W912P8-17-B-0017-0004.pdf
PDF 9 MB Posted
- Solicitation number
- W912P8-17-B-0017
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Abstract_W912P8-17-B-0017.pdf | ||
| W912P8-17-B-0017-0003.pdf | ||
| W912P8-17-B-0017-0002.pdf | ||
| W912P8-17-B-0017-0001.pdf | ||
| 17b0017.pdf | ||
| 385-1-1.pdf | ||
| Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W42HEM62991501
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference Invitation for Bid W912P8-17-B-0017 for Hurricane Protection System Nov-Nf-W-06b.2 Pointe Celeste Pump Station Fronting Protection Plaquemines Parish, Louisiana.
See Continuation Pages for Changes:
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Apr-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-17-B-0017
X 9B. DATED (SEE ITEM 11)
13-Mar-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Apr-2017
CODE
VICKSBURG DISTRICT CONTRACTING OFFICE
4155 CLAY ST.
VICKSBURG MS 39183-3435
W912EE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P8-17-B-0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The required response date/time has changed from 27-Apr-2017 02:00 PM to 02-May-2017 02:00 PM Central Time.
The 'issued by' organization has changed from
CONTRACTING DIV- CHIEF
CORPS OF ENGINEERS 7400 LEAKE AVENUE
NEW ORLEANS LA 70160-0267
to
VICKSBURG DISTRICT CONTRACTING OFFICE
4155 CLAY ST.
VICKSBURG MS 39183-3435
ALL PROJNET QUESTIONS SHALL BE SUBMITTED ON OR BEFORE 16 :00 HOURS
(04 :00 P.M. CENTRAL TIME) 27 APRIL 2017 TO BE ANSWERED. THE
GOVERNMENT WILL NOT GUARATEEE ANY QUESTIONS SUBMITTED AFTER
THIS DATE AND TIME WILL BE ADDRESSED.
SECTION 00010
Delete the BIDDING SCHEDULE (Revised by Amendment 0003) and substitute the attached revised BIDDING SCHEDULE therefore.
SECTION 26 05 00.00 40
1. Page 3, paragraph 1.1. Delete this paragraph in its entirety and substitute the following therefore:
“1.1 MEASUREMENT AND PAYMENT
1.1.1 Electrical Work
No measurement will be made for the electrical work covered under this section. Payment will be made at the contract job price for "Electrical Work". Price and Payment shall constitute full compensation for furnishing all plant, labor, equipment and materials, and performing the electrical work, including basic electrical work and methods, electrical distribution work, and the short-circuit/coordination study/arc-flash analysis; all as specified herein and as shown on the drawings
1.1.2 Entergy Utility Service
No measurement will be made for Entergy utility service work as shown on the drawings.
Payment will be made at the contract job price for "Entergy Utility Service". Price and payment shall constitute full compensation for Entergy to design, acquire utility easements, and furnish 480V/277Y 3-phase utility service to the site.”
2. Page 13. Add the following new paragraph as:
“3.3 Entergy Utility Service
Entergy will be responsible for the design, acquiring utility easements, and furnishing 480V/277Y 3-phase utility service to the site from the intersection of Pointe Celeste Pump Station Access Road and LA-23. For pricing, design, layout, and scheduling information contact Entergy Distribution Power Lines see Section 01100 GENERAL PROVISIONS, paragraph UTILITIES AND IMPROVEMENTS for contact information.”
DRAWINGS
SHEET IDENTIFICATION Nos. C-102, C-103, C-402, C-403, C-404, S-341, and S-342.
Delete these drawings in their entirety and substitute the attached revised drawings SHEET IDENTIFICATION Nos. C-102, C-103, C-402, C-403, C-404, S-341, and S-342 therefore.
