W912P819B0055_(plans).pdf
PDF 23 MB Posted
- Solicitation number
- W912P819B0055
About this file
Solicitation No. W912P819B0055 (plans)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P819B0055_Signed_Abstract.pdf | ||
| W912P819B0055-0001.pdf | ||
| W912P819B0055_(spec).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Binder1
| 1 - !2ndSheet |
| US Army Corps |
| 2 - Attention Bidders |
| 3 - INQUIRIES |
| 4 - !4thSheet (edited) |
| 6 - !5thSheet |
| 7 - 00010 |
| 8 - bid bond form |
| 18B0034_Solicitation_Package 8 |
| 18B0034_Solicitation_Package 9 |
| 9 - Sec 00100 |
| 10 - Sec 00600 |
| 11a - Wage Determination |
| 11b - Affirmative Action (lakecharles) |
| 12 - Sec 00800 |
| Binder2 (specs & plans) |
| A02 - Advertisement Specs, CR&P MDrdg FY19, Miles 17 to 34_1 (ED-19-043) |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01100 - GENERAL PROVISIONS |
| 01100 - GENERAL PROVISIONS |
| 1. DAMAGE TO WORK |
| 2. SAFETY PROVISIONS |
| 3. SIGNAL LIGHTS |
| 4. CONTINUITY OF WORK |
| 5. INSPECTION |
| 6. SHOALING |
| 7. ACCOMMODATIONS AND MEALS FOR INSPECTORS |
| 8. SEAWORTHINESS CERTIFICATION |
| 9. ENVIRONMENTAL LITIGATION |
| 10. STATE TAXES |
| 11. FUEL CONSUMPTION REPORTING REQUIREMENTS |
| 12. RIGHTS-OF-WAY |
| 13. VECTOR CONTROL |
| 14. ACCESS PLAN |
| 15. CONTRACT COORDINATION |
| 16. CONTRACTOR’S RESPONSIBILITY |
| 17. MOBILIZATION OF ATTENDANT PLANT |
| 18. SUPERVISION |
| 19. PRE-BID SITE VISIT |
| 20. WORK IN THE VICINITY OF OTHER GOVERNMENT CONTRACTORS |
| 21. SECURITY REQUIREMENTS |
| 22. REGULATORY REQUIREMENTS |
| 23. CONTRACTOR PERFORMANCE EVALUATIONS – CONSTRUCTION |
| 24. DATUM RELATIONSHIPS |
| 01100 - General Provisions - Attachments |
| CESO Form A-02 APP Checklist |
| Activity Hazard Analysis (AHA) |
| Form_385-10R Fuel Oil Transfer.pdf |
| Project Identification and Safety Performance Signs |
| 01 33 00 - SUBMITTAL PROCEDURES |
| 01 33 00 - SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 MEASUREMENT AND PAYMENT |
| 1.2 DEFINITIONS |
| 1.2.1 Submittal Descriptions SD |
| 1.2.2 Approving Authority |
| 1.2.3 Work |
| 1.3 SUBMITTALS |
| 1.4 SUBMITTAL CLASSIFICATION |
| 1.4.1 Government Approved |
| 1.4.2 Information Only |
| 1.5 APPROVED SUBMITTALS |
| 1.6 DISAPPROVED SUBMITTALS |
| 1.7 GENERAL |
| 1.8 SUBMITTAL REGISTER |
| 1.9 SCHEDULING |
| 1.10 TRANSMITTAL FORM ENG FORM 4025 |
| 1.11 SUBMITTAL PROCEDURES |
| 1.11.1 Procedures |
| 1.11.2 Deviations |
| 1.12 CONTROL OF SUBMITTALS |
| 1.13 GOVERNMENT APPROVED SUBMITTALS |
| 1.14 INFORMATION ONLY SUBMITTALS |
| 1.15 STAMPS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 45 00.15 10 - RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE RMS CM |
