AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
000 18 2017 OM-17-032
W912P8
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT. ROOM 172
7400 LEAKE AVE
NEW ORLEANS, LA 70118-3651
SEE ITEM 6
W912P8-17-B-0012
30 Jan 2017
The above numbered solicitation for Mississippi River, New Orleans Harbor Cutterhead Dredge Rental No. 3-2017,Orleans, Jefferson, Terrebonne, Plaquemines, and Lafourche Parishes, Louisiana, OM-17-032. Solicitation No. W912P8-17-B-0012 is hereby amended to establish a bid opening date and time of 26 September 2017 at 11:00 am (local time and place) in Room 328 and as shown on the follow pages.
NOTE: Bid Box is currently located in Room 326.
(SEE CONTINUATION)
Contracting Officer
18 Sep 201
DALMADO.MICHELLE.
ROSIER.1269867767
Digitally signed by
DALMADO.MICHELLE.ROSIER.1269867767
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=DALMADO.MICHELLE.ROSIER.1269867767 Date: 2017.09.18 13:49:49 -05'00'
Bidders, Offerors and applicants are cautioned to note the "Certification of Non-segregated Facilities" in the solicitation. Failure of a bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause.
In delivery of hand-carried bids, bidders are cautioned to allow sufficient time for delays which may be encountered as a result of frequent trains which are subject to block all access roads to place of bid opening for various lengths of time. Such delays DO NOT permit acceptance or consideration of late bids.
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
11. The contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
NSN 7540-01-155-3212 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
W912P8-17-B-0012
U.S. Army Engineer District, New Orleans 7400 Leake Ave.
New Orleans, LA 70118-3651
Mississippi River, New Orleans Harbor Cutterhead Dredge Rental Contracts No 3-2017, (OM-17-032)
This is an UNRESTRICTED procurement.
The requirements is to furnish one fully crewed and equipped hydraulic pipeline cutterhead on a rental basis for the subject contract. Work will be performed in the Houma Navigation Canal, Barataria Bay Waterway Bar Channel, and Baptiste Collette Bar Channel.
* See Paragraph 00010-1.5c
U.S. Army Engineer District, New Orleans Attn: CEMVN-CT-E 7400 Leake Ave., Room 155A New Orleans, LA 70118
Bridget M. Bonnecarrere (504)862-2876
OM-17-032
1 201/30/2017 local time
:00 m
00800-3.2
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 4-85) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
20b. SIGNATURE 20c. OFFER DATE
USACE, Lafayette Area Office 646 Cajundome Blvd., Suite 301 Lafayette, LA 70506-4290
USAED NEW ORLEANS
C/O USACE, FINANCE CENTER (UFC)
ATTN: CEFC-AO-P
Miss R, New Orleans Harbor and Various Bar Channels Cutterhead OM17032AM1
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00010
BID SCHEDULE
PART 1 GENERAL
1.1 BIDDING SCHEDULES
1.2 BID FORM NOTES
1.3 BIDDING
1.4 EVALUATION OF BIDS
1.5 CONDITIONS OF CONTRACT AWARD
1.6 BIDDER QUALIFICATIONS
1.7 PRE-AWARD INSPECTION OF PLANT
1.8 OPTION ITEMS
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
00010 Page 1
SECTION 00010
BID SCHEDULE
PART 1 GENERAL
1.1 BIDDING SCHEDULES
See bid schedules on the following pages.
00010 Page 2
* SEE BID FORM NOTES FOLLOWING LAST BID LOT
Section 00010 Page 3
SECTION 00010 – BIDDING SCHEDULE
Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge Rental No. 3-2017
Orleans, Jefferson, Terrebonne, Plaquemines, and Lafourche Parishes, Louisiana Solicitation No. W912P8-17-B-0012
LOT ONE, 27 IN. INSIDE DIAMETER (ID) PUMP DISCHARGE WITHOUT SUBMERGED PUMP
Bid Item DESCRIPTION Estimated Quantity Unit Unit Price Total Price
0001 MOBILIZATION AND DEMOBILIZATION 1 Job
HOUMA DREDGING: Rental of one fully operated cutterhead dredge with 27-inch ID pump discharge, attendant plant, and discharge pipeline as specified.
