A22_-_W912P8-17-R-0005,_Am_0004.pdf
PDF 2 MB Posted
- Solicitation number
- W912P8-17-R-0005
About this file
Amendment 4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A22_-_W912P8-17-R-0005,_Am_0005.pdf | ||
| SCHEDULE_B_17-R-0005_Am_0004.xlsx | XLSX spreadsheet | |
| A22_-_W912P8-17-R-0005,_Am_0003.pdf | ||
| SCHEDULE_B_17-R-0005.xlsx | XLSX spreadsheet | |
| A22_-_W912P8-17-R-0005,_Am_0002.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| A22_-_W912P8-17-R-0005,_Am_0001.pdf | ||
| A22_-_W912P8-17-R-0005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W42HEM12345678
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitation for Construction Management Services, primarily Quality Assurance Representative Services, primarily w ithin the New Orleans District, is amended as follow s:
1. Delete sections B, C, L, and M in their entireties and replace w ith attached, revised sections.
2. Provide answ ers to submitted questions.
3. Change proposal location: Submit proposals to Michelle, USACE-CEMVN-CT, temporary room 326.
4. Set questions due date to Tuesday, 7 March 2017, 1pm CST. Questions must be emailed to Michelle.
5. Re-set proposal due date and time to Tuesday, 14 March 2017, 10am CST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 45
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Mar-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-17-R-0005
X 9B. DATED (SEE ITEM 11)
26-Jan-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Mar-2017
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P8-17-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
SCHEDULE B PRICE LIST
CONSTRUCTION MANAGEMENT SERVICES
ANNOUNCEMENT NO. W912P8-17-R-0005
YEAR 1
ITEM
NO.
PAY ITEM ESTIMAT
ED
QUANTIT
Y
UNIT UNIT
PRICE
ESTIM
ATED
AMOU
NT
0001AA QAR II (S.T.) 200 HR
0001AB QAR II (O.T.) 20 HR
0001AC QAR II (S.D.) 2 HR
0002AA QAR III (S.T.) 20,000 HR
0002AB QAR III (O.T.) 2,000 HR
0002AC QAR III (S.D.) 200 HR
0003AA QAR V (S.T.) 4,000 HR
0003AB QAR V (O.T.) 400 HR
0003AC QAR V (S.D.) 40 HR
0004AA SUPV CONST REP (S.T.) 4,000 HR
0004AB SUPV CONST REP (O.T.) 400 HR
0004AC SUPV CONST REP (S.D.) 40 HR
0005AA QUALITY ASSURANCE MANAGER (S.T.) TBD HR XX XX
0005AB QUALITY ASSURANCE MANAGER (O.T.) TBD HR XX XX
0005AC QUALITY ASSURANCE MANAGER (S.D.) TBD HR XX XX
0006AA SECRETARY (S.T.) TBD HR XX XX
0006AB SECRETARY (O.T.) TBD HR XX XX
0006AC SECRETARY (S.D.) TBD HR XX XX
0007AA SCHEDULER (S.T.) 2,000 HR
0007AB SCHEDULER (O.T.) 200 HR
0007AC SCHEDULER (S.D.) 20 HR
0008AA EXPERT SCHEDULER (S.T.) 200 HR
0008AB EXPERT SCHEDULER (O.T.) 20 HR
0008AC EXPERT SCHEDULER (S.D) 2 HR
0009AA COST ESTIMATOR (S.T.) TBD HR XX XX
0009AB COST ESTIMATOR (O.T.) TBD HR XX XX
0009AC COST ESTIMATOR (S.D.) TBD HR XX XX
0010AA PROGRAM ANALYST (S.T.) 200 HR
0010AB PROGRAM ANALYST (O.T.) 20 HR
0010AC PROGRAM ANALYST (S.D.) 2 HR
0011AA CONST MANAGER (S.T.) TBD HR XX XX
0011AB CONST MANAGER (O.T.) TBD HR XX XX
0011AC CONST MANAGER (S.D.) TBD HR XX XX
0012AA CIVIL ENGR TECH I (S.T.) 200 HR
0012AB CIVIL ENGR TECH I (O.T.) 20 HR
0012AC CIVIL ENGR TECH I (S.D.) 2 HR
0013AA CIVIL ENGR TECH II (S.T.) 2,000 HR
0013AB CIVIL ENGR TECH II (O.T.) 200 HR
0013AC CIVIL ENGR TECH II (S.D.) 20 HR
0014 4X2 PICKUP TRUCK 6,000 DA
0015 4X4 PICKUP TRUCK 100 DA
0016 ADDITIONAL MILEAGE TBD JTR XX XX
0017AA PER DIEM LODGING TBD JTR XX XX
0017AB PER DIEM MEALS 500 DA
YEAR 1
PAY ITEM ESTIMAT
ED
QUANTIT
Y
UNIT UNIT
PRICE
ESTIM
ATED
AMOU
NT
0018 SPECIAL EQUIPMENT TBD DA XX XX
0019 SPECIAL TESTING TBD TBN XX XX
CONCRETE INSPECTION & TESTING
0020 ACI LEVEL 1 FIELD CONCRETE
TECHNICIAN
TBD HR XX XX
0021 REINFORCED CONCRETE SPECIAL
INSPECTOR
TBD HR XX XX
0022 PRESTRESSED CONCRETE SPECIAL
INSPECTOR
TBD HR XX XX
0023 ASTM C 117 MATERIALS FINER THAN #200
SIEVE BY WASH
10 EA
0024 ASTM C 136 SIEVE ANALYSIS OF FINE &
COARSE AGGREGATES
10 EA
0025 ASTM C 190 COMPRESSIVE STRENGTH OF
MORTARS CUBE SPECIMENS
10 EA
0026 ASTM C 39 COMPRESSIVE STRENGTH OF
CONCRETE SPECIMENS
10 EA
SOILS INSPECTION & TESTING
0027 NOISE & VIBRATION MONITORING WITH
EQUIPMENT
TBD HR XX XX
0028 VIBRATION MONITORING WITH
EQUIPMENT
TBD HR XX XX
0029 SENIOR FIELD SOILS TECHNICIAN TBD HR XX XX
0030 SOILS SPECIAL INSPECTOR TBD HR XX XX
0031 ASTM D 1140 AMOUNT OF MATERIAL IN
SOILS FINER THAN #200 SIEVE
10 EA
0032 ASTM D 1557 LABORATORY COMPACTION
OF SOIL MODIFIED EFFORT
10 EA
0033 ASTM D 2216 MOISTURE CONTENT BY
OVEN
10 EA
0034 ASTM D 2487 SOILS CLASSIFICATION 10 EA
0035 ASTM D 2974 ORGANIC SOILS TEST 10 EA
0036 ASTM D 422 GRAIN SIZE ANALYSIS – SIEVE
WITH HYDROMETER
10 EA
0037 ASTM D 4253 & ASTM D 4254 MAX & MIN
INDEX DENSITY
10 EA
0038 ASTM D 4318 LIQUID, PLASTIC LIMIT AND
PLASTICITY INDEX OF SOILS
10 EA
0039 ASTM D 4643 MOISTURE CONTENT
MICROWAVE OVEN METHOD
10 EA
0040 ASTM D 698 LABORATORY COMPACTION
OF SOIL STANDARD EFFORT
10 EA
0041 ASTM D 698 LABORATORY COMPACTION
OF SOIL STANDARD - 1 POINT
0042 ASTM D 854 SPECIFIC GRAVITY 10 EA
STEEL INSPECTION & TESTING
0043 CERTIFIED WELDING INSPECTOR (CWI) -
LEVEL II
TBD HR XX XX
0044 STRUCTURAL STEEL AND BOLTING
SPECIAL INSPECTOR
TBD HR XX XX
0045 ASTM E 709 MAGNETIC TEST 10 EA
0046 ASTM E 164 ULTRASONIC TEST 10 EA
0047 ASTM E 165 LIQUID PENETRANT TEST 10 EA
0048 ASTM E 94 RADIOGRAPHIC TEST 10 EA
NONDESTRUCTIVE TESTING
0049 ASNT NDT TECHNICIAN LEVEL III TBD HR XX XX
0050 ASNT NDT TECHNICIAN LEVEL II (NON CWI) TBD HR XX XX
0051 DISCONTINUITY ( HOLIDAY ) COATING
TEST
5 EA
0052 COATING THICKNESS TEST 5 EA
0053 HARDNESS TEST 5 EA
0054 ASTM E 488 HYDRAULIC RAM & JACK FOR
ANCHOR PULL TEST
5 EA
TOTAL YR 1
YEAR 2
PAY ITEM ESTIMAT
ED
QUANTIT
Y
UNIT UNIT
PRICE
ESTIM
ATED
AMOU
NT
0055AA QAR II (S.T.) 200 HR
0055AB QAR II (O.T.) 20 HR
0055AC QAR II (S.D.) 2 HR
0056AA QAR III (S.T.) 20,000 HR
0056AB QAR III (O.T.) 2,000 HR
0056AC QAR III (S.D.) 200 HR
0057AA QAR V (S.T.) 4,000 HR
0057AB QAR V (O.T.) 400 HR
0057AC QAR V (S.D.) 40 HR
0058AA SUPV CONST REP (S.T.) 4,000 HR
0058AB SUPV CONST REP (O.T.) 400 HR
0058AC SUPV CONST REP (S.D.) 40 HR
0059AA QUALITY ASSURANCE MANAGER (S.T.) TBD HR XX XX
0059AB QUALITY ASSURANCE MANAGER (O.T.) TBD HR XX XX
0059AC QUALITY ASSURANCE MANAGER (S.D.) TBD HR XX XX
0060AA SECRETARY (S.T.) TBD HR XX XX
0060AB SECRETARY (O.T.) TBD HR XX XX
0060AC SECRETARY (S.D.) TBD HR XX XX
0061AA SCHEDULER (S.T.) 2,000 HR
0061AB SCHEDULER (O.T.) 200 HR
0061AC SCHEDULER (S.D.) 20 HR
0062AA EXPERT SCHEDULER (S.T.) 200 HR
0062AB EXPERT SCHEDULER (O.T.) 20 HR
0062AC EXPERT SCHEDULER (S.D) 2 HR
0063AA COST ESTIMATOR (S.T.) TBD HR XX XX
0063AB COST ESTIMATOR (O.T.) TBD HR XX XX
0063AC COST ESTIMATOR (S.D.) TBD HR XX XX
0064AA PROGRAM ANALYST (S.T.) 200 HR
0064AB PROGRAM ANALYST (O.T.) 20 HR
0064AC PROGRAM ANALYST (S.D.) 2 HR
0065AA CONST MANAGER (S.T.) TBD HR XX XX
0065AB CONST MANAGER (O.T.) TBD HR XX XX
0065AC CONST MANAGER (S.D.) TBD HR XX XX
0066AA CIVIL ENGR TECH I (S.T.) 200 HR
0066AB CIVIL ENGR TECH I (O.T.) 20 HR
0066AC CIVIL ENGR TECH I (S.D.) 2 HR
0067AA CIVIL ENGR TECH II (S.T.) 2,000 HR
0067AB CIVIL ENGR TECH II (O.T.) 200 HR
0067AC CIVIL ENGR TECH II (S.D.) 20 HR
0068 4X2 PICKUP TRUCK 6,000 DA
0069 4X4 PICKUP TRUCK 100 DA
0070 ADDITIONAL MILEAGE TBD JTR XX XX
0071AA PER DIEM LODGING TBD JTR XX XX
0071AB PER DIEM MEALS 500 DA
YEAR 2
PAY ITEM ESTIMAT
ED
QUANTIT
Y
UNIT UNIT
PRICE
ESTIM
ATED
AMOU
NT
0072 SPECIAL EQUIPMENT TBD DA XX XX
0073 SPECIAL TESTING TBD TBN XX XX
CONCRETE INSPECTION & TESTING
0074 ACI LEVEL 1 FIELD CONCRETE
TECHNICIAN
TBD HR XX XX
0075 REINFORCED CONCRETE SPECIAL
INSPECTOR
TBD HR XX XX
0076 PRESTRESSED CONCRETE SPECIAL
INSPECTOR
TBD HR XX XX
0077 ASTM C 117 MATERIALS FINER THAN #200
SIEVE BY WASH
10 EA
0078 ASTM C 136 SIEVE ANALYSIS OF FINE &
COARSE AGGREGATES
10 EA
0079 ASTM C 190 COMPRESSIVE STRENGTH OF
MORTARS CUBE SPECIMENS
10 EA
0080 ASTM C 39 COMPRESSIVE STRENGTH OF
0081 NOISE & VIBRATION MONITORING WITH
EQUIPMENT
TBD HR XX XX
0082 VIBRATION MONITORING WITH
EQUIPMENT
TBD HR XX XX
0083 SENIOR FIELD SOILS TECHNICIAN TBD HR XX XX
0084 SOILS SPECIAL INSPECTOR TBD HR XX XX
0085 ASTM D 1140 AMOUNT OF MATERIAL IN
SOILS FINER THAN #200 SIEVE
10 EA
0086 ASTM D 1557 LABORATORY COMPACTION
OF SOIL MODIFIED EFFORT
10 EA
0087 ASTM D 2216 MOISTURE CONTENT BY
OVEN
10 EA
0088 ASTM D 2487 SOILS CLASSIFICATION 10 EA
0089 ASTM D 2974 ORGANIC SOILS TEST 10 EA
0090 ASTM D 422 GRAIN SIZE ANALYSIS – SIEVE
WITH HYDROMETER
0091 ASTM D 4253 & ASTM D 4254 MAX & MIN
INDEX DENSITY
10 EA
0092 ASTM D 4318 LIQUID, PLASTIC LIMIT AND
PLASTICITY INDEX OF SOILS
10 EA
0093 ASTM D 4643 MOISTURE CONTENT
MICROWAVE OVEN METHOD
10 EA
0094 ASTM D 698 LABORATORY COMPACTION
OF SOIL STANDARD EFFORT
10 EA
0095 ASTM D 698 LABORATORY COMPACTION
OF SOIL STANDARD - 1 POINT
0096 ASTM D 854 SPECIFIC GRAVITY 10 EA
0097 CERTIFIED WELDING INSPECTOR (CWI) -
LEVEL II
TBD HR XX XX
0098 STRUCTURAL STEEL AND BOLTING
SPECIAL INSPECTOR
TBD HR XX XX
0099 ASTM E 709 MAGNETIC TEST 10 EA
0100 ASTM E 164 ULTRASONIC TEST 10 EA
0101 ASTM E 165 LIQUID PENETRANT TEST 10 EA
0102 ASTM E 94 RADIOGRAPHIC TEST 10 EA
NONDESTRUCTIVE TESTING
0103 ASNT NDT TECHNICIAN LEVEL III TBD HR XX XX
0104 ASNT NDT TECHNICIAN LEVEL II (NON CWI) TBD HR XX XX
0105 DISCONTINUITY ( HOLIDAY ) COATING
TEST
5 EA
0106 COATING THICKNESS TEST 5 EA
0107 HARDNESS TEST 5 EA
0108 ASTM E 488 HYDRAULIC RAM & JACK FOR
TOTAL YR 2
YEAR 3
PAY ITEM ESTIMAT
ED
QUANTIT
Y
UNIT UNIT
PRICE
ESTIM
ATED
AMOU
NT
0109AA QAR II (S.T.) 200 HR
0109AB QAR II (O.T.) 20 HR
0109AC QAR II (S.D.) 2 HR
0110AA QAR III (S.T.) 20,000 HR
0110AB QAR III (O.T.) 2,000 HR
0110AC QAR III (S.D.) 200 HR
0111AA QAR V (S.T.) 4,000 HR
0111AB QAR V (O.T.) 400 HR
0111AC QAR V (S.D.) 40 HR
0112AA SUPV CONST REP (S.T.) 4,000 HR
0112AB SUPV CONST REP (O.T.) 400 HR
0112AC SUPV CONST REP (S.D.) 40 HR
0113AA QUALITY ASSURANCE MANAGER (S.T.) TBD HR XX XX
0113AB QUALITY ASSURANCE MANAGER (O.T.) TBD HR XX XX
0113AC QUALITY ASSURANCE MANAGER (S.D.) TBD HR XX XX
0114AA SECRETARY (S.T.) TBD HR XX XX
0114AB SECRETARY (O.T.) TBD HR XX XX
0114AC SECRETARY (S.D.) TBD HR XX XX
0115AA SCHEDULER (S.T.) 2,000 HR
0115AB SCHEDULER (O.T.) 200 HR
0115AC SCHEDULER (S.D.) 20 HR
0116AA EXPERT SCHEDULER (S.T.) 200 HR
0116AB EXPERT SCHEDULER (O.T.) 20 HR
0116AC EXPERT SCHEDULER (S.D) 2 HR
0117AA COST ESTIMATOR (S.T.) TBD HR XX XX
0117AB COST ESTIMATOR (O.T.) TBD HR XX XX
0117AC COST ESTIMATOR (S.D.) TBD HR XX XX
0118AA PROGRAM ANALYST (S.T.) 200 HR
0118AB PROGRAM ANALYST (O.T.) 20 HR
0118AC PROGRAM ANALYST (S.D.) 2 HR
0119AA CONST MANAGER (S.T.) TBD HR XX XX
0119AB CONST MANAGER (O.T.) TBD HR XX XX
0119AC CONST MANAGER (S.D.) TBD HR XX XX
0120AA CIVIL ENGR TECH I (S.T.) 200 HR
0120AB CIVIL ENGR TECH I (O.T.) 20 HR
0120AC CIVIL ENGR TECH I (S.D.) 2 HR
0121AA CIVIL ENGR TECH II (S.T.) 2,000 HR
0121AB CIVIL ENGR TECH II (O.T.) 200 HR
0121AC CIVIL ENGR TECH II (S.D.) 20 HR
0122 4X2 PICKUP TRUCK 6,000 DA
0123 4X4 PICKUP TRUCK 100 DA
0124 ADDITIONAL MILEAGE TBD JTR XX XX
0125AA PER DIEM LODGING TBD JTR XX XX
0125AB PER DIEM MEALS 500 DA
YEAR 3
PAY ITEM ESTIMAT
ED
QUANTIT
Y
UNIT UNIT
PRICE
ESTIM
ATED
AMOU
NT
0126 SPECIAL EQUIPMENT TBD DA XX XX
0127 SPECIAL TESTING TBD TBN XX XX
CONCRETE INSPECTION & TESTING
0128 ACI LEVEL 1 FIELD CONCRETE
TECHNICIAN
TBD HR XX XX
0129 REINFORCED CONCRETE SPECIAL
INSPECTOR
TBD HR XX XX
0130 PRESTRESSED CONCRETE SPECIAL
INSPECTOR
TBD HR XX XX
0131 ASTM C 117 MATERIALS FINER THAN #200
SIEVE BY WASH
10 EA
0132 ASTM C 136 SIEVE ANALYSIS OF FINE &
COARSE AGGREGATES
10 EA
0133 ASTM C 190 COMPRESSIVE STRENGTH OF
MORTARS CUBE SPECIMENS
10 EA
0134 ASTM C 39 COMPRESSIVE STRENGTH OF
0135 NOISE & VIBRATION MONITORING WITH
EQUIPMENT
TBD HR XX XX
0136 VIBRATION MONITORING WITH
EQUIPMENT
TBD HR XX XX
0137 SENIOR FIELD SOILS TECHNICIAN TBD HR XX XX
0138 SOILS SPECIAL INSPECTOR TBD HR XX XX
0139 ASTM D 1140 AMOUNT OF MATERIAL IN
SOILS FINER THAN #200 SIEVE
10 EA
0140 ASTM D 1557 LABORATORY COMPACTION
OF SOIL MODIFIED EFFORT
10 EA
0141 ASTM D 2216 MOISTURE CONTENT BY
OVEN
10 EA
0142 ASTM D 2487 SOILS CLASSIFICATION 10 EA
0143 ASTM D 2974 ORGANIC SOILS TEST 10 EA
0144 ASTM D 422 GRAIN SIZE ANALYSIS – SIEVE
WITH HYDROMETER
10 EA
0145 ASTM D 4253 & ASTM D 4254 MAX & MIN
INDEX DENSITY
10 EA
0146 ASTM D 4318 LIQUID, PLASTIC LIMIT AND
PLASTICITY INDEX OF SOILS
10 EA
0147 ASTM D 4643 MOISTURE CONTENT
MICROWAVE OVEN METHOD
10 EA
0148 ASTM D 698 LABORATORY COMPACTION
OF SOIL STANDARD EFFORT
10 EA
0149 ASTM D 698 LABORATORY COMPACTION
OF SOIL STANDARD - 1 POINT
0150 ASTM D 854 SPECIFIC GRAVITY 10 EA
0151 CERTIFIED WELDING INSPECTOR (CWI) -
LEVEL II
TBD HR XX XX
0152 STRUCTURAL STEEL AND BOLTING
SPECIAL INSPECTOR
TBD HR XX XX
0153 ASTM E 709 MAGNETIC TEST 10 EA
0154 ASTM E 164 ULTRASONIC TEST 10 EA
0155 ASTM E 165 LIQUID PENETRANT TEST 10 EA
0156 ASTM E 94 RADIOGRAPHIC TEST 10 EA
NONDESTRUCTIVE TESTING
0157 ASNT NDT TECHNICIAN LEVEL III TBD HR XX XX
0158 ASNT NDT TECHNICIAN LEVEL II (NON CWI) TBD HR XX XX
0159 DISCONTINUITY ( HOLIDAY ) COATING
TEST
5 EA
0160 COATING THICKNESS TEST 5 EA
0161 HARDNESS TEST 5 EA
0162 ASTM E 488 HYDRAULIC RAM & JACK FOR
TOTAL YR 3
YEAR 4
PAY ITEM ESTIMAT
ED
QUANTIT
Y
UNIT UNIT
PRICE
ESTIM
ATED
AMOU
NT
0163AA QAR II (S.T.) 200 HR
0163AB QAR II (O.T.) 20 HR
0163AC QAR II (S.D.) 2 HR
0164AA QAR III (S.T.) 20,000 HR
0164AB QAR III (O.T.) 2,000 HR
0164AC QAR III (S.D.) 200 HR
0165AA QAR V (S.T.) 4,000 HR
0165AB QAR V (O.T.) 400 HR
0165AC QAR V (S.D.) 40 HR
0166AA SUPV CONST REP (S.T.) 4,000 HR
0166AB SUPV CONST REP (O.T.) 400 HR
0166AC SUPV CONST REP (S.D.) 40 HR
0167AA QUALITY ASSURANCE MANAGER (S.T.) TBD HR XX XX
0167AB QUALITY ASSURANCE MANAGER (O.T.) TBD HR XX XX
0167AC QUALITY ASSURANCE MANAGER (S.D.) TBD HR XX XX
0168AA SECRETARY (S.T.) TBD HR XX XX
0168AB SECRETARY (O.T.) TBD HR XX XX
0168AC SECRETARY (S.D.) TBD HR XX XX
0169AA SCHEDULER (S.T.) 2,000 HR
0169AB SCHEDULER (O.T.) 200 HR
0169AC SCHEDULER (S.D.) 20 HR
0170AA EXPERT SCHEDULER (S.T.) 200 HR
0170AB EXPERT SCHEDULER (O.T.) 20 HR
0170AC EXPERT SCHEDULER (S.D) 2 HR
0171AA COST ESTIMATOR (S.T.) TBD HR XX XX
0171AB COST ESTIMATOR (O.T.) TBD HR XX XX
0171AC COST ESTIMATOR (S.D.) TBD HR XX XX
0172AA PROGRAM ANALYST (S.T.) 200 HR
0172AB PROGRAM ANALYST (O.T.) 20 HR
0172AC PROGRAM ANALYST (S.D.) 2 HR
0173AA CONST MANAGER (S.T.) TBD HR XX XX
0173AB CONST MANAGER (O.T.) TBD HR XX XX
0173AC CONST MANAGER (S.D.) TBD HR XX XX
0174AA CIVIL ENGR TECH I (S.T.) 200 HR
0174AB CIVIL ENGR TECH I (O.T.) 20 HR
0174AC CIVIL ENGR TECH I (S.D.) 2 HR
0175AA CIVIL ENGR TECH II (S.T.) 2,000 HR
0175AB CIVIL ENGR TECH II (O.T.) 200 HR
0175AC CIVIL ENGR TECH II (S.D.) 20 HR
0176 4X2 PICKUP TRUCK 6,000 DA
0177 4X4 PICKUP TRUCK 100 DA
0178 ADDITIONAL MILEAGE TBD JTR XX XX
0179AA PER DIEM LODGING TBD JTR XX XX
0179AB PER DIEM MEALS 500 DA
YEAR 4
PAY ITEM ESTIMAT
ED
QUANTIT
Y
UNIT UNIT
PRICE
ESTIM
ATED
AMOU
NT
0180 SPECIAL EQUIPMENT TBD DA XX XX
0181 SPECIAL TESTING TBD TBN XX XX
CONCRETE INSPECTION & TESTING
0182 ACI LEVEL 1 FIELD CONCRETE
TECHNICIAN
TBD HR XX XX
0183 REINFORCED CONCRETE SPECIAL
INSPECTOR
TBD HR XX XX
0184 PRESTRESSED CONCRETE SPECIAL
INSPECTOR
TBD HR XX XX
0185 ASTM C 117 MATERIALS FINER THAN #200
SIEVE BY WASH
10 EA
0186 ASTM C 136 SIEVE ANALYSIS OF FINE &
COARSE AGGREGATES
10 EA
0187 ASTM C 190 COMPRESSIVE STRENGTH OF
MORTARS CUBE SPECIMENS
0188 ASTM C 39 COMPRESSIVE STRENGTH OF
0189 NOISE & VIBRATION MONITORING WITH
EQUIPMENT
TBD HR XX XX
0190 VIBRATION MONITORING WITH
EQUIPMENT
TBD HR XX XX
0191 SENIOR FIELD SOILS TECHNICIAN TBD HR XX XX
0192 SOILS SPECIAL INSPECTOR TBD HR XX XX
0193 ASTM D 1140 AMOUNT OF MATERIAL IN
SOILS FINER THAN #200 SIEVE
10 EA
0194 ASTM D 1557 LABORATORY COMPACTION
OF SOIL MODIFIED EFFORT
10 EA
0195 ASTM D 2216 MOISTURE CONTENT BY
OVEN
10 EA
0196 ASTM D 2487 SOILS CLASSIFICATION 10 EA
0197 ASTM D 2974 ORGANIC SOILS TEST 10 EA
0198 ASTM D 422 GRAIN SIZE ANALYSIS – SIEVE
WITH HYDROMETER
10 EA
0199 ASTM D 4253 & ASTM D 4254 MAX & MIN
INDEX DENSITY
10 EA
0200 ASTM D 4318 LIQUID, PLASTIC LIMIT AND
PLASTICITY INDEX OF SOILS
10 EA
0201 ASTM D 4643 MOISTURE CONTENT
MICROWAVE OVEN METHOD
10 EA
0202 ASTM D 698 LABORATORY COMPACTION
OF SOIL STANDARD EFFORT
10 EA
0203 ASTM D 698 LABORATORY COMPACTION
OF SOIL STANDARD - 1 POINT
0204 ASTM D 854 SPECIFIC GRAVITY 10 EA
0205 CERTIFIED WELDING INSPECTOR (CWI) -
LEVEL II
TBD HR XX XX
0206 STRUCTURAL STEEL AND BOLTING
SPECIAL INSPECTOR
TBD HR XX XX
0207 ASTM E 709 MAGNETIC TEST 10 EA
0208 ASTM E 164 ULTRASONIC TEST 10 EA
0209 ASTM E 165 LIQUID PENETRANT TEST 10 EA
0210 ASTM E 94 RADIOGRAPHIC TEST 10 EA
NONDESTRUCTIVE TESTING
0211 ASNT NDT TECHNICIAN LEVEL III TBD HR XX XX
0212 ASNT NDT TECHNICIAN LEVEL II (NON CWI) TBD HR XX XX
0213 DISCONTINUITY ( HOLIDAY ) COATING
TEST
5 EA
0214 COATING THICKNESS TEST 5 EA
0215 HARDNESS TEST 5 EA
0216 ASTM E 488 HYDRAULIC RAM & JACK FOR
TOTAL YR 4
YEAR 5
PAY ITEM ESTIMAT
ED
QUANTIT
UNIT UNIT
PRICE
ESTIM
ATED
AMOU
Y NT
0217AA QAR II (S.T.) 200 HR
0217AB QAR II (O.T.) 20 HR
0217AC QAR II (S.D.) 2 HR
0218AA QAR III (S.T.) 20,000 HR
0218AB QAR III (O.T.) 2,000 HR
0218AC QAR III (S.D.) 200 HR
0219AA QAR V (S.T.) 4,000 HR
0219AB QAR V (O.T.) 400 HR
0219AC QAR V (S.D.) 40 HR
0220AA SUPV CONST REP (S.T.) 4,000 HR
0220AB SUPV CONST REP (O.T.) 400 HR
0220AC SUPV CONST REP (S.D.) 40 HR
0221AA QUALITY ASSURANCE MANAGER (S.T.) TBD HR XX XX
0221AB QUALITY ASSURANCE MANAGER (O.T.) TBD HR XX XX
0221AC QUALITY ASSURANCE MANAGER (S.D.) TBD HR XX XX
0222AA SECRETARY (S.T.) TBD HR XX XX
0222AB SECRETARY (O.T.) TBD HR XX XX
0222AC SECRETARY (S.D.) TBD HR XX XX
0223AA SCHEDULER (S.T.) 2,000 HR
0223AB SCHEDULER (O.T.) 200 HR
0223AC SCHEDULER (S.D.) 20 HR
0224AA EXPERT SCHEDULER (S.T.) 200 HR
0224AB EXPERT SCHEDULER (O.T.) 20 HR
0224AC EXPERT SCHEDULER (S.D) 2 HR
0225AA COST ESTIMATOR (S.T.) TBD HR XX XX
0225AB COST ESTIMATOR (O.T.) TBD HR XX XX
0225AC COST ESTIMATOR (S.D.) TBD HR XX XX
0226AA PROGRAM ANALYST (S.T.) 200 HR
0226AB PROGRAM ANALYST (O.T.) 20 HR
0226AC PROGRAM ANALYST (S.D.) 2 HR
0227AA CONST MANAGER (S.T.) TBD HR XX XX
0227AB CONST MANAGER (O.T.) TBD HR XX XX
0227AC CONST MANAGER (S.D.) TBD HR XX XX
0228AA CIVIL ENGR TECH I (S.T.) 200 HR
0228AB CIVIL ENGR TECH I (O.T.) 20 HR
0228AC CIVIL ENGR TECH I (S.D.) 2 HR
0229AA CIVIL ENGR TECH II (S.T.) 2,000 HR
0229AB CIVIL ENGR TECH II (O.T.) 200 HR
0229AC CIVIL ENGR TECH II (S.D.) 20 HR
0230 4X2 PICKUP TRUCK 6,000 DA
0231 4X4 PICKUP TRUCK 100 DA
0232 ADDITIONAL MILEAGE TBD JTR XX XX
0233AA PER DIEM LODGING TBD JTR XX XX
0233AB PER DIEM MEALS 500 DA
YEAR 5
PAY ITEM ESTIMAT
ED
QUANTIT
Y
UNIT UNIT
PRICE
ESTIM
ATED
AMOU
NT
0234 SPECIAL EQUIPMENT TBD DA XX XX
0235 SPECIAL TESTING TBD TBN XX XX
CONCRETE INSPECTION & TESTING
0236 ACI LEVEL 1 FIELD CONCRETE
TECHNICIAN
TBD HR XX XX
0237 REINFORCED CONCRETE SPECIAL
INSPECTOR
TBD HR XX XX
0238 PRESTRESSED CONCRETE SPECIAL
INSPECTOR
TBD HR XX XX
0239 ASTM C 117 MATERIALS FINER THAN #200
SIEVE BY WASH
10 EA
0240 ASTM C 136 SIEVE ANALYSIS OF FINE &
COARSE AGGREGATES
10 EA
0241 ASTM C 190 COMPRESSIVE STRENGTH OF
MORTARS CUBE SPECIMENS
10 EA
0242 ASTM C 39 COMPRESSIVE STRENGTH OF
0243 NOISE & VIBRATION MONITORING WITH
EQUIPMENT
TBD HR XX XX
0244 VIBRATION MONITORING WITH
EQUIPMENT
TBD HR XX XX
0245 SENIOR FIELD SOILS TECHNICIAN TBD HR XX XX
0246 SOILS SPECIAL INSPECTOR TBD HR XX XX
0247 ASTM D 1140 AMOUNT OF MATERIAL IN
SOILS FINER THAN #200 SIEVE
10 EA
0248 ASTM D 1557 LABORATORY COMPACTION
OF SOIL MODIFIED EFFORT
10 EA
0249 ASTM D 2216 MOISTURE CONTENT BY
OVEN
10 EA
0250 ASTM D 2487 SOILS CLASSIFICATION 10 EA
0251 ASTM D 2974 ORGANIC SOILS TEST 10 EA
0252 ASTM D 422 GRAIN SIZE ANALYSIS – SIEVE
WITH HYDROMETER
10 EA
0253 ASTM D 4253 & ASTM D 4254 MAX & MIN
INDEX DENSITY
10 EA
0254 ASTM D 4318 LIQUID, PLASTIC LIMIT AND
PLASTICITY INDEX OF SOILS
10 EA
0255 ASTM D 4643 MOISTURE CONTENT
MICROWAVE OVEN METHOD
10 EA
0256 ASTM D 698 LABORATORY COMPACTION
OF SOIL STANDARD EFFORT
10 EA
0257 ASTM D 698 LABORATORY COMPACTION
OF SOIL STANDARD - 1 POINT
0258 ASTM D 854 SPECIFIC GRAVITY 10 EA
0259 CERTIFIED WELDING INSPECTOR (CWI) -
LEVEL II
TBD HR XX XX
0260 STRUCTURAL STEEL AND BOLTING
SPECIAL INSPECTOR
TBD HR XX XX
0261 ASTM E 709 MAGNETIC TEST 10 EA
0262 ASTM E 164 ULTRASONIC TEST 10 EA
0263 ASTM E 165 LIQUID PENETRANT TEST 10 EA
0264 ASTM E 94 RADIOGRAPHIC TEST 10 EA
NONDESTRUCTIVE TESTING
0265 ASNT NDT TECHNICIAN LEVEL III TBD HR XX XX
0266 ASNT NDT TECHNICIAN LEVEL II (NON CWI) TBD HR XX XX
0267 DISCONTINUITY ( HOLIDAY ) COATING
TEST
5 EA
0268 COATING THICKNESS TEST 5 EA
0269 HARDNESS TEST 5 EA
0270 ASTM E 488 HYDRAULIC RAM & JACK FOR
TOTAL YR 5
GRAND TOTAL
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SCOPE OF WORK
NOTES
1 General: All work orders shall consist of personnel duly qualified and experienced to perform the type of required services in a manner satisfactory to the COR. The Contractor shall use professional judgment in determining what equipment and/or supplies are needed to complete each delivery order assignment. The Contracting Officer reserves the right to require the replacement of any personnel immediately and assign an inspector to monitor the activity of the work upon determining that work is not being performed in accordance with recognized standards of soil, concrete, and other testing, surveying, quality assurance and safety (work practice as well as safe equipment and apparel) procedures and competency. Payment for services will cease immediately upon such determination.
The Contractor shall make a satisfactory replacement for the removed personnel in accordance with direction from the Government. No payment will be made for travel in connection with replacement.
2 All testing requirements shall be paid as indicated in Schedule B of the contract under the applicable line items. Unless otherwise indicated, testing shall include all materials, equipment, and other miscellaneous costs necessary for performing and reporting test results.
3 Soil Classification shall be in accordance with the Unified Soil Classification System and ASTM D 2487.
4 Atterberg Limits Tests shall be performed in accordance with ASTM D 4318.
5 Soil Density (Nuclear or Sand Cone Method) shall be in accordance with ASTM D 2922 or ASTM D 1556, respectively.
6 Moisture Content shall be performed in accordance with ASTM D 2216 or ASTM D 3017, if density is determined by ASTM D 2922 above.
7 Compaction tests shall be in accordance with the requirements and techniques presented in ASTM D 698, (standard effort)or ASTM 1557 (modified effort).
8 Grain size analysis shall be performed in accordance with the requirements and procedures presented in
EM 1110-2-1906.
9 Relative Density shall be calculated by using ASTM D 4253 and ASTM D 4254, maximum and minimum index density.
10 Organic Soils Content test shall be performed in accordance with ASTM D 2974.
11 Curing and Compressive Strength Testing shall be performed in accordance with the requirements and techniques in ASTM C 31 and ASTM C 39.
12 Offerors shall furnish unit prices for each item listed in the pricing schedule requiring a unit price. If the offeror fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF AN OFFEROR OMITS
BOTH THE UNIT PRICE AND THE EXTENDED TOTAL OR ESTIMATED AMOUNT FOR ANY
ITEM, ITS PROPOSAL SHALL BE DECLARED NON-RESPONSIVE AND THEREFORE
INELIGIBLE FOR AWARD.
13 Offerors shall not furnish unit prices or the estimated amounts for Items Nos. 0005AA, 0005AB, 0005AC, 0006AA, 0006AB, 0006AC, 0009AA, 0009AB, 0009AC, 0011AA, 0011AB, 0011AC, 0016, 0017AA, 0018, 0019, 0020, 0021, 0022, 0027, 0028, 0029, 0030, 0043, 0044, 0049, 0050, 0059AA, 0059AB, 0059AC, 0060AA, 0060AB , 0060AC, 0063AA, 0063AB, 0063AC, 0065AA, 0065AB, 0065AC, 0070, 0071AA, 0072, 0073, 0074, 0075, 0076, 0081, 0082, 0083, 0084, 0097, 0098, 0103, 0104, 0113AA, 0113AB, 0113AC, 0114AA, 0114AB, 0114AC, 0117AA, 0117AB, 0117AC, 0119AA, 0119AB, 0119AC, 0124, 0125AA, 0126, 0127, 0128, 0129, 0130, 0135, 0136, 0137, 0138, 0151, 0152, 0157, 0158, 0167AA, 0167AB, 0167AC, 0168AA, 0168AB, 0168AC, 0171AA. 0171AB, 0171AC, 0173AA, 0173AB, 0173AC, 0178, 0179AA, 0180, 0181, 0182, 0183, 0184, 0189, 0190, 0191, 0192, 0205, 0206, 0211, 0212, 0221AA, 0221AB, 0221AC, 0222AA, 0222AB, 0222AC, 0225AA, 0225AB, 0225AC, 0227AA, 0227AB, 0227AC, 0232, 0233AA, 0234, 0235, 0236, 0237, 0238, 0243, 0244, 0245, 0246, 0259, 0260, 0265, and 0266. These CLINS are not priced in the base contract price schedule but may be utilized on the individual Task Orders.
14 Estimated quantities are provided on the base contract price schedule for evaluation purposes only. The
Government will not be bound to these quantities. The actual quantities will be furnished in each Task Order. The unit prices provided by the contractor are binding.
CONSTRUCTION SERVICES
SECTION C DESCRIPTION/
SPECIFICATIONS
C.1 DESCRIPTION
C.1.1 Location of Work - Construction management services for this contract will be performed primarily within the limits of the U.S. Army Engineer District, New Orleans and as directed by the Contracting Officer (KO) and in coordination with the Contracting Officer’s Representative (COR). As a regional contract, work may be located in areas assigned to other USACE Districts however, work will be primarily located within the boundaries of the New Orleans District.
C.1.2 Description of Work - The Contractor shall perform a broad range of construction management, quality assurance activities, and related services to satisfy fluctuating needs and conditions in accordance with plans developed by the Government, and other Government policy and regulations. The purpose of these activities is to manage the construction contracts and assure that construction of projects is in accordance with construction contract plans and specifications. Quality assurance activities to be performed shall include, but not be limited to:
coordinating, reading plans and specifications, monitoring, documenting, and reporting on construction contractor quality control activities and construction safety, progress, and testing. Section C.2 contains applicable technical references. Construction management services including tracking and management of project funds, submittal tracking and coordination, coordination with field personnel and other district elements concerning construction activities, modification and claim activities, and plan and specification review shall be required for the construction of levees, revetments and various structures, hydraulic and bucket dredging, the repair and/or maintenance of various structures, drainage structures and channels, debris removal, and other emergency services, but shall not be limited to the above.
C.1.3 Authorization and Assignment of Work - The general procedural guide for the authorization and assignment of work and for the performance of work under this contract is as follows:
a. Task Orders shall be either negotiated for the overall management of a particular project or work assignment or issued by the level of effort required for a stated duration. Written task orders for a designated period will be issued by the Contracting Officer. These task orders will in general define the work and will state the end product required, or the level of effort required for a stated duration. Task Orders will identify projects and the funds obligated against those projects.
b. The task orders issued by the Contracting Officer will be clarified as necessary, either verbally or in writing by the Contracting Officer's Representative, to furnish details governing each assignment under the task order, including the date for commencement of work on each respective assignment and the work items that are required.
C.1.4 Contractor Responsibilities - The Contractor shall be held responsible for the accuracy, quality and completeness of the services to be provided. In case of unsatisfactory work, the Contractor will be held responsible as stated in C.3.4 and reviewed in accordance with the Quality Assurance Surveillance Plan (QASP) referenced in C.1.13. In performing required services, the contractor shall provide all management necessary in receiving assignments, planning, training personnel, checking completed work, and reporting results. Full time Quality Assurance is required during construction activities. Additional services that may be required include preparation of cost estimates for changes, scheduling, review and verification of progress pay estimates, quality assurance activities, performing QA Testing, funds management, preparation of scope changes, and submittal management. Except as otherwise provided in the specifications, the Contractor shall furnish all plant, personnel, transportation, fuel and supply materials as necessary to perform the services required in each task order. All of the above shall be done in accordance with the specifications of this contract.
C.1.5 Contractor Performance - The Contractor shall be prepared to commence work on each task order within 3 calendar days after date of issuance of the task order by the Contracting Officer. The Contractor will be required to commence work on each task order at the designated locations at the time specified by the Contracting Officer or his Authorized Representative. The Contractor will be notified by the Contracting Officer after issuance of the task order of the date and time to commence work on each assignment. The Contractor will perform each assignment continuously as working conditions permit or as deemed necessary by the Contracting Officer or his Authorized Representative as it relates to the construction progress and requirements, except that the Government retains the right to adjust, suspend or terminate assignments as per paragraph C.1.5.2 of this contract. The Contractor is expected to review work in progress to monitor personnel performance in accordance with the contract specifications, Government policy and regulations. The Contractor shall furnish to the
Government timely notification when problems arise.
C.1.5.1 Commencement of Work on a task order - Prior to beginning assignments, each assigned employee is to meet with the COR’s designated Government Official indicated as the point of contact, to discuss specifics of the assignment. Each proposed assignment will be discussed by the Contractor's personnel and the COR’s designated Contract Coordinator as necessary to develop a mutual understanding of:
a. Type of work to be done.
b. End result expected by the Contracting Officer.
c. Methods to be used by the Contractor.
d. Reports to be submitted.
Payment shall be made to the contractor for applicable personnel attending prework meetings and shall be in accordance with the provisions of Paragraph C.1.3, Authorization and Assignment of Work. The contractor shall ensure that all contractor personnel will be properly oriented relative to the responsibilities and publications listed in C.2.1 prior to beginning an assignment.
The Contractor shall bear any costs to accomplish the above orientation for initial assignments, for substitutions, or replacements of personnel once work has begun, whether dictated by contractor or Government.
C.1.6 Approvals - For task orders utilizing labor hours, no payment will be made for services in excess of 8 hours in any one calendar day unless work is actually performed. The Contractor will obtain documented authorization prior to working more than 8 hours in any one calendar day or on a holiday. Should the contractor perform services in an overtime status, or on holidays due to emergencies, or in the event of other unforeseen circumstances without having obtained prior approval, he (contractor) must provide written justification to the Contracting Officer or the Authorized Representative on the first workday after performing the overtime or holiday work. The Contracting Officer or the Authorized Representative will review the contractor's justification to determine if post-authorization is warranted. No payment for overtime or holiday work will be made where prior written authorization or post-authorization is not granted.
C.1.7 Distribution of Work - The Government will determine which projects are to be furnished construction services by the Contractor and reserves the right to discontinue at any time the services provided herein subject to the guaranteed minimum. Insofar as distribution of assignments is concerned, the Contractor agrees that additional adjustments based upon alleged diversion of orders to Government or other forces shall not be a basis for a claim.
C.1.8 Contractor Mobilization - When so ordered by the Contracting Officer, the Contractor must furnish the required contract employees in compliance with paragraph C.1.5.
C.1.9 Completed Work - All completed work, including survey field notes, hydrographic survey recordings, computations and adjustments, lab test results, and other applicable reports shall be delivered to the appropriate Contracting Officer's Representative as needed in a timely manner.
C.1.10 Remote Areas - Services may be required to be performed in remote areas.
C.1.11 Travel - The contractor will furnish all necessary transportation. Except as may otherwise be provided in this contract, all travel will be at the contractor's expense. Time of service rendered will be computed on the basis of actual duty at the worksite except for instances where personnel are required to travel in a boat to reach the worksite, in which case time of service shall start when the boat providing transportation disembarks to transport personnel to the worksite. If Air Travel is necessary to perform job duties, travel expenses will be negotiated prior to travel and in accordance with the JTR.
C.1.5.2 Modifications to task orders - The Government reserves the right to increase or decrease the amount of services being furnished under each task order, or to discontinue completely or in part the services being furnished as may be deemed necessary by the Contracting Officer or the Authorized Representative. The Contractor agrees that no claim will be made for additional adjustments based upon increase, decrease, or discontinuance of services.
a. Employer’s Liability Insurance. The Contractor shall furnish evidence of Employer’s Liability Insurance in an amount of not less than $100,000.00.
b. General Liability Insurance. Bodily liability insurance in the minimum limits of $500,000.00 per occurrence on the comprehensive form of policy.
c. Automobile Liability Insurance. Minimum limits are $200,000.00 per person, $500,000.00 per occurrence for bodily injury and $20,000.00 per accident for property damage. This insurance shall cover the operation of all automobiles used in performance of the contract. All vehicles to be used in performance of this contract shall be expressly designated in the insurance policy. A copy of the list of such vehicles shall be submitted to the Contracting Officer. In the event that the contractor acquires a new vehicle for use on this contract after his insurance policy has been obtained, he shall immediately amend his policy to reflect the inclusion of the new vehicle on the policy. In no event shall the contractor drive a vehicle on the Government installation or construction work site without first obtaining the required coverage for said vehicle.
C.1.13 Government Quality Assurance Surveillance Plan
a. Purpose.
The purpose of the Quality Assurance Surveillance Plan (QASP) is to identify the methods and procedures the government will use to evaluate contractor performance. These methods and procedures are designed to ensure contract standards detailed in this section of the contract are achieved.
b. Objective.
This QASP has been developed by the requiring activity to ensure that Construction Management (CM) services are performed in a timely and accurate manner to support the New Orleans District Construction Division.·
c. Roles and Responsibilities:
1. Contracting Officer Representative (COR): The COR is charged with implementing this plan and ensuring successful contractor performance.
2. Contracting Officer: The Contracting Officer will take action when the COR identifies non-conforming CM services by the contractor.
d. Methods of Surveillance.
The COR and his representatives coordinate work and verify attendance. Also, contractor's QA personnel complete daily reports documenting all QA activities.
In addition, Quality Assurance Personnel in Construction Division will perform surveillance of contractor's field activities. Details of these inspections are provided to the COR and his representatives as needed.
e. Performance Requirements Summary:
All contractor activities must meet established CM standards, including compliance with Construction Division Operating Manual (CDOM), Quality Assurance Plans, BCOE processes, ASTM standards. Etc.
If The Contractor's work is found to be unsatisfactory during an assignment or after an assignment is completed, and if it is determined that fault or negligence on the part of the Contractor or his employee had caused the unsatisfactory condition, the Contractor will be liable for all costs in connection with correcting the unsatisfactory work. The work may be performed by Government forces or contractor forces at the direction of the Contracting Officer or the Authorized Representative. In any event, the Contractor will be
C.1.12 Insurance Requirements - The Contractor shall procure and maintain during the entire period of their performance under this contract the following minimum insurance:
held responsible for all costs required for correction of the unsatisfactory condition including payments for services, automotive expenses, equipment rental, supervision, and any other costs in connection therewith.
For situations where it is impractical for unsatisfactory work to be corrected, the contractor shall reimburse the Government for the unsatisfactory work by deducting the appropriate costs from the next invoice or by direct repayment. This information is also found in C.3.2, “unsatisfactory work”.
C.2 TECHNICAL SPECIFICATIONS
C.2.1 Technical Publications - All work performed under this contract shall be in accordance with the following publications. These publications, with the exception of the ASTM which needs to be purchased separately, will be provided on a disk. The contractor's personnel shall be familiar with, comply with, and enforce the provisions on same:
a. Corps of Engineers Manual EM 385-1-1 - Safety and Health Requirements Manual.
b. Corps of Engineers, Labor Relations Manual ER 1180-1-8.
c. Quality Assurance Representatives Guide EP 415-1-261, Volumes 1 through 4.
d. Department of the Army, Engineering Regulation ER 1180-1-6, 30 September 1995 -
Construction Quality Management.
e. Corps of Engineers, ER 1110-1-261, Quality Assurance of Laboratory Testing Procedures.
f. ASTM E 329-06a, Agencies Engaged in the Construction Inspection and/or Testing.
g. All applicable processes in the USACE Quality Management System (QMS)
h. New Orleans Construction Control Manual (NOCCM)
C.2.2 Technical Discrepancies - When construction contract plans and specifications (applicable for construction work to which construction personnel are assigned) are in conflict with the publications listed in C-
2.1 above, then the construction contract plans and specifications shall govern. When there appears to be a discrepancy between two or more construction contract specifications, in the construction contract plans, between any other regulations applicable to the construction contracts, or when there appears to be an ambiguity in any of these documents, then the construction quality assurance personnel shall appeal to the Contracting Officer's Representative to resolve discrepancies or ambiguities.
C.3 PERSONNEL
C.3.1 Personnel Requirements
C.3.1.1 General Qualifications - All personnel must be duly qualified and experienced to perform the type of required services in accordance with applicable Government regulations, policies, and standard operating procedures including, but not limited to that set forth in publications listed in Section C.2, TECHNICAL SPECIFICATIONS. The Contractor shall also be responsible for providing and maintaining a fully trained staff knowledgeable in compliance of all federal, state and local regulations applicable to Title VII and the Civil Rights Act of 1964, as amended. All personnel will be required to sign a procurement integrity form provided by the Government. The determination of whether personnel are duly qualified and experienced or whether the Contractor's work is unsatisfactory will be made by the Contracting Officer or the Authorized Representatives.
Personnel who are determined to be not qualified and/or experienced, or who do not perform the required services in accordance with the provisions herein, or who compromise or jeopardize the Government's position in any way, shall be replaced immediately by the Contractor at his (the Contractor's) expense. Correction of work or reimbursement to the Government by the Contractor shall be as set forth in C.3.4 - Unsatisfactory Work. Contract employees shall be thoroughly familiar with the construction phases of the respective work to which they are assigned. A Contractor employee may be assigned to any construction project wherein he/she meets the minimum qualifications for the level required, which will be determined by the Contracting Officer's Representative.
C.3.1.2 Specific Qualifications - The Contract employee must, at a minimum, have had experience and training described below: (Applicable education may be substituted for experience).
Position Description
Equiv Gov’t Pay
Grade
Spec Exp Yrs
Gen Exp
Total
USACE
Safety Trng Req’d
CQM
Trng
Deg
Const QAR II GS-06 2 2 4 Yes Yes HS Const QAR III GS-07 3 2 5 Yes Yes HS Const QAR V GS-09 4 3 7 Yes Yes HS Sprv Const Rep GS-11 6 3 9 Yes Yes HS Const Manager GS-12 3 3 6 Yes Yes BS(eng or construction management)
Quality Assurance Manager
GS-12 3 3 6 Yes No BS(Science or eng)
Cost Estimator GS-11 3 2 5 Yes No HS Scheduler GS-12 3 3 6 Yes No BS Expert Scheduler GS-13 5 3 8 Yes No BS Program Analyst GS-11 3 2 5 Yes No BS Secretary GS-05 0 3 3 Yes No HS Civil Engr Tech I GS-09 3 3 6 Yes No HS Civil Engr Tech II GS-11 5 3 8 Yes No HS
The specialized experience shall be limited to experience in concrete and earthwork placement, structural, electrical, mechanical, dredging, revetment, and emergency repairs, as deemed applicable by the Contracting Officer or Authorized Representative. All assigned Contract employees must comply with the education levels listed above. If an education requirement is not listed, the employee must be a high school graduate. All employees shall comply with the training requirements of C.3.1.5 prior to being qualified at the position required by the Contracting Officer or the Authorized Representative. With approval, QAR III's will be permitted to work at the next lower level until the training requirements of C.3.1.5 are met in full.
Personnel assigned as a Supervisory Construction Representative shall have experience leading a team of Quality Assurance Representatives. They shall have experience providing on the job training to QAR’s, and have the capability to identify and recommend resolutions to complex construction quality assurance issues encountered in the field.
Personnel assigned as a Construction Manager should have experience with complex construction contract modifications and claims. They should have a working knowledge of software programs utilized in developing modification packages, and proficient in negotiations on a diverse assortment of construction changes. Further, they should have extensive experience with construction submittals and funds management.
Personnel assigned as a Quality Assurance Manager shall have experience reviewing construction data and identifying discrepancies between quality control data and quality assurance data. They should have a working knowledge of materials testing software and Office products.
Personnel assigned as a Cost Estimator should have experience with estimating labor, material and equipment costs for contract modifications in a heavy civil and marine construction setting. Personnel should also have experience in construction contract negotiations.
Personnel assigned as a Scheduler should have experience with Primavera and scheduling in the fields of heavy civil and marine construction. An Expert Scheduler should have experience in construction contract claim scheduling.
Personnel assigned as program analysts should have experience in contract funds management and programming.
Personnel assigned as a Secretary shall have experience with providing administrative office support to an office. The Secretary shall have a working knowledge of Office software products.
Personnel assigned as Civil Engineering Technician I must be capable of assisting the Civil Engineer in application of principles, methods, and techniques of civil engineering technology, reviewing project specifications and conferring with the Civil Engineer concerning assistance required, such as plan preparation, acceptance testing, evaluation of field conditions, design changes, modifications, cost estimates and reports. The Civil Engineering Technician reviews survey notes, field computations and contract quantity computations. This work involves performing duties such as calculating dimensions, profile specifications, and quantities of materials using calculator or software programs. This technician shall develop a working knowledge of software programs utilized to develop modification packages.
Personnel assigned as Civil Engineering Technician II must be capable of assisting the Civil Engineer in application of principles, methods, and techniques of civil engineering technology, reviewing project specifications and conferring with the Civil Engineer concerning assistance required, such as plan preparation, acceptance testing, evaluation of field conditions, design changes, modifications, cost estimates and reports. The Civil Engineering Technician reviews survey notes, field computations and contract quantity computations. This work involves performing duties such as calculating dimensions, profile specifications, and quantities of materials using calculator or software programs. This technician shall develop a working knowledge of software programs utilized to develop modification packages. This technician shall be proficient in the file management program PROJECTWISE or similar and PRIMAVERA or similar software programs. In addition, this technician should have the knowledge and experience with reading and interpreting construction schedules and sequencing.
All other discipline descriptions can be found in Section J, Wage Determination.
C.3.1.3 Approval of Personnel - The contractor shall be responsible for furnishing personnel who meet the minimum qualifications as per Section C of the contract and for the requirements level as determined by the Contracting Officer's Representative for each assignment. The Contractor shall furnish a resume of experience and qualifications for each employee he proposes to furnish under this contract prior to any work being performed by each respective person. Each employee proposed will be evaluated by the Quality Assurance Branch of Construction Division to determine his/her respective highest qualification level. Resumes should, at a minimum, document education level, relevant work experience with start and stop dates and references.
Resumes should be mailed to the address given in Section D or emailed to the Contract coordinator, except that attention should be indicated for Chief, Quality Assurance Branch, Construction Division. For the services required at the beginning of the contract period, the contractor shall only submit for review and approval the resumes of individuals which were included in the contractor's proposal. Substitutions will only be allowed with approval of Contracting Officer or Authorized Representative.
C.3.1.4 Approval Exceptions - When the Contracting Officer or Authorized Representative determines that services are required which, due to exigency, do not allow sufficient time for approval to be granted as per para. C.3.1.3, the Contractor will be allowed to commence work pending said approval.
This is the start of the file's text. The full file is on GovTribe.