SECTION 00010 – BIDDING SCHEDULE
Hurricane Protection System, NOV-NF-W-06B.2, Pointe Celeste Pump Station Fronting Protection
Plaquemines Parish, Louisiana
Item DESCRIPTION Estimated Quantity Unit Unit Price Estimated Amount
BASE
0001 Mobilization and Demobilization 1 JOB FOR
Video and Photographic Documentation
1 JOB FOR
0003 Web Camera System 1 JOB FOR
0004 Floating Plant 1 JOB FOR
0005 Temporary Flood Protection 1 JOB FOR
0006 Temporary Retaining Structure 1 JOB FOR
0007 Silt Fences 2,000 LF
0008 Truck Wash-Down Rack 1 JOB FOR
0009 Drainage Pumping Assessment 1 JOB FOR
0010 Demolition 1 JOB FOR
0011 Catch Basin with Type B Grate 4 EA
0012 Reinforced Concrete Floodwall 1 JOB FOR
0013 Concrete Pipe Supports 5 EA
0014 Concrete Landings 4 EA
0015 Pump Station Repair Beams 1 JOB FOR
0016 Walkways and Stairs 2 EA
0017 Steel Handrails 1 JOB FOR
0018 Ladders 2 EA
0019 Discharge Pipes 1 JOB FOR
0020 Knife Gate Valves and Actuators 1 JOB FOR
"Revised by Amendment 0004"
0021 Flexible Couplings 1 JOB FOR
0022 Butterfly Valves and Actuator 1 JOB FOR
0023 Air Release Valves 1 JOB FOR
Discharge Bells - East Pump Station
1 JOB
FOR
Discharge Bells - West Pump Station
1 JOB
FOR
0026 Portable Valve Actuator 2 EA
0027 Piping Specialties 1 JOB FOR
0028 Electrical Work 1 JOB FOR
0029 Separator Geotextile 2,400 SY
0030 Reinforcement Geotextile 400 SY
0031 Clearing and Grubbing 1 JOB FOR
0032 Excavation, Drainage Canals 15,870 CY
0033 Excavation, Structural 15,500 CY
0034 Granular Backfill 1,200 CY
0035 Lightweight Backfill 3,287 CY
0036 Construction Dewatering 1 JOB FOR
Bypass Pumping System Operation
0037AA First 1,800 Hours 1,800 HR
0037AB All Over 1,800 Hours 1,000 HR
0038 Embankment, Compacted Fill
0038AA First 10,500 CY 10,500 CY
0038AB All Over 10,500 CY 3,200 CY
0039 Riprap 1,260 CY
0040 Grouted Riprap 855 CY
0041* Piling, Steel Sheet, Type PZ-22 38,942 SF
0042 Piling, Steel Sheet, Type PZ-27 5,106 SF
14 inch Pile, Concrete Precast, Prestressed
1,260 LF
0044 Compression Pile Tests
0044AA First Pile Tests 2 EA
0044AB All Over First Pile Tests 2 EA
0045 Tension Pile Tests
0045AA First Pile Test 1 EA
0045AB All Over First Pile Test 1 EA
0046 Load Frame and Test Piles 1 JOB FOR
0047 Furnish Steel Pipe Piles 79,371 LF
0048 Drive Steel Pipe Piles 79,371 LF
0049 Surfacing 1,500 CY
Turf Establishment and Maintenance
4 AC
0051 24-Inch Corrugated PVC Pipe 100 LF
0052 8-Inch Perforated PVC Pipe 400 LF
0053* Entergy Utility Service 1 JOB FOR
TOTAL BASE $
OPTION 1
0054* Bypass Pumping System - Contractor-Furnished
0054AA* First 260 CFS 260 CFS
0054AB* All Over 260 CFS 260 CFS
TOTAL BASE + OPTION 1 $
OPTION 2
0055* Bypass Pumping System - Government-Furnished
0055AA* First 4 Pumps 4 EA
0055AB* All Over 4 Pumps 3 EA
TOTAL BASE + OPTION 2 $
*Denotes changes from the previous Bidding Schedule. Some item numbers have changed.
**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.
Award will be made as a whole to one bidder.
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
X X
X X :1
W P
-X
P L
A Q
U E
M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
A G
W
H -4 -4
R O
B D
A U
E N
H A
U E
R P
E
H U
R R
IC
A N
E P
R O
T E
C T
IO
N S
Y S
T E
M
N O
V -N
F -W
-0
B .2 P
O
IN
T E C
E L E
S T
E
P U
M P S
T A
T
IO
N F
R O
N T
IN
G P
R O
T E
C T
IO
N
B
W P -1
-B -0
M A
R C
H
I.
