CALCASIEU RIVER AND PASS, LA CHANNELSIDE STONE ARMORING AND REPAIR (ED 18-071)
Solicitation number
W912P819B0039
Issued by

About this file

Amendment 0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

W912P8

Charles R. Zammit Jr.

The above numbered solicitation for Calcasieu River and Pass, LA - Channelside Stone Foreshore Protection Repairs and Armoring (ED 18-071) is hereby amended to provide responses to contractor questions and revise contract clause for Quantity Surveys as shown on continuation page.

BID OPENING DATE/TIME OF 2:00 PM CST, 5 JUNE 2019 REMAINS UNCHANGED.

USACE, Contracting Division

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS, LA 70118-3651

See Item 6

1 4

28-May-2019

06-May-2019

ZAMMIT.CHARLES.RAYMOND.JR.1230832656 Digitally signed by ZAMMIT.CHARLES.RAYMOND.JR.1230832656 Date: 2019.05.28 14:31:22 -05'00'

28 May 2019

W912P819B0039

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00700 - CONTRACT CLAUSES

The following have been added by full text:

52.236-16 QUANTITY SURVEYS (APR 1984) - ALTERNATE I (APR 1984)

(a) Quantity surveys shall be conducted, and the data derived from these surveys shall be used in computing the quantities of work performed and the actual construction completed and in place.

(b) The Contractor shall conduct the original and final surveys and surveys for any periods for which progress payments are requested. All these surveys shall be conducted under the direction of a representative of the Contracting Officer, unless the Contracting Officer waives this requirement in a specific instance. The Government shall make such computations as are necessary to determine the quantities of work performed or finally in place. The Contractor shall make the computations based on the surveys for any periods for which progress payments are requested.

(c) Promptly upon completing a survey, the Contractor shall furnish the originals of all field notes and all other records relating to the survey or to the layout of the work to the Contracting Officer, who shall use them as necessary to determine the amount of progress payments. The Contractor shall retain copies of all such material furnished to the Contracting Officer.

(End of clause)

Note: In paragraph (c), the word “Promptly” is defined as “within three (3) calendar days.”

The following have been deleted:

52.236-16 QUANTITY SURVEYS (APR 1984)

The following items are applicable to this modification:

QUESTIONS AND ANSWERS

BELOW ARE RESPONSES TO QUESTIONS RECEIVED FROM BIDDERS RELATIVE TO SOLICITATION

W912P819B0039. CONSIDER THESE RESPONSES TO ALSO SERVE AS CLARIFICATIONS/ REVISIONS

TO THE PLANS AND SPECIFICATIONS WHERE APPLICABLE.

Q1: The Calcasieu Lock on the GIWW is closed now 12 hrs. per day and there have been times when the wait to get through has been over 72 hours. I did not see that this delay was added into the performance time for the projects.

Can the contractor receive priority lockage for these projects so we will not have to wait to get through? This would have a huge cost impact on the projects if we could not get priority.

A1: The repairs at Calcasieu Lock are scheduled to be completed in the very near future and before this contract is awarded. In any case, the Contractor can request priority lockage for this project through the CO. This is not unusual and has been provided for Corps contactors on numerous occasions.

Q2: Must all work be performed from the water only or is the delivery; stockpiling; operation of heavy equipment and working from land on the existing island disposal sites and shorelines permitted?

A2: The project is designed to be constructed from the Calcasieu River ship channel. However, some work will be required along the land side of the optional bank armoring/ paving, between CDFs 17 and 19 (grading of bank, installation of geotextile which is required to extend a minimum of 5’ beyond where the paving meets the Top of Bank of the dressed area, as well as stone placement). As for repairs to the foreshore dikes, equipment is allowed along the banks to assist in moving/ placing stone to the meet the required theoretical section. However, no construction is permitted landside of the repairs proposed to the Optional Dugas Landing Sites “A”, “B” and “B- 1”.

The bidders should, however, note that the areas landward of the foreshore dikes fronting CDFs 17, 19, 22, D and H are disposal areas that are actively used by the Corps for annual maintenance dredging of the Calcasieu River ship channel, and may be quite wet and soft. In fact, all of the above mentioned areas, with the exception of the area landward of the foreshore dike fronting CDF D, are included in a current, ongoing maintenance dredging contract, awarded to Mike Hooks, Inc. and are subject to possibly being used for placement of hydraulic fill this year. So conditions may make it impractical to stockpile stone, as well as operate equipment behind these sites. In any case, work should be limited to the bare minimum required to perform required surveys and to shape the backside slope of the repairs to the dikes fronting these sites. The integrity/stability of the foreshore dikes, as well as the channel side earthen dikes of all CDFs, shall not be compromised. Any adverse impacts to these dikes as a result of the Contractors operations shall be repaired by the Contractor for this contract at its cost.

Q3: Is operating equipment and/or working on top of the new revetments permitted?

A3: Heavy equipment shall not be operated on top the foreshore dikes as it could impact the stability of the dikes.

Crossing over the dike (s) to access the backside is allowed, as long as it is performed at designated access locations/ corridors and submitted for review and approval prior to construction. Any damage resulting from equipment cross overs will result in the dike(s) being repaired to the required theoretical section and at no additional cost to the Government.

Q4: Can stone be stockpiled at various spots along the existing island disposal sites and mainland shore land and then transported and placed?

A4: See response to Question 2 above.

Q5: Are the access channels mandatory?

A5: If the intent of the question is to get clarification as the whether or not dredging for floatation access is mandatory, then the answer is no. The P&S simply provide the maximum allowable floatation/ access dredging.

Floatation needs are the Contractor’s responsibility as long as they comply with the maximum allowable floatation specified in the contract.

Q6: Please clarify (and to ensure the accuracy of barge displacement readings for measurement and payment), that pre-loading and post-loading barge displacements be measured at the quarry's loading facility.

A6: Not exactly sure of the purpose of this question which is relative to loading of the barges at the quarry for delivery. The Contracting Officer's representative will measure stone for payment by weight determined by barge displacement on the project site, and the displacement shall be determined before and after each barge is unloaded and the difference between these values shall be the quantity delivered. Barge displacement tables shall be provided for each barge used to deliver stone to the site. (See SECTION 35 31 19.03 12 of the specifications for further details)

Q7: We could not find in the documents any definition for an excusable weather delay. Sea state conditions at the project site can greatly impact the ability to work on certain days (such as today 5/21/2019). Please advise how this will be addressed during the Project.

A7: Time extensions for weather delays are not included. Extreme weather day delays, (i.e. an approaching tropical system) must be submitted by the Contractor and subject to approval by the Contracting Officer (CO).