Variation from the estimated quantity in the actual work performed under any second or subsequent subline item or elimination of all work under such a second or subsequent subline item will not be the basis for an adjustment in contract unit price.

(b) Where the actual quantity of work performed for item Nos.0002 is less than 85% of the quantity of the first subline item listed under such item, the contractor will be paid at the contract unit price for that subline item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause at Federal Acquisition Regulation (FAR) 52.211-18, VARIATION IN

ESTIMATED QUANTITY.

(c) If the actual quantity of work performed under item Nos. 0002 exceeds 115% or is less than 85% of the total estimated quantity of the subline item under that item and/or if the quantity of the work performed under the second subline item or any subsequent subline item under item Nos. NONE exceeds 115% or is less than 85% of the estimated quantity of any such subline item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-

18, VARIATION IN ESTIMATED QUANTITY.

(End of Clause)

The following have been modified:

INSTRUCTIONS TO BIDDERS

Due to the response for COVID-19, most federal employees have been mandated to telework, and currently only authorized personnel are allowed access to the District buildings throughout USACE. As a result, we have implemented the below procedures for all current and future bid openings, until such restrictions have been lifted and normal access has resumed at the MVN HQ Building.

Electronic Submission of Bids:

NOTE the change below to the Contract Specialist and Revised Teleconference Information..

MVN will utilize the DoD Safe website for receipt of electronic bids under IFB Solicitations. In order to submit an electronic bid please follow these steps:

1. Send an email containing your name and email address to the Contracting Officer and Contract Specialist associated with the IFB:

Contracting Officer – Mr. Christopher Nuccio, email: christopher.nuccio@usace.army.mil

Contract Specialist – Ms. Kimberly Drymala, email: kimberly.y.drymala@usace.army.mil

2. The Contracting Officer or Contract Specialist will go to the DoD Safe site, input your name and email address, and then will request the file from you. You will then receive an automated email from the site with a unique link in the email.

3. Once the email with the link is received, please click on the link in the email, which will take you to the DoD Safe site.

4. This will be a unique webpage where you can upload your file. The default page will load with the box checked off next to, “Send me an email when each recipient picks up the files”.

Please leave this box checked in order to receive a notification when the file is received from the Contracting Officer or Contract Specialist. Please leave unchecked, “Encrypt every file”. The site itself contains a high level of security in which additional encryption is not required.

5. When you are ready to upload your bid file (please use pdf format for bid submission), you can either click the blue button which says, “Click to Add Files or Drag Them Here” to locate the file on your computer, or simply drag the file onto the screen.

6. In the Description box that appears after uploading your file, please type your Company Name.

7. Click the button that appears at the bottom of the page, “Drop-off Files”. A banner will pop-up asking for confirmation that your upload does not contain Classified Information. Click ok on the banner.

8. You will be taken to a confirmation page that should say, “Drop-Off Completed” at the top.

This is your confirmation that your file was successfully uploaded to the site.

9. The Contracting Officer or Contract Specialist will receive an automated email stating that the file has been submitted. They will then send an email back to the company, confirming that they received the notice from the DoD Safe site.

The Bid Opening is currently scheduled for 25 August 2020, 11 AM CST. The Contracting Officer and Contract Specialist will begin downloading bids at 10:30 AM CST, which is the bid receipt cutoff time. All bids received after 10:30 AM CST on 25 August 2020 will be considered late.

Audio Teleconference Bid Opening Information:

Bid Opening will be held on Tuesday, 25 August 2020 at 11:00 AM CST. Please use the following call-in information to attend the meeting:

Toll-Free: 844-291-6360 Access Code: 8214175

Following the conclusion of the bid opening, the Bid Abstract will be uploaded to Beta.SAM website under this solicitation, within 24 hours.

Bid Bonds (Offer Guarantee) should be submitted electronically with the Bid Package as per the scheduled Bid Opening on the Amendment and per

Bidders are to ensure that the Original Certified Bonds are mailed to arrive in accordance with Block 12b of the SF1442 to the address provided in Block 7.

