OM-15-126

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered solicitation for Calcasieu River and Pass, 2015 Maintenance Dredging, Bar Channel Hopper Dredge Rental Contract No.

2-2015. Cameron Parish, LA (OM-15-126) is hereby amended to make several changes as show n on the follow ing pages and establish a bid opening date of 14 January 2016 at 2:00 p.m. local time and place. Bid opening w ill be held in Rm 167.

NOTE: For reference, a copy of the original solicitation w ill be uploaded to FBO w ith this Amendment. The changes made in the amendment w ill take precendence over the original solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Dec-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-15-B-0048

X 9B. DATED (SEE ITEM 11)

08-Sep-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Dec-2015

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P8-15-B-0048 AM0001 Calcasieu River and Pass, 2015 Maintenance Dredging, Bar Channel Hopper Dredge Rental Contract No. 2-2015. Cameron Parish, LA OM-15-126

AMENDMENT CHANGES

1. Bid opening of the subject solicitation is established for Thursday, 14 January 2016 at 2:00 pm and will be held in Room 167.

2. General Comment: The “Description and Magnitude of Work” is revised as follows: The work consists of furnishing one fully crewed and equipped self-propelled trailing suction-type hopper dredge on a rental basis for the removal and satisfactory disposal of shoal material in the Atchafalaya River Bar Channel (Station 700+00 to Station 1355+00), St. Mary Parish, Louisiana. This demonstration project requires the dredge to be capable of performing agitation dredging by pumping directly overboard (bypassing the hopper). The hopper must perform at the same slurry velocity at the dragarm as if the dredge material was pumped into the hopper. Work may be required in other areas of the New Orleans District and in areas of both the Galveston and Mobile Districts.

3. Page 3, Solicitation letter: Delete the solicitation letter in its entirety and replace with the attached.

4. Page 4, Inquiry/Contact Information Page: Delete in its entirety and replace with the attached.

5. Pages 7-8, SF1442: Delete SF1442 and replace with the attached.

6. Section 00010: Delete this section in its entirety and replace with the attached Section 00010 (pages 1-11).

7. Section 00800, paragraph 3.1.a “Delivery of Plant”: In the first sentence, delete the phrase “within 240 hours after receipt by the Contractor of the Notice to Proceed” and replace with “no later than 1 June 2016”. Also, in the second sentence, delete “mile -1.7 of the Calcasieu River (the seaward end of the rock jetties)” and replace with “Station 700+00 of the Atchafalaya River Bar Channel”.

8. Section 00800, paragraph 3.2.b “Prosecution, Option and Completion”: In the second sentence, delete the phrase “from 240 hours after receipt of notice to proceed by the Contractor” and replace with “no later than 1 June 2016”.

9. Section 01 35 26 Attachments: Delete the “Accident Prevention Program Contractor Hazard Analysis” attachment and the “Instructions for Completion of CEMVN Form 385-43/2R” attachment in their entirety and replace with the attached “Activity Hazard Analysis (AHA)”.

10. Section 01 57 20.00 10 General Comment: Throughout this section, delete “inflow and/or overflow screens”, “inflow screens”, and “overflow screens” and replace with “screens”. The screens must be located in such a way as to catch the turtle takes or parts before the dredged material is discharged directly overboard (bypass the hopper). The observers must be allowed to access the screens at all times throughout the contract.

11. Section 01 57 20.00 10, paragraph 3.9.2.c(7) “NMFS-Approved Protected Species Observer Requirements”: Change the link for sea turtle tissue sampling protocols on the USACE Jacksonville District website to: http://www.saj.usace.army.mil/Portals/44/docs/Engineering/ConstructionForms/geneticsampleprotocol.pdf.

http://www.saj.usace.army.mil/Portals/44/docs/Engineering/ConstructionForms/geneticsampleprotocol.pdf

Also, change the link for Gulf sturgeon tissue sampling protocol on the NMFS SERO PRD website to: http://www.nefsc.noaa.gov/nefsc/publications/tm/tm215/tm215.pdf.

12. Section 01 57 20.00 10, paragraph 3.10.a “Turtle Monitoring Equipment”: Delete the third sentence and replace with the following: “For locations where Sea Turtle requirements are in effect or at the direction of the Contracting Officer, the dredge shall have screens located in such a way as to catch the turtle takes or parts before the dredged material is discharged.”.

13. Section 01 57 20.00 10, paragraph 3.12.1 “Government Option”: Add the following sentence to the end of the paragraph: “If dredging operations cease for a period of 12 hours or more, relocation trawling shall be conducted for a minimum of 4 hours prior to resumption of dredging operations.”

14. Section 01 57 20.00 10, paragraph 3.12.4 “Trawling Requirements”: In the third sentence of the second paragraph, delete “not to exceed 42-minutes” and replace with “not to exceed 30-minutes”.

15. Section 01 57 20.00 10, paragraph 3.12.8.1 “Handling”: Add the following sentence to the end of the paragraph: “Sea turtles and Gulf sturgeons may also be carefully transferred to another vessel for transportation to the release location to enable the relocation trawler to continue sweeping the dredging site.”

16. Section 01 57 20.00 10, paragraph 3.14 “Primary and Secondary Dredging Regions: Sea Turtle Requirements Table”: Delete this paragraph in its entirety and replace with the attached paragraph 3.14 “Primary and Secondary Dredging Regions: Sea Turtle Requirements Table”.