410 Hour
Option
HOUMA OPTION DREDGING: Same plant as listed in Item No. 0002 of this bid lot. 307 Hour xxxxxxxxx
0004 DREDGE TOWING SERVICE 150 Mile
Option
OPTION DREDGE TOWING SERVICE:
Same towing service as listed in Item No.
0004 of this bid lot.
150 Mile xxxxxxxxx
PREPARATORY WORK FOR
BARATARIA BAR DREDGING REGION 1 Job
0007 BARATARIA BAR - HAY BALE
PLACEMENT
1 Job
Option
BARATARIA BAR - FLOTATION
CHANNEL EXCAVATION
1 Job
BARATARIA BAR DREDGING:
Rental of one fully operated cutterhead dredge with 27-inch ID pump discharge, attendant plant, and discharge pipeline as specified.
276 Hour
Option
BARATARIA BAR OPTION
DREDGING: Same plant as listed in Item No. 0009 of this bid lot.
207 Hour xxxxxxxxx
BAPTISTE COLLETTE DREDGING:
Rental of one fully operated cutterhead dredge with 27-inch ID pump discharge, attendant plant, and discharge pipeline as specified.
128 Hour
Option
BAPTISTE COLLETTE OPTION
DREDGING: Same plant as listed in Item No. 0011 of this bid lot.
96 Hour xxxxxxxxx
TOTAL: LOT ONE BID
Section 00010 Page 4
SECTION 00010 – BIDDING SCHEDULE
Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge Rental No. 3-2017
Orleans, Jefferson, Terrebonne, Plaquemines, and Lafourche Parishes, Louisiana Solicitation No. W912P8-17-B-0012
LOT TWO, 30 IN. INSIDE DIAMETER (ID) PUMP DISCHARGE WITHOUT SUBMERGED PUMP
Bid Item DESCRIPTION Estimated Quantity Unit Unit Price Total Price
0001 MOBILIZATION AND DEMOBILIZATION 1 Job
HOUMA DREDGING: Rental of one fully operated cutterhead dredge with 30-inch ID pump discharge, attendant plant, and discharge pipeline as specified.
285 Hour
Option
HOUMA OPTION DREDGING: Same plant as listed in Item No. 0002 of this bid lot. 214 Hour xxxxxxxxx
0004 DREDGE TOWING SERVICE 150 Mile
Option
OPTION DREDGE TOWING SERVICE:
Same towing service as listed in Item No.
0004 of this bid lot.
150 Mile xxxxxxxxx
PREPARATORY WORK FOR
BARATARIA BAR DREDGING REGION 1 Job
0007 BARATARIA BAR - HAY BALE
PLACEMENT
1 Job
Option
BARATARIA BAR - FLOTATION
CHANNEL EXCAVATION
1 Job
BARATARIA BAR DREDGING:
Rental of one fully operated cutterhead dredge with 30-inch ID pump discharge, attendant plant, and discharge pipeline as specified.
224 Hour
Option
BARATARIA BAR OPTION
DREDGING: Same plant as listed in Item No. 0009 of this bid lot.
168 Hour xxxxxxxxx
BAPTISTE COLLETTE DREDGING:
Rental of one fully operated cutterhead dredge with 30-inch ID pump discharge, attendant plant, and discharge pipeline as specified.
98 Hour
Option
BAPTISTE COLLETTE OPTION
DREDGING: Same plant as listed in Item No. 0011 of this bid lot.
73 Hour xxxxxxxxx
TOTAL: LOT TWO BID
Section 00010 Page 5
SECTION 00010 – BIDDING SCHEDULE
Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge Rental No. 3-2017
Orleans, Jefferson, Terrebonne, Plaquemines, and Lafourche Parishes, Louisiana Solicitation No. W912P8-17-B-0012
LOT THREE, 30 IN. INSIDE DIAMETER (ID) PUMP DISCHARGE WITH SUBMERGED PUMP
Bid Item DESCRIPTION Estimated Quantity Unit Unit Price Total Price
0001 MOBILIZATION AND DEMOBILIZATION 1 Job
HOUMA DREDGING: Rental of one fully operated cutterhead dredge with 30-inch ID pump discharge, submerged pump, attendant plant, and discharge pipeline as specified.