For any Questions please contact:

Contracting Officer – Mr. Christopher Nuccio, email: christopher.nuccio@usace.army.mil ;

Phone: 504-862-2704

Contract Specialist – Ms. Kimberly Drymala, email: kimberly.y.drymala@usace.army.mil ;

Phone: 504-862-1214

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES

Tiger Pass Maintenance Dredging

01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal register

01 45 04.00 10 SD-01 Preconstruction Submittals G CDContractor Quality Control Plan

01 57 20.01 12 SD-01 Preconstruction Submittals G ODTEnvironment Pollution Control

Plan G ODTBird Nesting Prevention Plan

01 78 02.00 10 SD-02 Shop Drawings

1.3.1 G EDC'As-Built' Drawings

1.3.1 G EDC'As-Built' Drawings

02 21 10.00 12 SD-02 Shop Drawings

3.1.3 G CDPreliminary Field Surveys

Before and After Dredging Cross Sections

Disposal Area Surveys SD-03 Product Data

G CDGrab Sampling Device Type SD-04 Samples Grab Samples

SD-05 Design Data Compiled Survey Data CD Disk

3.1.3 G CD EDPreliminary Field Surveys

Before and After Dredging Cross Sections

Disposal Area Surveys

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES

Tiger Pass Maintenance Dredging

02 21 10.00 12 SD-09 Manufacturer’s Field Reports Calibration checks

35 20 23.00 12 SD-01 Preconstruction Submittals 1.7.2Dredge Plant Data 3.2.2Plan of Operation

G EDCDisposal of Dredged Material G EDCAccess Plan

Construction Schedule

EDD,CT

SD-07 Certificates G EDCCertified Letters

SD-11 Closeout Submittals G EDCReport of Operations

35 20 23.33 SD-01 Preconstruction Submittals G OMDredge Plant Instrumentation

Plan Revisions SD-07 Certificates

G EDCLetter of National Dredging Quality Management Program Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

NAME AND TYPE PIPELINE

OTHER TOTAL SHIFTS PER DAY

AUTH.

DIMENSIONS

C/L STATIONS >

GMS/liter GMS/liter

TYPE

TYPE

MM TYPE

AMOUNT

AVERAGE WIDTH OF CUT (SWING) FEET

TOTAL ADVANCE THIS PERIOD FEET

TOTAL ADV. PREVIOUS TO THIS PERIOD FEET BOOSTER (in line) :

TOTAL ADVANCE TO DATE FEET

TOTAL LENGTH OF DISCHARGE PIPE: *SEE REVERSE SIDE HANDLING PIPE LINES HPL

AVERAGE LIFT FEET HANDLING ANCHOR LINES HAL

AVERAGE PUMP SPEED R.P.M. CLEARING PUMP AND PIPE LINE CPPL

AVERAGE GROSS CY'S DREDGED / PER PUMP HRS. CU. YDS. CLEARING CUTTER OR SUCTION HEAD CCSH

SCOWS LOADED NUMBER WAITING FOR SCOWS WFS

CU. YDS. TO AND FROM WHARF OR ANCHORAGE TFWA

CHANGING LOCATION OF PLANT ON JOB CLPJ

CUBIC YARDS REMOVED LOSS DUE TO OPPOSING NATURAL ELEMENTS LDNE

LOSS DUE TO PASSING VESSELS WVP

(1) GROSS (computed amount) SHORE LINE AND SHORE WORK SLSW

(2) CREDITED (pay place) WAITING FOR BOOSTER WFB

MINOR OPER. REPAIRS (explain in remarks) MOR

(1) GROSS (computed amount) WAITING FOR ATTENDANT PLANT WAP

(2) CREDITED (pay place) PREPARATION AND MAKING UP TOW PMUT

TRANSFERRING PLANT BETWEEN WORKS TPBW

(1) GROSS (computed amount) LAY TIME OFF SHIFT AND SATURDAYS LTOSS

(2) CREDITED (pay place) SUNDAYS AND HOLIDAYS SH

FIRE DRILL FD

MISCELLANEOUS (explain in remarks) MISC

TOTAL NON-EFFECTIVE WORKING TIME

DREDGE

TENDER #1

TENDER #2

SKIFF

CREW PCT OF TOTAL TIME IN PERIOD

SURVEY

BARGES

CRANE BARGE MAJOR REPAIRS AND ALTERATIONS

IDLER BARGE CESSATION

CUTTER-TYPE COLLISIONS

SPUD LENGTH MISCELLANEOUS (explain in remarks)

NUMBER OF TOTAL LOST TIME

INSPECTIONS PERCENTAGE OF TOTAL TIME

( ) NO

TOTAL TIME IN PERIOD 00:00

( ) YES

Version: 5/24/2018

SIZE

DREDGE ADVANCE MECHANISM

NO. OF TIMES AMOUNT

THRU: TO:

inch dia.

disch.