17. Section 35 01 50.73, paragraph 1.5.a “Inspection of Samples”: Delete “David Duthu – 504-862- 1868” and replace with “Mike Morris – 504-862-1963”.

18. Section 35 01 50.73, paragraph 3.1.2.a.(1) “Pre-Dredging Survey (Primary Dredging Region)”: In the first sentence, delete “0+00 and 400+00” and replace “700+00 and 1355+00”. In the second sentence, delete “1000 feet” and replace “500 feet”.

19. Section 35 01 50.73, paragraph 3.1.2.a.(2) “Pre-Dredging Survey (Primary Dredging Region)”:

Delete this paragraph in its entirety and mark as “Reserved”.

20. Section 35 01 50.73, paragraph 3.1.3.a “After Dredging Cross-Sections”: In the seventh sentence, delete “5,000 foot” and replace with “1,000 foot”.

21. Section 35 01 50.73: Add the following as paragraph 3.1.6 entitled “Progress Surveys”:

3.1.6 Progress Surveys

a. Progress surveys of the channel shall be taken as often as requested by the Contracting Officer or his/her representative. The cross-sections shall be taken at approximately 500-foot intervals along the channel. Depth soundings shall be made with the hydrographic surveying system (as described in paragraph entitled "Survey Equipment") and the recorded sounding density shall be one sounding for every 20 ft. along the cross-section runlines (normal to the centerline). The recorded depths shall be to a resolution of 0.1 ft.

The sensitivity/gain control setting that is selected for the survey area bottom material-type must also be used for the bar check calibrations and must not be adjusted during http://www.nefsc.noaa.gov/nefsc/publications/tm/tm215/tm215.pdf hydrographic surveying (EM 1110-2-1003, chapter 9-12b). In areas of consolidated bottom material, the digitized and recorded depth soundings shall indicate the true channel bottom. However, in survey areas containing unconsolidated bottom materials, acoustic measurements must be augmented with leadline measurements. These leadline measurements must be notated on the fathometer paper chart and taken at a minimum of 1,000 foot intervals; on the channel centerline and both edges of cut, or as determined by the Government representative on the jobsite. The procedures for surveying in unconsolidated bottom material areas are outlined and described in EM 1110-2-1003, chapter 21 and more specifically in 21-8. The real-time fathometer paper charting of the surveying runs, to include calibration and leadline events and all survey notations, shall be furnished to the Government. Electronic or digital fathometer read-outs will not be acceptable. Stored hydrographic data (x,y,z) shall also be furnished to the Government in a structured ASCII format on compact disk (CD) media.

b. The actual location of each sounding taken on each before dredging cross-section range shall be provided. This information shall be in the form of printout tabulation giving the actual distance of the soundings from the baseline (on an azimuth normal to the centerline of the cut). Soundings shall be to the nearest 0.1-foot referred to the water surface. This information shall also be plotted on a printout sheet, horizontal vertical scale, along with a section showing the required dredging dimensions. The time and date taken shall be shown and the gage reading applicable to the survey shall be shown. The applicable gage shall be read to the nearest 0.1-foot prior to and after each day's survey. More frequent readings may be required when directed by the Government Representative.

22. Section 35 01 50.73, paragraph 3.2.1 “Before Dredging”: In the first sentence, delete “the mid-way point of” and replace with “5,000-foot intervals at the centerline of the channel for”. Also, add the following sentence to the end of this paragraph: “Further samples may be required at the direction of the Contracting Officer's Representative.”.

23. Section 35 01 50.73, paragraph 3.3 “Grab Sample Identification Label”: Delete this paragraph in its entirety and replace with the attached paragraph 3.3 “Grab Sample Identification Label”.

24. Section 35 20 23.23, paragraph 1.2.1 “Mobilization and Demobilization”: Add the following sentences to the end of this paragraph: “All costs associated with modifying the dredge to be able to perform agitation dredging by pumping directly overboard shall be included in this item. If the dredge is sent to a Secondary Dredging Region and the dredge requires modification, an equitable adjustment will be made for additional costs associated with modifying the dredge.”.

25. Section 35 20 23.23, paragraph 1.2.2.1 “Unit of Measure”: In the last sentence, add “crew boat,” before “grab samples”.

26. Section 35 20 23.23, paragraph 1.2.2.1.e “75% Pay Time Hours”: Delete this paragraph in its entirety and mark as “Reserved”.

27. Section 35 20 23.23, paragraph 1.2.2.1.h “45% Pay Time Hours”: Delete this paragraph in its entirety and mark as “Reserved”.

28. Section 35 20 23.23, paragraph 1.2.2.1.i “35% Pay Time Hours”: At the end of subparagraph (1), add the following: “If the Contractor elects to go to a lay-up or supply point, the reduced rate will start at the point of where a dredging cycle is interrupted and will resume at the exact same cycle point. If a load has just been dumped and the Contractor elects to go to a lay-up or supply point, then the reduced rate will continue until dredging resumes on the next load.”.

29. Section 35 20 23.23, paragraph 1.2.2.1.j “21% Pay Time Hours”: At the end of subparagraph (1), add the following: “If the Contractor elects to go to a lay-up or supply point, the reduced rate will start at the point of where a dredging cycle is interrupted and will resume at the exact same cycle point. If a load has just been dumped and the Contractor elects to go to a lay-up or supply point, then the reduced rate will continue until dredging resumes on the next load.”.

