W912P818R0058_Amendment_0003.pdf

PDF 1 MB Posted

Attached to
Professional Services Various to Conduct Cultural Resources Investigations
Solicitation number
W912P818R0058
Issued by

About this file

Amendment 0003 for Solicitation W912P818R0058

View the file

Other files

File Type Posted
Am_0002.pdf PDF
Am_0001.pdf PDF
W912P818R0058.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W42HEM81281670

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered Solicitation for Cultural Resources Services for the Mississippi Valley Division and the Memphis, Vicksburg, or New Orleans Districts, is hereby amended as follows:

1. Make changes to the solicitation as detailed in the following pages.

2. Modify CLIN 0001 Description & Cancel Line Items 0002, 0003, 0004 and 0005.

3. Post Questions/Answers for Clarification.

4. Extend Proposal due date and time to 12:00 p.m. Wednesday, 14 November 2018.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P818R0058

X 9B. DATED (SEE ITEM 11)

10-Oct-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Nov-2018

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P818R0058

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 13-Nov-2018 12:00 PM to 14-Nov-2018 12:00 PM.

The delivery order maximum amount $7,500,000.00 has been added.

The delivery order minimum amount $10,000.00 has been added.

The contract maximum amount $7,500,000.00 has been added.

The contract minimum amount $10,000.00 has been added.

The contract maximum quantity 1,500,000.00 has been deleted.

The contract minimum quantity 30,000.00 has been deleted.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN description has changed from Base Year - Cultural Resources Services to Cultural Resources Services.

The CLIN extended description has changed from:

for the Mississippi Valley Division and the Memphis, Vicksburg, or New Orleans Districts within the division in accordance with the attached scope of work and contract terms and conditions. Period of Performance: TBD based upon date of award.

To:

for the Mississippi Valley Division and the Memphis, Vicksburg, or New Orleans Districts within the division in accordance with the attached scope of work and contract terms and conditions. Period of Performance: Five Years from Date of Award; Contract ceiling is $7,500,000.00 or five (5) years in duration, whichever is exhausted first.

The minimum guarantee amount is $10,000 for the duration of the contract.

CLIN 0002

The CLIN description has changed from Option Year 1 Cultural Resources Service to CANCELLED.

CLIN 0003

The CLIN description has changed from Option Year 2 Cultural Resources Service to CANCELLED.

CLIN 0004

The CLIN description has changed from Option Year 3 Cultural Resources Service to CANCELLED.

CLIN 0005

The CLIN description has changed from Option Year 4 Cultural Resources Service to CANCELLED.

The following have been modified:

PRICE SCHEDULE

Year 1

LINE

ITEM

DESCRIPTION UNIT

UNIT

PRICE TOTAL

LABOR

0001 Principal Investigator HOUR $

0002 Project Manager HOUR $ 0003 Field Archeologist HOUR $ 0004 Archeologist Technician 1 HOUR $ 0005 Archeologist Technician 2 HOUR $ 0006 Archeologist Technician 3 HOUR $ 0007 Laboratory Supervisor HOUR $ 0008 Laboratory Technician HOUR $ 0009 Historian HOUR $ 0010 Cultural Geographer HOUR $ 0011 Architectural Historian HOUR $ 0012 Geomorphologist HOUR $ 0013 Remote Sensing Specialist HOUR $ 0014 Cultural Anhropologist HOUR $ 0015 Sociologist HOUR $ 0016 Marine Archeologist HOUR $ 0017 Industrial Archeologist HOUR $ 0018 Computer Specialist HOUR $ 0019 Statistician HOUR $ 0020 Preservation Specialist HOUR $ 0021 Soils Scientist HOUR $ 0022 Technical Writer HOUR $ 0023 Photographer HOUR $ 0024 Cartographic Technician HOUR $ 0025 Draftsman HOUR $ 0026 Illustrator HOUR $ 0027 Word Processor HOUR $

LABOR SUBTOTAL

TRAVEL

0028 Mileage – Auto TBD $ 0029 Mileage – 4WD TBD $ 0030 Per Diem TBD $

TRAVEL SUBTOTAL TBD

SPECIAL PROCEDURES

0031 Faunal Analysis EACH TBD 0032 Pollen/Paleobotanical Analysis EACH TBD 0033 Skeletal Analysis EACH TBD 0034 Soil Sample Analysis-Chemical EACH TBD 0035 Soil Sample Analysis-Particle EACH TBD 0036 Radiocarbon Dating EACH TBD 0037 Archeomagnetic Dating EACH TBD

SPECIAL PROCEDURES SUBTOTAL EACH TBD

REPORT DUPLICATING

0038 Pages EACH TBD 0039 Oversize Figures EACH TBD 0040 Cover Stock and Binding EACH TBD

REPORT DULICATING SUBTOTAL

SPECIAL EQUIPMENT

0041 Marine Survey Boat-Inland Waters Day $ 0042 Marine Survey Boat-Coastal Waters Day $ 0043 Air Boat Day $ 0044 Small Motor Boat Day $ 0045 Marine Magnetometer Day $ 0046 Recording Fathometer Day $ 0047 Differential Global Positioning System Day $ 0048 Microwave Positioning System Day $ 0049 Electronic Distance Measurer Day $ 0050 Two-way Marine Radios Day $ 0051 Side-scan Sonar Day $ 0052 Sub-bottom Profiler Day $ 0053 Underwater Metal Detector Day $ 0054 Land Metal Detector Day $ 0055 Water pump/Jet System Day $ 0056 Surface-supplied Air System Day $ 0057 Scuba Gear Day $ 0058 Backhoe w/Operator Day $ 0059 Water Pump for Excavation Units Day $

SPECIAL EQUIPMENT SUBTOTAL

REIMBURSABLE ITEMS

0060 Curation Processing Fee EACH $ 0061 Special Equipment EACH TBD 0062 Special Material and Supplies EACH TBD

REIMBURSABLE ITEMS SUBTOTAL

GRAND TOTAL

Year 2

ITEM

DESCRIPTION UNIT UNIT

PRICE

TOTAL

0002 Project Manager HOUR $ 0003 Field Archeologist HOUR $ 0004 Archeologist Technician 1 HOUR $ 0005 Archeologist Technician 2 HOUR $ 0006 Archeologist Technician 3 HOUR $ 0007 Laboratory Supervisor HOUR $ 0008 Laboratory Technician HOUR $ 0009 Historian HOUR $ 0010 Cultural Geographer HOUR $ 0011 Architectural Historian HOUR $ 0012 Geomorphologist HOUR $ 0013 Remote Sensing Specialist HOUR $ 0014 Cultural Anhropologist HOUR $ 0015 Sociologist HOUR $ 0016 Marine Archeologist HOUR $ 0017 Industrial Archeologist HOUR $ 0018 Computer Specialist HOUR $ 0019 Statistician HOUR $ 0020 Preservation Specialist HOUR $ 0021 Soils Scientist HOUR $ 0022 Technical Writer HOUR $ 0023 Photographer HOUR $ 0024 Cartographic Technician HOUR $ 0025 Draftsman HOUR $ 0026 Illustrator HOUR $ 0027 Word Processor HOUR $

LABOR SUBTOTAL

TRAVEL

0028 Mileage – Auto Mile TBD 0029 Mileage – 4WD Mile TBD 0030 Per Diem Man

Day

TBD

TRAVEL SUBTOTAL

SPECIAL PROCEDURES

0031 Faunal Analysis EACH TBD 0032 Pollen/Paleobotanical Analysis EACH TBD 0033 Skeletal Analysis EACH TBD 0034 Soil Sample Analysis-Chemical EACH TBD 0035 Soil Sample Analysis-Particle EACH TBD 0036 Radiocarbon Dating EACH TBD 0037 Archeomagnetic Dating EACH TBD

SPECIAL PROCEDURES SUBTOTAL

0038 Pages EACH TBD

0039 Oversize Figures EACH TBD 0040 Cover Stock and Binding EACH TBD

REPORT DULICATING SUBTOTAL

SPECIAL EQUIPMENT

0041 Marine Survey Boat-Inland Waters Day

0042 Marine Survey Boat-Coastal Waters Day $ 0043 Air Boat Day $ 0044 Small Motor Boat Day $ 0045 Marine Magnetometer Day $ 0046 Recording Fathometer Day $ 0047 Differential Global Positioning System Day $ 0048 Microwave Positioning System Day $ 0049 Electronic Distance Measurer Day $ 0050 Two-way Marine Radios Day $ 0051 Side-scan Sonar Day $ 0052 Sub-bottom Profiler Day $ 0053 Underwater Metal Detector Day $ 0054 Land Metal Detector Day $ 0055 Water pump/Jet System Day $ 0056 Surface-supplied Air System Day $ 0057 Scuba Gear Day $ 0058 Backhoe w/Operator Day $ 0059 Water Pump for Excavation Units Day $

SPECIAL EQUIPMENT SUBTOTAL

REIMBURSABLE ITEMS

0060 Curation Processing Fee EACH TBD 0061 Special Equipment EACH TBD 0062 Special Material and Supplies EACH TBD

Year 3

ITEM

DESCRIPTION UNIT UNIT

0002 Project Manager HOUR $ 0003 Field Archeologist HOUR $ 0004 Archeologist Technician 1 HOUR $ 0005 Archeologist Technician 2 HOUR $ 0006 Archeologist Technician 3 HOUR $ 0007 Laboratory Supervisor HOUR $ 0008 Laboratory Technician HOUR $ 0009 Historian HOUR $ 0010 Cultural Geographer HOUR $ 0011 Architectural Historian HOUR $ 0012 Geomorphologist HOUR $ 0013 Remote Sensing Specialist HOUR $ 0014 Cultural Anhropologist HOUR $ 0015 Sociologist HOUR $ 0016 Marine Archeologist HOUR $ 0017 Industrial Archeologist HOUR $ 0018 Computer Specialist HOUR $ 0019 Statistician HOUR $ 0020 Preservation Specialist HOUR $ 0021 Soils Scientist HOUR $ 0022 Technical Writer HOUR $ 0023 Photographer HOUR $ 0024 Cartographic Technician HOUR $ 0025 Draftsman HOUR $ 0026 Illustrator HOUR $ 0027 Word Processor HOUR $

LABOR SUBTOTAL

TRAVEL

0028 Mileage – Auto Mile TBD 0029 Mileage – 4WD Mile TBD 0030 Per Diem Man

Day

TBD

TRAVEL SUBTOTAL

SPECIAL PROCEDURES

0031 Faunal Analysis EACH TBD 0032 Pollen/Paleobotanical Analysis EACH TBD 0033 Skeletal Analysis EACH TBD 0034 Soil Sample Analysis-Chemical EACH TBD 0035 Soil Sample Analysis-Particle EACH TBD 0036 Radiocarbon Dating EACH TBD 0037 Archeomagnetic Dating EACH TBD

SPECIAL PROCEDURES SUBTOTAL

REPORT DULICATING SUBTOTAL

SPECIAL EQUIPMENT

0041 Marine Survey Boat-Inland Waters Day $ 0042 Marine Survey Boat-Coastal Waters Day $ 0043 Air Boat Day $ 0044 Small Motor Boat Day $ 0045 Marine Magnetometer Day $ 0046 Recording Fathometer Day $ 0047 Differential Global Positioning System Day $ 0048 Microwave Positioning System Day $ 0049 Electronic Distance Measurer Day $ 0050 Two-way Marine Radios Day $ 0051 Side-scan Sonar Day $ 0052 Sub-bottom Profiler Day $ 0053 Underwater Metal Detector Day $ 0054 Land Metal Detector Day $ 0055 Water pump/Jet System Day $ 0056 Surface-supplied Air System Day $ 0057 Scuba Gear Day $ 0058 Backhoe w/Operator Day $ 0059 Water Pump for Excavation Units Day $

SPECIAL EQUIPMENT SUBTOTAL

REIMBURSABLE ITEMS

0060 Curation Processing Fee EACH $ 0061 Special Equipment EACH TBD 0062 Special Material and Supplies EACH TBD

Year 4

ITEM

DESCRIPTION UNIT UNIT

0002 Project Manager HOUR $ 0003 Field Archeologist HOUR $ 0004 Archeologist Technician 1 HOUR $ 0005 Archeologist Technician 2 HOUR $ 0006 Archeologist Technician 3 HOUR $ 0007 Laboratory Supervisor HOUR $ 0008 Laboratory Technician HOUR $ 0009 Historian HOUR $ 0010 Cultural Geographer HOUR $ 0011 Architectural Historian HOUR $ 0012 Geomorphologist HOUR $ 0013 Remote Sensing Specialist HOUR $ 0014 Cultural Anhropologist HOUR $ 0015 Sociologist HOUR $ 0016 Marine Archeologist HOUR $ 0017 Industrial Archeologist HOUR $ 0018 Computer Specialist HOUR $ 0019 Statistician HOUR $ 0020 Preservation Specialist HOUR $ 0021 Soils Scientist HOUR $ 0022 Technical Writer HOUR $ 0023 Photographer HOUR $ 0024 Cartographic Technician HOUR $ 0025 Draftsman HOUR $ 0026 Illustrator HOUR $ 0027 Word Processor HOUR

LABOR SUBTOTAL

TRAVEL

0028 Mileage – Auto Mile $ 0029 Mileage – 4WD Mile $ 0030 Per Diem Man

Day

TRAVEL SUBTOTAL $

SPECIAL PROCEDURES

0031 Faunal Analysis EACH TBD 0032 Pollen/Paleobotanical Analysis EACH TBD 0033 Skeletal Analysis EACH TBD 0034 Soil Sample Analysis-Chemical EACH TBD 0035 Soil Sample Analysis-Particle EACH TBD 0036 Radiocarbon Dating EACH TBD 0037 Archeomagnetic Dating EACH TBD

SPECIAL PROCEDURES SUBTOTAL

REPORT DULICATING SUBTOTAL

SPECIAL EQUIPMENT

0041 Marine Survey Boat-Inland Waters DAY $ 0042 Marine Survey Boat-Coastal Waters DAY $ 0043 Air Boat DAY $ 0044 Small Motor Boat DAY $ 0045 Marine Magnetometer DAY $ 0046 Recording Fathometer DAY $ 0047 Differential Global Positioning System DAY $ 0048 Microwave Positioning System DAY $ 0049 Electronic Distance Measurer DAY $ 0050 Two-way Marine Radios DAY $ 0051 Side-scan Sonar DAY $ 0052 Sub-bottom Profiler DAY $ 0053 Underwater Metal Detector DAY $ 0054 Land Metal Detector DAY $ 0055 Water pump/Jet System DAY $ 0056 Surface-supplied Air System DAY $ 0057 Scuba Gear DAY $ 0058 Backhoe w/Operator DAY $ 0059 Water Pump for Excavation Units DAY $

SPECIAL EQUIPMENT SUBTOTAL

REIMBURSABLE ITEMS

0060 Curation Processing Fee EACH $ 0061 Special Equipment EACH TBD 0062 Special Material and Supplies EACH TBD

Year 5

ITEM

DESCRIPTION UNIT UNIT

0002 Project Manager HOUR $ 0003 Field Archeologist HOUR $ 0004 Archeologist Technician 1 HOUR $ 0005 Archeologist Technician 2 HOUR $ 0006 Archeologist Technician 3 HOUR $ 0007 Laboratory Supervisor HOUR $ 0008 Laboratory Technician HOUR $ 0009 Historian HOUR $ 0010 Cultural Geographer HOUR $ 0011 Architectural Historian HOUR $ 0012 Geomorphologist HOUR $ 0013 Remote Sensing Specialist HOUR $ 0014 Cultural Anhropologist HOUR $ 0015 Sociologist HOUR $ 0016 Marine Archeologist HOUR $ 0017 Industrial Archeologist HOUR $ 0018 Computer Specialist HOUR $ 0019 Statistician HOUR $ 0020 Preservation Specialist HOUR $ 0021 Soils Scientist HOUR $ 0022 Technical Writer HOUR $ 0023 Photographer HOUR $ 0024 Cartographic Technician HOUR $ 0025 Draftsman HOUR $ 0026 Illustrator HOUR $ 0027 Word Processor HOUR

LABOR SUBTOTAL

TRAVEL

0028 Mileage – Auto Mile $ 0029 Mileage – 4WD Mile $ 0030 Per Diem Man

Day

TRAVEL SUBTOTAL

SPECIAL PROCEDURES

0031 Faunal Analysis EACH TBD 0032 Pollen/Paleobotanical Analysis EACH TBD 0033 Skeletal Analysis EACH TBD 0034 Soil Sample Analysis-Chemical EACH TBD 0035 Soil Sample Analysis-Particle EACH TBD 0036 Radiocarbon Dating EACH TBD 0037 Archeomagnetic Dating EACH TBD

SPECIAL PROCEDURES SUBTOTAL

REPORT DULICATING SUBTOTAL

SPECIAL EQUIPMENT

0041 Marine Survey Boat-Inland Waters Day $ 0042 Marine Survey Boat-Coastal Waters Day $ 0043 Air Boat Day $ 0044 Small Motor Boat Day $ 0045 Marine Magnetometer Day $ 0046 Recording Fathometer Day $ 0047 DifferentialGlobal Positioning System Day $ 0048 Microwave Positioning System Day $ 0049 Electronic Distance Measurer Day $ 0050 Two-way Marine Radios Day $ 0051 Side-scan Sonar Day $ 0052 Sub-bottom Profiler Day $ 0053 Underwater Metal Detector Day $ 0054 Land Metal Detector Day $ 0055 Water pump/Jet System Day $ 0056 Surface-supplied Air System Day $ 0057 Scuba Gear Day $ 0058 Backhoe w/Operator Day $ 0059 Water Pump for Excavation Units Day $