PROPULSION

REPORT NO.

SHOREDREDGE WORK

SCHEDULE

FROM:

DIPPER OR BUCKET

DATE OR

PERIOD

cu. yds. cap.

COMPLETION

PROJECT

AND

BAR

DEPTHWIDTH

SUCTION PIPE JETDREDGE PUMP

RANGES - RT, CL, LT

RANGES - RT, CL, LTWIDTH OF

SWING:

RANGES - RT, CL, LTLOCATION

(INCLUDE STATIONS

NUMBERS)

CHARACTER

OF

MATERIAL

(chargeable to cost of work)

CONTRACT OR

ORDER NUMBER

WEATHER

CONDITION miles

AVERAGE

DEPTH

RIVER

STAGE

MM

NUMBER

BEFORE DREDGING

GEOLOGICAL

CLASSIFICATION

CHANNEL

CONDITION

ABSOLUTE DENSITY VOIDS RATIOIN PLACE DENSITY

ITEM

MVN FORM 4267

AVERAGE LOAD PER SCOW

CONTRACT USE

ONLY

TOTAL EFFECTIVE AND NON-EFFECTIVE

ITEM

BY DIV & OCE

PERSONNEL

ATTENDANT PLANT

HOURS

(If "YES", explain under remarks on back) (Signature and Remarks

Required on reverse side)

NAME OR NUMBER

AMOUNT PREVIOUSLY REPORTED:

TOTAL AMOUNT DREDGED TO DATE:

PCT. OF NON-EFFECTIVE RENTAL TIME

REPORTS CONTROL SYMBOL

ENGCW-0-13

DAYS PER WEEK

CUTTER OR BUCKET

REPORT OF OPERATIONS -- PIPELINE, DIPPER OR BUCKET DREDGES

HORSEPOWER OF

DAILY[ ] [ ] [ ]NEW

WORK

MAINTE-

NANCE [ ] [ ] ANNUALCHARACTER OF

REPORT

DREDGE

OVERDEPTH

EFFECTIVE WORKING TIME

NON-EFFECTIVE WORKING TIME

NUMBER OF

CREWMEMBERS

TIMETIME

(chargeable to cost of work)

HIRED LABOR

TOTAL NUMBER OF DAYS

ON WHICH WORK WAS

DONE:

(clear, cloudy, rain, snow, and fog)

PUMPING OR DREDGING

PCT. OF EFFECTIVE RENTAL TIME

AFTER DREDGING

VISIBILITY

UNIT QUANTITY

FULL WIDTH

FULL WIDTH

FULL WIDTH

BY DISTRICT PERSONNEL

HAS ANYTHING DEVELOPED WHICH MIGHT LEAD

TO A CHANGE ORDER OR CLAIM?

TIME

(chargeable to cost of work)

LOST TIME

(not chargeable to cost of work)

AMOUNT DREDGED THIS PERIOD:

DISTRIBUTION OF TIMEWORK PERFORMED

GRAIN SIZE

WIND (maximum velocity & direction)

BEFORE DREDGING

CONTRACTOR

AFTER DREDGING

MINIMUM

GAGE LOCATION

MAXIMUM

MINIMUM

SOUNDING

FLOATING Marsh Trackhoes-30' SKIDDER Barges PONTOONS Marsh Trackhoes-60'

Metal Metal Metal Marsh Buggies Breast PVC PVC PVC Dozers Head

Flexifloat Other Other Total FEET in LINE Front End Loaders Line TOTAL LF Air Boats Other

ATV's ELBOWS Y-Valves

Stiff Spreaders Swivel

MATERIAL

SHORE CONNECTION START FINISH TOTAL CY TOTAL ACRES CLASSIFICATION

100% 70% 35% 0% TOTAL

BASE HOURS 00:00

OPTION HRS 00:00

OPERATING SUPPLIES

COMMODITIES UNIT QUANTITY QUANTITY VALUE

FUEL (oil) GAL.

