W912P8-16-B-0053-0001 Solicitation Amendment 001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P816B0053_Abstract.pdf | ||
| Am_0001 _16-B-0053.pdf | ||
| A22_-_Solicitation _16-B-0053.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OM-17-003
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitation for Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Rental Contract No.
3-2017, Plaquemines Parish, Louisiana (OM-17-003), is hereby amended as follows:
1) Set the bid opening date to 25 May 2017 at 11:00 am local time and place. The Bid Opening will be held in Room 167 at the USACE New Orleans District complex.
2) Make changes to the solicitation as detailed in the following pages.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W912P8-16-B-0053
X 9B. DATED (SEE ITEM 11)
03-Oct-2016
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-May-2017
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
5/22/2017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
W912P8-16-B-0053 AM0001 Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Rental Contract No. 3-2017, Plaquemines Parish, Louisiana (OM-17-003)
AMENDMENT CHANGES
1. Replace Wage Rate Determination with the attached updated rates for 2017.
2. Section 00010 “BID SCHEDULE”: Delete this section in its entirety and replace with the attached Section
00010 “BID SCHEDULE”.
3. Section 01 35 26, paragraph 1.11 “Hurricane Plan”: After the second sentence, add the following sentences: “Work being performed to satisfy the Hurricane Plan will not be measured for payment. Payment for all work associated with the Hurricane Plan and providing the equipment required shall be distributed throughout the existing bid items.”
4. Section 35 20 23.23, paragraph 2.2 “Gages”: Delete this paragraph in its entirety and replace with the attached paragraph 2.2.
5. Section 35 20 23.23, paragraph 3.3.1 “Mississippi River, Cubit’s Gap and Southwest Pass, Louisiana”:
After the first sentence, add the following sentence: “The authorized depth of -45 feet MLG is equivalent to -48.5 Mean Lower Low Water (MLLW) in the vicinity of Southwest Pass, up to Mile 13.4 Above Head of Passes.”
6. Section 35 20 23.23, paragraph 3.10.1 “Mississippi River & Southwest Pass”: Add the following sentence at the beginning of this paragraph, before the existing table: “To adjust the utility elevations from MLG to MLLW, the Contractor shall use the conversion 0.0’ MLLW = 3.5’ MLG.”
7. Section 35 20 23.23, paragraph 3.10.1 “Mississippi River & Southwest Pass”: For the Fieldwood Energy pipeline at Station 162+60 (Mile 1.9 BHP), delete “-79.7 ft.” and replace with “Unknown”.
8. Section 35 20 23.26, Paragraph 3.3 “Performance Requirements”: In the last sentence, delete “$5,051” and replace with “$5,055”.
Mississippi River Southwest Pass Hopper Rental Contract 3-2017 OM17003
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00010
BID SCHEDULE
PART 1 GENERAL
1.1 BIDDING SCHEDULES
1.2 BID FORM NOTES
1.3 BIDDING
1.4 EVALUATION OF BIDS
1.5 CONDITIONS OF CONTRACT AWARD
1.6 BIDDER QUALIFICATIONS
1.7 PRE-AWARD INSPECTION OF PLANT
1.8 OPTION ITEMS
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 00010 Page 1
SECTION 00010
BID SCHEDULE
PART 1 GENERAL
1.1 BIDDING SCHEDULES
SECTION 00010 - BIDDING SCHEDULE
MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO, SOUTHWEST PASS
HOPPER DREDGE RENTAL CONTRACT NO. 3-2017
PLAQUEMINES PARISH, LOUISIANA
SOLICITATION NO. W912P8-16-B-0053
LOT ONE, 38 inch Inside Diameter (ID) Pump Suction, 12,430 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant
Bid Item
Description Estimated Quantity
Unit Unit Price
Total Price
0001 Mobilization & Demobilization of hopper dredge and all attendant plant.
1 Job
0002 Dredging - Rental of a trailing type hopper dredge.
1081 Hour
Option
Option Dredging - Same plant listed in Item No. 0002 of this bid lot.