B
E T
A N
C E
S -T
O R
R E
S E .I
WEST PUMP STATION DRAINAGE PROFILE
-10
-20
-30
BACKFILL
EMBANKMENT
S T
A .9
S T
A .4
1+25 1+50 1+75 2+00 2+25 2+44
E L E
V A
T
IO
N N
A V
D
PVC PIPE
8" PERFORATED
PVC PIPE
8" PERFORATED
P I S
T A .0
S T
A .0
S T
A .6
PI
1+17 0+75
-10
-20
-30
0+00 0+25 0+50 1+00
E L E
V A
T
IO
N N
A V
D
SLOPE
X
.9
Y
.1
EL. 2.5
SLOPE
4'-2"x3'- 2.25"
CATCH BASIN
X
.9
Y
.8
PVC PIPE
8" PERFORATED
END 24"
CORREGATED
PE PIPE
S T
A .7
4'-2"x4'-2"
CATCH BASIN
BACKFILL
LIGHTWEIGHT
EL. 2.5
BEGIN 24"
CORREGATED
PE PIPE
INV. EL. -4.0
4" CRUSHED STONE
EL. 3.0
GEOTEXTILE FABRIC
SEPARATOR
GEOTEXTILE FABRIC
SEPARATOR
4" CRUSHED STONE
EL. 3.0
SLOPE TO DRAINSLOPE TO DRAIN
SLOPE SLOPE
SLOPE TO DRAINSLOPE TO DRAIN
SCALE: 1" = 10'
END 24"
CORRAGATED
PE PIPE
EL. -2.5BEGIN 24" CORREGATED
PE PIPE STA. 0+19.81
X 3750007.69
Y 395586.89
INV. EL.
-0.25
INV. EL.
-4.0
INV. EL.
-0.25
INV. EL.
-6.0
INV. EL.
-0.25
INV. EL.
-0.25
PE PIPE
24" CORREGATED
PE PIPE
24" CORREGATED
CATCH BASIN
4'-2"x4'-2" 4'-2"x3'-2.25"
CATCH BASIN
PE PIPE
24" CORREGATED
-5
M6
B S-316
0+50
1+00
P I
8" PERFORATED
PVC PIPE
LENGHT: 10'
8" PERFORATED
PVC PIPE
LENGHT: 30'
8" PERFORATED
PVC PIPE
LENGHT: 40'
8" PERFORATED
PVC PIPE
LENGHT: 15'
8" PERFORATED
PVC PIPE
LENGHT: 20'
M M
8" PERFORATED
PVC PIPE
LENGHT: 5'
H
C -1 -2 d g n
C-102
D R
A
IN
A G
E P
L A
N A
N D P
R O
F
IL
E
W E
S T P
U M
P S
T A
T
IO
N
WEST PUMP STATION DRAINAGE PLAN
WEST PUMP STATION
SCALE: 1" = 10'
N
LIGHTWEIGHT BACKFILL
EMBANKMENT BACKFILL
U
P D
A T
E D P
H O
T O
M A
R
A G
W
R
E V
IS
E D C
A L L
O U
T A
P R
A G
W
2 2
NEW ORLEANS DISTRICT
O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
X X
X X :1
W P
-X
P L
A Q
U E
M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
A G
W
H -4 -4
R O
B D
A U
E N
H A
U E
R P
E
H U
R R
IC
A N
E P
R O
T E
C T
IO
N S
Y S
T E
M
N O
V -N
F -W
-0
B .2 P
O
IN
T E C
E L E
S
M P S
T A
T
IO
N F
R O
N T
IN
G P
R O
T E
C T
W P -1
-B -0
M A
R C
H
I.
B
E T
A N
C E
S -T
O R
R E
S E .I
CATCH BASIN
PE PIPE
24" CORREGATED
CATCH BASIN
4'-2"x4'-2"
PE PIPE
24" CORREGATED
PE PIPE
24" CORREGATED
4'-2"x3'-2.25"
SLOPE SLOPE
-50
M
EL. 3.0
A
C-409
B
C-409
1+50
2+00
1+35
PI
2.6
3.9
EAST PUMP STATION
.1
LENGHT: 87.28 FT.
PVC PIPE
8" PERFORATED
LENGHT: 15 FT.
PVC PIPE
8" PERFORATED
LENGHT: 25'
PVC PIPE
8" PERFORATED
8" PERFORATED
PVC PIPE
LENGHT: 30'
8" PERFORATED
PVC PIPE
LENGHT: 10'
8" PERFORATED
PVC PIPE
LENGHT: 10'
8" PERFORATED
PVC PIPE
LENGHT: 40'
M
4'-2"x4'-2"
CATCH BASIN
END 24" CORRAGATED
PE PIPE STA. 2+24.05
X 3750243.62
Y 395473.75
-10
-20
-30
E L E
V A
T
IO
N N
A V
D
1+50 1+75 2+00 2+25 2+45
EAST PUMP STATION DRAINAGE PROFILE
S T
A .0
PVC PIPE
8" PERFORATED
S T
A .5
PVC PIPE
8" PERFORATED
P I S
T A .0
PVC PIPE
8" PERFORATED
PI
1+35
-10
-20
-30
0+00 0+25 0+50 0+75 1+00
E L E
V A
T
IO
N N
A V
D
1+25
4'-2"x3'- 2.25"
CATCH BASIN
SLOPE SLOPE SLOPE
EL. 2.5
SLOPE
INV. EL.
-7.0
BEGIN 24"
CORREGATED
PE PIPE
X
.0
Y
.1
BEGIN 24"
CORREGATED
PE PIPE
EL. -2.5
X
.8
Y
.1
INV.
EL. -4.0
4" CRUSHED STONE
4" CRUSHED STONE
GEOTEXTILE FABRIC
SEPARATOR
GEOTEXTILE FABRIC
SEPARATOR
GEOTEXTILE FABRIC
SEPARATOR
BACKFILL
LIGHTWEIGHT
BACKFILL
EMBANKMENT
4" CRUSHED STONE
EL. 3.0
SCALE: 1" = 10'
EL. 2.5
S T
A .1
S T
A .9
S T
A .0
INV. EL.
-0.25
INV. EL.
-0.25
INV. EL.
-0.25
INV. EL.
-0.25
END 24"
CORREGATED
PE PIPE
H
C -1 d g n
C-103
D R
A
IN
A G
E P
L A
N A
N D P
R O
F
IL
E
E A
S T P
U M
P S
T A
T
IO
N
EAST PUMP STATION DRAINAGE PLAN
SCALE: 1" = 10'
N
LIGHTWEIGHT BACKFILL
EMBANKMENT BACKFILL
U
P D
A T
E D P
H O
T O
M A
R
A G
W
A
P R
A G
W R
E V
IS
E D C
A L L
O
C-402
H
C -4 d g n
SCALE: 1" = 10'-0"
PHASE I
MONOLITH M10 AND M11 TRS
T R
S P
H A
S E I
M O
N O
L
IT
H M
M
0 20'10'
6. IF CONTRACTOR ELECTS TO DESIGN A CONTINUOS TRS SEE DRAWING C-409 FOR ADDITTIONAL NOTES.
5. ONLY ONE (1) OF THE EXISTING PUMP STATIONS SHALL BE TAKEN OUT OF SERVICE AT A TIME.
4. CONTRACTOR SHALL PROVIDE A MINIMUM OF 260 CFS CAPACITY OF BYPASS PUMPING.
IN PLACE IF PILES ARE WITHIN 10 FEET OF THE PERMANENT FLOODWALL PIPE PILES.
3. TRS SHEET PILE, TRS ANCHOR PILES, WORK PLATFORM PILES SHALL BE ABANDONED
2. SHIFT OR ADD ADDITIONAL STRUTS TO ALLOW FOR PILE DRIVING OPERATIONS.
DEWATERING SYSTEM IS CONTRACTOR DESIGN.
1. THE SEGMENTED TRS CONCEPTUAL DESIGN IS FOR BIDING PURPOSES ONLY, TRS AND
NOTES: SEGMENTED TRS
R
E V
IS
E D C
A L L O
U T S
/2
R D
/2
R D
R E
V
IS
E D C
A L L O
U T S
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
X X
X X :1
W P
-X
P L
A Q
U E
M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
A G
W
H -4 -4
R O
B D
A U
E N
H A
U E
R P
E
H U
R R
IC
A N
E P
R O
T E
C T
IO
N S
Y S
T E
M
N O
V -N
F -W
-0
B .2 P
O
IN
T E C
E L E
S
M P S
T A
T
IO
N F
R O
N T
IN
G P
R O
T E
C T
W P -1
-B -0
M A
R C
H
I.
B
E T
A N
C E
S -T
O R
R E
S E .I
-1
-15
-1
-1
-1
-5
-5
-5
-5
-5
-5
SCH. 100
STRUT 24"
SUPPORT
18" PIPE
SUPPORT
18" PIPE
SUPPORT
18" PIPE
SUPPORT
18" PIPE
25'-1"25'-1"
SUPPORT
18" PIPE
PILES
CONCRETE
PILES
CONCRETE
W24X229 PZ-27 MIN.
SCH. 100
STRUT 24"
N
0 0
W24X229 PZ-27 MIN.
PZ-27 MIN.
W24X229
10'-9"
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPLGPLGPLGPLGPLGPLGPLGPLGPLGPLGPLGPLGPLGPLGPLGPLGPL
SCH. 100
STRUT 24"
W24X229
PZ-27 MIN.
W24X229
BB
C-408
5'-0"
LIGHT WEIGHT BACK FILL
SHEET PILES
AS NECESSARY TO DRIVE TRS
REMOVE EXISTING SHEET PILING
111'-9"
TREMIE SLAB
LIGHT WEIGHT BACK FILL
SHEET PILES
AS NECESSARY TO DRIVE TRS
REMOVE EXISTING SHEET PILING
M10 EL. -8.75 M11 EL. -8.75M9 EL. -8.75M8 EL. -8.75
CUT OFF EL. -16.0
SHEET PILE
ABANDONED
T O B
E P
U L L E
D
S H
E E
T P
IL
F
IN
A L G
R A
D E
C U
T T O
F F B
E L
O W
B
E A
B A
N D
O N
E D
S H
E E
T P
BE ABANDONED
SHEET PILE TO
BELOW GRADE
CUT OFF 2'
2.6
3.9
WEST PUMP STATION
EAST PUMP STATION
.1
SCH. 100
STRUT 24"
PZ-27 MIN.PZ-27 MIN.
CUT OFF EL. 0.00
TO BE ABANDONED
SHEET PILE
2' BELOW GRADE
TO BE CUT OFF
OF M12 BASE SLAB.
OR 2' BELOW BOTTOM
2' BELOW FINAL GRADE
TO BE CUT OFF
BE ABANDONED
SHEET PILE TO
A
C-407
C-403
C -4 d g n
SCALE: 1" = 10'-0"
PHASE II
MONOLITH M10 AND M11 TRS
T R
S P
H A
S E I I
M O
N O
L
IT
H M
M
0 20'10'
6. IF CONTRACTOR ELECTS TO DESIGN A CONTINUOS TRS SEE DRAWING C-409 FOR ADDITTIONAL NOTES.
5. ONLY ONE (1) OF THE EXISTING PUMP STATIONS SHALL BE TAKEN OUT OF SERVICE AT A TIME.
4. CONTRACTOR SHALL PROVIDE A MINIMUM OF 260 CFS CAPACITY OF BYPASS PUMPING.
IN PLACE IF PILES ARE WITHIN 10 FEET OF THE PERMANENT FLOODWALL PIPE PILES.
3. TRS SHEET PILE, TRS ANCHOR PILES, WORK PLATFORM PILES SHALL BE ABANDONED
2. SHIFT OR ADD ADDITIONAL STRUTS TO ALLOW FOR PILE DRIVING OPERATIONS.
DEWATERING SYSTEM IS CONTRACTOR DESIGN.
1. THE SEGMENTED TRS CONCEPTUAL DESIGN IS FOR BIDING PURPOSES ONLY, TRS AND
NOTES: SEGMENTED TRS
R
E V
IS
E D C
A L L O
U T S
/2
R D
/2
R D
R E
V
IS
E D C
A L L O
U T
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
X X
X X :1
W P
-X
P L
A Q
U E
M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
A G
W
H -4 -4
R O
B D
A U
E N
H A
U E
R P
E
H U
R R
IC
A N
E P
R O
T E
C T
IO
N S
Y S
T E
M
N O
V -N
F -W
-0
B .2 P
O
IN
T E C
E L E
S
M P S
T A
T
IO
N F
R O
N T
IN
G P
R O
T E
C T
W P -1
-B -0
M A
R C
H
I.
B
E T
A N
C E
S -T
O R
R E
S E .I
-1
-15
-1
-1
-5
-5 -5
-5
-5
-5
-5
SUPPORT
18" PIPE
PILES
CONCRETE
PILES
CONCRETE
W24X229 PZ-27 MIN.