225 Hour
Option
HOUMA OPTION DREDGING: Same plant as listed in Item No. 0002 of this bid lot. 169 Hour xxxxxxxxx
0004 DREDGE TOWING SERVICE 150 Mile
Option
OPTION DREDGE TOWING SERVICE:
Same towing service as listed in Item No.
0004 of this bid lot.
150 Mile xxxxxxxxx
PREPARATORY WORK FOR
BARATARIA BAR DREDGING REGION 1 Job
0007 BARATARIA BAR - HAY BALE
PLACEMENT
1 Job
Option
BARATARIA BAR - FLOTATION
CHANNEL EXCAVATION
1 Job
BARATARIA BAR DREDGING:
Rental of one fully operated cutterhead dredge with 30-inch ID pump discharge, submerged pump, attendant plant, and discharge pipeline as specified.
179 Hour
Option
BARATARIA BAR OPTION
DREDGING: Same plant as listed in Item No. 0009 of this bid lot.
135 Hour xxxxxxxxx
BAPTISTE COLLETTE DREDGING:
Rental of one fully operated cutterhead dredge with 30-inch ID pump discharge, submerged pump, attendant plant, and discharge pipeline as specified.
78 Hour
Option
BAPTISTE COLLETTE OPTION
DREDGING: Same plant as listed in Item No. 0011 of this bid lot.
59 Hour xxxxxxxxx
TOTAL: LOT THREE BID
1.2 BID FORM NOTES
a. Bidders shall bid on all items including optional items (see "Evaluation of Options" FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
b. Bidders shall use the Item No. 0002 unit price to compute Option Item No. 0003 total price, Item No. 0004 unit price to compute Option Item No. 0005 total price, Item No. 0009 unit price to compute Option Item No. 0010 total price, and Item No. 0011 unit price to compute Option Item No. 0012 total price.
c. Any bid may be rejected if the Contracting Officer or his/her authorized representative determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only the total price of the bid, but the prices for individual line items as well.
Any bid may be rejected if the prices for any line items or subline items are materially unbalanced (see "Proposal Analysis Techniques" FAR 15.404-1(g)(3)).
d. THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442 after Notice of Award. The NTP will be issued after verification of acceptable performance and payment bonds. Within 48 hours after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his/her authorized representative. Physical work cannot start until the Quality Control System is set-up, the Accident Prevention Program and other required submittals have been submitted and approved, and all preliminary meetings called for under the contract have been conducted.
e. RAPID VENDOR PAYMENT: See the following web based instructions for the submission of invoices:
www.mvn.usace.army.mil/Business-With-Us/Contracting/Rapid-Vendor-Payment.
f. The unit "job" is a one-time payment for work performed. "Job" is synonymous with the previously used term "lump sum".
1.3 BIDDING
a. The bidder shall select only one bid lot, determined by the class of dredge intended to be used. Bids which are submitted on an inappropriate bid lot will be declared non-responsive.
b. Bidders shall furnish unit prices for all items listed on the schedule of bid items that require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items but does furnish an extended total or an estimated amount for such items, the Government will deem the unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
ESTIMATED AMOUNT FOR ANY REQUIRED ITEM, THE BID WILL BE DECLARED
NON-RESPONSIVE.
1.4 EVALUATION OF BIDS
a. To provide fair competition between dredges of dissimilar sizes and production rates, the hourly dredging quantities have been determined
00010 Page 6 based on the estimated quantity of shoal material to be removed and the nominal production rates of the dredges in each bid lot. The production rates shown in the minimum production rate chart located in the Dredging Regions Section(s) were used to make this determination.
b. The nominal dredge production rates listed in this solicitation were conservatively estimated based on lower-bound material face availability of this solicitation's dredging regions, which have variable and dynamic shoaling conditions. It is the bidder's responsibility to make its own assessment of the actual dredging conditions in order to prepare a bid for this work.
c. Award will be made to that responsible bidder presenting the lowest priced responsive bid in response to this solicitation, regardless of the Bid Lot used.
d. The hourly quantities for the Dredging and Option Dredging Items shown on the bid lots are 100% pay time hours. The actual term of the dredge rental may vary as a result of fractional pay time. Refer to Section 35 20 23.23, paragraph entitled "Dredging and Option Dredging Items", for additional information.
