W912P8-14-R-0036
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitation for Southeast Louisiana Urban Flood Control Project, SELA-26, Widening of Florida Avenue Canal, Phase IV St. Ferdinand Street to Peoples Avenue, Orleans Parish, LA is hereby modified as follow s:
1. Provide answ ers to all Contractor Questions submitted prior to the established deadline in Amendments 0002 & 0003, on the attached pages.
2. Minor plan and specification changes on the attached pages.
The deadline to submit clarification questions related to this amendment is 12:00pmCST, Monday, August 11, 2014. Questions submitted after this dealine and/or not related to this amendment w ill not be answ ered.
THE DUE DATE FOR THE SUBMISSION OF PROPOSALS OF 2:00PM CST, 13 AUGUST 2014 REMAINS UNCHANGED.
1. CONTRACT ID CODE PAGE OF PAGES
1 36
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Aug-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-14-R-0036
X 9B. DATED (SEE ITEM 11)
14-Jul-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Aug-2014
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION 00010
Pages 3, 4, 5, 6, 7, 8, and 9. Delete these pages in their entirety and substitute the attached revised pages 3, 4, 5, 6, 7, 8, and 9 therefore:
SECTION 33 30 00
Page 3, paragraphs 1.2.1 and 1.2.2. Delete these paragraphs in their entirety and substitute the following therefore:
“1.2.1 Gravity Sewer Lines
Measurement for satisfactory construction of the gravity sewer lines will be by the linear foot along the centerline of the sewer line, from centerline of manhole to centerline of manhole.
Payment will be made at the applicable contract unit price per linear foot for "8" Diameter
Gravity Sewer Line - OW-2a" (if Optional Work 2a is exercised), "10" Diameter Gravity
Sewer Line OW-2a" (if Optional Work 2a is exercised), or "8" Diameter Gravity Sewer Line
OW-2b" (if Optional Work 2b is exercised). Price and payment shall constitute full compensation for furnishing all plant, labor, materials, tools, and equipment required to complete the gravity sewer lines including installation, all pipe, fittings, wyes, bedding material, geotextile fabric, backfill, shoring, trenching, and foundation lumber, as specified herein and as shown on the drawings.
1.2.2 Sewer Siphons
Measurement for the sewer siphons will be per each satisfactorily installed. Payment will be made at the applicable contract unit price per each for "12" Diameter Sewer Siphon - OW-2a"
(if Optional Work 2a is exercised), "30" Diameter Sewer Siphon - OW-2a" (if Optional Work
2a is exercised), or 8" Diameter Sewer Siphon - OW-2b" (if Optional Work 2b is exercised).
Price and payment shall constitute full compensation for furnishing all plant, equipment, labor and materials to complete the installation of the sanitary sewer siphons and tie-ins to the existing system; and other work incidental thereto; all as specified herein and as shown on the drawings.”
SECTION 33 40 00
Page 4, paragraph 1.3.3. Delete this paragraph in its entirety and substitute the following therefore:
“1.3.3 Catch Basins
Measurement for satisfactory installation of catch basins will be per each. Payment will be made at the applicable contract unit price per each for “Standard Single Mountable Catch
Basin”, “Combination Manhole and Vertical Catch Basin”, "Drop Inlet Catch Basin with
Grate "A", "Drop Inlet Catch Basin with Grate "B", "Single Vertical Catch Basin (No. 1)", "Double Vertical Catch Basin (No. 1) or "Drain Concrete Trench and Frame". Price and payment shall constitute full compensation for furnishing all plant, labor, materials, and equipment to complete installation of the catch basins; including excavation, backfill, foundation and bedding materials, excavation protection; and other incidental work; all as specified herein and as shown on the drawings.”
DRAWINGS
Volume 1, SHEET IDENTIFICATION No. C-513, SECTION C-4. Change “WASTEWATER
AIR RELEASE VALVE. MODEL 48A AS MFGD. BY VAL-MATIC OR APPROVED
EQUAL.” to “A.R.I. 2-INCH D-040 COMBINATION AIR VALVE.”.