TOTAL COST OF PLANT

LUBRICANT GAL.

(oil)

LUBRICANT LBS.

(grease)

WATER GAL.

SUBSISTENCE SUPPLIES ……………………………………… $

MISCELLANEOUS SUPPLIES…………………………………

TOTAL……………………………………………………. $ $

NAME: NAME: NAME:

TITLE: TITLE: TITLE:

Version: 5/24/2018

MVN FORM 4267

ANCHORS

DISPOSAL AREA SUMMARY

LOCATION

TIME BREAKDOWN

REMARKS

SUMMARY OF DREDGE DISCHARGE PIPELINE, DISPOSAL AREAS and RENTAL TIME BREAKDOWN

ATTENDANT PLANT

DREDGE DISCHARGE PIPELINE DISPOSAL AREA EQUIPMENT ANCHORING SYSTEMS

(complete when submitting Annual report)

RECOMMENDED BY (Name, title, and signature) APPROVED BY (Name, title, and signature)

ANNUAL REPORT DATA

CONSUMED INVENTORY

COSTS PER RENTAL MINUTE

(Based on total operating costs)…………

SUBMERGEAMOUNT AMOUNT SHORE AMOUNT

SMALL TOOLS, ETC…………

TOTAL…………………………

SUBMITTEDED BY (Name, title, and signature)

REMARKS:

(End of F.Y. reporting period)……………

PLANT OWNERSHIP COSTS

(Actual for F.Y. reporting period):

DEPRECIATION………………

REPAIRS (Adjusted) …………

BOOK VALUE

(End of F.Y. reporting period)……………

BALANCE IN PLANT ACCOUNT

(End of F.Y. reporting period)……………

CESSATION OF WORK ……

Tiger Pass Bar Channel, Maintenance Dredging, #20-2 Ed 20-021

SECTION TABLE OF CONTENTS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

SECTION 35 20 23.33

NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM PIPELINE HYDRAULIC DREDGE

PART 1 GENERAL

1.1 DESCRIPTION

1.2 SUBMITTALS

1.3 MEASUREMENT AND PAYMENT

1.4 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM CERTIFICATION

1.5 DREDGE PLANT INSTRUMENTATION PLAN (DPIP)

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 REQUIREMENTS FOR REPORTED DATA