1.5 CONDITIONS OF CONTRACT AWARD
a. Award will be made as a whole to one bidder. The dredge and attendant plant offered in the bidding schedule shall be complete with full operating personnel and in operating status for the contract period. EM 385-1-1, Section 19, "Floating Plant and Marine Activities" shall be complied with at all times. NOTE: All work under these specifications shall be performed in accordance with the provisions of EM 385-1-1 "Army Corps of Engineers Safety and Health Requirements Manual", latest edition.
b. The Government may award the contract at the total bid price, comprised of the base items and option item(s); however, the Government will not be obligated to exercise any option item(s).
c. The number of hours of rental time stated in the bidding schedule is an estimated quantity. The dredge and attendant plant will be retained for an approximate number of days shown in the table below starting no later than 360 hours after receipt of Government Notice to Proceed by the Contractor.
00010 Page 7
APPROXIMATE DREDGE
CONTRACT DURATION
(BASE PLUS OPTION)
Bid Lot Discharge Line ID
(INCHES)
SUBMERGED PUMP Approximate Number of Rental Days
1 27 No 95
2 30 No 79
3 30 Yes 68
d. The bidder shall be capable of providing for assignment of the dredge and all attendant plant, complete and in full operating condition in all respects, no later than 360 hours after receipt of Notice to Proceed by the Contractor.
1.6 BIDDER QUALIFICATIONS
a. Before the Government will award a contract based on this solicitation, the apparent low bidder shall establish that it is responsible and entitled to award of the contract, by certifying that its dredge meets the appropriate production rate for the dredging region, as listed in the minimum production rate chart located in the Dredging Regions Section(s). The dredge must have performed at, or above, the listed production rate for at least 85 percent of the total contract duration, on any contracts that are used to prove plant capability, within three years prior to the bid opening date of this solicitation. Failure to establish the dredge's capability to meet the required production rate will result in a finding of non-responsibility.
b. A bidder may be rejected as non-responsible if it cannot show the necessary capital, experience, or equipment needed to perform the work described under this solicitation (see "Responsible Prospective Contractors" FAR 9.1). The bidder must also show that the dredge and attendant plant are not already obligated for the performance of other work which would delay commencement, performance, and completion of the solicited work; and must show that delivery of the dredge and attendant plant to the site of work can be made within the time allowed in the specifications.
c. Bidders must register in the System for Award Management (SAM) database in accordance with FAR 52.204-7 and DFARS 252.204-7004 Alt A.
1.7 PRE-AWARD INSPECTION OF PLANT
a. The apparent low bidder shall make the dredge and attendant plant available for inspection, to determine compliance with these specifications, as soon as practicable after bids are opened, and prior to contract award. If deficiencies are found during the inspection, the bidder will be notified in writing, which may be transmitted by email or facsimile. Upon receipt of such notice, the bidder shall correct all deficiencies at least two calendar days in advance of the projected contract award date.
00010 Page 8
b. Two calendar days before the projected award date, or upon notification by the bidder that the deficiencies have been corrected, a Government representative will re-inspect the dredge and attendant plant. If at that time the dredge and attendant plant do not meet the requirements of these specifications, the bidder will be rejected as non-responsible.
c. The Government may choose to waive the pre-award inspection if the projected contract award date is less than five calendar days after the bid opening date. Waiver of the pre-award inspection does not relieve the bidder from the requirement to provide a dredge and attendant plant in full compliance with the specifications.
