A21_-_W912P819B0017-0002.pdf
PDF 1 MB Posted
- Solicitation number
- W912P819B0017
About this file
Amendment 0002
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitation for Calcasieu River Salt Water Barrier, New Office Building and Control House, Calcasieu Parish, LA is hereby amended to provide responses to contractor questions, revised w age determination, and changes to the draw ings as show n on the continuation pages.
THE BID OPENING TIME/DATE HAS BEEN EXTENDED TO 2:00 PM CST, 3 APRIL 2019.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P819B0017
X 9B. DATED (SEE ITEM 11)
22-Feb-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Mar-2019
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P819B0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS & RESPONSES FOR W912P819B0017, CRSWB New Office Bldg & Control House (OM 17‐2401)
Question 1. Will the owner be supplying the Ice Maker, Refridg., TV, Multimedia, and stove show on sheet A‐01?
Response 1. Yes, the Owner (government) will supply the Ice Maker, refrigerator, TV, multimedia, and the stove.
The Contractor will install the Owner supplied stove (30” wide) and the Owner supplied refrigerator (33” wide) so these dimensions must be taken into account so that the appliances will fit in the kitchen. A note (no. 3) was added to drawing A‐01 stating this.
Question 2. Sheet C‐02 call for concrete piers to be 55.17 and 79 feet, sheet C‐04 call for the same piers to be 53’ and 70’. Which is correct?
Response 2. The concrete pile lengths (55.17’ & 79’) and the tip elevations (el ‐40 & el ‐53.33) are correct on sheet C‐02. Sheet C‐04 was revised to indicate 79’ (from 70’) long concrete piles on the control house and 55.17’ (from 53’) long concrete piles on the office. Also the pile tip elev. shown in section F on drawing S‐01 and section E on drawing S‐02 was revised from el. ‐37.83 to el ‐40.
Question 3. Will we be allowed to visit the site, if so please provide contact info.
Response 3. Section 00100, FAR Clause 52.236‐27, Site Visit (Construction) provides site visit information.
Question 4. IFB NO. W912P819B0017; Specification SECTION 12 32 00
The specifications for the Manufactured Wood Casework is calling for:
2.1 SYSTEM DESIGN
Provide wood cabinets, factory‐fabricated and finished in the manufacturer's standard sizes and finishes of the type, design, and configuration indicated. Construct cabinets as specified meeting the requirements of KCMA A161.1. Wall and base cabinet assemblies to consist of individual units joined into continuous sections. Use fastenings that permit removal and replacement of individual units without affecting the remainder of the installation. Provide counters with watertight sink rim when indicated, and removable drawers equipped with position stops to avoid accidental complete withdrawals.
Fix or adjust shelves as indicated. There are "NO" companies in Louisiana that have this certification, and "all" of the companies I have called in Texas do not quote on projects like this. They mostly work on apartments and larger scale projects.
Can you get with your design team and ask to remove this certification and or add the certification of AWI?
I have worked with several millwork supply companies in Louisiana that are AWI Certified, that do exceptional quality work.
Response 4. The certification requiring the cabinets to meet KCMA A161.1 remains unchanged.
Question 5. Section 01 10 04 – Inspectors’ Field Office – Please confirm the field office for government use will be required as per specs.
Response 5. Section 1100‐1, subsection 4.0, specifies the Inspector’s Field Office, and is required. Section 02 41 00, subsection 1.3.1 specifies the required (3) offices for on‐site Government employees’ use during demolition and construction. Required offices include work offices between the time the tear down of the existing office and completion of the new office, and moving of existing Government owned furniture into and out of the offices.
Question 6. Are there maximum allowable loads given for existing paving, primarily paving extended over water?
This information is needed for planning use of crane for pile driving.
Response 6. There is no ground level paving extending over water; sheetpile walls restrain the earth fill and paving.
Drawing C‐04 has been revised to indicate a cross hatched area where no pile drivers will be allowed and only pickup truck loads (max.) will be permitted. The maximum allowable loads on existing pavement outside of the hatched area shall be standard AASHTO HL93 loads.