1081 Hour XXXXXXXX
Total: LOT ONE BID
SECTION 00010 Page 2
SECTION 00010 - BIDDING SCHEDULE
MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO, SOUTHWEST PASS
HOPPER DREDGE RENTAL CONTRACT NO. 3-2017
PLAQUEMINES PARISH, LOUISIANA
SOLICITATION NO. W912P8-16-B-0053
LOT TWO, 33.5 inch Inside Diameter (ID) Pump Suction, 9,400 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant
Bid Item
Description Estimated Quantity
Unit Unit Price
Total Price
0001 Mobilization & Demobilization of hopper dredge and all attendant plant.
1 Job
0002 Dredging - Rental of a trailing type hopper dredge.
1425 Hour
Option
Option Dredging - Same plant listed in Item No. 0002 of this bid lot.
1425 Hour XXXXXXXX
Total: LOT TWO BID
SECTION 00010 Page 3
MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO, SOUTHWEST PASS
HOPPER DREDGE RENTAL CONTRACT NO. 3-2017
PLAQUEMINES PARISH, LOUISIANA
SOLICITATION NO. W912P8-16-B-0053
LOT THREE, 33.5 inch Inside Diameter (ID) Pump Suction, 6,300 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant
Bid Item
Description Estimated Quantity
Unit Unit Price
Total Price
0001 Mobilization & Demobilization of hopper dredge and all attendant plant.
1 Job
0002 Dredging - Rental of a trailing type hopper dredge.
1741 Hour
Option
Option Dredging - Same plant listed in Item No. 0002 of this bid lot.
1741 Hour XXXXXXXX
Total: LOT THREE BID
SECTION 00010 Page 4
MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO, SOUTHWEST PASS
HOPPER DREDGE RENTAL CONTRACT NO. 3-2017
PLAQUEMINES PARISH, LOUISIANA
SOLICITATION NO. W912P8-16-B-0053
LOT FOUR, 31.5 inch Inside Diameter (ID) Pump Suction, 6,540 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant
Bid Item
Description Estimated Quantity
Unit Unit Price
Total Price
0001 Mobilization & Demobilization of hopper dredge and all attendant plant.
1 Job
0002 Dredging - Rental of a trailing type hopper dredge.
1951 Hour
Option
Option Dredging - Same plant listed in Item No. 0002 of this bid lot.
1951 Hour XXXXXXXX
Total: LOT FOUR BID
SECTION 00010 Page 5
MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO, SOUTHWEST PASS
HOPPER DREDGE RENTAL CONTRACT NO. 3-2017
PLAQUEMINES PARISH, LOUISIANA
SOLICITATION NO. W912P8-16-B-0053
LOT FIVE, 30 inch Inside Diameter (ID) Pump Suction, 4,815 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant
Bid Item
Description Estimated Quantity
Unit Unit Price
Total Price
0001 Mobilization & Demobilization of hopper dredge and all attendant plant.
1 Job
0002 Dredging - Rental of a trailing type hopper dredge.
2003 Hour
Option
Option Dredging - Same plant listed in Item No. 0002 of this bid lot.
2003 Hour XXXXXXXX
Total: LOT FIVE BID
SECTION 00010 Page 6
MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO, SOUTHWEST PASS
HOPPER DREDGE RENTAL CONTRACT NO. 3-2017
PLAQUEMINES PARISH, LOUISIANA
SOLICITATION NO. W912P8-16-B-0053
LOT SIX, 28 inch Inside Diameter (ID) Pump Suction, 4,000 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant
Bid Item
Description Estimated Quantity
Unit Unit Price
Total Price
0001 Mobilization & Demobilization of hopper dredge and all attendant plant.
1 Job
0002 Dredging - Rental of a trailing type hopper dredge.
2152 Hour
Option
Option Dredging - Same plant listed in Item No. 0002 of this bid lot.