| 01 45 00.15 10 - RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE RMS CM |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 MEASUREMENT AND PAYMENT |
| 1.3 CONTRACT ADMINISTRATION |
| 1.3.1 Correspondence and Electronic Communications |
| 1.3.2 Other Factors |
| 1.4 RMS SOFTWARE |
| 1.5 SYSTEM REQUIREMENTS |
| 1.6 CONTRACT DATABASE - GOVERNMENT |
| 1.7 CONTRACT DATABASE - CONTRACTOR |
| 1.7.1 Administration |
| 1.7.1.1 Contractor Information |
| 1.7.1.2 Subcontractor Information |
| 1.7.1.3 Correspondence |
| 1.7.1.4 Equipment |
| 1.7.1.5 Reports |
| 1.7.1.6 Request For Information RFI |
| 1.7.2 Finances |
| 1.7.2.1 Pay Activity Data |
| 1.7.2.2 Payment Requests |
| 1.7.3 Quality Control QC |
| 1.7.3.1 Quality Control QC Reports |
| 1.7.3.2 Deficiency Tracking |
| 1.7.3.3 Three-Phase Control Meetings |
| 1.7.3.4 Labor and Equipment Hours |
| 1.7.3.5 Accident/Safety Reporting |
| 1.7.3.6 Definable Features of Work |
| 1.7.3.7 Activity Hazard Analysis |
| 1.7.4 Submittal Management |
| 1.7.5 Schedule |
| 1.7.6 Closeout |
| 1.8 IMPLEMENTATION |
| 1.9 NOTIFICATION OF NONCOMPLIANCE |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 45 04.00 10 - CONTRACTOR QUALITY CONTROL |
| 01 45 04.00 10 - CONTRACTOR QUALITY CONTROL |
| PART 1 GENERAL |
| 1.1 MEASUREMENT AND PAYMENT |
| 1.2 SUBMITTALS |
| 1.3 ELECTRONIC TEST REPORT DATA |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.2 CONTRACTOR QUALITY CONTROL CQC PLAN |
| 3.2.1 Content of the CQC Plan |
| 3.2.2 Acceptance of Plan |
| 3.2.3 Notification of Changes |
| 3.3 COORDINATION MEETING |
| 3.4 QUALITY CONTROL ORGANIZATION |
| 3.4.1 Personnel Requirements |
| 3.4.2 CQC System Manager |
| 3.4.3 CQC Personnel |
| 3.4.4 Additional Requirement |
| 3.4.5 Organizational Changes |
| 3.5 SUBMITTALS AND DELIVERABLES |
| 3.6 CONTROL |
| 3.6.1 Preparatory Phase |
| 3.6.2 Initial Phase |
| 3.6.3 Follow-up Phase |
| 3.6.4 Additional Preparatory and Initial Phases |
| 3.7 TESTS |
| 3.7.1 Testing Procedure |
| 3.7.2 Testing Laboratories |
| 3.7.2.1 Capability Check |
| 3.7.2.2 Capability Recheck |
3.7.3 Onsite Laboratory
| 3.8 COMPLETION INSPECTION |
| 3.8.1 Punch-Out Inspection |
| 3.8.2 Pre-Final Inspection |
| 3.8.3 Final Acceptance Inspection |
| 3.9 DOCUMENTATION |
| 3.10 SAMPLE FORMS |
| 3.11 NOTIFICATION OF NONCOMPLIANCE |
| 01 45 04_Constuction Control Manual 14Mar2016.pdf |
| Chapter 1 Introduction |
| 1. General: |
| 2. Definitions: |
| 3. Responsibility, Compilation, and Submittal of Test Results: |
| Chapter 2 Soils |
| 1. Scope: |
| 2. Samples: |
| 3. Testing Personnel: |
| 4. Typical Test Requirements: |
| 5. Sampling and Testing of Compacted Fill: |
| 6. Sampling and Testing of Un-Compacted Berm Material: |
| 7. Compilation of Test Data for Submittal: |
| 8. Soil Electronic Conductivity (EC) and Total Soluble Salt Analysis: |