Question 7. What is the thickness of paving at the locations for pile “cutouts”?
Response 7. The concrete paving at the cutout location is 4 inches thick.
Question 8. At the existing office building – will the existing “garage” walls under existing slab be included in demolition of office building?
Response 8. No, the 'garage' walls under the existing slab are NOT to be demolished and shall remain.
Question 9. The wage determination in the specs looks like it is for Iberville County. Is this the same wage determination as Calcasieu parish?
Response 9. The wage determination has been corrected to reflect Cameron Parish in lieu of Iberville Parish.
Question 10. Please confirm the occupancy/importance factor on the metal building – I did not find it referenced in the specs or drawings. I would assume that a facility such as this might need to be class IV “Essential” or at least “High”.
Response 10. The occupancy/importance factor on the metal building is the standard class II, which has a wind load factor of 1.0. The building is low occupancy and its loss would not affect the operability of the barrier structure.
General Decision Number: LA190033 01/04/2019 LA33
Superseded General Decision Number: LA20180037
State: Louisiana
Construction Type: Building
County: Cameron County in Louisiana.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/04/2019
ASBE0053-001 09/05/2016
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 24.72 8.39
ELEC0861-009 09/01/2018
Rates Fringes
ELECTRICIAN......................$ 27.78 13.25
ENGI0406-002 07/01/2014
Rates Fringes
POWER EQUIPMENT OPERATOR
(Crane)..........................$ 23.46 8.35
CRANE PREMIUMS:
50-150 Tons $1.75 Over 150 Tons $2.25
IRON0058-007 06/01/2017
Rates Fringes
IRONWORKER (REINFORCING AND
STRUCTURAL)......................$ 20.95 9.14
PAIN1244-011 08/01/2016
Rates Fringes
PAINTER (Spray)..................$ 18.63 7.53
* PLUM0060-008 12/03/2018
Rates Fringes
PLUMBER/PIPEFITTER...............$ 29.40 12.39
* ROOF0317-001 12/01/2018
Rates Fringes
ROOFER...........................$ 21.54 8.39
SHEE0214-009 09/01/2013
Rates Fringes
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 26.71 11.93
SHEE0214-013 09/01/2017
Rates Fringes
SHEET METAL WORKER (Excluding HVAC Duct Installation)..........$ 26.19 14.19
SULA2012-018 09/22/2014
Rates Fringes
BRICKLAYER.......................$ 20.00 0.00
CARPENTER........................$ 15.13 0.00
CEMENT MASON/CONCRETE FINISHER...$ 16.24 2.56
LABORER: Common or General......$ 10.45 0.00
LABORER: Mason Tender - Brick...$ 12.17 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 19.88 0.00
PAINTER (Brush and Roller).......$ 18.30 8.91
TILE SETTER......................$ 20.00 0.00
TRUCK DRIVER: Dump Truck........$ 17.26 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
P
P
MULTIMEDIA
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
SCHED
SEE
SCHEDSEE
SCHED
SEE
SCHED
SEE SEE
SCHED
A
B
Door Elevations 1/4" = 1'- 0"
Window Elevations 1/4" = 1'- 0"
"Storage" Function Lockset, 3 Pair
Butts (NRP), Flush Bolts (T&B)
Threshold, Weatherstripping
Kick Plate
When Sched.
FF
6" Steel Studs
Sheetrock
N.T.S.
N.T.S.
Rigid Frame
6" Steel Studs
Rigid Frame
" Treated Plywood8
WALLS
RE: FLOOR PLAN
FLOOR
4" Vinyl
BASE CEILING
CLG.
HEIGHT
Shutter Detail Roll-up
Door Housing
N.T.S.
24" Vinyl Tile
Industrial Grade 9'-0"
FINISH SCHEDULE FOR ALL ROOMS
Ceiling Tile System Suspended Acoustic
Painted
" Gyp Bd8
Brick Veneer
Brick Veneer
3" Brick Veneer
Air Space
Angle (Typ.)
" Galv.4 13"X3"X
Anchor Bolts
Base Plate
Insulation (Typ.)
6" Thick
Detail
Detail
(18" O.C.)