00010-3 Ed 11-147
SECTION 00010 – BIDDING SCHEDULE
SELA, Urban Flood Control Project, Widening of Florida Ave. Canal, Phase IV, St. Ferdinand Street to Peoples Avenue, Orleans Parish, Louisiana
Item DESCRIPTION Estimated
Quantity Unit Unit Price Estimated Amount
BASE WORK
0001 Mobilization and Demobilization 1 Job
0002 Railroad Insurance 1 Job
Entergy Transmission Power Outages
25 EA $5,250.00 $$131,250.00
0004 Temporary Retaining Structures 1 Job
Temporary Retaining Structures (Sheet Pile Left In Place)
1 Job
0006 Work Platform 1 Job
Temporary Dam Emergency Removal and Reconstruction
40 EA
0008 Traffic Control and Coordination 1 Job
Maintenance and Diversion of Storm Water
1 Job
0010 Selective Demolition 1 Job
Removal and Disposal of Asbestos Cement Waterline
203 LF
Cast-in-Place Flume (Florida Avenue Canal)
203 LF
Cast-in-Place Flume (Peoples Avenue Canal)
115 LF
0014 Box Culvert (Florida Avenue Canal) 892 LF
0015 Box Culvert (Almonaster Road) 174 LF
0016 Box Culvert (Lateral 'D') 198 LF
0017 Box Culvert (Benefit Street) 122 LF
0018 Box Culvert (Treasure Street) 124 LF
0019 Box Culvert (Abundance Street) 242 LF
0020 Box Culvert (Painters Street) 267 LF
0021 Box Culvert (Eads Street) 223 LF
0022 Box Culvert (Deers Street) 223 LF
00010-4 Ed 11-147
Box Culvert (Peoples Avenue Canal & Temporary Diversion Box Culvert)
611 LF
0024 Temporary Diversion Wall 1 Job
0025 8' x 8' Box Culvert Tie-In 1 Job
0026 Precast Box Culvert (Benefit Street) 1,012 LF
Precast Box Culvert (Treasure Street)
1,009 LF
Precast Box Culvert (Abundance Street)
897 LF
Precast Box Culvert (Painters Street)
697 LF
0030 Precast Box Culvert (Eads Street) 704 LF
0031 Precast Box Culvert (Deers Street) 705 LF
0032 Geotechnical Instrumentation 1 Job
0033 Electrical Work 1 Job
0034 Clearing and Grubbing 1 Job
0035 Structural Excavation 91,788 CY
0036 Structural Backfill 27,326 CY
0037 Construction Dewatering 1 Job
0038 Foundation Jet Grouting 1 Job
0039 Cantilevered Sheet Pile Wall 1 Job
0040* Furnish and Drive Prestressed Concrete Piles (14"x14")
6,489 LF
0041 Compression Pile Load Tests 7 EA
Furnish and Drive Steel H-Piles (HP 12x84)
300,824 LF
0043* Hollow Steel Pipe Piles (12") 27,714 LF
0044 Furnish and Drive Timber Piles 20,242 LF
Repair of Failed Areas in Asphalt Pavement
1,000 SY
0046 Granular Base Course (8" Thick) 44,769 SY
Granular Shoulder Course (4" Thick)
1,092 SY
0048 Geotextile Fabric 50,460 SY
0049 Geogrid 46,088 SY
00010-5 Ed 11-147
Asphaltic Concrete-Wearing/Binder Courses
26,008 SY
0051 Concrete Pavement (9" Thick) 15,695 SY
0052 Concrete Driveway (6" Thick) 11,430 SY
0053 Concrete Driveway (8" Thick) 7,128 SY
Incidental Concrete Pavement (4" Thick)
200 SY
Integral Concrete Curb (Barrier Type)
7,770 LF
Integral Concrete Curb (Mountable Type)
200 LF
Combination Concrete Curb and Gutter Bottom (Barrier Type)
157 LF
Combination Concrete Curb and Gutter Bottom (Mountable Type)
11,346 LF
0059 Concrete Sidewalk (4" Thick) 7,492 SY
0060 Concrete Handicap Ramp (4" Thick) 1,924 SY
0061 Pavement Markings 1 Job
0062 Chain Link Fencing and Gates 540 LF
0063 Fertilizing, Seeding, and Mulching 1 Job
48" Diameter Drainage Force Main (Florida Ave. Canal)
431 LF
0065 Pipe Support Structure 37 EA
0066 Fence Fans 8 EA
0067 12" Diameter RCP 10 LF
0068 15" Diameter RCP 373 LF
0069 18" Diameter RCP 4,091 LF
0070 24" Diameter RCP 9 LF
0071 30" Diameter RCP 329 LF
0072 Drain Brick Manhole (No. 1 & No. 2) 31 EA
0073* Drop Inlet Catch Basin with Grate "A”
4 EA
0074* Drop Inlet Catch Basin with Grate "B”
15 EA
0075* Single Vertical Catch Basin (No. 1) 115 EA
0076 Double Vertical Catch Basin (No. 1) 14 EA
00010-6 Ed 11-147
0077 Drain Concrete Trench and Frame 1 EA
Adjusting Existing Vertical Catch Basins and Drop Inlets
2 EA
0079 House Storm Drain Reconnections 4 EA
0080 Concrete Slope Pavement 1,159 SQ
0081 Railroad Ballast Stone 13,836 SY
0082+ Standard Single Mountable Catch Basin
15 EA
0083+ Combination Manhole and Vertical Catch Basin
35 EA
TOTAL BASE WORK: $
OPTIONAL WORK 1 (OW-1)
0084 8" Diameter PVC Waterline - OW-1 281 LF
8" Diameter Ductile Iron Waterline -
OW-1
207 LF
16" Diameter Ductile Iron Waterline
- OW-1
139 LF
42" Diameter Steel Water Transmission Line - OW-1
190 LF
50" Diameter Steel Water Transmission Line - OW-1
606 LF
0089 Fire Hydrant Assembly - OW-1 1 EA
8" Water Valve and Manhole - OW-
2 EA
16" Water Valve and Manhole -
OW-1
1 EA
42" Diameter Valve and Valve Manhole - OW-1
1 EA
0093 Sewer Brick Manholes - OW-1 1 EA
0094 Adjusting Brick Manholes - OW-1 2 EA
72" Diameter Sewer Force Main (Florida Avenue Canal) - OW-1
1,360 LF
72" Diameter Sewer Force Main (Peoples Ave. Canal)
162 LF
60" Diameter Sewer Force Main (Peoples Ave. Canal) - OW-1
1,315 LF
54" Diameter Sewer Force Main (Florida Ave. Canal) - OW-1
582 LF
72" / 54" Diameter Sewer Force Main Change-Over - OW-1
59 LF
00010-7 Ed 11-147
54" Diameter Valve and Valve Manhole - OW-1
2 EA
72" Diameter Valve and Valve -
OW-1
1 EA
36” Diameter Sewer Force Main -
OW-1
61 LF