2152 Hour XXXXXXXX
Total: LOT SIX BID
SECTION 00010 Page 7
MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO, SOUTHWEST PASS
HOPPER DREDGE RENTAL CONTRACT NO. 3-2017
PLAQUEMINES PARISH, LOUISIANA
SOLICITATION NO. W912P8-16-B-0053
LOT SEVEN, 27 inch Inside Diameter (ID) Pump Suction, 3,600 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant
Bid Item
Description Estimated Quantity
Unit Unit Price
Total Price
0001 Mobilization & Demobilization of hopper dredge and all attendant plant.
1 Job
0002 Dredging - Rental of a trailing type hopper dredge.
2427 Hour
Option
Option Dredging - Same plant listed in Item No. 0002 of this bid lot.
2427 Hour XXXXXXXX
Total: LOT SEVEN BID
SECTION 00010 Page 8
MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO, SOUTHWEST PASS
HOPPER DREDGE RENTAL CONTRACT NO. 3-2017
PLAQUEMINES PARISH, LOUISIANA
SOLICITATION NO. W912P8-16-B-0053
LOT EIGHT, 26 inch Inside Diameter (ID) Pump Suction, 4,000 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant
Bid Item
Description Estimated Quantity
Unit Unit Price
Total Price
0001 Mobilization & Demobilization of hopper dredge and all attendant plant.
1 Job
0002 Dredging - Rental of a trailing type hopper dredge.
2671 Hour
Option
Option Dredging - Same plant listed in Item No. 0002 of this bid lot.
2671 Hour XXXXXXXX
Total: LOT EIGHT BID
SECTION 00010 Page 9
MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO, SOUTHWEST PASS
HOPPER DREDGE RENTAL CONTRACT NO. 3-2017
PLAQUEMINES PARISH, LOUISIANA
SOLICITATION NO. W912P8-16-B-0053
LOT NINE, 27 inch Inside Diameter (ID) Pump Suction, 3,700 cubic yard Nominal Hopper Capacity, Two Dragarms and all attendant plant
Bid Item
Description Estimated Quantity
Unit Unit Price
Total Price
0001 Mobilization & Demobilization of hopper dredge and all attendant plant.
1 Job
0002 Dredging - Rental of a trailing type hopper dredge.
2796 Hour
Option
Option Dredging - Same plant listed in Item No. 0002 of this bid lot.
2796 Hour XXXXXXXX
Total: LOT NINE BID
SECTION 00010 Page 10
1.2 BID FORM NOTES
a. Bidders shall bid on all items including optional items. Failure to bid on all items will result in a non-responsive bid.
b. Bidders shall use the Item Number 0002 unit price to compute Item Number 0003 total price.
c. Any bid may be rejected if the Contracting Officer or his/her authorized representative determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only the total price of the bid, but the prices for individual line items as well.
Any bid may be rejected if the prices for any line items or subline items are materially unbalanced (see "Proposal Analysis Techniques" FAR 15.404-1(g)(3)).
d. The Notice to Proceed (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442 after Notice of Award. The NTP will be issued after verification of acceptable performance and payment bonds. Within 48 hours after issuance of NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Quality Control System is set-up, the Accident Prevention Program and other required submittals have been submitted and approved, and all preliminary meetings called for under the contract have been conducted.
e. RAPID VENDOR PAYMENT: See the following web based instructions for the submission of invoices:
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment
f. The unit "job" is a one-time payment for work performed. "Job" is synonymous with the previously used term "lump sum".
1.3 BIDDING
a. The bidder must select only one bid lot, determined by the class of dredge intended to be used. Bids which are submitted on an inappropriate bid lot will be declared non-responsive.
b. Bidders shall furnish unit prices for all items listed on the schedule of bid items that require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items but does furnish an extended total or an estimated amount for such items, the Government will deem the unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
ESTIMATED AMOUNT FOR ANY REQUIRED ITEM, THE BID WILL BE DECLARED
NON-RESPONSIVE.
1.4 EVALUATION OF BIDS
a. To provide fair competition between dredges of different production rate and capacity, the required dredging quantities and any optional dredging quantities are based on an estimated quantity of shoal material and on the tested production rate of each dredge class.