| 9. Field and Laboratory Determination of Non-Soil Volume for Levee Fill: |
| 10. Additional Testing: |
| Chapter 3 Concrete |
| 1. Scope: |
| 2. Samples: |
| 3. Testing Personnel: |
| 4. Typical Test Requirements: |
| 5. Compilation of Test Data for Submittal: |
| Chapter 4 Welding Inspection |
| 1. Scope: |
| 2. Definitions: |
| 3. Testing Personnel: |
| 4. Visual Inspection Requirements: |
| 5. Nondestructive Testing Requirements: |
| 6. Acceptance Criteria: |
| 7. Frequency of Testing: |
| 8. Compilation of Test Data for Submittal: |
| Appendix A – Test Form Management |
| 1. Report Numbering: |
| 2. Naming the Test Form Files: |
| 3. Submitting Test Forms: |
| 4. How to Access USACE QACC SharePoint Site |
| 5. Uploading test forms. |
| 6. Revisions and Special Naming Considerations: |
| Appendix B - Material Testing Laboratory Requirements |
| 1. Purpose: |
| 2. Applicability: |
| 3. References: |
| 4. Responsibilities: |
| 5. Procedures: |
| 6. Records: |
| Appendix C - Filling Out Test Form Templates |
| 1. Test Form Templates: |
| 2. MVNQ Terms Document: |
| 01 45 04_Contractor Quality Control - Attachments |
| 01 57 20.01 12 - ENVIRONMENTAL PROTECTION |
| 01 57 20.01 12 - ENVIRONMENTAL PROTECTION |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 APPLICABLE REGULATIONS |
| 1.3 SUBMITTALS |
| 1.4 MEASUREMENT AND PAYMENT |
| 1.4.1 Environmental Protection |
| 1.4.2 Bird Nesting Prevention and Avoidance Measures |
| 1.4.3 Non-Regulated Waste |
| 1.4.4 Hazardous/Regulated Waste |
| 1.5 QUALITY CONTROL |
| 1.5.1 General |
| 1.5.2 Reporting |
| 1.6 NOTIFICATION |
| 1.7 SUBCONTRACTORS |
| 1.8 IMPLEMENTATION |
| 1.9 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS |
| 1.10 REFERENCES |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 PROTECTION OF LAND RESOURCES |
| 3.1.1 General |
| 3.1.2 Prevention Of Landscape Defacement |
| 3.1.3 Temporary Excavation And Embankments |
| 3.1.4 Post-Construction Cleanup Or Obliteration |
| 3.1.5 Recording And Preserving Historical And Archeological Finds |
| 3.2 PROTECTION OF WATER RESOURCES |
| 3.2.1 Contamination Of Water |
| 3.2.2 Disposal Of Materials |
| 3.2.3 Erosion Control |
| 3.2.4 Fuel and Lubricants |
| 3.3 PROTECTION OF FISH AND WILDLIFE |
| 3.3.1 Colonial Nesting Birds |
| 3.3.1.1 General |
| 3.3.1.2 Reporting |
| 3.3.1.3 No Work Distances |
| 3.3.1.4 Bird Nesting Prevention and Avoidance Measures and Implementation |
| 3.3.1.5 Discovery of Bird Nests at the Work Site |
| 3.3.2 Manatees |
| 3.3.2.1 Special Operating Conditions If Manatees Are Present in the Project |
| 3.3.2.2 Manatee Sighting Reports |
| 3.4 JANITOR SERVICES |
| 3.5 DISPOSAL OF NON-REGULATED DEBRIS AND OTHER WASTE |