36” Diameter Valve and Valve Manhole - OW-1
1 EA
0104* 72” Steel Casing - OW-1 119 LF
0105* 78” Steel Casing - OW-1 89 LF
0106* 84” Steel Casing - OW-1 558 LF
0107* 96” Steel Casing - OW-1 248 LF
TOTAL OPTIONAL WORK 1: $
OPTIONAL WORK 2a (OW-2a)
(North Streets)
8" Diameter PVC Waterline – OW- 2a
5,275 LF
Replace 1” and Smaller Water Service Connection with 1” Service
- OW-2a
81 EA
0110 Fire Hydrant Assembly - OW-2a 13 EA
8” Water Valve and Manhole - OW- 2a
16 EA
0112* Temporary 2" Diameter PVC Waterline - OW-2a
7,340 LF
8" Diameter Gravity Sewer Line - OW-2a
3,464 LF
10" Diameter Gravity Sewer Line - OW-2a
318 LF
0115* 12" Diameter Sewer Siphon - OW- 2a
2 EA
0116* 30" Diameter Sewer Siphon - OW- 2a
1 EA
0117* Sewer Brick Manholes - OW-2a 31 EA
Remove and Replace Sewer House Service - OW-2a
87 EA
0119 Adjusting Sewer Cleanouts - OW-2a 5 EA
0120 Adjusting Brick Manholes - OW-2a 8 EA
TOTAL OPTIONAL WORK 2a: $
OPTIONAL WORK 2b (OW-2b) (South Streets)
0121* 8" Diameter PVC Waterline – OW - 2a
3,075 LF
00010-8 Ed 11-147
16" Diameter Ductile Iron Waterline
- OW-2b
203 LF
Replace 1” and Smaller Water Service Connection with 1” Service
- OW-2b
56 EA
Replace 2” Water Service Connection - OW-2b
1 EA
0125 Fire Hydrant Assembly - OW-2b 9 EA
8” Water Valve and Manhole - OW- 2b
6 EA
Temporary 2" Diameter PVC Waterline - OW-2b
6,150 LF
8" Diameter Gravity Sewer Line - OW-2b
4,243 LF
0129* 8" Diameter Sewer Siphon - OW-2b 1 EA
0130 Sewer Brick Manholes - OW-2b 26 EA
Remove and Replace Sewer House Service - OW-2b
44 EA
0132 Adjusting Sewer Cleanouts - OW-2b 4 EA
0133 Adjusting Brick Manholes - OW-2b 20 EA
TOTAL OPTIONAL WORK 2b: $
TOTAL BASE WORK OPTIONAL WORK 1
OPTIONAL WORK 2a OPTIONAL WORK 2b:
Previous Bid Items Nos. 91, 92, 93, 94, and 114 were deleted. Note, some item numbers have changed.
*Denotes a change from the previous Bidding Schedule.
+ Denotes an addition to the previous Bidding Schedule.
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE
DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR
AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2).
00010-9 Ed 11-147
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTIONAL WORK Items by written notice to the Contractor. The Government will exercise Optional Work 1 no sooner than 100 calendar days and no later than 200 calendar days after Notice to Proceed of this contract. The Government will exercise Optional Work 2a and Optional Work 2b no sooner than 350 calendar days and no later than 500 calendar days after notice to proceed of this contract. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
NOTE 5: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement.
Evaluation of options will not obligate the Government to exercise the option(s).
If an option is to be exercised at the time of contract award in accordance with FAR 17.208, FAR clause 52.217-4 shall be used in place of FAR clause 52.217- 5.
NOTE 6: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF
OPTIONAL WORK. In the event that OPTION WORK items (Items 081 through 0129) are exercised under the terms of the contract, the time required for completion of the contract will not be adjusted but shall be performed concurrent with the original contract duration of 1,460 calendar days established for the
BASE WORK items specified in the Contract Clause entitled
“COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52-
211-10 – APR 1984)”.
14-R-0036; SELA 26 Florida Avenue Canal Phase IV Clarifications
1. Based on the quantities provided for the Foundation Jet Grouting on page 26 of Amendment #1, it appears that the Government’s calculated quantity for CY of treated volume only includes a treatment area that covers from inside belly to inside belly of the TRS sheet piling. The Jet Grout/Cofferdam Details shown on sheet S-301 of Volume II confirms this assumption. This assumption would create an untreated area along the alignment of the TRS between the inside and outside bellies of the sheet piling. Is it the Government’s intent to only treat the area the inside belly of the sheets, or should the typical detail and estimated quantities be revised?
Response: The jet grout should extend to the outer belly. Revised quantities will be provided.
2. We’d like verification of quantities and unit of measure on the following bid items:
• Bid item 0118 - 12” diameter sewer siphon (OW-2a)
• Bid item 0119 - 30” diameter sewer siphon (OW-2a)
• Bid item 0132 - 8” diameter sewer siphon (OW-2b)
Response: Quantities and units of measure will be corrected in an amendment. The unit of measure is correct and the quantities will be revised.
3. Page 25 of Amendment 0001 indicates that 8,936 lf of 4”-6” waterline is to be removed as part of Bid Item 0010, “Selective Demolition”. While we have located these lines to be removed in the Utility Disposition Plans, CU-408 to CU-410 and CU-415-423 for Volume 1 and Volume 2, respectively, the plans indicate that these lines are to be removed and relocated.
