AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered solicitation for HSDRRS – Lake Pontchartrain and Vicinity (LPV) Mitigation, New Zydeco Ridge II Flood Side Bottom Land Hardw ood-Wet (BLH-W) and Brackish Marsh Restoration, St. Tammany Parish, Louisiana is hereby amended w ith Questions and Answ ers.

BID OPENING DATE & TIME OF DECEMBER 06, 2018, 2:00PM, CST REMAINS THE SAME.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Nov-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P818B0060

X 9B. DATED (SEE ITEM 11)

26-Oct-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Nov-2018

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P818B0060

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - SF 30 CONTINUATION

The following have been added by full text:

AM_05 - QUESTIONS & ANSWERS

Zydeco Pre-bid Question and Answer Sheet 11/29/2018

1. Q. What is the final disposition of the Spill Boxes?

Ans. To clarify what was stated at the Pre-bid site visit & in the Pre-bid Conference, and in accordance with SECTION 31 23 00.00 20 paragraph 1.3.2 and SECTION 35 20 23.00 12 paragraph 3.3.6 and DWG.

G-03. All spill boxes shall be removed when the dikes are degraded upon completion of dredge fill operations. There are (4) existing spill boxes, these spill boxes can either be utilized by the contractor for effluent flow or removed and replaced with a spill box design of the contractor’s choice. If utilized, the contractor will be responsible for the maintenance and operation of the existing spill boxes. All spill boxes, including the (4) existing shall be removed upon completion of dredge fill operations.

2. Q. What are the Tidal control methods?

Ans. There are no tidal control structures around the contract dump/fill site location. The site is subject to tidal flow. Tide readings are public knowledge and should be monitored accordingly. Tides can also be influenced by wind direction and other weather conditions.

3. Q. Where can the degrade material be utilized?

Ans. The degrade material can be utilized as fill material in any of the three fill locations and for maintenance of the dike system.

4. Q. Will the contractor be required to rehabilitate the 40 ft. buffer zone along the existing retention dikes?

Ans. The contractor will not be required to add additional material to the existing 40 ft. buffer zone as part of dike rehabilitation. Furthermore, the contractor will not be allowed to excavate within the 40 ft. buffer zone as part of dike rehabilitation. The Contractor shall construct dikes and utilize the designated borrow channel as depicted on DWG. C-10. The contractor is required to provide as-built cross sections of the rehabilitated dike system. As noted in SECTION 35 20 23.00 paragraph 3.3.3, “The Contractor is responsible for designing, building, and maintaining the dikes to safely retain the dredged material”.

5. Q. Can the board road width be reduced?

Ans. As depicted on DWG. C-03 the board road is required to be a minimum of 30 ft.

(End of Summary of Changes)

Amendment 05

Sign-In Sheet

Project Name: New Zydeco Ridge II Mitigation Project Site Visit

Date: 11/28/2018 Time: 10:00 AM Location: Project Site

Name Company

1. Tim Vestal Weeks Marine

2. Travis Williams Weeks Marine

3. Keith Pearse Great Lakes Dredge & Dock

4. Mike Nitska HydroTerra Tech

5. Perry Autin American Amphibious

6. Tiffany Brandhurst Delta Marine Support

7. David Detiveaux Dean

8. Chris Pelas Dean

9. Carlos Velasco Ceres Environmental

10. Walter Lewis White Star Commercial

11. Archie Jefferson White Star Commercial

12. Roy Becker Manson Construction

13. Mike Ashcraft Quality First Construction

14. Jeremy George USACE

15. Keith O’Cain USACE

16. Libby Behrens USACE

17. Patrick Erwin USACE

18. John Thompson USACE

19. Glenn Gremillion USACE

20. Charlie Zammit USACE

21.

22.

Amendment 05

Sign-In Sheet

Project Name: New Zydeco Ridge II Mitigation Project Pre-Bid Conference

Date: 11/29/2018 Time: 1:00 PM Location: Conference Room 125

Name Company

1. Amy Schexnayder Weeks Marine

2. Mike Nitska HydroTerra Tech

3. Tyler Roy Wilco Marsh Buggies

4. Carlos Velasco Ceres Environmental

5. Judi Almerico USACE

6. Jacob Stephens USACE

7. Charles Zammit USACE

8. Patrick Erwin USACE

9. Mike Lee Ceres Environmental

10. Hillary Frankie Orion Marine

11. Kyle Howell Manson Construction

12. Mason Sherman Manson Construction

13. Steve Auernhamer Great Lakes Dredge & Dock

14. Laura Campos Great Lakes Dredge & Dock

15. Keith O’Cain USACE

16. Perry Autin American Amphibious

17. Rick Broussard USACE

18. John Thompson USACE

19. Glenn Gremillion USACE