30. Section 35 20 23.23, paragraph 1.2.2.1.k “0% Pay Time Hours”: At the end of subparagraph (2), add the following: “The reduced rate will start at the point of where a dredging cycle is interrupted and will resume at the exact same cycle point. If a load has just been dumped and the Contractor elects to go to a lay-up or supply point, then the reduced rate will continue until dredging resumes on the next load.”.

31. Section 35 20 23.23, paragraph 1.2.2.1.k “0% Pay Time Hours”: At the end of subparagraph (3), add the following: “The reduced rate will start at the point of where a dredging cycle is interrupted and will resume at the exact same cycle point. If a load has just been dumped and the Contractor elects to go to a lay-up or supply point, then the reduced rate will continue until dredging resumes on the next load.”.

32. Section 35 20 23.23, paragraph 2.1.4.b “Dredge Plant”: Delete the “Theoretical Hopper Dredge Production Rates (cy/day)” table in its entirety and replace with the attached “Theoretical Hopper Dredge Production Rates (cy/day)” table.

33. Section 35 20 23.23, paragraph 2.1.4.c “Dredge Plant”: In the first sentence, delete “30 feet to 55 feet” and replace with “14 feet to 30 feet”.

34. Section 35 20 23.23, paragraph 2.1.4.d “Dredge Plant”: Delete this paragraph in its entirety and replace with the following paragraph:

d. The dredge must be capable of dredging as follows:

(1) Primary Dredging Region – Atchafalaya River Bar Channel: The dredge must be capable of performing agitation dredging by pumping directly overboard (bypassing the hopper).

The hopper must perform at the same slurry velocity at the dragarm as if the dredge material was pumped into the hopper.

(2) Secondary Dredging Regions: The dredge must be capable of dredging in either the agitation mode or dredge-and-haul mode, and must possess the ability to convert from one mode to the other at the jobsite. Agitation dredging must be accomplished by means of discharging from the dredge pumps into the hopper, with overboard disposal from the hopper at or above the water surface. The Contractor will be allowed to perform agitation dredging by pumping directly overboard (bypassing the hopper) only if prior approval is obtained from the Contracting Officer.

35. Section 35 20 23.23, paragraph 2.1.4.e “Dredge Plant”: Delete the last sentence in its entirety.

36. Section 35 20 23.23, paragraph 2.1.4.f “Dredge Plant”: In the first sentence, delete “on the Calcasieu River Bar Channel” and replace with “in Dredging Regions where Sea Turtle requirements are in effect”.

37. Section 35 20 23.23: Add the following as paragraph 2.1.5 entitled “Crew Boat”:

2.1.5 Crew Boat

The Contractor shall furnish, throughout the contract period, one diesel powered crew boat, with twin propellers, capable of maintaining and traveling no less than the minimum speed of 25 miles per hour / 22 knots, not less than 40 feet in overall length, with enclosed space for at least six passengers after installation of all required equipment. The crew boat shall meet or exceed all applicable US Coast Guard regulations for vessels 65 feet or less in length, and shall be certified by the US Coast Guard. The crew boat shall be equipped with the following:

(1) Air conditioning and heating;

(2) VHF-FM marine radio transceiver for ship to ship communications, described in the paragraph entitled "Communications Equipment";

(3) Navigation radar, as described in the paragraph entitled "Navigation Radar";

(4) Safety equipment meeting the inspection requirements of the US Coast Guard Auxiliary and EM 385-1-1.

(5) Global Positioning Equipment (GPS), as described in the paragraph entitled "Global Positioning System (GPS) Equipment".

Equipment, which fails to perform because of insufficient power or other mechanical deficiencies, or due to inexperienced operators, shall be replaced, or the operator replaced, as the case may be, within 12 hours after the Contractor is directed to do so by the Contracting Officer's Representative. The crew boat will be used solely for providing the Government Inspectors and Government agents transportation, and not for conducting surveys, providing transportation for the Contractor's personnel, or transporting the Contractor's supplies. The Contractor shall make provisions to obtain a separate crew boat or vessel for conducting Contractor-related operations.

The minimum full time crew for the crew boat shall be one operator. The crew boat shall be operated and available 24 hours a day. Refer to EM 385-1-1, Sections 19.F for additional crew and equipment requirements. Smoking shall not be allowed inside the cabin and operator's space while occupied by Government personnel. NO SMOKING signs shall be posted.

38. Section 35 20 23.23, paragraph 2.2 “Gages”: Add the following as paragraph 2.2.g:

2.2.g. The gage for the Atchafalaya River Bar Channel demonstration project is located on

Eugene Island.

39. Section 35 20 23.23, paragraph 2.7.a. “Services to be Furnished to the Government”: Delete subparagraph (2) and replace with the following subparagraphs:

(2) Suitable transportation between the worksite and all points on shore designated by the Contracting Officer, by means of the required crew boat or survey boat.

(3) Assistance throughout the contract in collecting and storing dredged material samples with available on-site resources.

(4) Furnish, as required by the inspectors, a competent three-man survey crew at all times, including survey boat operator, to work under the Government Inspector's direction.

Competent crew shall be knowledgeable in conducting electronic positioning surveys using the Contractor-furnished equipment, tying utility crossings to the baseline, offsetting the utility crossings, and setting dredging location buoys if necessary, without immediate supervision of the Government Inspectors. The survey crew shall be prepared to perform survey work within a 1-hour notice from Government Inspectors.