We have not found where the installation of the relocated 4”-6” waterline are paid for in either the Base Work items or Optional work items in the Bidding Schedule, Section 00010. Please indicate how we will be paid for these relocations.
Response: 4” and 6” lines will not be relocated. If being replaced, they will be replaced with the 8” lines as shown in the drawings.
4. Re: Amendment 1, Volume 1, sheets CU-110 through CU-112, the D.I.C.B. W/ GRATE “B” appear to be incorrectly numbered. There is a total count of 15, not 17 as numbered. Please correct the numbering, and the quantity on the bid form for bid item #0074.
Response: The quantities will be updated in an amendment. There is no need to adjust numbering.
5. Re: Amendment 1 discusses a NS Special Provisions document for the 5 discussed changes in Appendix A. Should Contractors anticipate another amendment including the referenced changes for Appendix A?
Response: Please see attached.
6. Re: Amendment 1, Answer No. 97. In response to the question, the Government admits that the 1460 day POP “…was not established to meet a specific completion date.” However, Block 11 of the original SF 1442 still lists the period of performance as “mandatory.” With the 408 required weather days and the scope of work added with Amendments 2 and 3, the 1460 day POP is not reasonable and, per the response to Question No. 97, unnecessary. Amended Drawings CG-401 through CG 407 in Amendment 2 and the revised Bidding Schedule in Amendment 3 add the installation of over 1,000 LF of 72” pipe, over 1,100 LF of 60” pipe, over 250 LF of 54” pipe, over 200 LF of 48” pipe, and over 650 LF of 72”-96” steel casings to the project. Additionally, the required sequencing shown on the revised Drawings place nearly all of this added effort on the critical path of the project. All of this work also requires the completion of other portions of the project by at least 3 other entities over whom the Contractor has no authority or any privy of contract. The Government, in response to Questions 98, 101, 102, 115, 117-122, 126 and 131, has already acknowledged a dozen situations that could give rise to an issue per the Changes clause. Regardless of the contractor chosen, the current 1460 day POP will be a high risk schedule and will likely cause significant debate during contract execution.
We suggest that the POP be extended so that the Government can evaluate overall proposal submittal based on reasonable scheduling and pricing.
Response: Question 97 requested the significance of the completion DATE. The completion DATE was not handpicked, mandated or pre-determined, but will be determined by the POP duration and estimated NTP. POP is mandatory and defined as the amount of time it would take to complete the effort, with more than one crew. The duration will not be changed. The additional 72” and 60” pipe installation can be completed concurrently with other efforts.
7. Amendment 2, Reference Section 33 11 00 2.7 and Volume I drawings (CU series). The drawings call for model 48A valmatic air release valve; however, the specifications call for ARI 2” D 040. Will the Government please clarify the correct valve?
Response: The correct valve is ARI 2” D 040 which will be clarified in an amendment.
8. Amendment 3, Revised Section 00010- Bidding Schedule and Volume 2 drawings, pages C- 142 through C-193, shows multiple catch basins labeled, per the legend, as “3 - Req’d Std.
Combination Vertical Catch Basin and Manhole and 4 – Req’d Std. Single Mountable Catch Basin”. The bid schedule does not include bid items for these 2 types of catch basins. Will the Government please provide bid items and quantities for these types of Catch Basins?
Response: The question is not referencing an amendment however the bid schedule will be adjusted to include these items.
9. Reference specification 01 57 23.02 09 page 7 section 3. What bid item should the contractor price the temporary drain lines listed in this section?
Response: The question is not referencing an amendment. However, the measurement and payment paragraph defines how the Government will pay for this item.
10. Amendment 3, Revised Section 00010 – Bidding Schedule, we have encountered some large quantity discrepancies. Bid item 0072 shows a quantity of 31 each, we have found 14 ea.
Bid item 0073 shows a quantity of 21 each, we have found 4 ea. Bid item 0075 shows a quantity of 149 each, we have found 130 ea. Bid item 0120 shows a quantity of 87 each, we have found
30. Please review and revise appropriate quantities, as these discrepancies impact direct and indirect costs, as well as the schedule.
Response: A new bidding schedule will be issued by amendment. Quantities for bid items 0073, 0075 and 0120 will be adjusted. Bid item 0072 is correct with a quantity of 31.
Please see the structural drawings which indicate that some of the side drains will tie into the top of the box culvert via drainage manhole. Abundance street has 9 of these drainage manholes.
11. Amendment 3, Revised Section 00010 - Bidding Schedule - We are coming up with significant quantity differences than provided quantities for bid items 0091, 0092, 0093, 0094, 0114, 0124, and 0130.
Response: A new bidding schedule will be issued by amendment. Bid items 091, 0092, 0093, and 0094 will be deleted. Quantities for bid items 0114 and 0124 are being adjusted and quantities for bid item 00130 shall remain as is.
12. Amendment 3, Revised Section 00010 – Bidding Schedule, bid items 0091 (10” Diameter Gravity Sewer Line) and 0092 (12” Gravity Sewer Line) in Optional Work 1. We have not been able to locate these quantities on the drawings. Please provide location of these bid items.
Response: These bid items will be removed from Optional Work 1 by amendment.
13. Amendment 2, revised Volume 2 drawings and Amendment 3, revised Section 00010 – Bidding Schedule, bid items 0073 (Drop Inlet Catch Basin with Grate “A”) and 0074 (Drop Inlet Catch Basin with Grate “B”). There are no standard drawings provided for these types of catch basins. Will the Government please provide standard drawings for these Catch Basins?