| 3.6 DISPOSAL OF REGULATED SOLID WASTES |
| 3.7 MAINTENANCE OF POLLUTION CONTROL FACILITIES |
| 3.8 REPORTING OF POLLUTION SPILLS |
| 3.9 TRAINING OF CONTRACTOR PERSONNEL |
| 01 78 02.00 10 - CLOSEOUT SUBMITTALS |
| 01 78 02.00 10 - CLOSEOUT SUBMITTALS |
| PART 1 GENERAL |
| 1.1 MEASUREMENT AND PAYMENT |
| 1.2 SUBMITTALS |
| 1.3 PROJECT RECORD DOCUMENTS |
| 1.3.1 "As-Built" Drawings |
| 1.3.1.1 Government Furnished Materials |
| 1.3.1.2 Working "As-Built" and Final "As-Built" Drawings |
| 1.3.1.3 Drawing Preparation |
| 1.3.1.4 Qualifications of CADD personnel |
| 1.3.1.5 Computer Aided Design and Drafting CADD Drawings |
| 1.3.1.6 Final As-Built Drawings |
| PART 2 PRODUCTS NOT USED |
| PART 3 EXECUTION NOT USED |
| DIVISION 02 - EXISTING CONDITIONS |
| 02 21 10.00 12 - SURVEYS |
| 02 21 10.00 12 - SURVEYS |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 MEASUREMENT AND PAYMENT |
| 1.2.1 Navigation Channel Surveys |
| 1.2.2 CDF Surveys |
| 1.3 REFERENCES |
| 1.4 SUBMITTALS |
| 1.5 QUALITY CONTROL |
| 1.6 PROFESSIONAL CERTIFICATION |
| 1.7 SURVEY EQUIPMENT |
| 1.7.1 Survey Boat |
| 1.7.2 Fathometer |
| 1.7.2.1 General |
| 1.7.2.2 Calibration |
| 1.7.2.3 Low Frequency Signal Parameters |
| 1.7.3 Lead Line/Level Rod |
| 1.7.4 Automatic Recording Tide Gage |
| 1.7.5 Positioning Equipment |
| 1.7.5.1 Electronic Surveys |
| 1.7.5.2 Compiled Survey Data CD Disk |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 COMMENCEMENT, PROSECUTION, AND COMPLETION |
| 3.1.1 General |
| 3.1.2 Positioning Surveys |
| 3.1.3 Preliminary Field Surveys |
| 3.1.4 Before and After Dredging Cross Sections |
| 3.1.5 Acceptance Profiles |
| 3.1.6 Survey Data |
| 3.1.7 CDF Surveys |
| 3.1.7.1 CDF Pre-Construction Profiles |
| 3.1.7.2 CDF Compliance Surveys |
| DIVISION 05 - METALS |
| 05 50 13 - MISCELLANEOUS METAL FABRICATIONS |
| 05 50 13 - MISCELLANEOUS METAL FABRICATIONS |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 MEASUREMENT AND PAYMENT |
| 1.3 REFERENCES |
| 1.4 SUBMITTALS |
| 1.5 SHOP DRAWINGS |
| 1.6 QUALITY CONTROL |
| 1.6.1 General |
| 1.6.2 Reporting |
| PART 2 PRODUCTS |
| 2.1 STRUCTURAL STEEL PLATES, SHAPES AND BARS |
| 2.2 BOLTS, NUTS AND WASHERS |
| 2.2.1 Bolts |
| 2.2.2 Nuts |
| 2.2.3 Washers |
| 2.2.4 Galvanizing |
| 2.3 HANDRAIL |
| 2.3.1 Aluminum Pipe |
| 2.3.2 In-Line Slip-On Fittings |
| 2.3.3 Setscrews |
2.4 FLOOR GRATINGS
| PART 3 EXECUTION |
| 3.1 EXECUTION |
| 3.1.1 Workmanship |
| 3.1.2 Dimensional Tolerances for Structural Work |
| 3.1.3 Structural Steel Fabrication |
| 3.2 STEEL WELDING |
| 3.2.1 Structural Steel |
| 3.2.1.1 General |
| 3.2.1.2 Welding Equipment |
| 3.2.1.3 Preparation of Base Metal |
| 3.2.1.4 Welding Procedure Specifications WPS |
| 3.2.1.5 Qualifications of Welders and Welding Operators |
| 3.2.1.6 Procedure Qualification Report PQR |
| 3.2.1.7 Technique |
| 3.2.1.8 Workmanship |
| 3.2.1.9 Inspection |
| 3.3 NONDESTRUCTIVE EXAMINATION |
| 3.3.1 Testing Personnel |
| 3.3.2 Examination Procedures |
| 3.3.2.1 Ultrasonic Testing |
| 3.3.2.2 Radiographic Testing |
| 3.3.2.3 Magnetic Particle Inspection |
| 3.3.2.4 Dye Penetrant Inspection |
| 3.4 BOLTED CONNECTIONS |
| 3.4.1 Structural Steel Connections |
| 3.4.1.1 Bolt Holes |
| 3.5 MISCELLANEOUS PROVISIONS |
| 3.5.1 Coal Tar Epoxy Coatings |
| 3.5.2 Cleaning of Corrosion-Resistant Steel |
| DIVISION 09 - FINISHES |
| 09 97 02.01 12 - PAINTING: COAL TAR EPOXY SYSTEM |
| 09 97 02.01 12 - PAINTING: COAL TAR EPOXY SYSTEM |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 MEASUREMENT AND PAYMENT |
| 1.3 SUBMITTALS |
| 1.4 QUALIFICATIONS |
| 1.4.1 Certified Professional |
| 1.4.2 Qualified Paint Contractor |
| 1.4.3 Coating Thickness Gage Qualification |
| 1.4.4 Qualifications of Coating Inspector |
| 1.5 SAMPLING AND TESTING |
| 1.6 SAFETY AND HEALTH PROVISIONS |
| 1.6.1 Abrasive Blasting |
| 1.6.1.1 Hoses And Nozzles |
| 1.6.1.2 Workers Other Than Blasters |
| 1.6.2 Cleaning with Compressed Air |
| 1.6.3 Cleaning with Solvents |
| 1.6.3.1 Ventilation |
| 1.6.3.2 Personal Protective Equipment |
| 1.6.4 Mixing Epoxy and Polyurethane Resin Formulations |
| 1.6.4.1 Exhaust Ventilation |
| 1.6.4.2 Personal Protective Equipment |
| 1.6.4.3 Medical Precautions |
| 1.6.4.4 Emergency Equipment |
| 1.6.5 Paint Application |
| 1.6.5.1 Ventilation |
| 1.6.5.2 Explosion Proof Equipment |
| 1.6.5.3 Further Precautions |
| 1.6.5.4 Ignition Sources |
| 1.6.6 Health Protection |
| 1.6.6.1 Air Sampling |
| 1.6.6.2 Respirators |
| 1.6.6.3 Protective Clothing and Equipment |
| 1.7 MEDICAL STATUS |
| 1.8 CHANGE IN MEDICAL STATUS |
| 1.9 ENVIRONMENTAL PROTECTION |
| 1.9.1 Waste Classification, Handling, and Disposal |
| 1.9.2 TSP Monitoring Plan |
1.10 PAINT PACKAGING, DELIVERY, AND STORAGE
| PART 2 PRODUCTS |
| 2.1 SPECIAL PAINT FORMULAS |
| 2.2 PAINT FORMULATIONS |
| 2.2.1 Formula C-200a, Coal Tar-Epoxy Black Paint |
| 2.2.2 Solvent and Thinners |
| 2.2.2.1 Xylene |
| PART 3 EXECUTION |
| 3.1 CLEANING AND PREPARATION OF SURFACES TO BE PAINTED |
| 3.1.1 General Requirements |
| 3.1.2 Surface Preparation |
| 3.1.3 Equipment |
| 3.2 PAINT APPLICATION |
| 3.2.1 General |
| 3.2.2 Mixing and Thinning |
| 3.2.3 Atmospheric and Surface Conditions |
| 3.2.4 Time Between Surface Preparation and Painting |
| 3.2.5 Method of Paint Application |
| 3.2.6 Coverage and Film Thickness |
| 3.2.6.1 Measurement on Ferrous Metal |
| 3.2.7 Progress of Painting Work |
| 3.2.8 Contacting Surfaces |
| 3.2.9 Drying Time Prior to Immersion |
| 3.2.10 Protection of Painted Surfaces |
| 3.2.11 Coal Tar-Epoxy Black Paint Formula C-200a |
| 3.2.11.1 Mixing |
| 3.2.11.2 Application |
| 3.2.11.3 Subsequent Coats |
| 3.2.11.4 Ambient Temperature |
| 3.2.11.5 Safety |
| 3.3 PAINT SYSTEMS APPLICATION |
| 3.3.1 Surface Preparation |
| 3.3.2 System No. 6-A-Z |
| 3.3.3 Protection of Nonpainted Items and Cleanup |
| 3.4 INSPECTION |
| 3.4.1 Paint Appearance and Testing |
| 3.5 PAINT REPAIR |
| 3.6 PAINTING SCHEDULES |
| DIVISION 33 - UTILITIES |
| 33 40 00 - STEEL CULVERT INSTALLATION |
| 33 40 00 - STEEL CULVERT INSTALLATION |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 MEASUREMENT AND PAYMENT |
| 1.3 REFERENCES |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.5.1 General |
| 1.5.2 Reporting |
| PART 2 PRODUCTS |
| 2.1 Steel Culvert Pipe |
| 2.2 Welds |
| PART 3 EXECUTION |
| 3.1 GENERAL |
| 3.2 EXCAVATION |
| 3.3 DAMAGED PIPES OR CASINGS |
| 3.4 TOLERANCES |
| 3.5 BACKFILLING |
| 3.6 SHORING |
| DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION |
| 35 20 23.00 12 - DREDGING |
| 35 20 23.00 12 - DREDGING |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 MEASUREMENT |
| 1.2.1 Quantity Surveys |
| 1.2.2 After Dredging Profiles |
| 1.2.3 Quantity Computations |
| 1.2.4 Acceptance Reach |
| 1.2.5 Timely Performance Of Quantity Surveys |
| 1.2.6 Progress Payments |
| 1.2.7 Radio And Telephone Communication Equipment |
| 1.2.8 Dike Construction |
| 1.2.9 Ditching and Draining |
| 1.3 PAYMENT |
| 1.3.1 Mobilization And Demobilization |
| 1.3.2 Dredging - Confined Disposal Facilities CDF |
| 1.3.3 CDF Dike Construction |
| 1.3.4 Radio and Telephone Communication Equipment |
| 1.3.5 Ditching and Draining |
| 1.4 SUBMITTALS |
| 1.5 QUALITY CONTROL |
| 1.5.1 Quality Control Reports |
| 1.5.2 Report Of Operations |
| 1.5.3 Construction Schedule |
| 1.5.4 Access Plan |
| 1.6 RADIO AND TELEPHONE COMMUNICATIONS |
| 1.6.1 Maritime Radio Transceiver |
| 1.6.2 Radio Equipment For Additional Dredges |
| 1.6.3 Cellular Telephone and Internet |
| 1.7 PLANT |
| 1.7.1 General Requirements |
| 1.7.2 Capacity |
| 1.7.3 Inspectors Government Agents Transportation |
| 1.7.4 Automatic Identification System AIS |
1.8 REFERENCES
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 DREDGING |
| 3.1.1 Dredging Limits |
| 3.1.2 Hydraulic Cutterhead Dredging |
| 3.1.3 Channel Dimensions |
| 3.1.4 Order of Work |
| 3.1.5 Excessive Dredging |
| 3.1.6 Slides |
| 3.1.7 Character Of Materials |
| 3.1.8 Continuous Dredging |
| 3.2 WORKING IN THE VICINITY OF PIPELINES, STRUCTURES, AND UTILITY CROSSINGS |
| 3.2.1 Dredging Precautions Over Pipeline and Utilities |
| 3.2.1.1 Plan of Operations at Pipeline and Utility Crossings |
| 3.2.1.2 Certified Letters to Pipeline and Utilities Owners |
| 3.2.2 Existing Pipelines, Structures Or Utilities |
| 3.2.3 Unidentified Pipelines, Structures, Or Utilities |
| 3.2.4 Utility and Pipeline Marking Requirement |
| 3.3 DISPOSAL OF DREDGE MATERIAL |
| 3.3.1 Main Channel Confined Disposal Facilities |
| 3.3.1.1 CDF Access |
| 3.3.1.2 CDF Retention Dikes |
| 3.3.1.3 CDF Weirs and Effluent Discharge |
| 3.3.1.4 Pipeline Discharge |
| 3.3.1.5 Failures of Retention Dikes and Weirs |
| 3.3.2 Excessive Pipeline Discharge |
| 3.3.3 Effluent Sedimentation |
| 3.3.4 Deposition In Non-Approved Areas |
| 3.3.5 Prevention Of Damage |
| 3.3.6 Protection Of Government Monuments, Markers, Or Towers |
| 3.3.7 Submerged Discharge Lines |
3.4 CDF DITCHING AND DRAINING
| Dredge and Attendant Plant Data Sheet |
| MVN FORM_4267.pdf |
| FRONT |
| BACK |
| MVN Form_322 |
| Box Cut Section |
| A02 - Signed Plans - CR&P MDrdg FY19, Mile 17.0 to 34.0 (ED-19-043) |
| G-01_Cover(signed) |
| Plans - Calcasieu Maint. Dredging FY19, Mile 17.0 to 34.0 (ED-19-043)(Reduced Size) |
| G-02_ Vin Map |
| G-03_General Notes Legend and Abrv |
| G-04_Tabulations Channel Algn and Curve Data |
| G-05_Main Channel Dredge Cut Template |
| S-01 |
| C-01_STA. 1897+67 TO STA. 1735+00_(MILE 36-33) |
| C-02_STA. 1735+00 TO STA. 1625+00_(MILE 33-31) |
| C-03_STA. 1625+00 TO STA. 1515+00_(MILE 31-29) |
| C-04_STA. 1515+00 TO STA. 1385+00_(MILE 29-26.5) |
| C-05_STA. 1385+00 TO STA. 1285+00 _(MILE 26.5-24.5) |
| C-06_STA. 1285+00 TO STA. 1170+00_(MILE 24.5-22) |
| C-07_STA. 1170+00 TO 1055+00_(MILE 22-20) |
| C-08_STA. 1055+00 TO STA. 950+00_(MILE 20-18) |
| C-09_STA. 950+00 TO 845+00_(MILE 18 - 16) |
| C-10_STA. 845+00 TO STA. 740+00_(MILE 16-14) |
| C-11_STA. 740+00 TO STA. 635+00_(MILE 14-12) |
| C-12_STA. 635+00 TO STA. 525+00_(MILE 12-10) |
| C-13_STA. 525+00 TO STA. 415+00_(MILE 10-8) |
| C-14_STA. 415+00 TO STA. 305+00_(MILE 8-6) |
| C-15_STA. 305+00 TO STA. 199+02.70_(MILE 6-5) |
| C-16_Ditching & Draining_CDF-E |
| C-17_Ditching & Draining_CDF-M |
| C-18_Devils Elbow |
| C-19_CROSS SECTIONS_STA. 893+60 TO STA. 980+00 |
| C-20_CROSS SECTIONS_STA. 990+00 TO STA. 1080+00 |
| C-21_CROSS SECTIONS_STA. 1090+00 TO STA. 1175+45 |
| C-22_CROSS SECTIONS_STA. 1180+00 TO STA. 1242+54 |
| C-23_CROSS SECTIONS_STA. 1250+00 TO STA. 1320+00 |
| C-24_CROSS SECTIONS_STA. 1324+20 TO STA. 1400+00 |
| C-25_CROSS SECTIONS_STA. 1406+01 TO STA. 1452+45 |
| C-26_CROSS SECTIONS_STA. 1460+00 TO STA. 1504+85 |
| C-27_CROSS SECTIONS_STA. 1510+00 TO STA. 1580+00 |
| C-28_CROSS SECTIONS_STA. 1590+00 TO STA. 1680+00 |
| C-29_CROSS SECTIONS_STA. 1689+32 TO STA. 1740+74 |
| C-30_CROSS SECTIONS_STA. 1741+48 TO STA. 1798+81 |
| S-02 |
| S-03 |
| S-04 |
| S-05 |
| S-06 |
File details come from the government source that posted it.