1.8 OPTION ITEMS
a. The Government may require the delivery of, in whole or part, any Option Items. The Government may exercise an Option Item by written notice to the Contractor. If the Government activates the Option Item, the activation will occur while the Contractor's equipment is in the work vicinity as described in the applicable Dredging Region Section(s). If Option Dredging Item work is exercised, it shall be performed as a continuance of Dredging Item work, which shall be activated first.
b. No additional mobilization/demobilization will be paid to the Contractor for Option Item work performed within the work region. The Contractor shall commence performance of optional work no more than three calendar days after the time the Contractor receives the Government's Notice to Proceed with the optional work.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
00010 Page 9
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 20 23.23 19
HYDRAULIC DREDGING - BARATARIA BAY WATERWAY BAR CHANNEL DREDGING REGION
PART 1 GENERAL
1.1 SCOPE
1.2 MEASUREMENT AND PAYMENT
1.2.1 Payment Item: Preparatory Work For Barataria Bar Dredging Region
1.2.2 Payment Item: Barataria Bar - Hay Bale Placement
1.2.3 Option Item: Barataria Bar - Flotation Channel Excavation
1.2.4 Non-Standard Dredging Conditions
1.2.5 Dredging and Option Dredging Items
1.3 EXISTING STRUCTURES OR UTILITIES
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.1 DREDGING
3.1.1 Dredging Region
3.1.1.1 Barataria Bay Waterway Bar Channel
3.1.2 Pipeline and Equipment Access
3.1.3 Hay Bale Placement
3.1.4 Flotation Channel Excavation
3.1.5 Archeological Site
3.1.6 Dredge Discharge Pipeline
3.1.7 Before and After Disposal Surveys
3.1.8 Before and After Dredging Cross Sections
3.1.9 Survey Data
3.2 PREVIOUS DREDGING CONTRACTS
3.3 MINIMUM PRODUCTION RATE REQUIREMENTS
3.4 HORIZONTAL AND VERTICAL CONTROL POINTS
ATTACHMENTS:
Barataria Bay Waterway Bar Channel Maintenance Dredging Plates
Minimum Production Rate Tables
-- End of Section Table of Contents --
SECTION 35 20 23.23 19 Page 1
SECTION 35 20 23.23 19
HYDRAULIC DREDGING - BARATARIA BAY WATERWAY BAR CHANNEL DREDGING REGION
PART 1 GENERAL
1.1 SCOPE
This section details specific requirements, which are in addition to the general requirements set forth in the specifications, for the Barataria Bay Waterway Bar Channel Dredging Region. The work covered by this section consists of furnishing all labor, materials, and equipment, and performing all work required for dredging in the specified dredging region, except for those measures set forth in other technical portions of the specifications.
1.2 MEASUREMENT AND PAYMENT
Payment for the work covered under this section shall be included in the applicable contract unit price per hour for "Barataria Bar Dredging" and "Barataria Bar Option Dredging" except for "Preparatory Work For Barataria Bar Dredging Region", "Barataria Bar - Hay Bale Placement" and Option Item "Barataria Bar - Flotation Channel Excavation".
1.2.1 Payment Item: Preparatory Work For Barataria Bar Dredging Region
All costs associated with the mobilization of any dredge plant required for the Barataria Bay Waterway Bar Channel Dredging Region that is in excess of what was required at the Houma Navigation Canal Dredging Region shall be included in the job price for "Preparatory Work For Barataria Bar Dredging Region". Once dredging operations are complete in the Barataria Bar Channel, payment for demobilization of any dredge plant not required for use in the Baptiste Collette Bar Channel Dredging Region shall also be included in the job price for "Preparatory Work For Barataria Bar Dredging Region".
1.2.2 Payment Item: Barataria Bar - Hay Bale Placement
All costs associated with the mobilization, placement, and maintenance of hay bales on the Primary Disposal Area shall be included in the job price for "Barataria Bar - Hay Bale Placement".
1.2.3 Option Item: Barataria Bar - Flotation Channel Excavation
All costs associated with excavating and maintaining the flotation channel to access the disposal area(s) shall be included in the job price for Option Item "Barataria Bar - Flotation Channel Excavation".