Response: The question is not referencing an amendment. However please refer to detail D-3264 for Item 0073 and detail D-3265 for Item 74, except that it utilizes a different grate which is shown in Volume 2 drawing CU-507 from the original solicitation.
14. Amendment 3, Revised Section 00010 – Bidding Schedule, bid item 0080 (Concrete Sloped Pavement) shows a unit quantity of 1,159 SQ (square) which equates to 115,900 SF.
Abundance, Treasure and Benefit box culvert to Peoples Canal are the only areas in the drawings that identify new slope paving. The total approximate quantity in these locations is about 4,000 SF.
• Will the Government please clarify the correct bid item quantity?
• Should the unit be in square yards rather than squares?
• If the quantity is correct, will the Government please identify the additional locations where concrete sloped paving is required?
Response: The question is not referencing an amendment. However, the quantity is correct and in the correct unit of measure. Please refer to Volume 1 C-118 from the original solicitation drawings for the slope paving along Peoples Canal.
15. Our take-off reflects a discrepancy with the following bid items. Can you please verify quantities?
0106 – 72” Steel Casing – OW-1 Bid quantity 116 lf; 0107 – 78” Steel Casing – OW-1 Bid quantity 92 lf; 0108 – 84” Steel Casing – OW-1 Bid quantity 372 lf; 0109 – 96” Steel Casing – OW-1 Bid quantity 89 lf.
Response: Quantities will be adjusted in an amendment.
16. Addendum No.2 added a substantial amount of 60” SFM and 72” SFM.
Will additional contract time be added to include this work?
Response: Additional time will not be added. The newer sewer force mains can be construction concurrently with other items.
17. The revised drawings in Addendum No.2 do not show the anode locations as stated in the Cathodic Protection specification.
Please provide the location of anodes for the sewer force mains, water main, drainage main and casing pipes for the above referenced utilities and S&WB feeders so we can determine the quantity.
Response: Exact location will be field determined by the Contracting Officer. Proximity and accessibility for replacing will be a determining factor. Detail 1815-PI shown on sheet CU-507 indicates the minimum spacing of anodes. Sewerage and Water Board electrical feeders are located in the electrical drawings for both volumes.
For clarification:
54” - 72” pipes will require a minimum of one anode. Spacing will not exceed 650 ft. If the pipe crosses a canal, one anode will be required on each side.
36” - 48” pipes will require a minimum of one anode. Spacing will not exceed 1000 ft. If the pipe crosses a canal, one anode will be required on each side.
18. Amendment 2, Section 33 40 00, paragraph 3.2.6, will precast catch basins be allowed in lieu of brick?
Response: Yes, precast catch basins will be allowed.
19. Amendment 2, Volume I, drawing GC-407 was provided as a revised drawing; however, there appears to be no change. Please clarify.
Response: Only the background of this sheet changed to reflect new work shown in a previous construction phase.
20. If any of the questions submitted in response to Amendments 2 & 3, or notifications of apparent errors or inconsistencies within the text of the RFP are not resolved prior to the submittal date, we assume that the provisions of FAR 52.215-8, Order of Precedence, will apply. Is this correct?
Answer: See Section 00700 FAR clause 52.236-21. Specifications shall govern over drawings.
21. On Sheet CU117 dated 7/25/2014, states see sheet C-512 for manhole details for 36” Solid Wedge Gate Valve in concrete manhole. However, sheet C-512 does not show a concrete manhole for a 36” Valve. What size does the 36” valve manhole need to be?
Response: Manhole dimensions can be made by using dimensions shown and extrapolating for a 36” valve.
22. Will spiral weld steel pipe be allowed on this project? In SECTION 33 11 00 Page 12, under
2.1.5 it is allowed, however that is the only place I can find any reference to spiral seam welded steel pipe. Everything is stated longitudinal weld on steel pipe. This makes a huge difference in availability & price.
Response: Yes.
23. Does the steel pipe need to be fabricated in the USA?
Response: Please refer to the Buy American Act Clause in the specifications with regard to Free Trade Agreement exclusions.
Piling schedule updates:
Block No. No. Piles
Depth of Piles
Pile Length Per Block Pile Type
Peoples Ave. Canal:
Block B-PEO-05 196 x 44 = 8624 Steel Pipe
Block B-PEO-06 84 x 44 = 3696 Steel Pipe Almonaster Canal
Block B-ALM-01 78 x 48 = 3744 Steel Pipe Block B-ALM-02 25 x 48 = 1200 Steel Pipe
Pipe Supports 103 x 63 = 6,489 Concrete
Quantity Updates:
0038 Foundation Jet Grouting
Jet grouting at Benefit St – 19,917 cy Jet grouting at Treasure St – 19,904 cy Jet grouting at Abundance St – 19,838 cy Jet grouting at Painters St – 16,290 cy Jet grouting at Eads St – 15,439 cy Jet grouting at Deers St– 15,491 cy Jet grouting at Block 8 – 10,155 cy Jet grouting at Adjacent to track 7 – 8,568 cy
It is to be expressly understood that the accuracy of these estimates is in no way warranted and that the furnishing of this information to a bidder will not relieve him of his responsibility to estimate the quantities involved. It is further to be expressly understood that in no case will such estimates be used as a basis of a claim against the Government.