40. Section 35 20 23.23, paragraph 3.3 “Primary Dredging Region”: Add the following sentences to the end of the paragraph:

The authorized dimensions of the Atchafalaya River Bar Channel are -20 feet Mean Low Gulf (MLG) datum by 400 feet bottom wide. The specified elevation in the dredging assignment will not exceed 2 feet below the authorized elevation and may be specified above the authorized dimensions when determined to be beneficial to the Government. See the attached Atchafalaya River Bar Channel Plate at the end of this section.

41. Section 35 20 23.23, paragraph 3.3.1 “Calcasieu River Bar Channel, Louisiana: Change the paragraph number from “3.3.1” to “3.4.5”. The Calcasieu River Bar Channel is a Secondary Dredging Region.

42. Section 35 20 23.23, paragraph 3.10 “List of Utilities”: Add the attached list of utilities for the Atchafalaya River Bar Channel as paragraph 3.10.2 entitled “Atchafalaya River Bar Channel”.

43. Section 35 20 23.23 Attachment: At the end of Section 35 20 23.23, add the attached plate entitled “Atchafalaya River Bar Channel Maintenance Dredging”.

44. Section 35 20 23.26, paragraph 3.3 “Performance Requirements”: In the last sentence, delete “$4,817” and replace with “$5,051”.

ALL INQUIRIES REGARDING THIS SOLICITATION

SHOULD BE MADE TO THE FOLLOWING:

BRIDGET BONNECARRERE & BRADLEY A. COX

CONTRACT SPECIALISTS

U.S. ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT

E‐MAILS: BRIDGET.M.BONNECARRERE@USACE.ARMY.MIL

PHONE: (504)‐862‐2876

AND/OR

BRADLEY.A.COX@USACE.ARMY.MIL

PHONE: (504) 862‐1083

COLLECT CALLS NOT ACCEPTED

NOTE: FOR THE MOST PROMPT RESPONSE, PLEASE SEND ALL QUESTIONS VIA

E‐MAIL.

DEPARTMENT OF THE ARMY

NEW ORLEANS DISTRICT, CORPS OF ENGINEERS

P.O. BOX 60267

NEW ORLEANS, LOUISIANA 70160-0267

OM 15-126

REPLY TO

ATTENTION OF

CEMVN-CT-E 08 September 2015

SOLICITATION: W912P8-15-B-0048

UNRESTRICTED

FOR: Calcasieu River and Pass, 2015 Maintenance Dredging, Bar Channel Hopper Dredge Rental Contract No. 2-2015 (OM-15-126)

TO OPEN: TIME AND PLACE OF BID OPENING WILL BE ESTABLISHED IN AN AMENDMENT

I. NOTE THE AFFIRMATIVE ACTION PROGRAM REQUIREMENT OF THE EQUAL

OPPORTUNITY CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING FROM

THIS SOLICITATION.

II. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS SOLICITATION.

Bidders, offerors and applicants are cautioned to note the "Certification of Non-segregated Facilities" in the solicitation. Failure of a bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause.

III. Prospective contractors must register in the System for Award Management (SAM). See FAR Clause 52.204-7 for required information. The website for SAM is https://www.sam.gov. You will be required to provide your company’s Dun and Bradstreet (D&B) D-U-N-S number. If you do not already have a D&B D-U-N-S number, one can be requested at http://fedgov.dnb.com/webform.

BIDDERS MUST PROVIDE FULL, ACCURATE AND COMPLETE INFORMATION AS REQUIRED BY

THIS SOLICITATION AND ITS ATTACHMENTS. THE PENALTY FOR MAKING FALSE

STATEMENTS IN BIDS IS PRESCRIBED IN 18 U.S.C. 1001. (FAR 52.214-4 APR 1984)

DESCRIPTION AND MAGNITUDE OF WORK: The work consists of furnishing one fully crewed and equipped self-propelled trailing suction-type hopper dredge on a rental basis for the removal and satisfactory disposal of shoal material in the Atchafalaya River Bar Channel (Station 700+00 to Station 1355+00), St. Mary Parish, Louisiana. This demonstration project requires the dredge to be capable of performing agitation dredging by pumping directly overboard (bypassing the hopper). The hopper must perform at the same slurry velocity at the dragarm as if the dredge material was pumped into the hopper.

Work may be required in other areas of the New Orleans District and in areas of both the Galveston and Mobile Districts.

CAUTION TO BIDDERS: In delivery of hand-carried bids, bidders are cautioned to allow sufficient time for delays which may be encountered as a result of frequent trains which are subject to block all access roads to place of bid opening for various lengths of time. Such delays DO NOT permit acceptance or consideration of late bids.

NOTE: ALL WORK UNDER THESE SPECIFICATIONS SHALL BE PERFORMED IN ACCORDANCE

WITH THE PROVISIONS OF EM 385-1-1 "CORPS OF ENGINEERS SAFETY AND HEALTH

REQUIREMENTS MANUAL", DATED 30 NOVEMBER 2014.

ATTENTION:

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER

W912P8-15-B-0048

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

09/08/2015

PAGE OF PAGES

01 2 IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

OM-15-126

7. ISSUED BY CODE 8. ADDRESS OFFER TO

U.S. Army Engineer District, New Orleans Attn: CEMVN-CT-E 7400 Leake Ave., Room 172 New Orleans, LA 70118-3651

U.S. Army Engineer District, New Orleans 7400 Leake Ave.

New Orleans, LA 70118-3651

9. FOR INFORMATION

CALL:

a. NAME

Bridget.M.Bonnecarrere

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

(504) 862-2876

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

Calcasieu River and Pass, 2015 Maintenance Dredging, Bar Channel Hopper Dredge Rental Contract No. 2-2015, Cameron Parish, Louisiana

The work consists of furnishing one fully crewed and equipped self-propelled trailing suction-type hopper dredge on a rental basis for the removal and satisfactory disposal of shoal material in the Atchafalaya River Bar Channel (Station 700+00 to Station 1355+00), St. Mary Parish, Louisiana. This demonstration project requires the dredge to be capable of performing agitation dredging by pumping directly overboard (bypassing the hopper). The hopper must perform at the same slurry velocity at the dragarm as if the dredge material was pumped into the hopper. Work may be required in other areas of the New Orleans District and in areas of both the Galveston and Mobile Districts.

Magnitude of Construction is between $1,000,000.00 and $5,000,000.00.

* See Section 00010, Pgs 10; para 1.5(c).

11. The contractor shall begin performance within *** calendar days and complete it within * calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

12b. CALENDAR DAYS

a. copies to perform the work required are due at the place specified in Item 8 by ___2:00 pm___ (hour)Sealed offers in original and 0 local time 01/14/2016 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than 30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

*** No later than 1 June 2016

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

USAED, NEW ORLEANS

C/O USACE, FINANCE CENTER (UFC)

ATTN: CEFC-AO-P

5720 INTEGRITY DRIVE

MILLINGTON, TN 38054-5005

U.S. Army Corps of Engineers – Lafayette Area Office 646 Cajundome Blvd., Suite 301 Lafayette, LA 70506-4290

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

Cage Code: DUNs #:

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

Calcasieu River Bar Channel HDR 2-2015 OM15126

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00010

BID SCHEDULE

PART 1 GENERAL

1.1 BIDDING SCHEDULES

1.2 BID FORM NOTES

1.3 BIDDING

1.4 EVALUATION OF BIDS

1.5 CONDITIONS OF CONTRACT AWARD

1.6 BIDDER QUALIFICATIONS

1.7 PRE-AWARD INSPECTION OF PLANT

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section Table of Contents --

SECTION 00010 Page 1

Section 00010, pages 1-11

SECTION 00010

BID SCHEDULE

PART 1 GENERAL

1.1 BIDDING SCHEDULES

SECTION 00010 - BIDDING SCHEDULE

CALCASIEU RIVER AND PASS, 2015 MAINTENANCE DREDGING

BAR CHANNEL HOPPER DREDGE RENTAL CONTRACT NO. 2-2015

CAMERON PARISH, LOUISIANA

(ATCHAFALAYA RIVER BAR CHANNEL DEMONSTRATION PROJECT)

SOLICITATION NO. W912P8-15-B-0048

LOT ONE, 30 in. Inside Diameter (ID) Pump Suction, 4,815 cy Nominal Hopper Capacity, 2 Dragarms and all attendant plant

Bid Item

Description Estimated Quantity

Unit Unit Price

Total Price

0001 Mobilization & Demobilization of hopper dredge and all attendant plant.

1 Job

0002 Dredging - Rental of a trailing type hopper dredge

1128 Hour

Option

Option Dredging - Same plant listed in Item No. 0002 of this bid lot.

564 Hour XXXXXXXX

Total: LOT ONE BID

SECTION 00010 Page 2

SECTION 00010 - BIDDING SCHEDULE

CALCASIEU RIVER AND PASS, 2015 MAINTENANCE DREDGING

BAR CHANNEL HOPPER DREDGE RENTAL CONTRACT NO. 2-2015

CAMERON PARISH, LOUISIANA

(ATCHAFALAYA RIVER BAR CHANNEL DEMONSTRATION PROJECT)

SOLICITATION NO. W912P8-15-B-0048

LOT TWO, 28 in. Inside Diameter (ID) Pump Suction, 4,000 cy Nominal Hopper Capacity, 2 Dragarms and all attendant plant

Bid Item

Description Estimated Quantity

Unit Unit Price

Total Price

0001 Mobilization & Demobilization of hopper dredge and all attendant plant.

1 Job

0002 Dredging - Rental of a trailing type hopper dredge

1158 Hour

Option

Option Dredging - Same plant listed in Item No. 0002 of this bid lot.

579 Hour XXXXXXXX

Total: LOT TWO BID

SECTION 00010 Page 3

CALCASIEU RIVER AND PASS, 2015 MAINTENANCE DREDGING

BAR CHANNEL HOPPER DREDGE RENTAL CONTRACT NO. 2-2015

CAMERON PARISH, LOUISIANA

(ATCHAFALAYA RIVER BAR CHANNEL DEMONSTRATION PROJECT)

SOLICITATION NO. W912P8-15-B-0048

LOT THREE, 27 in. Inside Diameter (ID) Pump Suction, 3,600 cy Nominal Hopper Capacity, 2 Dragarms and all attendant plant

Bid Item

Description Estimated Quantity

Unit Unit Price

Total Price

0001 Mobilization & Demobilization of hopper dredge and all attendant plant.

1 Job

0002 Dredging - Rental of a trailing type hopper dredge

1174 Hour

Option

Option Dredging - Same plant listed in Item No. 0002 of this bid lot.

587 Hour XXXXXXXX

Total: LOT THREE BID

SECTION 00010 Page 4

CALCASIEU RIVER AND PASS, 2015 MAINTENANCE DREDGING

BAR CHANNEL HOPPER DREDGE RENTAL CONTRACT NO. 2-2015

CAMERON PARISH, LOUISIANA

(ATCHAFALAYA RIVER BAR CHANNEL DEMONSTRATION PROJECT)

SOLICITATION NO. W912P8-15-B-0048

LOT FOUR, 26 in. Inside Diameter (ID) Pump Suction, 4,000 cy Nominal Hopper Capacity, 2 Dragarms and all attendant plant

Bid Item

Description Estimated Quantity

Unit Unit Price

Total Price

0001 Mobilization & Demobilization of hopper dredge and all attendant plant.

1 Job

0002 Dredging - Rental of a trailing type hopper dredge

1605 Hour

Option

Option Dredging - Same plant listed in Item No. 0002 of this bid lot.

803 Hour XXXXXXXX

Total: LOT FOUR BID

SECTION 00010 Page 5

CALCASIEU RIVER AND PASS, 2015 MAINTENANCE DREDGING

BAR CHANNEL HOPPER DREDGE RENTAL CONTRACT NO. 2-2015

CAMERON PARISH, LOUISIANA

(ATCHAFALAYA RIVER BAR CHANNEL DEMONSTRATION PROJECT)

SOLICITATION NO. W912P8-15-B-0048

LOT FIVE, 27 in. Inside Diameter (ID) Pump Suction, 3,700 cy Nominal Hopper Capacity, 2 Dragarms and all attendant plant

Bid Item

Description Estimated Quantity

Unit Unit Price

Total Price

0001 Mobilization & Demobilization of hopper dredge and all attendant plant.

1 Job

0002 Dredging - Rental of a trailing type hopper dredge

1649 Hour

Option

Option Dredging - Same plant listed in Item No. 0002 of this bid lot.

825 Hour XXXXXXXX

Total: LOT FIVE BID

SECTION 00010 Page 6

CALCASIEU RIVER AND PASS, 2015 MAINTENANCE DREDGING

BAR CHANNEL HOPPER DREDGE RENTAL CONTRACT NO. 2-2015

CAMERON PARISH, LOUISIANA

(ATCHAFALAYA RIVER BAR CHANNEL DEMONSTRATION PROJECT)

SOLICITATION NO. W912P8-15-B-0048

LOT SIX, 28 in. Inside Diameter (ID) Pump Suction, 4,350 cy Nominal Hopper Capacity, 1 Dragarm and all attendant plant

Bid Item

Description Estimated Quantity

Unit Unit Price

Total Price

0001 Mobilization & Demobilization of hopper dredge and all attendant plant.

1 Job

0002 Dredging - Rental of a trailing type hopper dredge

2126 Hour

Option

Option Dredging - Same plant listed in Item No. 0002 of this bid lot.

1063 Hour XXXXXXXX

Total: LOT SIX BID

SECTION 00010 Page 7

CALCASIEU RIVER AND PASS, 2015 MAINTENANCE DREDGING

BAR CHANNEL HOPPER DREDGE RENTAL CONTRACT NO. 2-2015

CAMERON PARISH, LOUISIANA

(ATCHAFALAYA RIVER BAR CHANNEL DEMONSTRATION PROJECT)

SOLICITATION NO. W912P8-15-B-0048

LOT SEVEN, 21.5 in. Inside Diameter (ID) Pump Suction, 1,300 cy Nominal Hopper Capacity, 1 Dragarm and all attendant plant

Bid Item

Description Estimated Quantity

Unit Unit Price

Total Price

0001 Mobilization & Demobilization of hopper dredge and all attendant plant.

1 Job

0002 Dredging - Rental of a trailing type hopper dredge

4567 Hour

Option

Option Dredging - Same plant listed in Item No. 0002 of this bid lot.

2284 Hour XXXXXXXX

Total: LOT SEVEN BID

SECTION 00010 Page 8

1.2 BID FORM NOTES

a. Bidders shall bid on all items including optional items. Failure to bid on all items will result in a non-responsive bid.

b. Bidders shall use the Item No. 0002 unit price to compute Item Nos.

0002 and 0003 total prices.

c. Any bid may be rejected if the Contracting Officer or his/her authorized representative determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only the total price of the bid, but the prices for individual line items as well. Any bid may be rejected if the prices for any line items or subline items are materially unbalanced (see "Proposal Analysis Techniques" FAR 15.404-1(g)(3)).

d. The Notice to Proceed (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442 after Notice of Award. The NTP will be issued after verification of acceptable performance and payment bonds. Within two days after issuance of NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.

e. RAPID VENDOR PAYMENT: See the following web based instructions for the submission of invoices:

http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.

f. The unit "Job" is a one-time payment for work performed. "Job" is synonymous with the previously used term "lump sum".

1.3 BIDDING

a. The bidder must select only one bid lot, determined by the class of dredge intended to be used. Bids which are submitted on an inappropriate bid lot will be declared non-responsive.

b. Bidders shall furnish unit prices for all items listed on the schedule of bid items that require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items but does furnish an extended total or an estimated amount for such items, the Government will deem the unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED

ESTIMATED AMOUNT FOR ANY REQUIRED ITEM, THE BID WILL BE DECLARED

NON-RESPONSIVE.