1.2.4 Non-Standard Dredging Conditions
The following conditions will be considered non-standard:
a. Those conditions described in Section 35 20 23.23, paragraph entitled "Dredging in Non-Standard Reaches and Conditions".
SECTION 35 20 23.23 19 Page 2
b. Any locations within the Barataria Bar Channel where the dredging template from station -75+00 to -210+00 yields less than a 250 foot swing width.
1.2.5 Dredging and Option Dredging Items
Reference Section 35 20 23.23, paragraph entitled "70% Pay Time Hours".
Movement of the dredge and attendant plant from the Houma Navigation Canal Dredging Region to the Barataria Bay Waterway Bar Channel Dredging Region will be paid at 70% of the contract unit price per hour for "Barataria Bar Dredging".
1.3 EXISTING STRUCTURES OR UTILITIES
The structures or utilities listed below are known to be located within or near the dredging region.
Structure or Utility
Owner Information Approximate C/L Station
Elevation (feet MLG)
Two Electrical Power Lines
Entergy
Mr. Terry Hebert 504-343-7273 crosses disposal area
Unknown
20-inch Oil Pipeline
Chevron Pipeline Co.
Attn: Land Team Lead South
1400 Smith St., 38114 Houston, TX 77002-7327
Mr. Steven Fontana 985-446-4658 SFontana@chevron.com
Mr. Thomas August, Jr.
713-372-9657 Thomas.August@chevron.com near disposal area (crosses flotation channel)
3.0' below mudline
4-inch flowline McMoran Oil and Gas, LP
1615 Poydras St.
New Orleans, LA 70112 504-582-4000
-224+69 3.0' below mudline
SECTION 35 20 23.23 19 Page 3
Structure or Utility
Owner Information Approximate C/L Station
Elevation (feet MLG)
12-inch Oil Pipeline
Energy XXI
1021 Main St.
Suite 2626 Houston, TX 77002
Ms. Amy Moreau 713-594-7994
-242+27 3.0' below mudline
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.1 DREDGING
3.1.1 Dredging Region
3.1.1.1 Barataria Bay Waterway Bar Channel
a. The authorized dimensions for the Barataria Bay Waterway Bar Channel are -15 feet Mean Low Gulf (MLG) by 250 feet bottom width from Station -75+00 to -210+00. The Contracting Officer or his/her authorized representative may issue dredging assignments for all or portions of this dredging region. Each dredging assignment will define the dredging template to be dredged by the Contractor. The dredging template will include the swing width, the side slope, and the specified elevation. The specified elevation in the dredging assignment will not exceed 3 feet below the authorized elevation and may be specified above the authorized dimensions when determined to be beneficial to the Government.
b. Disposal of dredge material shall be at the Government's direction. The approved disposal sites are listed below and are shown on the Barataria Bay Waterway Bar Channel Maintenance Dredging Plates.
1) Primary Disposal Area: Material deposited in the Primary Disposal Area shall be deposited to a maximum final elevation of +4.0 feet MLG. The Contractor shall place grade stakes in the vicinity of the discharge location to monitor spoil elevation. It is the intent of this placement to nourish the area adjacent to the beach including filling the pond between the open sand area and Fort Livingston. The initial discharge location shall be established to maximize fill of this pond area. The discharge point shall also be placed on the fish cells with the intent to fill the cells and the open water perimeter. The Contractor shall monitor effluent at all times to ensure material does not flow into Fort Livingston, the Lyle S. St. Amant Laboratory buildings, or the flotation channel. To ensure that these areas are not affected by dredge material placement, the Contractor shall place hay bales as shown on the plate and as stated in the paragraph entitled "Hay Bale Placement". If dredge material flows into any of these areas, it shall be removed by the Contractor at no expense to the Government. Discharge material shall not be directed toward Fort Livingston, and no discharge or vehicular
SECTION 35 20 23.23 19 Page 4 access shall be allowed within the 75 foot corridor shown on the plate. When the primary disposal area is filled to the satisfaction of the Contracting Officer's Representative, the Contractor will be directed to move the discharge location to the secondary disposal area.
2) Secondary Disposal Area: Material deposited in the Secondary Disposal Area shall be deposited along the edge of the gulf side beach, in the immediate vicinity of the water's edge. The secondary placement shall be contiguous with the primary placement in the primary disposal area. At no time during construction shall any equipment be operated in areas along the beach with existing vegetation. Disposal shall initiate at the western limit of proposed disposal. The discharge line shall be placed so as to direct the discharge parallel to the shoreline and in an easterly direction in an effort to maximize material retention. No direct discharge shall be placed within 50 feet of the existing buildings of the Lyle S. St. Amant Laboratory buildings. The elevation of the material shall not exceed +4.0 feet MLG. As the maximum elevation is reached, the discharge line shall be moved as necessary to maintain construction of a continuous disposal berm, in compliance with this elevation.
3.1.2 Pipeline and Equipment Access
a. When disposing in either the Primary or Secondary Disposal area, the pipeline shall be routed from the Barataria Bar Channel to the disposal area(s) through points D and E (points are shown on the plate). Disposal area equipment is allowed to access the disposal area(s) through points D and E; however, the Contractor shall ensure that equipment and pipeline is not placed over the existing stone dike surrounding Fort Livingston.
b. There are Entergy lines that cross the diposal area near the gulf shoreline. The exact location and depth of these lines are unknown.
Therefore, pipeline and equipment shall not come up through the gulf and cross the gulf shoreline.
c. If the flotation channel is used to access the disposal area(s), the bankline that is allowed for equipment access is shown on the plate.
d. Excavation for access to the disposal area(s) is only allowed within the designated flotation channel shown on the plate.
3.1.3 Hay Bale Placement
The Contractor shall place hay bales to deflect material away from Fort Livingston, the Lyle S. St. Amant Laboratory Buildings, and the flotation channel. The hay bales shall be placed on the approximate alignment as shown on the plate. LIDAR elevations taken in 2010 are provided on the plate; however, it is the Contractor's responsibility to assess current site conditions to determine the work effort necessary. Placement of the hay bales shall be approved by the Contracting Officer's Representative prior to commencement of dredging.
3.1.4 Flotation Channel Excavation
If the flotation channel is used for equipment access, excavation of the flotation channel may be required. If excavation is required, the flotation channel shall be excavated to the minimum dimensions necessary, SECTION 35 20 23.23 19 Page 5 and excavation is not allowed within 15 feet of the rock dike. The bottom width of the flotation channel shall not exceed 70 feet and the bottom elevation shall not exceed -8.0 feet MLG in depth. The excavated material shall be placed on either side of the channel and shall not exceed +4.5 feet MLG. The excavated material shall not be placed on existing marsh, and the Contractor shall not backfill the flotation channel. Flotation channel surveys taken in June 2017 are provided on the plate; however, it is the Contractor's responsibility to assess current site conditions to determine the work effort necessary for construction. If the rock dike is disturbed during excavation or use of the flotation channel, the rock shall be restored to its original condition at the Contractor's expense.
3.1.5 Archeological Site
A boundary, as shown by points A through D on the plate, has been established around Fort Livingston, an existing archeological site. The Contractor shall ensure that no damage occurs to this site during disposal operations. No material discharge or access (vehicular or staging of materials) shall occur in this boundary.
3.1.6 Dredge Discharge Pipeline
The Contractor shall provide 21,000 feet of serviceable floating, submerged, or shore pipeline and all associated equipment as directed by the Government. See Section 35 20 23.23, paragraph entitled "Dredge Discharge Pipeline", for additional information regarding pipeline requirements.
3.1.7 Before and After Disposal Surveys
Before and after disposal area surveys shall be taken at the Government's direction within the primary disposal area and secondary disposal area.
Soundings and/or rod readings shall be recorded to the nearest tenth of a foot and the distance between soundings and/or rod readings shall not exceed 25 feet. The surveys shall extend to adequately cover the area impacted by dredge material placement.
a. Primary Disposal Area: Cross-sections shall be taken normal to the beach and shall encompass the entire primary disposal area, as depicted on the plate by points A through G. Spacing between the cross sections shall not exceed 50 feet.
b. Secondary Disposal Area: Cross-sections shall be taken normal to the beach, beginning at the water's edge and extending 100 feet gulfward.
Spacing between the cross sections shall not exceed 100 feet.
c. All surveys shall be tied/referenced to the centerline of the channel. All notes resulting from these surveys shall be presented to the Contracting Officer's Representative. The Contractor shall provide a topographic plot of the disposal site. The plot shall have contour intervals of not less than 1 foot and a scale of 1 inch = 30 feet. The before and after disposal surveys shall be furnished to the Government in a Microstation version 5.07.01.22 (or updated) design file containing survey elevations with contours in one foot increments. A hard copy of the before and after disposal surveys with contours shall also be furnished to the Government. All survey data shall be in NAD
83. Data shall also be furnished to the Government in a computerized IBM-compatible structured ASCII format on magnetic media. Each disk submitted shall bear a pre-printed disk label that provides for disk
SECTION 35 20 23.23 19 Page 6 contents, have a write protect seal mechanism, and provide a space to indicate disk virus check. All disks submitted shall be virus checked, cleared of viruses if necessary, and all disk label entries completed.
Copies of the before and after disposal surveys shall be submitted to Mr. Ed Creef electronically at Edward.D.Creef@usace.army.mil or by hard copy to the address listed below:
US Army Corps of Engineers New Orleans District Attn: Mr. Ed Creef, CEMVN-OD-T Room 296 7400 Leake Ave New Orleans, LA 70118
3.1.8 Before and After Dredging Cross Sections
In addition to the requirements in Section 35 01 50.73, paragraph entitled "Before and After Dredging Cross Sections", the before and after dredging cross sections of the channel shall be taken at approximately 200-foot intervals along the channel.
3.1.9 Survey Data
In addition to the requirements in Section 35 01 50.73, paragraph entitled "Survey Data", the Contractor shall promptly plot the channel cross sections on a scale of 1 inch = 25 feet horizontal and 1 inch = 10 feet vertical.
3.2 PREVIOUS DREDGING CONTRACTS
Contact the contract personnel listed at the beginning of the specifications for information regarding previous dredging contracts.
3.3 MINIMUM PRODUCTION RATE REQUIREMENTS
a. The Minimum Production Rate Tables attached at the end of this section show the minimum production rates required for the dredges. Dredges shall meet or exceed these production rates.
b. If a dredge's submerged pump becomes inoperable and the Contractor elects to continue dredging, then the Contractor will be allowed to operate without the submerged pump provided the specifications have a bid lot for that size dredge without a submerged pump and provided the dredge meets the minimum production rate shown on the chart above and as specified in Section 35 20 23.23, paragraph entitled "Required Production and Dredging Tolerances". For a dredge with an inoperable submerged pump, the new unit price per hour for "Barataria Bar Dredging" and "Barataria Bar Option Dredging" shall be computed as follows:
New unit price per hour = (Original Base Item Estimated Quantity)x(Original Base Item Unit Price) Estimated Quantity From Base Item Bid Schedule of Applicable Bid Lot for the Same Size Dredge Without a Submerged Pump
The remaining hours, if any, on the Basic Payment Items will be prorated so that payments available to the Contractor under Option Payment Items will be unchanged. Option dredging payment hours will also be prorated separately, so that the total payments available to the Contractor for exercised options remain unchanged.
SECTION 35 20 23.23 19 Page 7
3.4 HORIZONTAL AND VERTICAL CONTROL POINTS
Horizontal and vertical control points are shown on the plate attached at the end of this section.
-- End of Section --
SECTION 35 20 23.23 19 Page 8
35 20 23.23 19 ATTACHMENT
MINIMUM PRODUCTION RATE TABLE
The following chart shows the minimum production rates the dredge must perform at as specified in paragraph 35 20 23.23 entitled “Required Production and Dredging Tolerances”.
BARATARIA BAR CHANNEL MINIMUM PRODUCTION RATE TABLE
Dredge Size Submerged Pump Yes / No
Minimum Output (cy/hr)
27 inch No 1667
30 inch No 2058
30 inch Yes 2563