AS REQUESTED, THE REVISED NORFOLK SOUTHERN SPECIAL PROVISIONS,
APPENDIX E, WITH THE CHANGES NOTED AT THE SELA 26 PROJECT SITE VISIT
FOLLOWS THE QUESTIONS AND ANSWERS:
Norfolk Southern Railway Company
Norfolk Southern - Special Provisions for Protection of Railway Interests
Rev. 1 – 9/23/13 Appendix
E-1
E. Norfolk Southern – Special Provisions for Protection of Railway Interests
1. AUTHORITY OF RAILROAD ENGINEER AND SPONSOR ENGINEER:
Norfolk Southern Railway Company, hereinafter referred to as “Railroad”, and their authorized representative shall have final authority in all matters affecting the safe maintenance of railroad traffic including the adequacy of the foundations and structures supporting the railroad tracks. For Public Projects impacting the Railroad, the Railroad’s Public Projects Engineer, hereinafter referred to as “Railroad Engineer”, will serve as the authorized representative of the Railroad.
The authorized representative of the Project Sponsor (“Sponsor”), hereinafter referred to as the “Sponsor’s Engineer”, shall have authority over all other matters as prescribed herein and in the Project Specifications.
The Sponsor’s Prime Contractor, hereinafter referred to as “Contractor” shall be responsible for completing any and all work in accordance with the terms prescribed herein and in the Project Specifications.
2. NOTICE OF STARTING WORK:
A. The Contractor shall not commence any work on railroad rights-of-way until he has complied with the following conditions:
1. Signed and received a fully executed copy of the required Norfolk Southern Construction Right of Entry Agreement.
2. Given the Railroad written notice in electronic format to the Railroad Engineer, with copy to the Sponsor’s Engineer who has been designated to be in charge of the work, at least ten days in advance of the date he proposes to begin work on Railroad rights-of-way.
3. Obtained written approval from the Railroad of Railroad Protective Liability Insurance coverage as required by paragraph 14 herein. It should be noted that the Railroad does not accept notation of Railroad Protective insurance on a certificate of liability insurance form or Binders as Railroad must have the full original countersigned policy. Further, please note that mere receipt of the policy is not the only issue but review for compliance. Due to the number of projects system-wide, it typically takes a minimum of 30-45 days for the Railroad to review.
4. Obtained Railroad’s Flagging Services as required by paragraph 7 herein.
5. Obtained written authorization from the Railroad to begin work on Railroad’s rights-of-way, such authorization to include an outline of specific conditions with which he must comply.
6. Furnished a schedule for all work within the Railroad’s rights-of-way as required by paragraph 7.B.1.
B. The Railroad’s written authorization to proceed with the work shall include the names, addresses, and telephone numbers of the Railroad’s representatives who are to be
E-2 notified as hereinafter required. Where more than one representative is designated, the area of responsibility of each representative shall be specified.
3. INTERFERENCE WITH RAILROAD OPERATIONS:
A. The Contractor shall so arrange and conduct his work that there will be no interference with Railroad’s operations, including train, signal, telephone and telegraphic services, or damage to the property of the Railroad or to poles, wires, and other facilities of tenants on the rights-of-way of the Railroad. Whenever work is liable to affect the operations or safety of trains, the method of doing such work shall first be submitted to the Railroad Engineer for approval, but such approval shall not relieve the Contractor from liability. Any work to be performed by the Contractor which requires flagging service or inspection service shall be deferred by the Contractor until the flagging service or inspection service required by the Railroad is available at the job site.
B. Whenever work within Railroad’s rights-of-way is of such a nature that impediment to Railroad’s operations such as use of runaround tracks or necessity for reduced speed is unavoidable, the Contractor shall schedule and conduct his operations so that such impediment is reduced to the absolute minimum.
C. Should conditions arising from, or in connection with the work, require that immediate and unusual provisions be made to protect operations and property of the Railroad, the Contractor shall make such provisions. If in the judgment of the Railroad Engineer, or in his absence, the Railroad’s Division Engineer, such provisions is insufficient, either may require or provide such provisions as he deems necessary. In any event, such unusual provisions shall be at the Contractor’s expense and without cost to the Railroad or the Sponsor.
D. “One Call” Services do not locate buried Railroad utilities. The contractor shall contact the
Railroad’s representative 2 days in advance of work at those places where excavation, pile driving, or heavy loads may damage the Railroad’s underground facilities. Upon request from the Contractor or Sponsor, Railroad forces will locate and paint mark or flag the Railroad’s underground facilities. The Contractor shall avoid excavation or other disturbances of these facilities. If disturbance or excavation is required near a buried Railroad facility, the contractor shall coordinate with the Railroad to have the facility potholed manually with careful hand excavation. The facility shall be protected by the Contractor during the course of the disturbance under the supervision and direction of the Railroad’s representative.
4. TRACK CLEARANCES:
A. The minimum track clearances to be maintained by the Contractor during construction are shown on the Project Plans. If temporary clearances are not shown on the project plans, the following criteria shall govern the use of falsework and formwork above or adjacent to operated tracks.
1. A minimum vertical clearance of 22’-0” above top of highest rail shall be maintained at all times.
2. A minimum horizontal clearance of 13’-0” from centerline of tangent track or 14’-0” from centerline of curved track shall be maintained at all times. Additional horizontal clearance may be required in special cases to be safe for operating conditions. This additional clearance will be as determined by the Railroad Engineer.
E-3
3. All proposed temporary clearances which are less than those listed above must be submitted to Railroad Engineer for approval prior to construction and must also be authorized by the regulatory body of the State if less than the legally prescribed clearances.
4. The temporary clearance requirements noted above shall also apply to all other physical obstructions including, but not limited to: stockpiled materials, parked equipment, placement or driving of piles, and bracing or other construction supports.
B. Before undertaking any work within Railroad right-of-way, and before placing any obstruction over any track, the Contractor shall:
1. Notify the Railroad’s representative at least 72 hours in advance of the work.
2. Receive assurance from the Railroad’s representative that arrangements have been made for flagging service as may be necessary.
3. Receive permission from the Railroad’s representative to proceed with the work.
4. Ascertain that the Sponsor’s Engineer has received copies of notice to the Railroad and of the Railroad’s response thereto.
5. CONSTRUCTION PROCEDURES:
A. General:
1. Construction work and operations by the Contractor on Railroad property shall be:
a. Subject to the inspection and approval of the Railroad Engineer or their designated Construction Engineering Representative.
b. In accordance with the Railroad’s written outline of specific conditions.
c. In accordance with the Railroad’s general rules, regulations and requirements including those relating to safety, fall protection and personal protective equipment.
d. In accordance with these Special Provisions.
2. Submittal Requirements
a. The Contractor shall submit all construction related correspondence and submittals electronically to the Railroad Engineer.
b. The Contractor shall allow for 30 days for the Railroad’s review and response.
c. All work in the vicinity of the Railroad’s property that has the potential to affect the Railroad’s train operations or disturb the Railroad’s Property must be submitted and approved by the Railroad prior to work being performed.
E-4
d. All submittals and calculations must be signed and sealed by a registered engineer licensed in the state of the project work.
e. All submittals shall first be approved by the Sponsor’s Engineer and the
Railroad Engineer, but such approval shall not relieve the Contractor from liability.
f. For all construction projects, the following submittals, but not limited to those listed below, shall be provided for review and approval when applicable:
i. General Means and Methods
ii. Ballast Protection
iii. Construction Excavation & Shoring
iv. Pipe, Culvert, & Tunnel Installations
v. Demolition Procedure
vi. Erection & Hoisting Procedure
vii. Debris Shielding or Containment
viii. Blasting
ix. Formwork for the bridge deck, diaphragms, overhang brackets, and protective platforms
x. Bent Cap Falsework. A lift plan will be required if the contractor want to move the falsework over the tracks.
g. For Undergrade Bridges (Bridges carrying the Railroad) the following submittals in addition to those listed above shall be provided for review and approval:
i. Shop Drawings
ii. Bearing Shop Drawings and Material Certifications
iii. Concrete Mix Design
iv. Structural Steel, Rebar, and/or Strand Certifications
v. 28 day Cylinder Test for Concrete Strength
vi. Waterproofing Material Certification
vii. Test Reports for Fracture Critical Members
viii. Foundation Construction Reports
Fabrication may not begin until the Railroad has approved the required shop drawings.
h. The Contractor shall include in all submissions a detailed narrative indicating the progression of work with the anticipated timeframe to complete each task.
Work will not be permitted to commence until the Contractor has provided the Railroad with a satisfactory plan that the project will be undertaken without scheduling, performance or safety related issues. Submission shall also provide a listing of the anticipated equipment to be used, the location of all equipment to be used and insure a contingency plan of action is in place should a primary piece of equipment malfunction.
B. Ballast Protection
1. The Contractor shall submit the proposed ballast protection system detailing the specific filter fabric and anchorage system to be used during all construction activities.
E-5
2. The ballast protection is to extend 25’ beyond the proposed limit of work, be installed at the start of the project and be continuously maintained to prevent all contaminants from entering the ballast section of all tracks for the entire duration of the project.
C. Excavation:
1. The subgrade of an operated track shall be maintained with edge of berm at least 10’-0” from centerline of track and not more than 24-inches below top of rail. Contractor will not be required to make existing section meet this specification if substandard, in which case existing section will be maintained.
2. Additionally, the Railroad will require the installation of an OSHA approved handrail and orange construction safety fencing for all excavations of the Railroad right-of-way.
D. Excavation for Structures and Shoring Protection:
1. The Contractor will be required to take special precaution and care in connection with excavating and shoring pits, and in driving piles or sheeting for footings adjacent to tracks to provide adequate lateral support for the tracks and the loads which they carry, without disturbance of track alignment and surface, and to avoid obstructing track clearances with working equipment, tools or other material.
2. All plans and calculations for shoring shall be prepared, signed, and sealed by a Registered Professional Engineer licensed in the state of the proposed project, in accordance with Norfolk Southern’s Overhead Grade Separation Design Criteria, subsection H.1.4.E-Construction Excavation (Refer to Norfolk Southern Public Projects Manual Appendix H). The Registered Professional Engineer will be responsible for the accuracy for all controlling dimensions as well as the selection of soil design values which will accurately reflect the actual field conditions.
3. The Contractor shall provide a detailed installation and removal plan of the shoring components. Any component that will be installed via the use of a crane or any other lifting device shall be subject to the guidelines outlined in section 5.G of these provisions.
4. The Contractor shall be required to survey the track(s) and Railroad embankment and provide a cross section of the proposed excavation in relation to the tracks.
5. Calculations for the proposed shoring should include deflection calculations. The maximum deflection for excavations within 18’-0” of the centerline of the nearest track shall be 3/8”. For all other cases, the max deflection shall not exceed ½”.
6. Additionally, the Railroad will require the installation of an OSHA approved handrail and orange construction safety fencing for all excavations of the Railroad right-of-way.
E. Pipe, Culvert, & Tunnel Installations
a. Pipe, Culvert, & Tunnel Installations shall be in accordance with the appropriate Norfolk Southern Design Specification as noted below:
i. For Open Cut Method refer to Norfolk Southern Public Projects Manual Appendix H.4.6.
E-6
ii. For Jack and Bore Method refer to Norfolk Southern Public Projects
Manual Appendix H.4.7.
iii. For Tunneling Method refer to Norfolk Southern Public Projects
Manual Appendix H.4.8.
F. Demolition Procedures
1. General
a. Demolition plans are required for all spans over the track(s), for all spans adjacent to the track(s), if located on (or partially on) Railroad right-of-way; and in all situations where cranes will be situated on, over, or adjacent to Railroad right-of-way and within a distance of the boom length plus 15’-0” from the centerline of track.
b. Railroad tracks and other Railroad property must be protected from damage during the procedure.
c. A pre-demolition meeting shall be conducted with the Sponsor, the Railroad
Engineer or their representative, and the key Contractor’s personnel prior to the start of the demolition procedure.
d. The Railroad Engineer or his designated representative must be present at the site during the entire demolition procedure period.
e. Existing, obsolete, bridge piers shall be removed to a sufficient depth below grade to enable restoration of the existing/proposed track ditch, but in no case less than 2’-0” below final grade.
a. In addition to the submittal requirements outlined in Section 5.A.2 of these provisions, the Contractor shall submit the following for approval by the Railroad Engineer:
i. A plan showing the location of cranes, horizontally and vertically, operating radii, with delivery or disposal locations shown. The location of all tracks and other Railroad facilities as well as all obstructions such as wire lines, poles, adjacent structures, etc. must also be shown.
ii. Rating sheets showing cranes or lifting devices to be adequate for
150% of the actual weight of the pick, including all rigging components. A complete set of crane charts, including crane, counterweight, and boom nomenclature is to be submitted. Safety factors that may have been “built-in” to the crane charts are not to be considered when determining the 150% factor of safety.
iii. Plans and computations showing the weight of the pick must be submitted. Calculations shall be made from plans of the existing
E-7 structure showing complete and sufficient details with supporting data for the demolition the structure. If plans do not exist, lifting weights must be calculated from field measurements. The field measurements are to be made under the supervision of the Registered Professional Engineer submitting the procedure and calculations.
iv. The Contractor shall provide a sketch of all rigging components from the crane’s hook block to the beam. Catalog cuts or information sheets of all rigging components with their lifting capacities shall be provided. All rigging must be adequate for 150% of the actual weight of the pick. Safety factors that may have been “built-in” to the rating charts are not to be considered when determining the 150% factor of safety. All rigging components shall be clearly identified and tagged with their rated lifting capacities. The position of the rigging in the field shall not differ from what is shown on the final plan without prior review from the Sponsor and the Railroad.
v. A complete demolition procedure, including the order of lifts, time required for each lift, and any repositioning or re-hitching of the crane or cranes.
vi. Design and supporting calculations for the temporary support of components, including but not limited to the stability of the superstructure during the temporary condition, temporary girder tie-downs and falsework.
3. Overhead Demolition Debris Shield
a. The demolition debris shield shall be installed prior to the demolition of the bridge deck or other relevant portions of the superstructure over the track area to catch all falling debris.
b. The demolition debris shield shall provide a minimum vertical clearance as specified in Section 4.A.1 of these provisions or maintain the existing vertical clearance if the existing clearance is less than that specified in Section 4.A.1.
c. The Contractor shall include the demolition debris shield installation/removal means and methods as part of the proposed Demolition procedure submission.
d. The Contractor shall submit the demolition debris shield design and supporting calculations for approval by the Railroad Engineer.
e. The demolition debris shield shall have a minimum design load of 50 pounds per square foot plus the weight of the equipment, debris, personnel, and other loads to be carried.
f. The Contractor shall include the proposed bridge deck removal procedure in its demolition means and methods and shall verify that the size and quantity of the demolition debris generated by the procedure does not exceed the shield design loads.
E-8
g. The Contractor shall clean the demolition debris shield daily or more frequently as dictated either by the approved design parameters or as directed by the Railroad Engineer.
4. Vertical Demolition Debris Shield
a. A vertical demolition debris shield may be required for substructure removals in close proximity to the Railroad’s track and other facilities, as determined by the Railroad Engineer.
G. Erection & Hoisting Procedures
1. General
a. Erection plans are required for all spans over the track(s), for all spans adjacent to the track(s), if located on (or partially on) Railroad right-of-way; and in all situations where cranes will be situated on, over, or adjacent to Railroad right-of-way and within a distance of the boom length plus 15’-0” from the centerline of track.
b. Railroad tracks and other Railroad property must be protected from damage during the erection procedure.
c. A pre-erection meeting shall be conducted with the Sponsor, the Railroad
Engineer or their representative, and the key Contractor’s personnel prior to the start of the erection procedure.
d. The Railroad Engineer or his designated representative must be present at the site during the entire erection procedure period.
e. For field splices located over Railroad property, a minimum of 50% of the holes for each connection shall be filled with bolts or pins prior to releasing the crane. A minimum of 50% of the holes filled shall be filled with bolts. All bolts must be appropriately tightened.