SECTION 00010 Page 11
b. Award will be made to that responsible Bidder presenting the lowest-priced responsive bid in response to this solicitation, regardless of the bid lot used.
c. The hourly quantity shown on the bid lots for Bid Items designated as "Dredging" are 100% pay time hours. The actual calendar duration of the contract may vary as a result of fractional pay time. Refer to Section 35 20 23.23, paragraph entitled "Dredging and Option Dredging Items" for additional information.
1.5 CONDITIONS OF CONTRACT AWARD
a. Award will be made as a whole to one bidder. The dredge and attendant plant offered in the bidding schedule shall be complete with full operating personnel and in operating status for the contract period. EM 385-1-1, Section 19, "Floating Plant and Marine Activities" shall be complied with at all times. NOTE: All work under these specifications shall be performed in accordance with the provisions of EM 385-1-1 "Army Corps or Engineers Safety and Health Requirements Manual", latest edition.
b. The Government may award the contract at the total bid price, comprised of the base items and option item(s); however, the Government will not be obligated to exercise any option item(s).
c. The number of rental time hours for each bid lot of the bidding schedule are estimated quantities. The dredge and attendant plant will be retained for an approximate number of days according to the table below starting no later than 120 hours after receipt of Notice to Proceed by the Contractor.
SECTION 00010 Page 12
APPROXIMATE HOPPER DREDGE
CONTRACT DURATION
(BASE PLUS OPTION)
Bid Lot Pump Inside Dia. (inches)
Hopper Size (Cubic Yards)
Number of Dragarms
Approximate Number of Rental Days
1 38 12430 2 139
2 33.5 9400 2 171
3 33.5 6300 2 200
4 31.5 6540 2 219
5 30 4815 2 224
6 28 4000 2 237
7 27 3600 2 262
8 26 4000 2 285
9 27 3700 2 296
d. The bidder must be capable of providing for assignment of the dredge and all attendant plant, complete and in full operating condition in all respects, no later than 120 hours after receipt of Notice to Proceed by the Contractor.
1.6 BIDDER QUALIFICATIONS
a. Before the Government will award a contract based on this solicitation, the apparent low bidder shall establish that it is responsible and entitled to award of the contract, by certifying that its dredge meets the appropriate production rate, as listed in the table of Section 35 20 23.23, paragraph entitled "Dredge Plant". The dredge must perform at or above the listed production rate at least 85% of the time, as established by other contracts completed within three years prior to the bid opening date of this solicitation. Failure to establish an adequate capability will result in a finding of non-responsibility.
b. A bidder may be rejected as non-responsible if it cannot show the necessary capital, experience, or equipment needed to perform the work described under this solicitation (see "Responsible Prospective Contractors" FAR 9.1). The bidder must also show that the dredge and attendant plant is not already obligated for the performance of other work that would delay commencement, performance, and completion of the solicited work; and must show that delivery of the dredge and attendant plant to the site of work can be made within the time allowed in the specifications.
c. Bidders must register in the System for Award Management (SAM) database in accordance with FAR 52.204-7 and DFARS 252.204-7004 Alt A.
SECTION 00010 Page 13
1.7 PRE-AWARD INSPECTION OF PLANT
a. The apparent low bidder shall make the dredge and attendant plant available for inspection, to determine compliance with these specifications, as soon as practicable after bids are opened and prior to contract award. If deficiencies are found during the inspection, the bidder will be notified in writing, which may be transmitted by email or facsimile. Upon receipt of such notice, the bidder shall correct all deficiencies at least two calendar days in advance of the projected contract award date.
b. Two calendar days before the projected award date or upon notification by the bidder that the deficiencies have been corrected, a Government representative will re-inspect the dredge and attendant plant. If at that time the dredge and attendant plant do not meet the requirements of these specifications, the bidder will be rejected as non-responsible.
c. The Government may choose to waive the pre-award inspection if the projected contract award date is less than five calendar days after the bid opening date. Waiver of the pre-award inspection does not relieve the bidder from the requirement to provide a dredge and attendant plant in full compliance with the specifications.