" Ø Screws/Bolts4
Finish Schedule1
3" Brick
Plate To Wind Beam, Typ.)
(Continuous 1" Above Base
")16 3Angles (3"X3"X
6" Steel Studs equal attachment system) 9" O.C. all around (or owner approved
" Ø Screws at4 1" Flange All Around w/ 4
Cable X-Bracing
" Plywood8
" Treated Plywood8
A-01A DC
D .A
X A N
S I
D
W P
-X
W P
-X
INCENTIVE
CLAUSES
E ER
I N
G
N I
G N
E
LA
V
UE
YOUR KEY TO
HIGHER PROFITS
S .D
S .D
:1
C A
L C
A S
IE
U P
A R
IS
H L
O U
IS
IA
N A
A A
A
A
A
AA
A
B
A
A
RIGID FRAME
RIGID FRAME
- opp. hand on east side) (Typ. all int. steel columns on east side) (Typ. 3 locations - opp. hand
N
N E
W O
F F
IC
E B
U
IL
D
IN
G P
L A
N
C A
L C
A S
IE
U R
IV
E R S
A L T W
A T
E R B
A R
R
IE
R
A N
D C
O N
T R
O L H
O U
S E
N E
W O
F F
IC
E B
U
IL
D
IN
G
3'-0"
4'-0"
Lite Narrow
" Sheetrock8
6" Brick Ledge
RIGID FRAME
CC
C
2'-0"
Horizontal Slide Window Clear Anodized Aluminum
Painted Hollow Metal Frame 1/4" Clear Inboard 1/4" Tinted Outboard 1' InsulatedTempered Glass
Storm Shutter Roll Up
Storm Shutter Roll Up
Painted Hollow Metal Frame 1/4" Clear Inboard 1/4" Tinted Outboard 1' InsulatedTempered Glass
SCHEDSEE
SCHEDSEE
(Inside actuated - Typ. all windows)
H -4 -4
(SEE DWG. S-01)
AROUND PORCH AREA
CURBING AND HANDRAIL
FOR DETAILS)
(SEE DWG. S-09
BEAM
MONORAIL
2 TON
RIGID FRAME
EXTERIOR
EL. 27.5
SLAB
HOUSE
CONTROL
NEW
TO REMAIN
AND HANDRAIL
EXISTING CURB
OF OFFICE SLAB
EXISTING EDGE
TO REMAIN
AND HANDRAIL
EXISTING CURB
(BELOW)
SEE DETAIL 5
(BELOW)
SEE DETAIL 4
BD. ON EACH SIDE OF STUDS
" TYPE 'X' GYPSUM8
5TO ROOF W/2-
2 HR. FIRE RATED WALLS EXTENDED
6" STUD WALL
ADJUSTABLE SHELVES
DOWN
X 10' HIGH
6" STUD WALL
ADJUSTABLE SHELVES
" GYPSUM BD. BELOW8
5AND
" PLYWOOD DECK ON TOP8
516" O.C. W/
10" 18 GA. STL. JOISTS
45°
STAIRS
ATTIC
CABINETS BELOW
COUNTER TOP W/
6' X 5' X 2'W
COUNTER
2'W X 4'L
WINDOW
RECEPTION
SLIDING
W/CABINETS BELOW
BENCH ALUMINUM TOP
6' X 6' X 2' W WORK
CABINETS
OVERHEAD A/C CONDENSOR
TRANSFORMER
ELECTRIC
45A DISC.
70A DISC.
S -1
F
O R D
E T
A
IL
S
(S E
E D
W G S -1
A
N D
T O E
X
G E
N
B L
D G
N E
W W
A L
K W
A Y /P
L A
T F
O R
M
RIGID FRAME
w/SHELVES
STORAGE CABINET
6'-0" X 16" X 6'-0"H w/SHELVES & DOORS
CABINETS
4'6" X 16" X 6'-0"H
Office
Lockmaster's File Room
Assistant
Admin.
CABINET
BENCH
Office
Mechanic's
Waiting Area
Bathroom
Porch
Room
Electrical
Conference Room
HOUSE STAIRS
NEW CONTROL
Ice
MOUNT TV
WALL
CONFORM WITH OSHA REQUIREMENTS.