SPECIAL EQUIPMENT SUBTOTAL

REIMBURSABLE ITEMS

0060 Curation Processing Fee EACH $ 0061 Special Equipment EACH TBD 0062 Special Material and Supplies EACH TBD

SECTION I - CONTRACT CLAUSES

The following have been modified:

52.216-19 ORDER LIMITATIONS (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,500.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor -

(1) Any order for a single item in excess of (insert dollar figure or quantity);

(2) Any order for a combination of items in excess of $7,500,000.00 (insert dollar figure or quantity); or

(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 3 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause)

(End of Summary of Changes)

The following items are applicable to this modification:

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTINUATION PAGE

Delete the Contract Minimum/Maximum Quantity and Contract Value for CLINs 0002 - 0005.

QUESTIONS & ANSWERS

1) Question: Regarding Solicitation Number W912P818R0058, on Page 276 of the solicitation, am I correct in assuming that complete copies of previous work (i.e. reports) are required and not project summary descriptions?

2. History of previous work of a similar nature. Provide examples of two of each of the following in .pdf format on CD:

* Literature and records search

* Research design development

* Cultural Resource Reconnaissance, Phase I surveys, and Phase II testing projects

* Phase III data recovery (mitigation) projects (prehistoric, historic, terrestrial and underwater)

Answer: We do wish to see examples of the bulleted items as they appear in a Report, and not only a summary description of work that has included the bulleted items.

2) Question: In reference to the subject line RFP, I have a question on what the key personnel are? There are 16 required personnel listed in the solicitation; do we need to provide resumes for each of the listed personnel?

Answer: Yes, they should provide a resume for the lead person who fills each of those key positions.

3) Question: In section B, is the unit something like hour, day, page, etc.? If that is correct, are we supposed to add up the unit price for 1 unit to come up with our totals and grand totals? If so, is the maximum amount the

7.5 million divided by 5 years (1.5 million a year)?

Answer: Offerors are not required to fill in this section as this will be five-year contract with a ceiling price of $7,500,000 per contract issued. Please complete the Price Schedule with rates for each year.

4) Question: In section K, page 264 - I am not familiar with most of the items. Would you explain this part to me?

Answer: 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS – COMMERCIAL ITEMS (AUG 2018) are additional clauses incorporated by reference and some are only applicable if checked, otherwise not applicable as the clause states. Please refer to the Federal Acquisition Regulations at www.farsite.gov for additional information and applicability.

5) Question: In section L, page 274 - is the unique identifier our DUNS number?

Answer: Yes

6) Question: In section M, page 276 – do you want a cd copy of our history of previous work in addition to the ones included in our printed proposal?

Answer: Yes

7) Question: Price Schedule-for items on the pricing schedule that cannot be estimated at this time such as Travel, do we carry over a value of “0” to come up with the TRAVEL SUBTOTAL?

Answer: Entering "TBN" (To Be Negotiated) or "TBD" (To Be Determined) is acceptable for any prices that absolutely cannot be estimated at this time. If selected, Contractor and Government will negotiate or agree on this price either before Contract Award or it will be determined during contract negotiations as to whether the item can be negotiated before the issuance of each Task Order Award.

8) Question: Price Schedule-to calculate the TOTAL, do we assume “1” for each unit for both labor categories and Special Procedures?

Answer: Entering "TBN" (To Be Negotiated) or "TBD" (To Be Determined) is acceptable for any prices that absolutely cannot be estimated at this time. If selected, Contractor and Government will negotiate or agree on this price either before Contract Award or it will be determined during contract negotiations as to whether the item can be negotiated before the issuance of each Task Order Award.

9) Question: Front pages of the submittal- are we to enter the Grand Totals per year (base and options) years in CLIN0001-0005 respectively.

Answer: No entry required by the Offeror. Price Schedule should be completed.

10) Question: Is the bid-opening public and/or will it be streamed.

Answer: There will not be a public bid opening. This is a Request for Proposal not an IFB, Invitation for Bids.

11) Question: If a project example provided has a deliverable that is other than PDF (i.e. geo database), can it be included on CD?

Answer: Format deemed most appropriate to demonstrate that this ability can be met, is acceptable.

12) Question: Is there a page limit to the response?

Answer: No page limit required

13) Question: Are there any formatting requirements for the hard copy response?

Answer: No formatting requirements exist.

File details come from the government source that posted it.