1.4 EVALUATION OF BIDS

a. To provide fair competition between dredges of different production rate and capacity, the required dredging quantities and any optional dredging quantities are based on an estimated quantity of shoal material, and on the tested production rate of each dredge class.

b. Award will be made to that responsible Bidder presenting the

SECTION 00010 Page 9 lowest-priced responsive bid in response to this solicitation, regardless of the bid lot used.

c. The hourly quantity shown on the bid lots for Bid Items designated as "Dredging" are 100% pay time hours. The actual calendar duration of the contract may vary as a result of fractional pay time. Refer to Section 35 20 23.23, paragraph entitled "Dredging and Option Dredging Items" for additional information.

1.5 CONDITIONS OF CONTRACT AWARD

a. Award will be made as a whole to one bidder. The dredge and attendant plant offered in the bidding schedule shall be complete with full operating personnel and in operating status for the contract period. EM 385-1-1, Section 19, "Floating Plant and Marine Activities" shall be complied with at all times. NOTE: All work under these specifications shall be performed in accordance with the provisions of EM 385-1-1 "Army Corps of Engineers Safety and Health Requirements Manual", latest edition.

b. The Government may award the contract at the total bid price, comprised of the base items and option item(s); however, the Government will not be obligated to exercise any option item(s).

c. The number of rental time hours for each bid lot of the bidding schedule are estimated quantities. The dredge and attendant plant will be retained for an approximate number of days according to the table below starting from no later than 1 June 2016.

APPROXIMATE HOPPER DREDGE

CONTRACT DURATION

(BASE PLUS OPTION)

Bid Lot Pump Inside Diameter (Inches)

Hopper Size (Cubic Yards)

Number of Dragarms

Approximate Number of Rental Days

1 30 4815 2 118

2 28 4000 2 120

3 27 3600 2 121

4 26 4000 2 150

5 27 3700 2 153

6 28 4350 1 186

7 21.5 1300 1 354

d. The bidder must be capable of providing for assignment of the dredge and all attendant plant, complete and in full operating condition in all respects, no later than 1 June 2016.

1.6 BIDDER QUALIFICATIONS

a. Before the Government will award a contract based on this solicitation, the apparent low bidder shall establish that it is responsible and entitled to award of the contract, by certifying that its dredge meets the appropriate production rate, as listed in the table in Section 35 20 23.23, paragraph entitled "Dredge Plant". The

SECTION 00010 Page 10 dredge must perform at or above the listed production rate at least 85% of the time, as established by other contracts completed within three years prior to the bid opening date of this solicitation. Failure to establish an adequate capability will result in a finding of non-responsibility.

b. A bidder may be rejected as non-responsible if it cannot show the necessary capital, experience, or equipment needed to perform the work described under this solicitation (see "Responsible Prospective Contractors" FAR 9.1). The bidder must also show that the dredge and attendant plant is not already obligated for the performance of other work that would delay commencement, performance, and completion of the solicited work; and must show that delivery of the dredge and attendant plant to the site of work can be made within the time allowed in the specifications.

c. Bidders must register in the System for Award Management (SAM) database in accordance with FAR 52.204-7 and DFARS 252.204-7004 Alt A.

1.7 PRE-AWARD INSPECTION OF PLANT

a. The apparent low bidder shall make the dredge and attendant plant available for inspection, to determine compliance with these specifications, as soon as practicable after bids are opened, and prior to contract award. If deficiencies are found during the inspection, the bidder will be notified in writing, which may be transmitted by email or facsimile. Upon receipt of such notice, the bidder shall correct all deficiencies at least two calendar days in advance of the projected contract award date.

b. Two calendar days before the projected award date, or upon notification by the bidder that the deficiencies have been corrected, a Government representative will re-inspect the dredge and attendant plant. If at that time the dredge and attendant plant do not meet the requirements of these specifications, the bidder will be rejected as non-responsible.

c. The Government may choose to waive the pre-award inspection if the projected contract award date is less than five calendar days after the bid opening date. Waiver of the pre-award inspection does not relieve the bidder from the requirement to provide a dredge and attendant plant in full compliance with the specifications.

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section --

SECTION 00010 Page 11

Activity Hazard Analysis (AHA) Activity/Work Task: Overall Risk Assessment Code (RAC) (Use highest code)

Project Location: Risk Assessment Code (RAC) Matrix

Contract Number:

Severity

Probability

Date Prepared: Frequent Likely Occasional Seldom Unlikely

Prepared by (Name/Title):

Catastrophic E E H H M

Critical E H H M L

Reviewed by (Name/Title):

Marginal H M M L L Negligible M L L L L

Notes: (Field Notes, Review Comments, etc.)

Step 1: Review each “Hazard” with identified safety “Controls” and determine RAC (See above)

“Probability” is the likelihood to cause an incident, near miss, or accident and identified as: Frequent, Likely, Occasional, Seldom or Unlikely. RAC Chart “Severity” is the outcome/degree if an incident, near miss, or accident did occur and identified as: Catastrophic, Critical, Marginal, or Negligible

E = Extremely High Risk H = High Risk

Step 2: Identify the RAC (Probability/Severity) as E, H, M, or L for each “Hazard” on AHA. Annotate the overall highest RAC at the top of AHA.

M = Moderate Risk L = Low Risk

Job Steps Hazards Controls RAC

Equipment to be Used Training Requirements/Competent or

Qualified Personnel name(s) Inspection Requirements

Section 01 35 26 ATTACHMENT

Section 01 35 26 Attachment: "Activity Hazard Analysis (AHA)"

Section 01 57 20.00, paragraph 3.14 "Primary and Secondary Dredging Regions: Sea Turtle Requirements Table"

3.14 PRIMARY AND SECONDARY DREDGING REGIONS: SEA TURTLE REQUIREMENTS TABLE

Sea Turtle Requirements In Effect

New Orleans District Mobile District

All Locations

Galveston District All LocationsCalc.

River

Pass, Bar

Channel

Atch.

River Bar Channel

Miss.

River

Southwest Pass

Miss.

River

Crossings

Turtle Screen Installed

Yes Yes No No Yes Yes

Floodlights installed

Yes Yes No No Yes Yes

NMFS-Approved Protected Species Observers Required

Yes Yes No No Yes Yes

Sea Turtle Deflectors Installed

Yes Yes No No Yes Yes

Sea Turtle Trawling and Relocation

CO CO No No CO CO

Notes:

1. Sea turtle requirements shall not be in place for locations showing an indication of "No". However, through an equitable adjustment to the contract, the Contracting Officer or his/her representative may require NMFS-Approved Protected Species Observers or sea turtle monitoring equipment for locations showing an indication of "No".

2. The dredge shall arrive at the job site with the sea turtle requirements in place for locations where "Yes" is indicated.

3. For locations when "CO" is indicated, the requirement will be at the option and direction of the Contracting Officer and subject to the contract clause entitled "Changes" (FAR 52.243-4).

SECTION 01 57 20.00 10 Page 18

Section 35 01 50.73, paragraph 3.3 "Grab Sample Identification Label"

3.3 GRAB SAMPLE IDENTIFICATION LABEL

DELIVER TO: U.S. Army Corps of Engineers New Orleans District 7400 Leake Avenue New Orleans, LA 70118

ATTN: CEMVN-ED-F

Rm. No. 105 504-862-1658

Alternate #s: 504-862-1963 and 504-862-1740

GRAB SAMPLE IDENTIFICATION LABEL

Calcasieu River and Pass, 2015 Maintenance Dredging, Bar Channel Hopper Dredge Rental Contract No. 2-2015

(Atchafalaya River Bar Channel Demonstration Project)

Reproduce form as necessary, complete for each sampling effort, and securely affix to corresponding sample container. Refer to paragraph in this section entitled "Sample Identifications" for details on completing this form.

CONTRACT NO.: _________________________ DATE: _________________

SAMPLE NO. BD-__________________________ TIME: __________________

SAMPLE LOCATION:C/L Sta. __________________________________________

X=_________________________________________

Y=_________________________________________

CORRECTED DEPTH BELOW WATER SURFACE [FT MLG]= _______________

GRAB SAMPLING DEVICE TYPE USED: ________________________________

VISUAL MATERIAL CLASSIFICATION: _________________________________

SAMPLING PERFORMED BY:

NAME: __________________________________ NUMBER: _______________

PROJECT INSPECTOR:

NAME: __________________________________ NUMBER: _______________

INITIALS: _____________________ DATE RECEIVED: __________________

Section 35 20 23.23, "Theorectical Hopper DRedge Production Rate" Table

THEORETICAL HOPPER DREDGE PRODUCTION RATES (cy/day)

Bid Lot

Pump Inside

Diameter (inches)

Hopper Size (cubic yards)

Number of Drag Arms

Dredge & Haul

Production All

Projects

Agitation Production

SW Pass (cy/day)

Calcasieu Bar & Atchafalaya Bar

(cy/day)

1 30.0 4,815 2 45,029 135,530 152,471

2 28.0 4,000 2 41,663 131,994 148,493

3 27.0 3,600 2 36,435 130,153 146,422

4 26.0 4,000 2 34,095 95,227 107,129

5 27.0 3,700 2 32,476 92,724 104,314

6 28.0 4,350 1 27,176 71,904 80,892

7 21.5 1,300 1 11,784 33,472 37,656

Section 35 20 23.23, paragraph 3.10.2 "Atchafalaya River Bar Channel"

3.10.2 Atchafalaya River Bar Channel

Utility Diameter (Inches)

Approximate Station (C/L)

Elevation (feet)

MLG

Owner and Telephone Number

30" Gas Pipeline

1098+50 Unknown Nautilus Pipeline 195 Equity Blve Houma, LA 70360

Depp Cheramie 985-209-9433 depp.cheramie@enbridge.com

30" Gas Pipeline

1149+23 Unknown ANR Pipeline 112 Rue Beauregard Lafayette, LA 70548

Raymond Harst 337-591-1615, 337-572-3522 raymond_harst@transcanada.com

20" Gas Pipeline

1152+46 Unknown ANR Pipeline (see above)

20" Gas Pipeline

1268+70 Unknown Contango Oil and Gas 717 Texas Ave, Ste. 2900

Houston, TX 77002

Michael Autin 713-960-0454, 832-540-7676 mautin@contango.com

22" Gas Pipeline

1366+29 Unknown Trunkline Gas 4094 Hwy 56

Houma LA 70363

William Tieken 985-876-5712 ext. 5421 william.tieken@energytransfer.com

AM0001 Content.pdf
AM0001
Revised Contact Info Page
Revised Solicitation Letter
Revised SF1442
Revised Specs
2015-12-21T14:22:19-0600
BONNECARRERE.BRIDGET.MARIE.1379032067

File details come from the government source that posted it. Updated .