1.8 OPTION ITEMS
a. The Government may require the delivery of, in whole or part, any Option Items. The Government may exercise an Option Item by written notice to the Contractor. If the Government activates the Option Item, the activation will occur while the Contractor's equipment is in the work vicinity as described in the applicable Dredging Region Section(s). If "Option Dredging" Item work is exercised, it shall be performed as a continuance of "Dredging" Item work, which shall be activated first.
b. No additional mobilization/demobilization will be paid to the Contractor for Option Item work performed within the work region. The Contractor shall commence performance of optional work no more than 3 calendar days after the time the Contractor receives the Government's Notice to Proceed with the optional work.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
SECTION 00010 Page 14
Section 35 20 23.23, Paragraph 2.2 "Gages"
2.2 GAGES
a. Staff gages or recording gages are present in each dredging region, which indicate the water surface elevation. The locations of the appropriate gages will be provided by the Contracting Officer at the pre-work conference. These gages shall be read a minimum of twice a day, while dredging is performed, at the direction of the Contracting Officer.
b. Project depths for all dredging regions are measured from 0.0 feet MLLW (Mean Lower Low Water) datum except where otherwise stated within paragraph entitled "Location and Description of Work". The required actual depths are determined as the listed project depth plus the gage reading.
c. The gage for the Calcasieu River is located at the Lake Charles Pilots dock two miles southwest of Cameron, LA.
d. The following staff gages shall be used for the Southwest Pass dredging region.
GAGE NAME (ID) LOCATION (MILE) GAGE CORRECTION
TO MLLW
Venice (01480) 10.5 AHP (RDB) (-) 0.30
Pilottown (01525) 2.0 AHP (LDB) (-) 0.30
WH-7 (01545) -0.5 BHP (LDB) (-) 0.18
Mile 7.5 (01575) -7.5 BHP (LDB) 0.17
Light #14 (01625) -12.0 BHP (LDB) 0.39
East Jetty (01670) -17.9 BHP (LDB) 0.68
Note: All gages are set to NAVD88 (2009.55). The gage corrections shall be added to the gage readings to adjust them to MLLW.
e. Project depths for the Mississippi River Crossings are measured from the Low Water Reference Plane (LWRP). The gages for this area are set to the National Geodetic Vertical Datum (NGVD). The required actual depths are determined as the water surface elevation plus the project depth, minus the LWRP elevation. At some crossings, linear interpolation between gages may be required to determine the water surface elevation and LWRP elevation.
f. The Contractor shall furnish a Hazen or compatible remote, automatic recording tide gage that may be monitored aboard the dredge.
However, it shall be understood that this gage is not to be used for reducing surveys of the channel.
g. This information is provided to comply with the requirements outlined in EM 1110-2-6056, Standards and Procedures for Referencing Project Elevation Grades to Nationwide Vertical Datums. This engineering manual outlines the requirement to reference all coastal navigation projects to Mean Lower Low Water (MLLW). The relationship to the authorized project datum, Mean Low Gulf (MLG), is provided below for reference.
For Southwest Pass, 0.0 feet MLLW = 3.5 feet MLG.
The project benchmarks referenced below have been incorporated into the National Spatial Reference System database:
(1) SOUTHWEST PASS PROJECT BENCHMARK
Mississippi River at Venice
DESIGNATION: 876 0849 A TIDAL
PID: AT1390
LAT/LON: N 29 16 00.52795 W 089 21 10.35484 NAD83 (2011)
NORTH/EAST: N 284,325.15 E 3,912,287.82 SPC LA S (US feet) ELEVATION: 1.53 feet NAVD88 (2009.55) ELEVATION: 4.73 feet MLG
MARKER: BENCH MARK DISK
STAMPING: 0849 A 1985
DESCRIPTION: THE STATION IS LOCATED IN VENICE, 8 MILES SOUTH SOUTHEAST
OF BURAS, AT THE END OF HWY. 23 ON A GRAVEL ROAD LEADING TO NEW
CONSTRUCTION AT THE TIME OF RECON AND A RED AND WHITE TOWER. (LOCATION
OF NEW BUILDING WILL BE A WILDLIFE AND FISHERIES HEADQUARTER).
OWNERSHIP- PLAQUEMINES PARISH. TO REACH THE STATION FROM THE
INTERSECTION OF THE POST OFFICE AND HWY. 23 GO SOUTHEAST ON HWY. 23 FOR .9
MILES TO A CURVE TO THE RIGHT, GO AROUND CURVE TO A CROSS ROAD ( JUMP
BASIN RD.), TURN LEFT FOR .05 MILES TO A SHELL ROAS TO RIGHT (OFFSHORE
SHIPYARD RD.) TURN RIGHT AND GO SOUTHEAST FOR .15 MILES TO A MARK ON
THE LEFT ALONG A FENCE LINE JUST BEFORE ENTERING INTO A GATE. 23.7 M
NORTH FROM THE NORTH 1 OF 2 YELLOW KEYPAD SUPPORT POSTS, 13.7 M EAST
FROM A RED FIRE HYDRANT, 8.0 M NORTHEAST FROM THE CENTER OF A GRAVEL
ROAD, 1.0 M NORTHEAST FROM A METAL POST WITH WITNESS SIGN ATTACHED, 0.5
M FROM A CARSONITE WITNESS POST, AND 0.3 M BELOW THE LEVEL OF THE
GROUND.
(2) CALCASIEU RIVER BAR CHANNEL PROJECT BENCHMARK
Calcasieu River at Cameron
DESIGNATION: 876 8094 E TIDAL
PID: DJ9387
LAT/LON: N 29 46 05.85405 W 093 20 29.04536 NAD83 (NA2011)
NORTH/EAST: N 466,812.80 E 2,643,771.70 SPC LA S (US feet) ELEVATION: 4.56 feet NAVD88 (2009.55) ELEVATION: 6.86 feet MLG
MARKER: FLANGE-ENCASED ROD
STAMPING: 8094 E 2004
DESCRIPTION: TO REACH FROM THE JUNCTION OF LA-27 AND DAVIS ROAD IN
CAMERON, GO 2.55 MI SOUTH ON DAVIS ROAD TO THE BOAT RAMP AREA AND THE
MARK ON THE NORTH SIDE NEAR ENTRANCE. MARK IS 91 FT NORTHWEST OF DAVIS
ROAD CENTERLINE, 42 FT NORTH OF THE BOAT RAMP PARKING AREA, 18 FT SOUTH
OF TOP OF BANK, 3.75 FT SOUTH OF A WITNESS POST AND 3.5 FT
EAST-SOUTHEAST OF SECURITY TIE DOWN.
Wage Rate Determination - 2017 General Decision Number: LA170011 01/06/2017 LA11
Superseded General Decision Number: LA20160011
State: Louisiana
Construction Type: Heavy Dredging
Counties: Louisiana Statewide.
DREDGING PROJECTS ALONG THE GULF COAST AREA INCLUDING THE
MISSISSIPPI RIVER AND ITS TRIBUTARIES TO THE OHIO RIVER
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017
* SULA1994-001 04/01/1994
Rates Fringes
Derrick Operator.................$ 7.25
Dozer Operator...................$ 7.25
Dredge 16" and Over Deckhand....................$ 7.25 Dredge tender operator......$ 7.25 Fireman.....................$ 7.25 First assistant engineer....$ 7.25 Leverman....................$ 7.25 Oiler.......................$ 7.25 Second assistant engineer...$ 7.25 Shoreman....................$ 7.25 Third assistant engineer....$ 7.25 Truck driver................$ 7.25 Welder......................$ 7.25
Dredge Under 16" Deckhand....................$ 7.25 Dredge tender operator......$ 7.25 Leverman....................$ 7.25 Oiler.......................$ 7.25 Welder......................$ 7.25
Hydraulic Dredging First cook..................$ 7.25 Handyman....................$ 7.25
Janitor, cabin person.......$ 7.25 Second cook.................$ 7.25
Marsh Buggy Dragline, Oiler......$ 7.25
Marsh Buggy Dragline, Operator...$ 7.25
Self-Propelled Hopper Dredge, Drag Tender......................$ 9.70 3.45+a
FOOTNOTE: Fourteen paid vacation days and eight paid holidays: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day & Christmas Day provided the employee has one year of service.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or
"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION