W912P8-17-R-0002_Solicitation.pdf
PDF 322 KB Posted
- Attached to
- Drydock and Repair Towboat Kent
- Solicitation number
- W912P8-17-R-0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A22_-_Am_0002.pdf | ||
| Am_0001.pdf | ||
| H01_-_100-1012_S2_of_5.pdf | ||
| H01_-_506_1010_S1_of_1.PDF | ||
| H01_-_CJN.pdf | ||
| H01_-_505_1009_S2_of_2.PDF | ||
| H01_-_806-1002_1of1.pdf | ||
| H01_-_805-1030_S1_of_1.pdf | ||
| H01_-_513_1015_S1_of_1.PDF | ||
| H01_-_519-1018_S1_of_1.pdf | ||
| H01_-_100-1012_S1_of_5.pdf | ||
| H01_-_299-11.pdf | ||
| H01_-_100-1012_S3_of_5.pdf | ||
| H01_-_100-1006_S1_of_3.pdf | ||
| H01_-_100_1011_S1_of_1.PDF | ||
| H01_-_100-1012_S4_of_5.pdf | ||
| H01_-_100-1012_S5_of_5.pdf | ||
| H01_-_203_1016_S1_of_1.PDF | ||
| H01_-_508-1021_S1_of_1.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912P8-17-R-0002 08-Nov-2016
b. TELEPHONE NUMBER
504-862-2340
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 22 Nov 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912P89. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
LAUREN A GANDOLFI
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W42HEM62859395
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W912P8 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
OD-PHY SPT BR/FACILITS MGT SEC
MR. DAVID G PICKETT
CORPS OF ENGINEERS
7400 LEAKE AVE
NEW ORLEANS LA 70118
TEL: 504-862-2381 FAX: 504-862-1912
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
NAICS:
336611
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF67
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912P8-17-R-0002
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
KENT SHIPYARD REPAIRS
FFP
KENT SHIPYARD REPAIRS
FOB: Destination
MILSTRIP: W42HEM62859395
PURCHASE REQUEST NUMBER: W42HEM62859395
NET AMT
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
CLIN DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT
0001 1.4 Drydocking 1 JB
0002 1.5 Gas Freeing and 1 JB
Gas Free Certificate
0003 1.6 Ultrasonic Testing 1 JB
0004 1.7.1 5/16" Steel 50 SF
Plate (OPTIONAL)
0005 1.7.2 3/8" Steel 50 SF
Plate (OPTIONAL)
0006 1.7.3 1/2" Steel 50 SF
Plate (OPTIONAL)
0007 1.7.4 Structurals 200 LB
(OPTIONAL)
0008 1.7.5 Rubrail 10 LF
(OPTIONAL)
0009 1.8.1 1/4" Fillet 25 LF
Weld (OPTIONAL)
0010 1.9 Cleaning and 1 JB
Painting
0011 1.10 Propellers, 1 JB Propeller Shafts and Bearings
0012 1.11.1 Stern Tube 2 EA Bearing (OPTIONAL)
0013 1.11.2 Strut Tube 2 EA Bearing (OPTIONAL)
0014 1.12.1 Main Engine 2 EA Alignment (OPTIONAL)
0015 1.13.1 Anodes 20 EA
(OPTIONAL)
0016 1.14 Compressed Air 1 JB System
0017 1.15 Sea Chest Valves 1 JB
0018 1.16 Sea Strainers 1 JB
0019 1.17 Overboard 1 JB Discharge Connections
0020 1.18 Fathometer 1 JB Transducer
0021 1.19 Shower Pans 1 JB
0022 1.20 Fuel Piping 1 JB Repair
0023 1.21 Gear Cooler 1 JB Expansion Tanks
0024 1.22 Shaft Well Piping 1 JB
0025 1.23 Flooring 1 JB
0026 1.24 Pilothouse Air 1 JB Conditioner
0027 1.25 Engine Room Fans 1 JB
0028 1.26 Superstructure 1 JB Plating Repair
0029 1.27 Generator Service 1 JB
0030 1.28 Generator Day 1 JB Tank Fuel Shutoffs
0031 1.29 Generator Fuel 1 JB Piping
0032 1.30 Fire Main System 1 JB
0033 1.31 Radar 1 JB
TOTAL
NOTES:
1. Prospective offerors are encouraged to examine the vessel prior to proposal submission. Specific dates for examining the vessel will be scheduled by Mr. David Pickett, Marine Management Section, (504)862-2381.
Failure to examine the vessel before submitting a proposal will not be considered cause for a claim against the Government.
2. Award will be made as a whole to one offeror.
3. The offeror is required to offer on all line items. Failure to submit an offer on all line items shall result in a non-responsive offer, requiring rejection thereof. In the event that an offeror is willing to waive costs associated with an individual line item, he is required to insert descriptive words or abbreviations such as "no charge" or "N.C."
4. Offerors shall furnish unit prices for all line items. If the offeror fails to insert a unit price in the appropriate blank for the required items but does furnish an extended total or an estimated amount for such items, the Government will deem his unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE
OFFEROR OMITS BOTH THE UNIT PRICE AND THE EXTENDED AMOUNT FOR ANY REQUIRED
ITEM, HIS OFFER WILL BE DECLARED NON-RESPONSIVE.
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
1. SCOPE (INFORMATION). The Contractor shall furnish all management, supervision, labor, subcontracting, services of manufacturer's representatives and all facilities, utilities, equipment, tools, lubricants, fuels, shore power, materials and articles (excluding Government-furnished property) required to fully execute the Mandatory and Contracting Officer authorized Optional work items specified herein.
1.1 VESSEL DATA (INFORMATION). The KENT is a welded steel towboat 85’ long, 32’ wide and 10'-6" deep. The light displacement is 304 long tons. The loaded displacement is 410 long tons. Loaded draft is approximately 8’-6”.
NOTICE: THE INTERIOR SURFACES OF THE VESSEL ARE COATED WITH PAINT CONTAINING
LEAD. The Contractor shall perform all work in strict accordance with Federal, State, and Local regulations, laws, codes and practices and EM 385-1- 1 regarding lead based coatings. See paragraph 4.5.1 for additional requirements regarding lead based paint.
There will be no separate measurement and payment for lead abatement, environmental and personnel monitoring, disposal, and any other activity associated with coatings containing lead. The cost shall be included in and distributed among those items requiring this work.
The Contractor shall provide copies of all completed hazardous waste manifests to the Contracting Officer. The coatings on the interior of the forepeak ballast tank and the interior of the potable water tank do not contain lead.
1.1.1 CONTRACT DRAWINGS (INFORMATION). The work shall conform to the following contract drawings, all of which form a part of these specifications and are available on the web at www.fedbizopps.gov. All drawings are available in pdf format.
(1) 100-1006, 1 of 3, General Arrangement
(2) 100-1011, 1 of 1, Keel Cooling and Piping
(3) 100-1012, 1 thru 5 of 5, Main Hull Structure
(4) 203-1016, 1 of 1, Shafting Details
(5) 505-1009, 2 of 2, Sewage and Drain Piping
(6) 506-1010, 1 of 1, Fire Piping System
(7) 508-1021, 1 of 1, Bilge and Ballast System
(8) 513-1015, 1 of 1, Compressed Air Piping
(9) 519-1018, 1 of 1, Rudder Details
(10) 805-1030, 1 of 1, Profile
(11) 806-1002, 1 of 1, Lines Plan
(12) CJN, 2-1/2” Constant Flow Nozzle Assembly
(13) 299-11, Elkhart “Python” Monitor Nozzle
1.1.2 SECURITY (INFORMATION). The contractor will not have access to the CORPS network. This is an unclassified contract and the contractor will not have access to critical information. The contractor and all associated sub-contractors shall receive locally developed training provided by the MVN Security Office on the local suspicious activity reporting program. Please call 504-862-2342 for the power point presentation for this training. This training is used to inform employees of the types of behavior to watch for and to instruct employees to report suspicious activity relating to the project.
Contractors will provide local background checks to the COR or the security office before performing work.
1.1.3 iWATCH and/or CorpsWatch Training (INFORMATION). The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA which is the MVN Security Office) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
1.1.4 E-VERIFY PROGRAM (INFORMATION). Pre‐screen candidates using E‐Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible candidates must be provided to the COR no later than 3 business days after the initial contract award.
1.2 CONTRACTOR QUALITY CONTROL AND GOVERNMENT QUALITY ASSURANCE
(INFORMATION). The Contractor shall establish and maintain a quality control plan as specified in paragraph 2.2. The Government will evaluate the Contractor’s performance in accordance with the Quality Assurance Surveillance Plan as specified in paragraph 2.8.
1.3 APPLICABLE PUBLICATIONS (INFORMATION). The following publications form part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. The latest revision shall be used unless otherwise specified.
(1) American Bureau of Shipping (ABS).
Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways
(2) American Society for Testing and Materials (ASTM).
A36 Structural Steel
(3) Manufacturers’ Standardization Society of the Valve and Fittings Industry, Inc. Standard Practice (MSS).
SP-61 Pressure Testing of Steel Valves
(4) Federal Regulations (CFR).
29 CFR 1915 Occupational Safety and Health Standards for Shipyard Employment
(5) National Board of Boiler and Pressure Vessel Inspectors (NBBI).
NBIC National Board Inspection Code
(6) Steel Structures Painting Council (SSPC)
SSPC-SP 1 Solvent Cleaning
SSPC-SP 3 Power Tool Cleaning
SSPC-SP 6 Commercial Blast Cleaning
SSPC-SP 7 Brush-Off Blast Cleaning
SSPC-SP 10 Near White Blast Cleaning
1.4 DRYDOCKING (CLIN 0001). Dry-dock the vessel and hold it on dry dock until all underwater repairs, cleaning, painting and dry-dock inspections are complete and all painting up to the deck is thoroughly dry. Pump all bilges dry, remove all debris, degrease with detergent, rinse, and dispose of the contents in accordance with all Federal, State and Local regulations. Furnish the Contracting Officer with copies of all waste manifests identifying the name and address of the transporters and the treatment and/or disposal facility.
1.5 GAS FREEING AND GAS-FREE CERTIFICATE (CLIN 0002).
1.5.1 Before beginning any hot work, clean and gas-free the affected spaces as required by 29 CFR 1915. Spaces requiring the gas-freeing shall be "Safe for Workers and Safe for Hot Work".
1.5.2 Test and certify the affected spaces in accordance with 29 CFR 1915.
Testing and certification shall be accomplished by a Marine Chemist certified by the National Fire Protection Association, a US Coast Guard authorized person, or a “competent person” as required by 29 CFR 1915.
1.5.3 Maintain the affected spaces in a "Safe for Workers and Safe for Hot Work" condition until all hot work is complete. Inspect and test each affected space in accordance with 29 CFR 1915 to insure that the condition within the space is maintained.
1.5.4 Furnish and display the Marine Chemist certificate in the immediate vicinity of the affected operation. Furnish one additional copy to the Contracting Officer.
1.5.5 The cost of testing and providing gas-free certificates shall be included in this item. The cost of cleaning and gas freeing the affected spaces shall be included in and proportioned among the bid prices for each item of work requiring cleaning and gas-freeing.
1.6 ULTRASONIC TESTING (CLIN 0003). Furnish the required instruments and services of an American Society for Nondestructive Testing ACCP Level II certified ultrasonic technician to gauge the thickness of the hull plating and keel coolers at the 240 locations defined below:
1.6.1 Nine hull belts, ten shots per belt (six on the bottom, two on each side, two and four feet off the bottom), nine inches aft of frames 3, 9, 15, 20, 25, 30, 34, 40, and 46.
1.6.2 150 shots on the keel coolers, one shot every five feet.
1.6.3 Furnish a report to the COR within seven calendar days after the vessel is dry-docked. The report shall include sketches indicating the reading locations and tables containing the readings and the percent diminution.
Readings exceeding the allowable regulatory diminution of 25 and 30 percent depending on location shall be highlighted. The price shall include any related services such as electricity, water, staging, and surface preparation necessary to take the ultrasonic readings.
1.7 RENEWAL OF HULL PLATING, STRUCTURALS, AND RUBRAIL (OPTIONAL). Crop out and renew hull plating and structurals with new steel conforming to ASTM A36 where directed by the Contracting Officer. Hull plating is defined as all bottom, side, bilge, headlog, sternlog, deck, bulkhead, and tank plating.
Structurals are defined as all angle, t-bar, and fabricated structural shapes attached to hull plating. Rubrail is defined as the half pipe fender with internal flat bar stiffener welded to the side above the waterline. All renewals shall duplicate existing construction in size, type and shape.
Welding of new plating shall be continuous butt welds all around with a seal weld on the inside. Welding of plating to structurals shall be as original and not less than that recommended by the American Bureau of Shipping "Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways." All surfaces of new plating and structurals shall be cleaned in accordance with SSPC-SP 10 and coated with two 8 mil DFT coats of PPG Amercoat 240 epoxy or equal, if originally coated. The total dry film thickness shall not be less than 16 mils. The color shall be haze grey. The exterior of new hull and deck plating shall be coated in accordance with the associated paragraph below. The cost of removal and replacement of interferences, all welding, fairing up of existing plating, staging and cleaning and painting shall be included in this item. The quantity of each optional item required will be identified after a visual examination of the hull and an evaluation of the ultrasonic thickness readings are completed. Actual quantities may be more or less than the estimated quantities. The actual quantity of each material item will be measured after installation and rounded to the nearest whole number. SEE PARAGRAPH 4.2 FOR INFORMATION REGARDING OPTIONAL ITEMS. The following quantities will be used to evaluate bids:
1.7.1 5/16" Steel Plate - 50 Sq. Ft. (CLIN 0004) (OPTIONAL)
1.7.2 3/8" Steel Plate - 50 Sq. Ft. (CLIN 0005) (OPTIONAL)
1.7.3 1/2" Steel Plate - 50 Sq. Ft. (CLIN 0006) (OPTIONAL)
1.7.4 Structurals - 200 Lbs. (CLIN 0007) (OPTIONAL)
1.7.5 Rubrail - 10 Lineal Feet (CLIN 0008) (OPTIONAL)
1.7.6 Test all new welded joints in the hull plating for leaks under an air pressure of 1.5 psig. All seams shall be sprayed with a soap solution and proven tight in the presence of the COR. In applying the air pressure, the contractor shall use a positive method of prohibiting any pressure in excess of 1.5 PSIG. All soap solution that was applied to the hull exterior for testing shall be cleaned prior to painting. All cracks, defective welds or plate deterioration resulting in leaks shall be reported in writing to the COR. Upon completion of repairs, each leaking compartment shall be retested in the presence of the COR until proven watertight. Remove all blanks, blind flanges, or other test appurtenances upon completion. If the affected space cannot be pressure tested the welded joints shall be tested with a water hose at a pressure not less than 50 psi, with a nozzle of not less than 1/2 inch in diameter and held not more than 5 feet from the joint being tested. Testing shall be done after all work has been cleaned, all plating and structurals renewed, and prior to painting.
1.7.7 Welding of leaks in existing structure or members discovered as a result of testing performed in paragraph 1.7.6 will be accomplished in accordance with paragraph 1.8. Welding of leaks in material installed or connections made by the Contractor shall be done by the Contractor without additional cost to the Government. After the vessel is undocked, a thorough examination of the hull will be made for leaks by the Government Inspector. If leaks are found, the Contractor shall dry-dock the vessel, make the necessary repairs and undock the vessel at his expense if the leaks are found in material installed or connections made by him.
1.8 WELDING (OPTIONAL). Furnish welders and qualified welding operators, fully equipped, including staging and consumables, prepare joints and apply welding as directed by the Contracting Officer. Welding procedure specifications shall be qualified in accordance with the ABS Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways. A copy of each qualified welding procedure specification and procedure qualification record shall be submitted to the Contracting Officer.
Welders, welding operators, and tack welders shall be qualified to produce welds in accordance with the above welding procedure specifications. Copies of the performance qualification test records for each welder, welding operator, or tack welder shall be submitted to the Contracting Officer. SEE PARAGRAPH 4.2 FOR INFORMATION REGARDING OPTIONAL ITEMS. The following quantities will be used to evaluate bids:
1.8.1 1/4" Fillet Weld - 25 Linear Feet (CLIN 0009) (OPTIONAL)
1.9 CLEANING AND PAINTING (CLIN 0010).
1.9.1 Tanks. Remove and dispose of the contents of the following tanks and associated piping in accordance with Federal, State, and local regulations.
The location of the tanks are shown on drawing number 806-1002, sheet 1 of 1, Lines Plan. The oily bilge tank and dirty oil tank locations are transposed on this drawing. The volumes below are full tank capacities. The estimated amount of fluid that will be remaining in each of the tanks below will be provided through a solicitation amendment approximately two weeks before proposals are due.
(1) Two fuel oil tanks, 10,760 gallons each.
(2) One fuel oil day tank, 5475 gallons.
(3) Two lube oil tanks, 920 gallons each.
(4) One oily bilge tank, 2,100 gallons.
(5) One used oil tank, 2,100 gallons.
Open the manhole covers to the above tanks and discard the existing gaskets.
Clean all interior surfaces of the above tanks in accordance with SSPC-SP 1.
The tanks shall be inspected and approved by the COR before the tank is closed after cleaning. Clean the gasket surfaces of the manhole cover and tank.
Install a new nitrile rubber gasket and reinstall the manhole cover to close the tank. Install new studs, washers, and nuts of equal type to the original, if damaged upon removal or installation.
1.9.2 Hull Exterior. Clean the hull exterior from the top of the bulwarks down to the keel, including the bow, stern, sides, bottom, all pad eyes, struts, rudders, keel coolers, and the interior of the sea chest by high pressure water washing, hand scraping and spot and sweep blasting. The high pressure water washing shall be done at 3500-5000 psi to remove salts, weed and soft shell fouling. Compatible detergents shall be employed to remove any oil or grease contamination if necessary. Hard shell fouling shall be removed by hand scraping. Spot blasting to SSPC-SP 6 shall be done to all areas of failed and damaged coating where the steel substrate is exposed. Sweep blasting to SSPC-SP 7 shall be done to the remaining area. Feather the perimeter of spot blasted areas with rotary tools. Use fine sand for sweep blasting to prevent damage to adhered epoxy base coatings and antifouling.
Apply two 8 mil DFT coats of PPG Amercoat 240 epoxy or equal to the areas that were spot blasted. The total dry film thickness shall not be less than 16 mils. The first coat shall be red. The topcoat shall be black. Apply one 3 mil DFT coat of black PPG PSX 1001 acrylic polysiloxane or equal to the hull exterior from the waterline up to the top of the bulwarks. Apply two 5 mil DFT coats of PPG ABC#3 antifouling or equal to the hull from the waterline down to the keel including the bow, stern, sides, bottom, all pad eyes, struts, rudders, keel coolers and the interior of the sea chest. The first coat shall be blue. The top coat shall be red. The antifouling shall be applied before the epoxy has cured in accordance with the manufacturer’s instructions. Apply two 2 mil DFT coats of white epoxy to all identification and draft marks on the port and starboard sides of the hull.
Shift the vessel on its blocks after the hull coating has cured for immersion in accordance with the manufacturer’s specifications. Clean and coat the block landing areas in accordance with the adjacent area specifications above.
Remove and reinstall the sea chest strainer plate to clean and paint inside.
The hull exterior was last cleaned and painted in January 2012 with the same paint system as above. The substrate was cleaned to near white condition by sandblasting.
1.10 PROPELLERS, PROPELLER SHAFTS, AND BEARINGS (CLIN 0011). Remove the two propellers and two propeller shafts. Measure the inside diameter of the two stern tube bearings and two strut bearings, fore and aft at 0 and 90 degrees.
Measure the two existing shafts and the two spare shafts for straightness and out of roundness at the bearing journals and tapers. Measure the run out of the face and the pilot bore of the couplings on the spare shafts. Check the blue fit of the existing couplings and spare propellers on the spare shafts.
Remove the packing, disassemble, degrease, and clean and inspect both stuffing boxes. Inspect and pressure test the seal bladders in the stuffing boxes.
Furnish a condition report on the bearings, shafts, couplings and stuffing boxes to the COR within seven calendar days after the vessel is dry-docked.
Install the spare shafts and propellers and strap the propeller nuts to the shaft ends with stainless steel flat bar. Install new flax packing in the stuffing boxes and lubricate. Check the alignment of the shafting at the coupling after the vessel has been afloat for 12 hours with fuel and water tanks full. Furnish an alignment report to the COR for approval before the couplings are bolted together. See drawing number 203-1016, sheet 1 of 1, for shafting details. Additional repairs may be authorized by the Contracting Officer through a modification to the contract.
1.11 REPLACEMENT OF STRUT AND STERN TUBE BEARINGS (OPTIONAL). Remove the existing strut and/or stern tube bearings and install new 5-1/2” ID x 7- 1/4” OD, brass shelled, rubber, flanged bearings as directed by the Contracting Officer. The installation shall include the preparation of the bearing housing, machining the bearing, replacement of stainless steel set screws, and the installation of epoxy filler. The following quantities will be used to evaluate bids:
1.11.1 Stern Tube Bearing – 2 each (CLIN 0012)(OPTIONAL)
1.11.2 Strut Tube Bearing – 2 each (CLIN 0013)(OPTIONAL)
1.12 MAIN ENGINE ALIGNMENT (OPTIONAL). Align each main engine as directed by the Contracting Officer. Each engine and shaft shall be aligned to not more 0.004” difference at the coupling faces, top to bottom and side and side.
The alignment shall include the removal and replacement of the chocking compound with Chockfast Orange or equal. The following quantities will be used to evaluate bids:
1.12.1 Main Engine Alignment – 2 each (CLIN 0014)(OPTIONAL)
1.13 ANODES (OPTIONAL). Remove and replace zinc anodes on the hull exterior, inside the forepeak ballast tank, and inside the sea chest as directed by the Contracting Officer. Surface weld all pits in way of the existing anode mount locations and grind flush. Furnish and weld on new Galvotech GA-23 zinc anodes or equal. Each anode shall be 22 pounds with cast-in galvanized straps.
Repair damaged coatings in way of new anode locations. The following quantities will be used to evaluate bids:
1.13.1 Anodes – 20 each (CLIN 0015)(OPTIONAL).
1.14 COMPRESSED AIR SYSTEM (CLIN 0016). Perform an external and internal inspection and a hydrostatic test to the two 125 gallon air receivers in the engine room, the 250 gallon receiver in the upper machinery room, and the 20 gallon air receiver below the pilothouse in accordance with the NBBI, NBIC.
Inspect and test the pressure relief devices and gages in accordance with the NBBI, NBIC. Furnish a report describing the procedures and results of the inspections and tests to the COR. Details of the compressed air system are shown on drawing number 513-1015, sheet 1 of 1, Compressed Air Piping.
1.15 SEA CHEST VALVES (CLIN 0017). Remove the two gate valves from the sea chest and disassemble. Clean and inspect for damage and worn parts. Furnish a condition report to the COR describing the required repairs and replacements within seven calendar days after the vessel is dry-docked. Clean, machine, or grind the valve discs, disc guides, and seats. Replace all gaskets and packing with material equal to original. Replace any bolts, nuts, and washers equal to original, if damaged. Reassemble the valves and perform a shell test and seat closure test in accordance with the MSS SP-61. Clean and coat the valves with a urethane primer and topcoat paint system. Reinstall the valves and correct all leaks. The two valves are cast steel gate valves, one 2-1/2 inch and one 6 inch, nominal size. Replace the one inch schedule 80 nipple and one inch gate valve on the sea chest for compressed air blow down with a new equivalent valve. The nipple shall be welded all around on both sides of the sea chest plate. Additional repairs to the valves may be authorized by the
Contracting Officer through a modification to the contract.
1.16 SEA STRAINERS (CLIN 0018). Disassemble and clean the 6 inch and 2-1/2 inch simplex strainers on the sea chest. Inspect for damage and worn parts.
Furnish a condition report to the COR describing the required repairs and replacements within seven calendar days after the vessel is dry-docked.
Reassemble and reinstall the strainers with new gaskets and fasteners as required. Test for functional operation and leaks. Additional repairs to the strainer may be authorized by the Contracting Officer through a modification to the contract.
1.17 OVERBOARD DISCHARGE CONNECTIONS (CLIN 0019). Replace the six overboard discharge pipes from the side shell to and including the first inboard valve.
The overboard discharges shall include the schedule 160 steel piping, pipe flanges, gaskets, and fasteners. Replace the six check valves with valves equal to the original. The piping penetrations shall be welded all around on both sides at the side shell. There are three 1-1/2 inch and three 2 inch discharges. The details are shown on drawings 505-1009, 2 of 2, Sewage and Drain Piping, 506-1010, 1 of 1, Fire Piping System, and 508-1021, 1 of 1, Bilge and Ballast System. Clean and paint the above work in accordance with SSPC-SP 3 and apply two 8 mil DFT coats of white PPG Amercoat 240 epoxy or equal. Do not paint those discharges that pass through fuel or lube oil tanks. The shaft well pump discharges are replaced under paragraph 1.20, CLIN 0021.
1.18 FATHOMETER TRANSDUCER (CLIN 0020). Remove the cofferdam cover and discard the existing gasket. Remove the existing fathometer transducer from the transducer well and return to the Government. Replace the hull bottom plate within the well and drill a new mounting hole sized for the new Government furnished transducer. Clean and paint the interior and exterior of the transducer well and cover plate in accordance with SSPC-SP 3 and apply two 8 mil DFT coats of white PPG Amercoat 240 epoxy or equal. Clean and paint the exterior of the new hull bottom plate in accordance with paragraph 1.9.2.
Install the new transducer in the well with 1/8 inch thick neoprene rubber gaskets on the inside and outside of the hull plate and 3M 101 polysulfide marine sealant or equal. Replace the neoprene gasket on the cover plate and close the cofferdam. Replace the CGB cable gland in the cofferdam cover and install the transducer cable in the gland. The Government will make the cable terminations at the junction box.
1.19 SHOWER PANS (CLIN 0021). Remove the existing epoxy shower pan coatings, clean in accordance with SSPC-SP 3 and apply Dex-O-Tex Deco-Flor troweled epoxy floor coating or equal to the three shower pans in accordance with the manufacturer’s instructions. The coating shall be applied up the surrounding bulkheads 4 inches making an integral cove base. An appropriate primer shall be applied to the steel as recommended by the coating manufacturer. Install three new strainer plates in the drains.
1.20 FUEL PIPING REPAIR (CLIN 0022). Repair the fuel leak in the piping in the water tank void. Remove all traces of leaked and spilled fuel upon completion of the repair. Repair affected coatings.
1.21 GEAR COOLER EXPANSION TANKS (CLIN 0023). Remove the existing port and starboard gear cooler expansion tanks from the side engine room bulkheads.
Fabricate and install new aluminum expansion tanks equal to the existing tanks at the same mounting locations. Flush the gear cooling systems and refill with a new 50% solution of ethylene glycol antifreeze. Repair affected coatings.
The new expansion tanks shall be unpainted.
1.22 SHAFT WELL PIPING (CLIN 0024). Replace the existing discharge piping and valves for the port and starboard propeller shaft well bilge pumps from the pumps to the hull side shell plating. The new piping shall be one inch schedule 80 black steel pipe except it shall be one inch schedule 160 between the side shell and first inboard valve. The new valves shall be equivalent to the existing valves. Replace the hose, fittings and hose clamps between the pumps and new discharge piping. Piping penetrating the bulkheads and side shell shall be continuously welded all around on both sides. Install new pipe hangers on 24 inch centers that are welded to the bulkheads. Clean and paint the above work in accordance with SSPC-SP 3 and apply two 8 mil DFT coats of white PPG Amercoat 240 epoxy or equal.
1.23 FLOORING (CLIN 0025). Replace the flooring on the main deck in the galley, pantry, head and hallway between the engine room and galley. Remove the existing vinyl sheet flooring and install Armstrong Standard Excelon 1/8 inch thick vinyl composition tile or equal. Clean the substrate and install compatible underlayment as required to provide a smooth level surface in accordance with the manufacturer’s recommendations. Replace all vinyl cove base with new material equal to original. Remove the wood molding from in front of the kitchen counter and replace with wood quarter round equal in color. The tile color will be selected by the COR from a manufacturer’s sample selection of neutrals provided by the contractor. The samples shall be actual tiles or a portion of a tile.
1.24 PILOTHOUSE AIR CONDITIONER (CLIN 0026). Remove the existing window air conditioning unit from the bulkhead and return to the Government. Modify the existing mounting location by increasing the size and install the new Government furnished window air conditioner. Relocate the surface mounted power receptacle for the air conditioner. Replace circuit breaker #2 in LP3 in the pilothouse with a 20 amp breaker. Clean and paint the above work in accordance with SSPC-SP 3 and apply two 8 mil DFT coats of white PPG Amercoat 240 epoxy or equal.
1.25 ENGINE ROOM FANS (CLIN 0027). Replace the port and starboard lower engine room ventilation tube axial fans located behind the louvered covers on the main deck. The new fans shall be equal in size and capacity to the existing fans.
1.26 SUPERSTRUCTURE PLATING REPAIR (CLIN 0028). Crop out and replace the vertical side plating on the starboard side exterior stairs to the pilothouse that has two holes in it. Clean and paint the above work in accordance with SSPC-SP 3 and apply two 8 mil DFT coats of white PPG Amercoat 240 epoxy or equal. Drill a 2 inch diameter drain hole in the adjacent overhanging deck plate where directed by the COR.
1.27 GENERATOR SERVICE (CLIN 0029). Furnish the services of a John Deere trained mechanic to perform the following maintenance to the port and starboard model PE4045TFM75 generator engines, serial numbers PE4045T820931 and PE4045T829601:
(1) Replace zinc plugs.
(2) Check engine mounts.
(3) Clean crankcase ventilation assembly.
(4) Check automatic belt tensioner.
(5) Replace alternator drive belt.
(6) Perform coolant solution analysis and add supplemental coolant additives as required.
(7) Check and adjust engine valve clearance.
1.28 GENERATOR DAY TANK FUEL SHUTOFFS (CLIN 0030). Install individual remote fuel supply shutoffs on the exterior of the aft upper machinery room bulkhead for the port and starboard generators. Install labels at the operators which read “Emergency Fuel Shutoff – Port (and Starboard) Generator”. Clean and paint the above work in accordance with SSPC-SP 3 and apply two 8 mil DFT coats of white PPG Amercoat 240 epoxy or equal.
1.29 GENERATOR FUEL PIPING (CLIN 0031). Replace the hose in the generator day tank fuel fill line with schedule 40 black steel pipe. The size shall be equal to the fill piping between the tank and hose. Install new pipe hangers on 24 inch centers that are welded to the structure and bulkhead between the pump and the tank. Clean and paint the above work in accordance with SSPC-SP 3 and apply two 8 mil DFT coats of white PPG Amercoat 240 epoxy or equal.
1.30 FIRE MAIN SYSTEM (CLIN 0032). Flush all the fire main piping of all debris from the pilothouse monitor and the two cabin deck monitors down to the sea chest. Remove the three “Python” monitor nozzles, the three “CJN” adjustable nozzles and the three butterfly valves from the piping.
Disassemble, clean and furnish a condition report describing the damage, deterioration and recommended repairs. Reassemble the three monitor nozzles and three “CJN” adjustable nozzles with new gaskets and O-rings. Reassemble the fire main system with new gaskets and test by running the fire pump.
Repair all the leaks in the above work. Additional repairs and replacement of components may be authorized through a modification of the contract. Refer to drawings numbers CJN and 299-11 from the Elkhart Brass Manufacturing Company and 506-1010, 1 of 1, Fire Piping System for component details.
1.31 RADAR (CLIN 0033). Remove the existing radar system in its entirety and return it to the Government. Furnish and install a new Furuno 1935, 4 KW, 48 nautical mile, 10.4 inch color LCD radar with 3.5 foot open array antenna or equal. Furnish and install a Furuno 220WX ultrasonic weather station or equal. Furnish and install a Furuno RD33 4.3 inch color LCD navigation organizer or equal. All of the above shall be installed in the pilothouse at the existing radar location and interconnected with each other and the existing GPS and AIS with the appropriate cables, converters and connection kits. The removal, replacement and/or modification of all joiner work, interferences and equipment mounting surfaces shall be included in this item.
All cabling shall be installed beneath the joiner work. All cable penetrations through the pilothouse shall be made watertight. The services of an equipment manufacturer’s representative shall be acquired to assure the proper installation, operation and calibration of the equipment. The weather station compass shall be calibrated in accordance with the manufacturer’s instructions. The existing GPS is a Furuno GP-1850WD, serial number 3479- 0300. The existing AIS is a Furuno FA-150, serial number 00512.
2. INSPECTION AND ACCEPTANCE (INFORMATION)
2.1 The Contractor shall perform or have performed the inspections and tests required to substantiate that the supplies and services provided under this contract conform to the specifications, drawings and contract requirements herein. The Contractor shall also perform or have performed the inspections and tests specified herein.
2.2 The Contractor shall provide and maintain a Quality Control Program covering all work specified in the Job Order. The program shall result in the preparation and maintenance of documentation. The documentation shall define the tests and inspections to be accomplished for each specification item keyed to the appropriate contract line item number and paragraph of the specification.
2.3 The Government Inspector shall witness all tests and inspections. The Contractor shall make certain that all materials, installation and workmanship meet the requirements of the specifications and are ready for test or inspection prior to notifying the Government Inspector.
2.4 The Contractor shall notify the Government Inspector at least 24 hours before all testing and inspection. The Government Inspector will be available to witness testing and inspection of completed work Monday thru Friday, except Federal Holidays. The time of his availability will depend upon the distance between the Contractor's or Subcontractor's facility and New Orleans, LA.
2.5 The Contractor shall proceed with work if the Government Inspector is not present to witness the inspection or test after the scheduled time provided the advanced notice required in paragraph 2.4 above has been given. The Contractor shall document his inspection or test as if the Government Inspector was present.
2.6 Witnessing tests and inspections by the Government Inspector does not constitute acceptance of the item and does not relieve the Contractor of the responsibility of assuring that the work conforms to the requirements of the specifications.
2.7 Work subcontracted and performed away from the shipyard is covered by this Quality Control Program. The prime Contractor cannot delegate the authority to witness or perform and sign for tests and inspections conducted away from his facility without approval of the Contracting Officer. If the Subcontractor has an established Quality Control Program with designated organization and personnel, the prime Contractor may designate an appropriate individual in that organization as his authorized representative. Such designation shall clearly indicate that the individual is an employee of a subcontractor and shall be subject to the approval of the Contracting Officer.
The Government Inspector will witness tests and inspections at the Subcontractor's facility in accordance with paragraphs 2.4 and 2.5 above.
2.8 QUALITY ASSURANCE SURVEILLANCE PLAN. This plan will be used to assure the Government that the work specified under this contract is completed satisfactorily. This plan is included for information purposes only. All work performed will be monitored by the Government Inspector on a daily basis.
The performance based deliverables identified in Table 2.8.1 will be inspected and tested (if applicable) and either approved or rejected by the Government.
The Contractor shall correct all deficiencies in rejected work at no additional cost to the Government unless caused by reasons beyond the control of the Contractor.
Table 2.8.1 - PERFORMANCE REQUIREMENTS
Requirement Performance
Objective Monitoring Method
Allowable Deviation
Remedy
Dry dock All work Observation of 0% deviation Re-work performed in accordance with Paragraph 1 and 4 and all sub-paragraphs.
performed in accordance with the specifications, manufacturer’s recommendations and accepted commercial marine practice.
the Contractor’s activities and workmanship during the performance of this contract.
Monitor the Contractor furnished parts and materials.
from specifications allowed.
performance of unacceptable work at no additional cost to the Government.
All other remedies allowed by FAR Clause 52.212-4 can be used for unacceptable performance.
Acceptance and Inspection performed in accordance with Paragraph 2 and all sub-paragraphs.
Conformance as specified, acceptable Contractor Quality Control Program, acceptable testing, reporting and notification as required by the specifications.
Observation and review of the Contractor’s Quality Control Program, inspections, documentations, and notification requirements.
0% deviation from specifications allowed.
Re-performance of unacceptable work at no additional cost to the Government.
All other remedies allowed by FAR Clause 52.212-4 can be used for unacceptable performance.
Completion and delivery in accordance with Paragraph 3 and all sub-paragraphs.
Completion of all work, proper submittals completed and approved.
Paragraph 3.1 Return of vessel within 45 days of delivery to the Contractor’s facility.
Observation of work progress and review of required submittals.
Final acceptance date of vessel.
0% deviation from specifications and delivery date requirement unless documentation is provided to demonstrate that delays are beyond the Contractor’s control.
If Government monitoring of work schedule and progress reveals that scheduled completion date is in danger, the Contractor will be required to provide necessary resources to return to an acceptable schedule.
All other remedies allowed by
FAR Clause 52.212-4 can be used for unacceptable performance.
3. DELIVERIES OR PERFORMANCE (INFORMATION)
3.1 COMMENCEMENT, EXECUTION AND COMPLETION. The Contractor is required to commence work under this job order immediately upon delivery of the vessel to him, to execute the work with diligence and to complete the work within forty-five (45) calendar days.
3.1.1 The Contractor is required to accept delivery of the vessel within fifteen (15) calendar days after the date of receipt of the written notice of award or by a date mutually agreed upon by the Contractor and the Government.
3.2 DELIVERY AND RETURN OF THE VESSEL.
3.2.1 Delivery. The Government will deliver the vessel to the Contractor's facility. The time of commencement will be the time the vessel arrives at the Contractor's facility.
3.2.2 Return. The Contractor shall return the vessel to the Government at the point of delivery upon completion and acceptance of all work. The time of completion will be the time of acceptance of all work by the Government Inspector.
3.3 LIQUIDATED DAMAGES. If the Contractor fails to deliver the supplies or perform the services within the time frame specified in this contract, or any extension, the Contractor shall, in place of actual damages, pay to the Government as fixed, agreed, and liquidated damages, for each calendar day of delay the sum of $800.
3.4 SCHEDULE AND PROGRESS OF WORK. The Contractor shall submit a schedule to the Contracting Officer for accomplishing the work before work starts. The schedule shall include a bar chart for each contract line item, including optional items, that shows start and completion dates. The chart shall show the order in which the Contractor proposes to accomplish all work. The schedule shall be updated weekly reflecting the actual progress attained in comparison to the proposed schedule. The updated reports shall be submitted to the Contracting Officer on Monday for the previous work week. Supplement each schedule with a comprehensive written narrative describing:
(1) The amount of progress on work items during the reporting period.
(2) Problems encountered.
(3) Known or anticipated delays, their causes, the impact on the work and the corrective action taken or proposed.
The Contractor shall take appropriate steps necessary to improve his progress if he falls behind the progress schedule in the opinion of the Contracting Officer. The Contracting Officer may require the Contractor to increase the number of shifts and/or overtime, days of work and/or amount of plant used as deemed necessary to regain progress to complete all work within the time specified, without additional cost to the Government.
3.5 LOCATION. The Contractor's facility shall be located within a 100 mile radius of the U.S. Army Engineer District office facility, 7400 Leake Avenue, New Orleans, LA 70118. Any bid proposing performance at a location beyond this stated limit will be determined non-responsive and rejected.
3.6 LIST OF DELIVERABLES. The following documents and their location within the specifications are required deliverables.
(1) Hazardous Waste Manifests, 1.1
(2) Background Checks, 1.1.2
(3) iWatch/Corpswatch Training Certificates, 1.1.3
(4) E-Verify Program List, 1.1.4
(5) Bilge Waste Manifests, 1.4
(5) Marine Chemist Certificate, 1.5.4
(6) Ultrasonic Test Report, 1.6.3
(7) Qualified Weld Procedure Specifications and Procedure Qualification Records, 1.8
(8) Welder Performance Qualification Test Records, 1.8, 4.9
(9) Propeller and Shaft Report, 1.10
(10) Compressed Air System Report, 1.12
(11) Sea Chest Valve Report, 1.13
(12) Sea Strainer Condition Report, 1.14
(13) Fire Main System Report, 1.28
(14) Work Schedule, 3.4
(15) Accident Prevention Program Plan, Hazard Analysis, Checklist, Lead Compliance Plan, 4.5.1
(16) Hazardous Energy Control Plan, 4.5.2
(17) Material Safety Data Sheets, 4.14.4
4. SPECIAL CONTRACT REQUIREMENTS (INFORMATION)
4.1 MANDATORY ITEMS. All mandatory items, those not specifically identified as INFORMATION or OPTIONAL, shall be accomplished and completed within the specified performance period.
4.2 OPTIONAL ITEMS. Certain items identified as OPTIONAL in the bidding schedule and description/specifications may or may not be required. No work shall be performed on any item identified as OPTIONAL unless authorized in writing, in whole or in part, by the Contracting Officer. When authorized, the Contractor shall perform the OPTIONAL work required at the unit price quoted in the schedule in the quantities authorized. The total actual quantity authorized may be less or more than the estimated quantity. The Contractor shall allow sufficient time to perform the total estimated quantity of all OPTIONAL items in the bidding schedule.
4.3 WHARFAGE, DOCKAGE, ETC. The Contractor shall be responsible for and pay all expenses of wharfage, tonnage, dockage, mooring, shore power, etc. The Contractor shall provide:
(1) All mooring lines and fenders sufficient in strength, quantity, location and quality to prevent damage to the vessel and the dock.
(2) All necessary labor, material, services and equipment as required to safely move the vessel while it is in his possession.
(3) Adequate protection during adverse weather conditions including, but not limited to, moving the vessel to a safe harbor and providing additional mooring lines and anchors.
(4) The necessary facilities for and shall bear the expense of any movement of the vessel while it is in his possession.
(5) Shore power at the required voltage, phase, and current required to operate all equipment aboard the vessel from the time of commencement to the time of completion as defined in paragraph 3.2.
4.4 INTERFERENCE. The Contractor shall remove and reinstall any interference required to accomplish the work specified without additional contract time or cost to the Government. Interference is defined as any part of the vessel, installed or portable, that must be removed or disturbed to accomplish the work specified. All damaged or missing fasteners shall be replaced with fasteners of the same size and type as original. New gaskets, packing and seals shall be installed on all disturbed connections and proven leak free.
Damaged lagging and insulation shall be repaired or replaced. All new work or disturbed old work shall be cleaned and painted in accordance with Section C.
All interferences shall be returned to their original operational position and condition upon reinstallation.