EQUIVALENT. ALL HANDRAILS TO BE CONSTRUCTED TO
"SPEED-RAIL" AND "NU-RAIL" FITTINGS, OR GOV. APPROVED
ALUMINUM HANDRAILS WITH HOLLAENDER ALUMINUM
" SCH. 40, (1.9" O.D.),2
1CONTRACTOR TO SUPPLY 1
NOTE:
4'-9"
6'-0"
24'-6"
8'-4" 7'-10"
4'-0" 10'-0" 20'-0"
50'-0"
16'-0"
8'-8"7'-4"
7'-6"
7'-6"
27'-0"
13'-4"14'-2"
10'-5"10'-0"20'-0"
7'-4"
17'-0"
14'-2"
"16 116'-4
2'-6"
8'-5"
" 7
9'-7" 1'-9"
1'-6"7'-0"1'-6"
2'-6"
2' -0
7' -8
6"
1' -0
8"
Stationary Handrail
N.T.S.
"3"
1.9" O.D.
OF POST NOT TO EXCEED 8'-0")
(CENTER TO CENTER SPACING
" SCH.40 ALUMINUM PIPE2
EQUIVALENT
DUTY OR GOVERNMENT APPROVED
PIPE POST - HOLLAENDER #48 HEAVY
" ALUM.2
1ALUMINUM CASTING FOR 1
APPROVED EQUIVALENT
" ALUMINUM PIPE POST OR GOV.2
ALUMINUM CASTING FITTINGS FOR
HOLLAENDER "SPEED-RAIL"/"NU-RAIL"
J-BOLTS (4 REQ'D -EA. BASE)
" 316 SS8
3OR CAST-IN-PLACE
W/ HILTI HIT HY 100 ADHESIVE
" SS316 ANCHOR RODS 8
1" x 58
Safety is a Part of Your Contract
Ledge 6" Brick
FLOOR DRAIN
12" SIDE LITE
O M
-2
-C
R S
W B -A -0
.d g n
M A
R
TAKEN INTO ACCOUNT, SO APPLIANCES WILL FIT IN KITCHEN
REFRIGERATOR (33" WIDE); THESE DIMENSIONS MUST BE
STOVE (30" WIDE) AND GOVERNMENT SUPPLIED
CONTRACTOR SHALL INSTALL GOVERNMENT SUPPLIED
REFRIGERATOR, TV, MULTIMEDIA, AND STOVE. THE
3. THE GOVERNMENT WILL SUPPLY THE ICE MAKER,
AS OTHERWISE NOTED.
2. ALL INTERIOR WALLS 4" STL. STUDS X 10' HIGH EXCEPT
IN ORDER TO BE CONCEALED IN 6" METAL STUD WALLS.
1. FLANGE WIDTH OF ALL RIGID FRAMES SHALL BE 6"
NOTES:
/2
/1
HOLLOW METAL
PAIR FLUSH PANEL
WITH NARROW LITE
A
FLUSH PANEL
SOLID CORE WOOD
B
1 1/2 Pair Butts, Stop, Silencers
"Storage" Function Lockset
1 1/2 Pair Butts (NRP), Threshold, "Entrance" Function Lockset, HARDWARE
FLUSH PANEL
HOLLOW MTL.