SCH. 100
STRUT 24"
N
0 0
W24X229 PZ-27 MIN.
PZ-27 MIN.
W24X229
10'-9"
PLGPLGPLGPLGPLGPLGPLGPLGPLGPLGPLGPLGPLGPLGPLGPLGPL
SCH. 100
STRUT 24"
W24X229
PZ-27 MIN.
W24X229
5'-0"
LIGHT WEIGHT BACK FILL
SHEET PILES
AS NECESSARY TO DRIVE TRS
REMOVE EXISTING SHEET PILING
111'-9"
TREMIE SLAB
LIGHT WEIGHT BACK FILL
SHEET PILES
AS NECESSARY TO DRIVE TRS
REMOVE EXISTING SHEET PILING
M10 EL. -8.75 M11 EL. -8.75M9 EL. -8.75M8 EL. -8.75
CUT OFF EL. -16.0
SHEET PILE
ABANDONED
T O B
E P
U L L E
D
S H
E E
T P
F
IN
A L G
R A
D E
C U
T T O
F F B
E L
W
B
E A
B A
N D
O N
E D
S H
E E
T P
BELOW GRADE
CUT OFF 2'
2.6
3.9
WEST PUMP STATION
EAST PUMP STATION
.1
SCH. 100
STRUT 24"
PZ-27 MIN.PZ-27 MIN.
CUT OFF EL. 0.00
TO BE ABANDONED
SHEET PILE
2' BELOW GRADE
TO BE CUT OFF
OF M12 BASE SLAB.
OR 2' BELOW BOTTOM
2' BELOW FINAL GRADE
TO BE CUT OFF
C -4 d g n
C-404
SCALE: 1" = 10'-0"
MONOLITH M7 TRS PHASE I
P H
A S
E I
M O
N O
L
IT
H M
T
R S
0 20'10'
N
6. IF CONTRACTOR ELECTS TO DESIGN A CONTINUOS TRS SEE DRAWING C-409 FOR ADDITTIONAL NOTES.
5. ONLY ONE (1) OF THE EXISTING PUMP STATIONS SHALL BE TAKEN OUT OF SERVICE AT A TIME.
4. CONTRACTOR SHALL PROVIDE A MINIMUM OF 260 CFS CAPACITY OF BYPASS PUMPING.
IN PLACE IF PILES ARE WITHIN 10 FEET OF THE PERMANENT FLOODWALL PIPE PILES.
3. TRS SHEET PILE, TRS ANCHOR PILES, WORK PLATFORM PILES SHALL BE ABANDONED
2. SHIFT OR ADD ADDITIONAL STRUTS TO ALLOW FOR PILE DRIVING OPERATIONS.
DEWATERING SYSTEM IS CONTRACTOR DESIGN.
1. THE SEGMENTED TRS CONCEPTUAL DESIGN IS FOR BIDING PURPOSES ONLY, TRS AND
NOTES: SEGMENTED TRS
A
P R
R D
R E
V
IS
E D C
A L L O
U T S
R E
V
IS
E D C
A L L O
U T S
A P
R
R D
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
X X
X X :1
W P
-X
P L
A Q
U E
M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
A G
W
H -4 -4
R O
B D
A U
E N
H A
U E
R P
E
H U
R R
IC
A N
E P
R O
T E
C T
IO
N S
Y S
T E
M
N O
V -N
F -W
-0
B .2 P
O
IN
T E C
E L E
S
M P S
T A
T
IO
N F
R O
N T
IN
G P
R O
T E
C T
W P -1
-B -0
M A
R C
H
I.
B
E T
A N
C E
S -T
O R
R E
S E .I
-20
-25
-5
-5
-5
-5
.9
62'-11"
47'-1"
100.5634°
0 7
10'-0"
WALER W24x229
SHEET PILES
AS NECESSARY TO DRIVE TRS
REMOVE EXISTING SHEET PILING
SHEET PILES
AS NECESSARY TO DRIVE TRS
REMOVE EXISTING SHEET PILING
PZ-27 MIN.
W24x229
PZ-27 MIN.
W24x229
PZ-27 MIN.
W24x229
CUT OFF EL. -16.0
BE ABANDONED
SHEET PILE TO
BELOW GRADE
CUT OFF 2'
EL. 0.00
CUT OFF
OF THE M6 BASE SLAB
2' BELOW THE BOTTOM
FINAL GRADE OR
CUT OFF 2' BELOW
BE ABANDONED
SHEET PILE TO
BE PULLED
SHEET PILE TO
LIGHT WEIGHT BACK FILLLIGHT WEIGHT BACKFILL
CUT OFF EL. 0.00
BE ABANDONED
SHEET PILE TO
M
M
5'-0"
PI 1
S-341
R E
P A
IR
B
E A
M D
E T
A
IL
W E
S T P
U M
P S
T A
T
IO
N
R
E V
IS
E D P
A G
E A
P R
R D
R
E V
IS
E D N
O T
E A
P R
R D
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
X X
X X :1
W P
-X
P L
A Q
U E
M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
A G
W
H -4 -4
R O
B D
A U
E N
H A
U E
R P
E
H U
R R
IC
A N
E P
R O
T E
C T
IO
N S
Y S
T E
M
N O
V -N
F -W
-0
B .2 P
O
IN
T E C
E L E
S
M P S
T A
T
IO
N F
R O
N T
IN
G P
R O
T E
C T
W P -1
-B -0
M A
R C
H
I.
B
E T
A N
C E
S -T
O R
R E
S E .I
SCALE: 1" = 1'-0" 1
18"� STEEL PILE
1/2" STIFFENERS
SCALE: 1" = 1'-0" 2
EXISTING PUMP STATION BEAM
PL 1/2" X 11-1/2" X 9-1/2"
2'-0"
W14X193
FIELD FIT
CONTRACTOR SHALL
HSS10X8X1/2
W14X193
1/2" STIFFENERS
DETAIL
7"
3/4" PLATE
DETAIL
7"
W14X193
1/2" STIFFENERS
3/4" PLATE
STRUTS
EXISTING
SHEET PILE
ABANDONED
EXISTING
18"� STEEL PILE
HSS10X8X1/2
(8) HSS10X8X1/2
SHEET PILE
EXISTING ABANDONED
TIP EL. = -60.0
EXISTING SHEET PILE
SCALE:14" = 1'-0"
EL. 10.5
STATION BEAMS
EXISTING PUMP
STRUT
EXISTING
SEE DETAIL 1 W14X132
HSS10X8X1/2
SHEET PILE
EXISTING ABANDONED
REPAIR BEAMS
CUT TO INSTALL
SHEET PILE
EXISTING ABANDONED
DO NOT DISTURB
EXISTING SUPPORT SHEET PILE
DO NOT DISTURB
EXISTING SUPPORT SHEET PILE
18"� STEEL PILE32'-6"
SEE DETAIL 1
18"� STEEL PILE
EL. +/- 3.7
STATION BEAM
EXISTING PUMP
WEST PUMP STATION
REPAIR BEAM DETAIL
WEST PUMP STATION
REPAIR BEAM SECTION
SCALE:14" = 1'-0"
+/- 3'-0"
1/2" STIFFENERS
+/- 3'-0"
(2) W14X132
8'-9"
SCALE:14" = 1'-0"
A
SECTION
A
NOTE:
1. ALL COMPONETS OF THE REPAIR BEAMS SHALL BE PAINTED WITH COAL
TAR EPOXY PER SPECIFICATIONS. THE CONTRACTOR SHALL FIELD
TOUCH UP THE PAINT DAMAGED DURNING INSTALLATION AND WELDING.
2. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING HSS BEAMS.
3. REPAIR BEAM AND PILES SHALL BE INSTALLED PRIOR TO DEWATERING
TRS.
4. SHIM HSS MEMBER AS REQUIRED TO FIT UNDER EXISTING BEAM.
5. THE CONTRACTOR SHALL PROVIDE SHORING AND SUPPORT TO THE
EXISTING PUMP STATION WHILE INSTALLING THE REPAIR BEAMS. TOTAL
APPROXIMATE WEIGHT OF PUMP STATION IS 145 KIPS. PROVIDE SHORING
TO SUPPORT THE WEIGHT OF BUILDING.
TOP OF PILE EL. 0.75
SEE DETAIL 2
SHEET PILE
EXISTING ABANDONED
S-342
S -3 d g n
R E
P A
IR
B
E A
M D
E T
A
IL
E A
S T P
U M
P S
T A
T
IO
N
R
E V
IS
E D P
A G
E A
P R
R D
R
E V
IS
E D N
O T
E A
P R
R D
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
A N
S I
D
X X
X X :1
W P
-X
P L
A Q
U E
M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
A G
W
H -4 -4
R O
B D
A U
E N
H A
U E
R P
E
H U
R R
IC
A N
E P
R O
T E
C T
IO
N S
Y S
T E
M
N O
V -N
F -W
-0
B .2 P
O
IN
T E C
E L E
S
M P S
T A
T
IO
N F
R O
N T
IN
G P
R O
T E
C T
W P -1
-B -0
M A
R C
H
I.
B
E T
A N
C E
S -T
O R
R E
S E .I
SCALE: 1" = 1'-0" 1
18"� STEEL PILE
1/2" STIFFENERS
SCALE: 1" = 1'-0" 2
EXISTING PUMP STATION BEAM
PL 1/2" X 11-1/2" X 9-1/2"
2'-0"
W14X193
FIELD FIT
CONTRACTOR SHALL
HSS10X8X1/2
W14X193
1/2" STIFFENERS
DETAIL
7"
3/4" PLATE
DETAIL
7"
W14X193
1/2" STIFFENERS
3/4" PLATE
EXISTING SHEET PILE EXISTING SHEET PILE
(4) HSS 10X8X1/2
STATION BEAMS
EXISTING PUMP
SEE NOTE 5
EXISTING SHEET PILE.
DO NOT DISTURB
EXISTING SUPPORT SHEET PILE
DO NOT DISTURB
EXISTING SUPPORT SHEET PILE
REPAIR BEAMS
CUT TO INSTALL
SHEET PILE
EXISTING ABANDONED
TIP EL. = -60.0
5'-6"
STATION BEAMS
EXISTING PUMP
18"� STEEL PILE
EL. 12.3
EL. 12.3
W14X193
EL. +/- 5.5
EAST PUMP STATION
REPAIR BEAM DETAIL
SCALE:14" = 1'-0"
EAST PUMP STATION
REPAIR BEAM SECTION
SCALE:14" = 1'-0"
SEE NOTE 6 & 7
SCALE:14" = 1'-0"
SECTION
A
A
NOTE:
1. PAINT BEAM AND PLATES WITH COAL TAR EPOXY PER SPECIFICATIONS.
2. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING HSS BEAMS.
3. REPAIR BEAM AND PILES TO BE INSTALLED PRIOR TO DEWATERING
TRS.
4. SHIM HSS MEMBER AS REQUIRED TO FIT UNDER EXISTING BEAM.
5. CONTRACTOR MAY CUT EXISTING SHEET PILE TO FIT W14X193 BEAM
UNDER PUMP STATION.
6. CONTRACTOR TO REMOVE MEMBER AND SUBMIT SHORING PLAN TO
SUPPORT PUMP STATION WEIGHT WHILE PLACING BEAM UNDER PUMP
STATION. TOTAL APPROXIMATE WEIGHT OF PUMP STATION IS 145 KIPS.
PROVIDE SHORING TO SUPPORT AT LEAST 14 OF WEIGHT.
7. REPLACE MEMBER AND WELD TO NEW W14 X193 BEAM.
SEE NOTE 6 & 7
18"� STEEL PILE18"� STEEL PILE
+/- 3'-0"
+/- 3'-0"
"16 1341'-4
(2) W14X193
TOP OF PILE EL. 3.75
| Am_0004_Drawings W912P8 17-B-0017_NOV-NF-W-06B.2_Ed 14-030.pdf |
| Am_0004_W912P8 17-B-0017_NOV-NF-W-06B.2_Ed 14-030.pdf |
| “1.1 MEASUREMENT AND PAYMENT |
| 1.1.1 Electrical Work |
| Amend 004 drawings.pdf |
| H447593_C-102--- |
| H447593_C-103--- |
| H447593_C-402--- |
| H447593_C-403--- |
| H447593_C-404--- |
| H447593_S-341--- |
| H447593_S-342--- |
| Amend 004 drawings.pdf |
| H447593_C-102--- |
| H447593_C-103--- |
| H447593_C-402--- |
| H447593_C-403--- |
| H447593_C-404--- |
| H447593_S-341--- |
| H447593_S-342--- |
File details come from the government source that posted it. Updated .