3.1.1 Message Bundle Data

3.1.1.1 Messages

3.1.1.1.1 Message Time

3.1.1.1.2 Comment

3.1.1.2 Dredge Events - Work Event

3.1.1.2.1 Vertical Correction

3.1.1.2.2 Cutter/Suction Head Location and Movement

3.1.1.2.2.1 Cutter/Suction Head Horizontal Position

3.1.1.2.2.2 Cutter/Suction Invert Depth

3.1.1.2.2.3 Cutter/Suction Head Heading

3.1.1.2.3 Dredge Activity

3.1.1.2.3.1 Slurry Velocity

3.1.1.2.3.2 Slurry Density

3.1.1.2.3.3 Pump RPM

3.1.1.2.3.4 Pump Vacuum

3.1.1.2.3.5 Pump Outlet Pressure

3.1.1.2.4 Outfall Information (Open Water/Spill Barge Disposal)

3.1.1.2.4.1 Discharge Horizontal Position

3.1.1.3 Dredge Events - State Event

3.1.1.3.1 Message Time

3.1.1.3.2 Contract Event

3.1.1.3.2.1 Contract Number

3.1.1.3.2.2 Contract Start and End

3.1.1.3.3 Tide Station/River Stage Gage Event

3.1.1.3.3.1 Station Name

3.1.1.3.4 Length of Pipe Event

3.1.1.3.4.1 Floating Pipe

3.1.1.3.4.2 Submerged Pipe

3.1.1.3.4.3 Shore Pipe

3.1.1.3.5 Booster Pump Event

3.1.1.3.5.1 Number of Booster Pumps

3.1.1.3.6 Dredge Advance

3.1.1.3.7 Outfall Information

3.1.1.3.7.1 Discharge Location

SECTION 35 20 23.33 Page 1

3.1.1.3.7.2 Discharge Horizontal Position

3.1.1.3.7.3 Discharge Outfall Heading

3.1.1.3.7.4 Discharge Pipe Elevation

3.1.1.3.8 Non-effective Work Event

3.1.1.3.8.1 Non-effective Work Interval

3.1.1.3.8.2 Dredge Function Code

3.1.1.3.8.3 Additional Comments

3.2 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SYSTEM REQUIREMENTS

3.2.1 Computer Requirements

3.2.2 Software

3.2.3 UPS

3.2.4 Internet Access

3.2.5 Data Routing Requirements

3.3 DREDGE MONITORING DATA

3.3.1 General

3.3.2 Data Measurement Frequency

3.3.2.1 Work Event Messages

3.3.2.2 State Event Messages

3.3.3 Parameter Transmission to the Web Service

3.3.4 Contractor Data Backup

3.4 PERFORMANCE REQUIREMENTS

3.5 QUALITY ASSURANCE CHECKS

3.6 CONTRACTOR QUALITY CONTROL

3.7 LIST OF ITEMS PROVIDED BY THE CONTRACTOR

-- End of Section Table of Contents --

SECTION 35 20 23.33 Page 2

SECTION 35 20 23.33

NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM

PIPELINE HYDRAULIC DREDGE

PART 1 GENERAL

1.1 DESCRIPTION

The work under this contract requires use of the US Army Corps of Engineers (USACE) National Dredging Quality Management Program (DQM) to monitor the dredge's status at all times during the contract duration and manage data history.

This performance-based specification section identifies the minimum required output as well as the precision and instrumentation requirements.

The requirements may be satisfied using equipment and technical procedures selected by the Contractor.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office responsible for review of the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00, "Submittal Procedures":

SD-01, Preconstruction Submittals

Dredge Plant Instrumentation Plan Revisions; G, OM

SD-07, Certificates

Letter of National Dredging Quality Management Program Certification; G, EDC

1.3 MEASUREMENT AND PAYMENT

No separate measurement or payment will be made for the installation, operation, and maintenance of the DQM-certified system as specified herein for the duration of the dredging operations. All costs in connection therewith shall be considered a subsidiary obligation of the Contractor and shall be included in the contract unit price for "Dredging".

1.4 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM CERTIFICATION

The Contractor shall have a current certification from the DQM Program for the cutter/suction head hydraulic dredge instrumentation system to be used under this contract. Standard Operating Procedures (SOP) and criteria for certification are presented on the DQM website at https://dqm.usace.army.mil.

SECTION 35 20 23.33 Page 3

1.5 DREDGE PLANT INSTRUMENTATION PLAN (DPIP)

The Contractor shall have a digital copy of the Dredge Plant Instrumentation Plan (DPIP) on file with the DQM Support Center. While working on site, the Contractor shall also maintain on the dredge a copy of the DPIP, which is easily accessible to Government personnel at all times.

This document shall accurately describe the sensors used, the configuration of the system, how sensor data will be collected, how quality control on the data will be performed, and how the sensors/data-reporting equipment will be calibrated and repaired if it fails. A description of the computed dredge-specific data and how the sensor data will be transmitted to the DQM database shall also be included. Prior to the start of work, the Contractor shall submit to the DQM Support Center any addendum or modifications made to the plan subsequent to its original submission. Requirements and a template for the DPIP are available on the DQM website at https://dqm.usace.army.mil.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 REQUIREMENTS FOR REPORTED DATA

The Contractor shall provide, operate, and maintain all hardware and software to meet these specifications. The Contractor shall also be responsible for the replacement, repair, and calibration of the sensors and other necessary data acquisition equipment needed to supply the required data.

The procedure to complete a repair shall be documented and completed as soon as practical. If repair is not possible within two business days of any sensor failure, a plan and timeline to complete the repair shall be submitted. Upon completion of a repair, replacement, installation, modification, or calibration, the Contractor shall notify the Contracting Officer's Representative (COR). The COR may request recalibration of the sensors or other hardware components at any time during the contract as deemed necessary.

The Contractor shall keep a log of sensor repair, replacement, installation, modification, and calibration in the dredge's onboard copy of the DPIP. The log shall contain a three-year history of sensor maintenance, including the time of the sensor failures (and subsequent repairs), the time and results of sensor calibrations, the time of sensor replacements, and the time that backup sensor systems were initiated to provide the required data. It shall also contain the name of the person responsible for the sensor work.

Sensors installed shall be capable of collecting parameters within the specified accuracies and resolutions indicated in the following subparagraphs and transmit these parameters to the DQM database. All data shall be transmitted in JSON message bundles. Each bundle can contain multiple message types. Sensor data shall be transmitted as work event messages, and data which relates to the operational state of the dredge or its sensors shall be transmitted as state event messages. See paragraph entitled "Parameter Transmission to the Web Service".

3.1.1 Message Bundle Data

Every message bundle shall contain descriptive data that relates the

SECTION 35 20 23.33 Page 4 message to a given dredge plant and date/time. The start of a message bundle shall be identified by the tag "DQM_data".

3.1.1.1 Messages

Messages contain operational data that populates the DQM database for a dredge plant. A message shall consist of an event type and its associated data (as defined in paragraphs entitled "Dredge Events"), a date/time stamp indicating when the event occurred or started, and a comment providing clarification or metadata about the situation. There are multiple event types, but they all fall into one of two categories - work events and state events.

3.1.1.1.1 Message Time

In a work event message, message time is the date and time that the data is collected from the sensors; in a state event message, message time is the date and time that the state event begins. The message time shall be reported to the nearest second and referenced to Coordinated Universal Time (UTC) time based on a 24-hour format (YYYY-MM-DD HH:MM:SS). In order to ensure accuracy and reliability, the time stamp shall be synchronized to UTC format from an accurate, unchangeable source (for example, a GPS National Marine Electronics Association [NMEA] datastring). Message time shall be identified by the tag "msg_time".

3.1.1.1.2 Comment

Comments concerning the work event or state event messages being transmitted provide descriptive information that relates to the data. An example of a comment for work event data is information about a sensor issue; an example of a comment for state event data is a description of operations. A comment shall be identified by the introductory tag "comment", and the comment shall consist of no more than 250 characters.

3.1.1.2 Dredge Events - Work Event

There are two types of dredge event messages - work event messages and state event messages. Work event messages contain data that are instantaneously collected or calculated from sensors and are logged as a series of events. Work events are triggered by a time interval change (as described in paragraph entitled "Work Event Messages"). All work event messages shall be initiated by the header tag "work_event".

3.1.1.2.1 Vertical Correction

The variation of the water level from the vertical datum for the river stage or tidal gage described in the state events shall be obtained using appropriate equipment to give the water level with an accuracy of +/- 0.1

ft. Vertical correction values above project datum described in the dredging specification shall be entered with a positive sign and those below with a negative sign. The tag for vertical correction shall be "vert_correction".

3.1.1.2.2 Cutter/Suction Head Location and Movement

The X, Y, and Z components of the cutter/suction head location shall be monitored. Additional calculations made from the observed values determine the rates of movement to track the progress of the dredge.

SECTION 35 20 23.33 Page 5

3.1.1.2.2.1 Cutter/Suction Head Horizontal Position

The forwardmost point of the cutter/suction head shall be obtained using a positioning system operating with a minimum accuracy level of 3-10 feet horizontal Circular Error Probable (CEP). It shall be reported as Latitude/Longitude WGS 84 in decimal degrees with West Longitude and South Latitude values reported as negative. Position values shall be identified by the tags "ch_latitude" and "ch_longitude".

3.1.1.2.2.2 Cutter/Suction Invert Depth

Cutter/suction invert depth is the depth of the invert of the suction mouth relative to the surface of the water. Instrumentation shall be capable of reporting to an accuracy of +/- 0.5 foot and a resolution to the nearest

0.1 foot with no tidal adjustments. Minimum accuracies are conditional to relatively calm water. The tag "ch_depth" shall be used to identify the cutter/suction head depth.

3.1.1.2.2.3 Cutter/Suction Head Heading

The cutter/suction head heading is the angle of the centerline of the cutter/suction head and dredge ladder measured relative to true north. All headings shall be provided using industry-standard equipment. The heading shall be accurate to within 5 degrees and reported to the nearest whole degree with values from 000 (true north) to 359 degrees referenced to a clockwise positive direction convention. The tag "ch_heading" shall be used to identify the cutter/suction head heading.

3.1.1.2.3 Dredge Activity

Dredge activity shall be monitored using a combination of the following parameters.