C
FLUSH PANEL
SOLID CORE
D
WOOD
G
WOOD6'-8" 1 3/4 MTL
3'-0"
DOOR SCHEDULE
MARK
E
TYPE DETAILS
WOOD
WOOD
MAT'L
6'-8"
6'-8"
1 3/4
1 3/4 MTL
REMARKS
SETS
B Pr 2'- 6" 7'-0" 1 3/4
WIDTH HEIGHT THK FRAME HDW SET
C 3'-0" 7'-0" 1 3/4
MTLMTL
MTL MTL
C 7'-0" 1 3/4 MTL MTL
E 3'-0" 6'-8" WOOD MTL1 3/4
A 3'-0" 6'-8" 1 3/4 WOOD MTL
MTL
G 6'-8" 1 3/4 WOOD MTL
F
HOLLOW CORE
FLUSH PANEL
WOOD
E
A 3'-0" 6'-8" 1 3/4 WOOD MTL
E 3'-0" 6'-8" 1 3/4 WOOD MTL
MTLWOOD1 3/46'-8"3'-0"D
6'-8"A WOOD1 3/4 MTL
E 6'-8" WOOD1 3/4 MTL
E 3'-0" 6'-8" WOOD1 3/4 MTL
Weatherstripping
3 Pair Butts (NRP), Flush Bolts (T&B)
"Entrance" Function Lockset, Threshold, Weatherstripping
1 1/2 Pair Butts, Stop, Silencers
"Bathroom" Function Lockset
"Office" Function Lockset
1 1/2 Pair Butts, Stop, Silencers
1 1/2 Pair Butts, Stop, Silencers
"Passage" Function Lockset7
Insulated Core
INSULATED CORE
2 hr. fire rated
3'-0"
Insulated Core
Pr 2'-3"
Pr 2'-3"
Pr 3'-0"
Insulated Core
2'-4"
F
Pr 3'-0"
WOOD6'-8" 1 3/4 MTLF Pr 3'-0"
Sliding Doors - 6' Span
Sliding Doors - 6' Span
SLIDING CLOSET
G
LOVERED BI-FOLD
NEW ORLEANS DISTRICT
O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A DC
D .A
X A N
S I
D
W P
-X
W P
-X
S .D
S .D
C A
L C
A S
IE
U P
A R
IS
H L
O U
IS
IA
N A
C A
L C
A S
IE
U R
IV
E R S
A L T W
A T
E R B
A R
R
IE
R
A N
D C
O N
T R
O L H
O U
S E
N E
W O
F F
IC
E B
U
IL
D
IN
G
H -4 -4
:4
N
Safety is a Part of Your Contract
10'-10"14'-3"
8'-10"10'-0"10'-0"10'-0"8'-10"1'-2" 1'-2"
8"
10'-3"
CTRL HOUSE
EXISTING
WELL SLAB
EXISTING
AND CONC. PILES
BUILDING SLAB
EXISTING OFFICE
PILE CAP AND PILES
EXISTING CONCRETE SHEET
EXISTING ASPHALT
PILE LAYOUT
" = 1'-0"4
1SCALE:
C-04
P
IL
E L
A Y
O U
T P
L A
N
M A
R
O M
-2
-C
R S
W B -C -0
.d g n
MACHINERY PITS
INCENTIVE
CLAUSES
E ER
I N
G
N I
G N
E
LA
V
UE
YOUR KEY TO
HIGHER PROFITS
CONC. PILES
14" SQ. X 79' LG.
SECTION @ EL. 10.0
GATE WALL -
GATE WALL -
PLAN VIEW, EL. 17.0
HSS10.000 X 0.375"
STEEL PIPE
HSS10.000 X 0.375"
STEEL PIPE
CONC. PILES, TYP.
14" SQ. X 55.17' LG.
P L
O T D
A T
E
/2
/1
E X
IS
T
IG
N C
O N
C R
E T
E
E X
IS
T
IN
G A
S P
H A
L T
T O
P O
F B
A N
K
NO PILE DRIVERS OR HEAVY EQUIP.
PICKUP TRUCK LOADS ONLY (MAX.)
O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
W P
-X
W P
-X
C A
L C
A S
IE
U P
A R
IS
H L
O U
IS
IA
N A
C A
L C
A S
IE
U R
IV
E R S
A L T W
A T
E R B
A R
R
IE
R
INCENTIVE
CLAUSES
E ER
I N
G
N I
G N
E
LA
V
UE
YOUR KEY TO
HIGHER PROFITS
A DC
S .D
S .D
D .A
X 1 :1
A N
D C
O N
T R
O L H
O U
S E
N E
W O
F F
IC
E B
U
IL
D
IN
G
PLAN
SECTION G
SECTION F
F
S-1
S-01
N E
W O
F F
IC
E B
U
IL
D
IN
G F
O U
N D
A T
IO
N
8'-10"10'-0"10'-0"10'-0"8'-10"
50'-0"
8'-10"10'-0"10'-0"10'-0"8'-10"1'-2" 1'-2"
EDGE OF EXISTING OFFICE BLDG. SLAB
EXISTING SLAB
2'-4"
34'-0"16'-0"
3'-0"12'-0"3'-0" 50'-0"
16'-0"
EL. 17.19
EL. 17.19
G
S-1
E
S-1
NEW PRECAST CONCRETE SLAB
EL.17.3
EL. 17.05
EL. 17.05
E L .1
.0
16'-0"
EL.17.0
E L .0
EL.17.05
8'-8"
SECTION H
NTS
EL.17.0
EL.17.3
H
S-1
5'-8"6'-0"
EXISTING ASPHALT EL. 6.0
EL.17.19
H -4 -4
" PER FT16
1SLOPE
EL. 27.5
SLAB
HOUSE
CONTROL
NEW
CONCRETE SLAB
TOP OF NEW
EL. 17.19
AND PILES BELOW
CONC. PILE CAPS
NEW PRECAST
TO THE MAX. EXTENT POSSIBLE.
GALVANIZED AFTER SHOP FABRICATION
ALL STEEL SHALL BE HOT DIPPED
NOTE:
C/L STAIRS
RIGID FRAME
DIM., AS REQ'D FOR
PEDESTAL @ EL. 17.19
(TYP.)
" CHAMFER2
(TYP.)
" CHAMFER2
" = 1'-0"8
3SCALE:
" PER FT.16
CONC. PILES
NEW 14" SQ.
BRACING
GALV.8
3L6X6X
ALL RIGID FRAMES
TYP. ONLY AT
E X
IS
T
IN
G C
O N
C P
IL
E
BUILDING SLAB
EXISTING OFFICE
OFFICE BLDG. SLAB
EDGE OF EXISTING
NEW OFFICE BLDG. SLAB
NEW OFFICE BLDG. PILE CAP
0 10'2' 4' 6' 8'12''
" = 1'- 0''8
3SCALE:
AND TO PREVENT MOVEMENT DURING DRIVING.
USE SUPPORT BRACES TO LEVEL THE STEEL TEMPLATE
NOTE: BEFORE DRIVING PILES CONTRACTOR SHALL
" = 1'-0"8
3SCALE:
" = 1'-0"8
3SCALE:
9 "
6"
6"
6"
6"
PER BLDG. MENU. (TYP.)
ANCHOR BOLTS SIZE/LAYOUT
IN CURB
3" GAP
" PER FT16
1SLOPE
J U
L
53.0' LG
CONC. PILES
NEW 14" SQ.
Safety is a Part of Your Contract
AS REQ'D FOR RIGID FRAME
PEDESTAL @ EL. 17.19 DIM.,
TON HOIST (6-0" OPENING)
GATE IN HANDRAIL FOR 2
O M
-2
-C
R S
W B -S -0
.d g n
/3 /1
EL.-40.0 EL.-40.0
O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
W P
-X
W P
-X
C A
L C
A S
IE
U P
A R
IS
H L
O U
IS
IA
N A
C A
L C
A S
IE
U R
IV
E R S
A L T W
A T
E R B
A R
R
IE
R
INCENTIVE
CLAUSES
E ER
I N
G
N I
G N
E
LA
V
UE
YOUR KEY TO
HIGHER PROFITS
A DC
S .D
S .D
D .A
X 1 :1
A N
D C
O N
T R
O L H
O U
S E
N E
W O
F F
IC
E B
U
IL
D
IN
G
S-1
ESECTION
N.T.S. (4 - REQUIRED)
TIE-ROD ASSEMBLY
SLAB TO CAP CONNECTION
TYP.
KEYED SLAB JOINT RECESSED TIE-ROD HOLE
S-02
N E
W O
F F
IC
E B
U
IL
D
IN
G F
O U
N D
A T
IO
N
El. 17.19
H -4 -4
Pile Recess
2'-4" LG.
#10 REBAR
DRIFT PIN,
OF 16, EVENLY SPACED
PER SLAB SECTION PER PILE CAP FOR A TOTAL
USE A MIN OF 2 SLAB TO PILE CAP CONNECTIONS
NOTE:
POSSIBLE IN THE SHOP.
AFTER FABRICATION TO THE MAX. EXTENT
ALL STEEL SHALL BE HOT DIPPED GALVANIZED
NOTE:
125 FT-LBS LUBRICATED
TORQUING TO 170 FT-LBS DRY OR
FILL W/NON-SHRINK GROUT AFTER
VARIES
T Y
P
UNLESS OTHERWISE SPECIFIED
ALL REBAR IS CONTINUOUS
NOTE:
TARRED FELT
2 LAYERS, NO. 30
VARIES
DOWEL PINS (TYP.)
#8 X 12" REBAR
(TYP. EA. SIDE)
CENTER OF SLAB
#3 BAR X 8" LG.
2'-0" x 2'-4" CAPSILL
EACH SIDE.
#5 REBARS,
PERFORMANCE GROUT
DAYTON SURE GRIP HIGH
#4 BAR (STIRRUPS) @ 8" o.c.
5000 PSI CONCRETE
2 LAYERS No.30 TERRED FELT
TOP OF PILE
El. 15.17
Conc. Pile
Prestressed
(SLAB ONLY)
GALV.PIPE SLEEVE
2" Ø I.D. SCH. 40
(FILL W/ NON-SHRINK GROUT)
"DEEP4
14" Ø x 1
V A
R
IE
S V
A R
IE
S
NON-SHRINK GROUT)
DOWN HOLES (FILL WITH
2"Ø I.D. RECESSED TIE-
2'-4"
(FILL WITH NON-SHRINK GROUT)
OBLONG HOLES IN CAP
"X 5" X 8" DEEP2
" = 1'-0"4
3SCALE:
" = 1'-0"4
3SCALE:
AFTER PANEL INSTALLATION
& ELASTO-SEAL JOINT SEALANT (TYP.)
" RADIUS REQUIRED FOR SLAB JOINTS 8
NOTE:
1"
"8 3R
"V
A R
IE
S
"4
THRU SLAB
" HOLE2
" GALV. TIE-ROD 8
3"
V A
R
IE
S
THRU SLAB
" HOLE2
3"Ø X 3" DEEP
V A
R
IE
S
" = 1'-0"2
1SCALE: 1
PRECAST SLAB, 7" MIN.
AS NEEDED
6" MIN. THREAD
"Ø GALV. TIE-ROD 8
"Ø GALV. TIE-ROD, 2-HEX NUTS & 2 FLAT WASHERS8
" = 1'-0"4
3SCALE:
1'-8"
14"
" 5
10"6" 6"
6"
6"Ø
2" Clr.
3"Ø
4" 4"
LC
6"Ø CORRUGATED HOLE
FOR ANGLE BRACING ON COLUMNS
" HOLES FOR 1" GALV. BOLTS 4
CANTILEVER L - 3'-9" X 11" LEGS
INTERNAL U - 8'-0" X 11" LEGS
(2)- #8 "U" OR L BARS
(2)- #8 REBARS, (EACH BOT. CORNER)
(2)- #8 REBARS EACH SIDE
#5 @ 10" o.c. OTHER WAY
OF #5 @ 6" o.c. &. 2 LAYERS
GRADE 60 REBARS - 2 LAYERS
0 2'1' 3'12''
" = 1' - 0''2
1SCALE: 1
0 2' 4'1' 3' 5'12''
" = 1'- 0''4
3SCALE:
Safety is a Part of Your Contract
J U
L
O M
-2
-C
R S
W B -S -0
.d g n
/3 /1
BOT. OF PILE
EL .-40.0
| Binder1 (rev dwgs).pdf |
| OM_17-2401-CRSWB-A-01 |
| OM_17-2401-CRSWB-C-04 |
| OM_17-2401-CRSWB-S-01 |
| OM_17-2401-CRSWB-S-02 |
File details come from the government source that posted it.