3.1.1.2.3.1 Slurry Velocity

A flow-metering device, calibrated according to the manufacturer's specifications, shall be used to record the slurry velocity to the nearest

0.01 fps with an accuracy of plus 0.1 fps. If the manufacturer does not specify a frequency of recalibration, calibration shall be conducted prior to the commencement of work. The slurry velocity shall be measured for the same pipeline inside diameter as that used for the slurry density measurement. The tag "slurry_velocity" shall be associated with this value.

3.1.1.2.3.2 Slurry Density

A density-metering device, calibrated according to the manufacturer's specifications, shall be used to record the slurry density to the nearest

0.01 g/cc. It is understood that the accuracy of this sensor can vary based on several factors, including the type of material, the magnitude of the cut, and the length of time since calibration. If the manufacturer does not specify a frequency of recalibration, calibration shall be conducted prior to the commencement of work. Continuous monitoring of this sensor ensures that drift and other factors inherent in the dredging process can be accounted for in monitoring dredge activity. The tag "slurry_density" shall be associated with this value.

3.1.1.2.3.3 Pump RPM

The pump rpm is the number of revolutions per minute measured for the

SECTION 35 20 23.33 Page 6 slurry pump shaft. The shaft revolution rate (rev/min) shall be measured with the highest level of accuracy that is standard on the vessel's operational displays either at the bridge or in the engine room. This value shall be identified by the tag "rpm".

3.1.1.2.3.4 Pump Vacuum

The vacuum pressure of the dredge pump(s) (inches of mercury) shall be measured as near to the eye as practicable in the pump's suction pipe with the highest level of accuracy that is standard on the vessel's operational displays either at the leverman's controls or in the engine room. Vacuum pressure shall be identified by the tag "vacuum".

3.1.1.2.3.5 Pump Outlet Pressure

The pump outlet pressure shall be measured in the discharge line on the pump side of the flap valve in terms of pounds per square inch (psi) on a gauge. Pump outlet pressure shall be identified by the tag "outlet_psi".

3.1.1.2.4 Outfall Information (Open Water/Spill Barge Disposal)

The X and Y position of the terminal end of the outfall pipe shall be monitored continuously and the position reported as part of the work event string.

3.1.1.2.4.1 Discharge Horizontal Position

The horizontal position of the outfall end of the discharge pipe shall be obtained using a positioning system operating with a minimum accuracy level of 3-10 feet horizontal Circular Error Probable (CEP). It shall be reported as Latitude/Longitude WGS 84 in decimal degrees with West Longitude and South Latitude values being reported as negative. Position values shall be identified by the tags "outfall_latitude" and "outfall_longitude".

3.1.1.3 Dredge Events - State Event

There are two types of dredge event messages - work event messages and state event messages. State event messages provide information about the current state of the dredge equipment or operations. They are created and sent only when a state changes. Since state events often cannot be collected in real time, state events are tagged with a date time stamp (referenced to Coordinated Universal Time [UTC]) that indicates when the state change happened relative to the work event message tag. This data is considered to be "true" until another state event tag is received. Each type of state event message shall be indicated by a specific header tag as enumerated in the following subparagraphs. State events can be transmitted along with work event message bundles directly by the contractor using the indicated format, or they can be entered on the "State" tab in the DQM-provided software.

3.1.1.3.1 Message Time

The state event time is the date and time that the event starts. The leverman's time shall be entered to the nearest second as local time and automatically converted to and reported in UTC based on a 24-hour format (YYYY-MM-DD HH:MM:SS). Message time shall be identified by the tag "msg_time".

SECTION 35 20 23.33 Page 7

3.1.1.3.2 Contract Event

Information concerning the contract under which dredging is being performed shall be reported at the start and completion of each contract using the header tag "contract_event".

3.1.1.3.2.1 Contract Number

The USACE-assigned contract number for the project shall be reported using the tag "contract_number".

3.1.1.3.2.2 Contract Start and End

The start and end of a contract shall be reported using the tag "event_type" with the appropriate value of "start" or "end".

3.1.1.3.3 Tide Station/River Stage Gage Event

Properties associated with the vertical correction (see paragraph entitled "Vertical Correction") for the tide station/river stage gage shall be grouped together under the header tag "station_event". This information shall be sent at the start of the contract and each time the dredge has moved enough to change the station being used.

3.1.1.3.3.1 Station Name

The station name is a concise name defining the tide station/river stage gage begin referred to.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .